Loading...
HomeMy WebLinkAboutContract 47735-CO1 FORT WORTH, City of Fort Worth CITY SECRUARY Change Order Request Breakdown CONTRACT NO._ Project Name Sandy Lane Improvements City Sec# 47735 Client Project#(s)l C01736 Contractorl Cole Construction, Inc. PM Ken Thorne inspectorl Randy Horton Change Order Submittal# 0 Date 3/15/2017 Contract Time Dept. PARD Totals CD Original Contract Amount $1,104,134.00 $1,104,134.00 Extras to Date $0.00 Credits to Date $0.00 Pending Change Orders(in M&C Process) $0.00 Contract Cost to Date $1,104,134.00 $1,104,134.00 Amount of Proposed Change Order $87,402.50 $87,402.50 Revised Contract Amount $1,191,536.50 $1,191,536.50 Original Funds Available for Change Orders $89,546.12 $89,546.12 Remaining Funds Available for this CO $89,546.12 $89,546.12 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 7.92% MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $1,380,167.50 JUSTIFICATION (REASONS)FOR CHANGE ORDER :o Ronald P. GonMes,Ask City OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX (w a r u t ri r it City of Fort worth �IP--' Change Order Additions Project Name I Sand Lane Im rovements City Sec# 47735 Client Project# I C01736 Contraeto Cole Construction,Inc. PM Ken Thome Inspector Randy Horton Change Order Submittal# Date 3/1512017 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit UnitsTotal Modification o ing Walls at Northrive Grossing a e o eac Adjust Existing Sanitary Sewer Manhole to New ropose r e Inst—all Retaining Wall at South Drive Parking Area Q lightpoe- x ep ace Concrete Curb and Gutter along South Drive comer o new parking) Demo Existing Sidewalk(Southof Southrive Entryaong SandyLane) 7A77—' buu.uuu00000 emove xisbng Tree at South Drive Entry PARD 1.00000000 LS $1,8uu.uu �I,duu.uu Remove Existing Concrete Flume in East Parking Area PARD ___TTGU7M7T SF $2.60 Replace Existing oncrete ume m ast Parking Area installation o of TXDO I Type ex ase at East Parking Area and South installation o itiona ype'R Asphalt(at East Parking Area and South installation of sod along west side of playground(along Swaleline) Excavate an ower Rip Rap at North Endo Headwall PARD 88,394.50 Sub ota tions Change Order Additions Page 2 of 4 P.)R r"t)R III City of Fort worth I--- Change Order Deletions Project Name Sandy Lane Improvements City Sec# 47735 Client Project# C01736 Contractor Cale Construction,Inc. PM Ken Thorne inspectorF Randy Horton Change Order Submittal# O1 Date 3/1512017 LIELL I IONS Unit Unit os o a Mange Urcler Allowance HARD PARD 992.0 u otal Ue1etioFFs--l-----7S72-.M Change Order Deletions Page 3 of 4 MISBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 FoRrWoRTH r City of Fort Worth ACCEPTANCE OF PREVIOUS MBE COMMITMENT FORM (for use with CHANGE ORDERS or AMENDMENTS greater than $50,000) To be Completed by City Project Manager Change Order(for Construction Contract) Project Name: City Project Number Capital Improvements a Sandy Lane Park C01736 City Project Manager Contractor: Bryan Lyness Cole Construction, Inc. City's MBE Project Goal: 13 % Original Amount of Contract: $1,104,134.00 Accepted MBE Commitment: 14 % Total of Previous Change Orders: $0.00 Date of Last MBE Report: 512212017 Amount for this Change Order: $87,402..50 Change Order* 1 Revised Amount of Contract: $1,191,536.50 Date: 3/15/2017 Language to be inserted In the M&C for this Contract Cole Construction, Inc. agrees to maintain its initial MBE commitment of 14%that it made on the original contract and extend and maintain that same MBE commitment of 14% to this first change order. Therefore Cole Construction, Inc, remains in compliance with the City's BIDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous MBE Commitment form executed by an authorized representative of its company. r T/o/be Completed by the Representative of the CoVractor L 1 11 &17 '. 7 Printed Signature T' A horized Signature/Date Cole Construction, Inc. Company Name Contact Name(if different) Z C..! L/, L/Z�- 60-W Address ,LE-mail address City/State/Zip Phone number Fax Number as of MBE% Paid to Date Date City ProjeEf Manager has reviewed the work associated with is ZMangg Order, considers it the same or similar to work in the ori ' al Contract, and recommends that the Contractor have the option to retai o firm its existing MBE commitment. Al 17 Bryan Lyness City Project Manager Ci roJect Ma ger Signature Da e To be Completed by the MiWBE Compliance Staff M/WBE Compli nce Staff ID# MBE Current % Level via Last Report Recd Co - A - f � MNVBE Signature Date FORTWORTH, City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: COSub01 Change Order No.: Pa - COApp01 Date Started: 2017-05-08 City Sec. No.: 47735 Date Due: 2017-05-31 Project Name: Sandy Lane Park Improvements Project Numbers: 01736 DOE Numbers: Project additional subgrade and park improvement items where included Description: to complete a stream bank rehabilitation and park improvement project. Project Manager: Bryan Lyness City Inspector: Randy Horton Contractor: Cole Construction, Inc. COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: PARD $ 87,402.50 39302-0800450-5330102--C01736-1 0 Total Cost: $ 87,402.50 Total Requested Days: 0 Approval Status: Approved: Yes Comments: Funding verified User: Debra Rose Date: 2017-05-23 2:37 PM Approved: Yes Comments: User: Tadd Vinson Date: 2017-05-23 3:15 PM Approved: Yes Comments: User: Bryan Lyness Date: 2017-05-23 3:26 PM Approved: Yes Comments: User: Joel McElhany Date: 2017-06-02 3:03 PM Approved: Yes Comments: User: Richard Zavala Date: 2017-06-07 1:10 PM Approved: Yes Comments: User: Doug Black Date: 2017-06-14 4:28 PM Approved: Yes Comments: User: Susan Alanis Date: 2017-06-19 5:13 PM Action Required: review and approve Routing Assigned To: Due Date: Assigned By: Due Time: Links 2 fortworthgov/PACS/01736 -Sandy Lane Park Improvements/Contractor/Change Orders/C01736 - Sandy Lane - Change Order#1 - Breakdown - 05032017.xlsx fortworthgov/PACS/01736 -Sandy Lane Park Improvements/Contractor/Change Orders/C01736 - Sandy Lane- CO1 - Acceptance of Previous MBE Commitment- 06022017.pdf Attachments(0) No Attachments have been added to this form. Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Nan of Empl yee/Signature �C t Title D This form is N/A as No City Funds are associated with this Contract l Printed Name Signature