HomeMy WebLinkAboutContract 45378-2A CITY SECRETARY ✓� CONTRACT N0. �JJ l�� vf1 Form 2146-L (Rev.10/7 1) CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: Pagel of 1 1.CONTRACTOR: Austin Bridge and Road,LP CCSJ: 0902-48-775 2.Change Order Work Limits:Sta. 156+00 to Sta. 160+00 Dirks Rd Phase 2 Project: 3.Type of Change(on federal-aid non-exempt projects): Major (Major/Minor) Highway: Dirks Rd 4.Describe the change and the reason for the change order. When necessary,include County: Tarrant exceptions to this agreement. District: 02-Fort Worth Differing site conditions required additional items:adjust irrigation&fire hydrant, lower manhole,relocate traffic box,underdrains for groundwater,and various Contract quantity overruns and underruns. Number: 45378 5.New or revised plan sheet(s)are attached and numbered: Each signatory hereby warrants that each has the authority to execute this Change Order. By signing this change order,the contractor agrees to waive any and all The following information must be provided claims for additional compensation due to any and all other expenses; additional changes for time,overhead and profit;or loss of compensation Time Ext.#: 2 Days added on this C.O.: 146 as a result of this change.Further,the contractor agrees that this agreement is made in accordance with Item and the Contract Exceptions should be noted in the response for#5 above. Amt.added by this change order: $223,661.50 For 7xDOT use only: THE CONTRACTOR Date 3 Days participating: 146 By Austin Bridge and Road,L Amount participating: $0.00 Type Printed Name Jerry Cull on Signature Date Typed/Printed Title North Texas Area Manager Name/Title RECOMMENDED FOR EXECUTION: Name/Title Date Name/Title ❑APPROVED F1 REQUEST APPROVAL Name/Title At .�c� Date me it e Date ?MPPROVED (Ajwt f REQUEST APPROVAL Boal iW;etsigI _�ll eorfek 76117 me/Title Date Name/Title r Date ZAPPROVED ❑REQUEST APPROVAL M -9i me/Titie 11` D 0� FD e/Title Date _ OVEDP gineer'sSeOF n r .F.fqtp�I V by; •.................... fEON J ar WILSON JR. / �� 92571 .�. Ka s r, dity Secretary 0�F'�7CENSEd.. �Q. S O 0 0 0 0 0 V1 0 0 0 W O l0 V1 C; 06 W, o m o v, 'o m r, N r» vi Nm 0) of Z O 00 Ch N O ID M N %Q M 00rl O kD N N O N r %D kD O M NV)V) m O r o` ko o$ a 6 a Vi Li % v ry r: r N Ol r N r L1 L) Q.'W W p > Z O� o w cm m Oo 0 0 0 0 0 0 Ln o 0 0 0? o d r F, O lD 01 N N O O Vl to Vl N N m Lj N M O� er Vl G7 N L) L7 t0 T N 'D M d' Nw I� M N O 01 M Lr1 tf1 O 1. lD � O M N O Ln ir-1 O V rn O� 00' � Oi O Vi [F n rn' to V• rr - Oi Vl 6� 00 N N' LU F N O O� O Z O O O O O O O O O O O O O O O O O rV N %D O N O O r m L1 r- i-- c- N U F}.. kD Ln N N M m dN, V !- N L1 Z Q C1 N ot o h o 0 0 0 0 0 0 0 0 0 L ~ " CO O O' d CO 0 0 0 0 0 0 0 0 0 0 0 N ko N C� J V CO N M O M 00 = 7 Z p H N N L N W o� (� +LU0 0 0 0 0 0 0 CC a NN o 1XI o � m OZ N n kD N ON t7 1- m Cd r-:, uj Z 0 :3 Z CY Q ' n . 41 L'f 1n 0 0 0 0 M O O O L1 O O O 00 O O 06 m Ln lD Li N 06 m L•1 N %D m V It M N d\ C r, O %ND O M N 00 m V1 V Ol N trj [t Vt k6 M O y 0 (� Z a m F 1 LL LL LL t� Ln Q Q LL (/� (/� (/� LL (n r J V _! S S J J W W J J J J J J O F 0) 03 E a1 O O N �n a) _ •a1 O C M w, z C E S E a) C �+ f- N E O Z N v LS1 23 C a) E µ . r •f0 a) i. i C X c W O c o V = }- R m C N N C +O' N vi •0 •m cFA m O C m E O O () O 01 D1 r0 r0 rn '^ V rQ E u Ill O. m a NV ?: O ` V +.:.' 'd a� N y > y � > n2 n :3 Va 0> O O a0 in O b a Y o o -a a ca 3 ° °• v V N a) 'o 'a '(3 O O a) 'O a) oa) C m C .J � C] K K N V � m w w ..t ~ O 00 00 N L) n 00 m '[t N m d• N CO a% O a- N LD 00 W CO O O\ O\ O O O O 0 O 0 r FORTWORTH. Altamesa Blvd(f/I(/a Dirks Road)Phase 2 from Granbury Road to Chisolm Trail Parkway CSJ: 0902-48-775, Project No. 00768 Change Order No.2 Funding Change Order No. 2 will be City funded with NO TxDOT participation and includes items previously approved by the City. r i; Change order No. 2 will allow for the following items: Item No.2 Remove stab base and asphalt(8"-10") ' This item reduced by$28,550 based on field conditions. !I Item No. 3 Remove stab base and asphalt(0"-4") This item increased by$39,360 based on field conditions Item No. 15 Trench Excavation Protection This item increased by$96 based on field adjustments Item No. 18 Riprap(conc)(cl b)(51n) 1 An additional$26,280 was necessary at 36" headwall Item No. 22 RC Pipe(cl III)(24in) This item increased by$8,635 based on field adjustments j i Item No. 23 RC Pipe(cl III)(30in) This item increased by$7,000 based on field adjustments It Item No. 28 Manh(compl)(ty 1) Added 2 manholes due to field adjustments for$7,200 I Item No.32 Barricades,signs&traffic handling Increased by$28,000 due to several project delays Item No. 34 Constructing Detours Field conditions required additional detours for$59,520 i Item No. 37 Port ctb(move)(low prof)(ty1) Insufficient quantity in bid,added$400 Transportation and Public Works Department The City of Fort Worth * 1000 Tlu-ockmorton Sheet*Fort Worth,Texas 76102 FORTWORTH, Item No. 51 WI<zn pay mark remove(w)(4"dot) Insufficient quantity in bid,added$21 Item No.58 Port change message sign Insufficient quantity in bid,added$3,570 Item No.77 Temp spl shoring Full bid quantity not used reduced by$47,466 Item No.86 Retaining wall(drill shaft)(facia) Insufficient quantity in bid,added$22,576 i Item No. 149 Drill seeding(temp)(warm) Full bid quantity not used reduced by$1,038.92 Item No. 150 Drill seeding(temp)(cool) Full bid quantity not used reduced by$1,038.92 Item No. 153 Rock filter dams(install)(ty4) Additional quantity necessary due to field conditions,added$9,120 Item No. 154 Rock filter dams(remove) Additional quantity necessary due to field conditions,added$1,071 Item No. 161 Excavation(special) Additional quantity necessary due to field conditions,added$2,971.60 Item No. 162 Embankment Additional quantity necessary due to field conditions,added$1,012 Item No. 163 Embankment Additional quantity necessary due to field conditions, added$34,200 Item No. 166 Temporary spl shoring Full bid quantity not used reduced by$15,029.10 Item No. 168 Riprap(stone protection)(12in) Full bid quantity not used reduced by$11,000 Item No. 182 Backfill subgrade and rem spoil Additional quantity necessary due to field conditions,added$20,518.29 Transportation and Public Works Department The City of Fort Worth * 1000 Throckmorton Street*Fort Worth,Texas 76102 THO FORTWaR Item No. 185 Install Vibropiers Full bid quantity not used reduced by$91,288.12 Item No. 187 Geogrid Additional quantity necessary due to field conditions, added$6,110.40 Item No. 188 Geofabric Full bid quantity not used reduced by$1,693.12 Item No. 193 Additional rr flagging straight time Full bid quantity not used reduced by$8,224 Item No. 194 Additional rr flagging overtime Full bid quantity not used reduced by$6,200 Item No. 201 Ad* irrigation valves and fire hydrant Irrigation and fire hydrant in conflict with pavement added $19,015 Item No. 202 Cut&cap 24" casing(incl rr flagging) Water line casing in conflict with rr ditch added $20,766 Item No. 203 Lower sanitary sewer manhole Manholes needed to lowered for pavement added$15,195 Item No. 204 Relocate traffic signal box In conflict with pavement added $4,627 Item No. 207 Vibropier unit cost adjustment Contract cost adjustment due to reduced quantity, added$17,667.50 I Item No. 208 Adjust underdrain Underdrain in RR ROW relocated and adjusted,added$5,033 Item No. 209 Disposal of rr timbers Buried RR timbers discovered in rr ROW during excavation, added $11,345 Item No. 210 Remove obstruction at abutment Unknown angled support discovered abutment, added $6,287 I Item No.211 Ty6(6") underdrain 1 Added to alleviate groundwater in roadway subgrade, added$54,013.89 Transportation and Public Works Department The City of Fort Worth * 1000 Throckmorton Sheet*Fort Worth,Texas 76102 j FORTWORTH. Item No 212 Remove and dispose 84" drill shaft below grade Drilled support discovered during excavation,added $3,579 Time Extension Oncor, Charter,ATT,and Atmos delayed the project from October 1, 2015 thru May 9,2016. Oncor had utility poles and underground line that were not an adequate depth for the new roadway grades. Charter,ATT, and Atmos' underground lines were also not at adequate depth for the new roadway grades. Oncor cleared the project on January 12,2016, Charter cleared the project on January 26, 2016, ATT cleared the project on April 26, 2016 and Atmos cleared the project May 9, 2016. During the delay the contractor could not prepare the subgrade which resulted in a project delay. The City will grant the contractor an additional 146 days for the franchise utility delay. T anl<you. to- A -- 1y Leon Wilson,Jr., P.E. Date Senior Professional Engineer Attachments TxDOT Form 2146-L Austin Bridge and Road, LP Proposals Revised Sheet Transportation and Public Works Department The City of Fort Worth * 1000 Throckmorton Sheet*Fort Worth,Texas 76102 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee/Signat fre Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature f I I u' i Ii N i i i I �I