HomeMy WebLinkAboutContract 46866-A1 CITY SECRETARY tlll
�j
a y ro 7 8 .9 ro CONTRACT NO. V� Agreement Number
AJW-FN-CSA-15-2178-A1
Amendment Number 1
��G� �0�� AMENDMENT NUMBER ONE
0. c, � NON-FEDERAL REIMBURSABLE AGREEMENT
�� G�cS�cQ�pO
ti BETWEEN
� w
It
� 69 L 9�' DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
AND
CITY OF FORT WORTH
FORT WORTH ALLIANCE AIRPORT
FORT WORTH,TEXAS
ARTICLE 10, Changes and Modifications, of Non-Federal Reimbursable Agreement Number
AJW-FN-CSA-15-2178 ("Agreement")requires that changes to the Agreement be formalized by
a written modification and that any modification to the Agreement be executed in writing and
signed by the authorized representative of each party.
The Federal Aviation Administration(FAA) and the City of Fort Worth(Sponsor)mutually
concur that the Agreement should be amended by revising and/or amending Articles 3.AlI,
3.13 13 and C.9 as more specifically set forth below. Additionally,this amendment will modify
language in Article 3.D regarding availability of Grant information,Article 7 Estimated Cost,
Article 9 Reimbursement and Accounting Arrangements and Replace "Amendment"with
"Modification"when referencing iterations of agreement.
The parties agree that the Agreement is hereby amended as follows:
ARTICLE 3.A.2 Scope
Modify to read:
a. Relocate and upgrade the Runway 34R Localizer(LOC)with a MARK 20A, 20 element
antenna array expansion kit.
Add:
c. Upgrade the Runway 16L LOC with a MARK 20A, 20 element antenna array expansion
kit.
ARTICLE 3.B.13
Add: OFFICIAL RECORD
CITU SECRETARY
W®FM,TX
Non-Federal Reimbursable Agreement V84 Page 1 of 6
Agreement Number
AJW-FN-CSA-15-2178-A1
Amendment Number 1
Runway 16L LOC
a) Inspect and technically support the installation of the MARK 20A LOC expansion kit,
provided as Government Furnished Material (GFM);
b) Add necessary LOC electronics to the existing antenna array;
c) Inspect and provide technical support for the installation of grounding materials; and
d) Coordinate and conduct flight check operations in support of the LOC including
commissioning.
Runway 34R LOC
h) Inspect and technically support the installation of the MARK 20A expansion kit,
provided by the FAA in order to maintain project schedule and reduce operational
impacts. Sponsor will replenish FAA stock with the new MARK 20A expansion kit
which they had previously ordered;
i) Add necessary LOC electronics to the existing antenna array.
ARTICLE 3.C.9
Add:
Runway 16L LOC
a) Survey, stake, layout and construct the LOC foundations necessary to accommodate the
six (6) additional antenna arrays,
b) Furnish and install the coax, power and control cables between shelter and antenna array
per approved FAA drawings. Fund coax cables from antenna distribution box to
individual antennas;
c) Assemble and erect the new GFM additional antenna arrays, raceway, control and
distribution box (dog house) antenna cabling, conduits with frangible couplings per
approved FAA drawings; and
d) Provide funding for all activities necessary to accommodate the expansion of the LOC
antenna array. Funded activities include the material, construction, electronic installation,
flight check, and any environmental remediation.
Runway 34R LOC
1) Install new MARK 20A expansion kit, raceway, control and distribution box,and
DUCU;
m) Sponsor will direct Thales to ship the new MARK 20A expansion kit which has been
ordered, directly to the FAA to replenish FAA stock;
n) Provide funding for all activities necessary to accommodate the expansion of the LOC
antenna array. Funded activities include the material, construction, electronic
installation, flight check, and any environmental remediation.
Article 3.1) is amended as follows:
This agreement is in whole or in part funded with funding from an AIP grant [x] Yes [] No. If
Yes, the grant date is: 7/15/15 and the grant number is: 3-48-0296-055-2015. If the grant
Non-Federal Reimbursable Agreement V84 Page 2 of 6
Agreement Number
AJW-FN-CSA-15-2178-A1
Amendment Number 1
information is not available at the time of agreement execution,the Sponsor will provide the
grant information to the FAA when it becomes available.
ARTICLE 7 is amended to read:
The estimated additional FAA costs associated with this amendment are as follows:
Estimated Co
JA
Description of Reimbursable Item
Labor
Construction Oversight(RE Services)WB4050 $4,834.80
Electronics Equipment Installation/Checkout/Testing WB4060 $3,685.20
Labor Subtotal $8,520.00
Labor Overhead $1,197.02
Total Labor $9,717.02
Non-Labor
Transportation/Electronic/Construction Materials WB4050,WB4060 $10,000.00
Flight Inspection/AeroNav Procedure Development WB4070 $19,572.00
Non-Labor Subtotal $29,572.00
Non-Labor Overhead $1,774.32
Total Non-Labor $31,346.32
TOTAL ESTIMATED COST $41,063.34
Description of Reimbursable Item Cost
New Estimated Cost: $1,668,225.54
Total received from the Project Sponsor for the original: ($1,627,162.20)
Total of this amendment: $41,063.34
ARTICLE 9. Reimbursement and Accounting Arrangements is amended to read as follows:
A. The Sponsor agrees to prepay the entire estimated cost of the Agreement. The Sponsor
will send a copy of the executed Agreement and submit full advance payment in the
amount stated in Article 7 to the Accounting Division listed in Section C of this Article.
The advance payment will be held as a non-interest bearing deposit. Such advance
payment by the Sponsor must be received before the FAA incurs any obligation to
implement this Agreement. Upon completion of this Agreement,the final costs will be
netted against the advance payment and, as appropriate, a refund or final bill will be sent
to the sponsor. Per U.S. Treasury guidelines,refunds under$1.00 will not beprocessed.
Additionally,FAA will not bill the sponsor for amounts less than$1.00.
Non-Federal Reimbursable Agreement V84 Page 3 of 6
Agreement Number
AJW-FN-CSA-15-2178-A1
Amendment Number 1
B. The Sponsor certifies that arrangements for sufficient funding have been made to cover
the estimated costs of the Agreement.
C. The Accounting Division is identified by the FAA as the billing office for this
Agreement. The Sponsor will send a copy of the executed Agreement and submit the full
advance payment to the Accounting Division. The sponsor can either mail the payment
to the address shown below or submit payment (via check or credit card)electronically
via pay.gov. All payments mailed to the FAA must include the Agreement number,
Agreement name, Sponsor name, and project location.
The mailing address is:
FAA Mike Monroney Aeronautical Center
Attn: AMK-322, Reimbursable Receipt Team
P.O. Box 25770
Oklahoma City, OK 73125
The overnight mailing address is:
FAA Mike Monroney Aeronautical Center
Attn: AMK-322, Reimbursable Receipt Team
6500 S. MacArthur Blvd.
Oklahoma City, OK 73169
Telephone: (405) 954-3771
The Sponsor hereby identifies the office to which the FAA will render bills for the project
costs incurred as:
City of Fort Worth
Attn: Fernando Costa, Assistant City Manager
200 Texas Street
Fort Worth, Texas 76102
Telephone: (817) 392-6122
D. The FAA will provide a quarterly Statement of Account of costs incurred against the
advance payment.
E. The cost estimates contained in Article 7 are expected to be the maximum costs
associated with this Agreement, but may be modified to recover the FAA's actual costs.
If during the course of this Agreement actual costs are expected to exceed the estimated
costs, the FAA will notify the Sponsor immediately. The FAA will also provide the
Sponsor an amendment to the Agreement which includes the FAA's additional costs.
The Sponsor agrees to prepay the entire estimated cost of the amendment. The Sponsor
will send a copy of the executed amendment to the Agreement to the FAA-Mike
Monroney Aeronautical Center with the additional advance payment. Work identified in
the amendment cannot start until receipt of the additional advance payment. In addition,
in the event that a contractor performing work pursuant to the scope of this Agreement
brings a claim against the FAA and the FAA incurs additional costs as a result of the
Non-Federal Reimbursable Agreement V84 Page 4 of 6
Agreement Number
AJW-FN-CSA-15-2178-A1
Amendment Number 1
claim,the Sponsor agrees to reimburse the FAA for the additional costs incurred whether
or not a final bill or a refund has been sent.
All other terms and conditions in the original Agreement remain unchanged.
AGREED:
The FAA and the Sponsor agree to the provisions of this Amendment, Amendment Number 1,as
indicated by the signatures of their duly authorized officers.
FEDERAL AVIATION CITY OF FORT WORTH, TX
ADMINISTRATION
SIGNATURE SIGNATURE ,,,
NAME _ NAME Fernando Costa.
TITLE _ Contracting Officer TITLE Assistant City Manager
DATE DATE 6 7
APPROVAL RECOMMENDED:
By:
tead,AAE
Director,
els,Aviation
APPROVED AS TO FORM AND LEGALITY M&C No.: n/a
M&C Date:
Al-
By:
John "JB" trong
Assistant City Attorney
ATTEST:
0 z
Mary 7. er 'a * pFFICIAL RECORD
City Secret ry ..... CITY 901MAW
FT.WORT149 Tx
Non-Federal Reimbursable Agreement V84 Page 5 of 6
Agreement Number
AJW-FN-CSA-15-2178-Al
Amendment Number 1
claim, the Sponsor agrees to reimburse the FAA for the additional costs incurred whether
or not a final bill or a refund has been sent.
All other terms and conditions in the original Agreement remain unchanged.
AGREED:
The FAA and the Sponsor agree to the provisions of this Amendment, Amendment Number 1, as
indicated by the signatures of their duly authorized officers.
FEDERAL AVIATION
ADMINISTRATION
SIGNATURE
NAME 8XAPI-5y IC 40SAA"'
TITLE _ Contracting Officer
DATE _ � 12 i / / 7
APPROVAL RECOMMENDED:
By:
1. Welstead, AAE
Director, Aviation
APPROVED AS TO FORM AND LEGALITY
By. -
J)�
ohn "JB" Strong
Assistant City Attorney
ATTEST:
Cil Secretary
CITY OF FORT WORTH, TX
SIGNATUREca
NAME Fernando Costa
TITLE Assistant City Manager
DATE G116 17
M&C No.: n/a
M&C Date:
Non -Federal Reimbursable Agreement V84 Page 5 of 6
Agreement Number
AJW-FN-CSA-15-2178-A1
Amendment Number 1
Contract Manager
By signing, ackno dge at I am the person responsible for the monitoring and administration of
this co incl i en ring all performance and reporting requirements.
Juli epecialistlenior
Prsect Administrative Assistant
Aviation Department
Non-Federal Reimbursable Agreement V84 Page 6 of 6