HomeMy WebLinkAboutOrdinance 22786-06-2017Ordinance No. 22786-06-2017
AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS IN
THE AMOUNT OF $81,450.00 IN THE WATER CAPITAL PROJECTS FUND, FROM
AVAILABLE FUNDS, FOR THE PURPOSE OF FUNDING THE HOT MIX ASPHALTIC
CONCRETE (2015-5) HIR STREET REHABILITATION PROJECT; PROVIDING FOR A
SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR
ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND
PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS:
SECTION 1
That in addition to those amounts allocated to the various City departments for Fiscal Year 2016-2017 in the
Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the amount
of $81,450.00 in the Water Capital Projects Fund, from available funds, for the purpose of funding the Hot Mix
Asphaltic Concrete (2015-5) HIR Street Rehabilitation project.
SECTION 2.
That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void
for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair
the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall
be and remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance 22394-09-2016 and all other ordinances and
appropriations amending the same except in those instances where the provisions of this ordinance are in
direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of
said prior ordinances and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance shall take effect upon adoption.
APPROVED AS TO FORM AND LEGALITY:
Douglas W Black
Sr. Assistant City Attorney
ADOPTED AND EFFECTIVE: June 20, 2017
CITY ECRETARI � �7
ar J. Ka r
MAYORAND COUNCIL COMMUNICATION MAP
HMAC 2015-05 STRET REHABILITATION C01 MAP PAGE 1
� 6G
��� � 46H
N `'� � 2° ��,
• S
��� 9,�o a'�i a� RSF TR F��c
. .
� LIWELL LAN �2� ����� � ��� p�R��'F
,po C
va
DISTRICT: 2
NORTH HILL LANE
46L
PORTRIDGE DRIVE
MARINEMEADYJWS DRIVE
<
��2�
G
�sM R�Fi�F��CO
Ro,�o
NOR�H RIDGE ROAD
0
Q
w
_
w
w
F-
SOUTH RIDGE ROAD
FATHOM DRIVE
46R W
RIDGEMEADOWS DRIVE �
0
0
Z
�
J
Q
�
�yright 2011 City of Fort Worth. Unauthorizized reproduction is a violation of applicable laws.
s product is for information purposes and may not have been prepared for or be suitable for legal, engineering, or surveying purposes.
loes not represent an on-thearound survev and represents onlV lhe approximate relative location of propertv boundaries.
q�Fc
RFF
�o����
PAL�MA B�ANCA DRN
T
�NM��FB
Ri�G
F
Raqo
�<F
N
� :� SyFF�Ri
� �� �'F
�
���� v
�
� �
�
; �U
� _� ��V
w Q�
� Q
_ � �
O J��� �
� � O
m �� � �
� ��� Q�
J� C�
C TTqGE QR/ � � �.
��
Q
ELL D
BOLERO COURT `\
-� �
CITY PROJECT#: 02644
MAYOR AND COUNCIL COMMUNICATION MAP
HMAC 2015-05 STRET REHABILITATION C01 MAP PAGE 2
-� �
w
N ST S REET � NE 21 ST S REET - _
� �
z
• Q �
� w
J �
J �
W �
U
Z
2 W 20TH STR ET E 20TH S REET 6�
2L
�
5���� 2
����� c�o
� L
� � N��
��� `��s �
,� c�'�Q� �9L �tP ��
����� ��.�� �G n N���
�.`� � � ���� � ��y ��
�� �.��� DISTRICT: 2 �G
'� N COMMERCE STREET 2 'L
�� n� ��
��J� ��� 'A��j` �o����
2 � Q,�PJ �`'� o�,�,�s�
�'� N
F9�� �l/ �G � ��� �
�� �G� ti� 2 �
��,� � yo
�9 G
����1 �`�'p L��'G �,�o�, w
�`A '`r6, �` � �
`9'p�- ��'� s2a ���. Z e
0
F �
s2P G�� �O Q �� �
� / U
'9�� Q �'�� Z
C� �
�
�t�, Z � ,�
��� \ �0�� ���� �
�
� ��� pQ'� 5 J ��,� 2
�'p �'G S�� J�t'� W w �'o
G�� � �pP � �w ��'�c`
�9L� G u� � ��
z Z �`
�G� Q o �,��
z � �C
w �
m =
z �
�yright 2011 City of Fort Worih. Unaulhorizized reproduction is a violalion of applicable laws.
� product is for information purposes and may not have been prepared for or be suitable for legal, engineering, o� 5�rvey��9 P��oS�. C I TY P ROJ E CT#: 02644
loes not represent an on-thearound survev and represents onlv the approximate relative location of propertv boundaries.
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Appro�ed on 6/20/2017 - Ordinance No. 22786-06 2017
DATE: Tuesday, June 20, 2017
LOG NAME: 20HMAC (2015-5) HIR STREET REHABILITATION
REFERENCE NO.: **C-28281
SUBJECT:
Authorize Additional Street Segments of North Hill Lane and North Commerce Street to City Secretary
Contract No. 47193 with Cutler Repaving Inc., with No Increase to the Contract Amount, Provide for
Additional Staff and Project Costs of $102,450.00 for a Revised Project Amount of $4,379,656.65 and
Adopt Appropriation Ordinance (COUNCIL DISTRICT 2)
RECOMMENDATION:
It is recommended that the City Councii:
1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water Capital Projects Fund in the amount of $81,450.00 in the HMAC 2015-5 Hot-In-Place
Reconstruction from available funds for the addition of the North Hill Lane and North Commerce Street
rehabilitation street segments; and
2. Transfer appropriations and receipts in the Stormwater Cap Project Bond Fund in the amount of
$21,000.00 from Greenfield Acres Drainage Improvements to HMAC 2015-5 Hot-In-Piace Reconstruction
for the addition of the North Hill Lane rehabilitation street segment.
DISCUSSION:
On September 15, 2015, (M&C C-27464) the City Council authorized the execution of a contract with
Cutler Repaving Inc., in the amount of $3,714,606.65 for Hot Mix Asphaltic Concrete (2015-5) HIR Street
Rehabilitation. Two additional street segments will be added to the contract in conjunction with separate
utility contracts for the replacement of water lines and storm drains. The Transportation and Public Works
Department and the Water Department share in these rehabilitation costs in lieu of permanent trench
repair, under the utility contract. The street segments that will be added to the contract are listed in the
table below. Quantity underruns in the initial street segments of City Secretary Contract No. 47193 have
provided the capacity to add these two street segments without increasing the existing contract
amount. Funding to cover the cost of the rehabilitation on these two added street segments will be
appropriated from the Water Capital Project Fund and transferred from the available balance in
Stormwater Cap Project Bond Fund of the existing Greenfield Acres Drainage Improvement Project. The
contract time will be extended by 59 calendar days to complete these two additional streets.
€Streets
� _ � _ �___�__
�North Hill Lane
__��r__�.____ _-___ .__..-- ----.
lNorth Commerce Street
Limits
Tee Head Drive to Cindy Lane
_�T_T__ _ _ .__._ _ ____-- --_____.�v �___.____. _ _.._._ _ . _ _ __. .
East Northside Drive to East Central Avenue
M/WBE OFFICE: Cutler Repaving, Inc., is in compliance with the City's DBE Ordinance by committing to
10 percent MBE participation on this project. The City's MBE goal on this project is 10 percent
Logname: 20HMAC (2015-5) HIR STREET REHABILITATION Page 1 of 2
These projects are located in COUNCIL DISTRICT 2, Mapsco 46M and 62Q.
This contract will have no impact to future operating budgets for TPW Department.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as appropriated, of
the Stormwater Cap Project Bond Fund, and upon approval of the above recommendations and adoption
of the attached Appropriation Ordinance, funds will be available in the current capital budget, as
appropriated, of the Water Capital Projects Fund. The Fiscal Year 2017 Water Operating Budget includes
appropriations of $21,060,000.00 for the purpose of providing Pay-As-You-Go Funding for Water Capital
Projects. After this transfer for Fiscal Year 2017, the balance will be $4,586,966.00
FUND IDENTIFIERS (FIDs):
TO
Fund Department cc
ID �
FROM
(Fund Department cc
ID �
un�Project
ID
un�Project (Progra
ID �
CERTIFICATIONS:
Submitted for CitY Manager's Office by_
Oriqinatinq Department Head:
Additional Information Contact:
�Activity� Budget � Reference # � moun
� Year (Chartfield 2)
Activity Budget Reference # moun
' __� Year Chartfield 2
Jay Chapa (5804)
Douglas Wiersig (7801)
Kristian Sugrim (8902)
Logname: 20HMAC (2015-5) HIR STREET REHABILITATION Page 2 of 2