Loading...
HomeMy WebLinkAboutContract 47349-CO3 CITYSECRETARY FORT WORTH. Cit of Fort Worth CONTRACT NO. q� C_�, ~ � Change Order Request Breakdown ProjectNamel N.Beach Street from Fossil Creek to NE Loop 820 City Sec# 1 47349 Client Project#(s)l 02238 Change Order Submittal# Date 12/2/2016 Dept. TIPW Water Sewer Contract Time Totals CD Original Contract Amount $5,675,296.15 $89,335.52 $82,214.26 $5,846,845.93 541 Extras to Date $82,180.00 $0.00 $82,180.00 7 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date ;.$5,757".,,47615 $89,33552 $82,2126_ $5,929,025.93 548 Amount of Proposed Change Order $3,300.00 Revised Contract Amount :$5,760;776151°: $85,335;52" x$82,2[456 $5,932,325.93 548 Original Funds Available for Change Orders $488,154.00 $6,250.00 $5,750.00 $500,154.00 Remaining Funds Available for this CO 0Q $417,974.00 Additional Funding(if necessary) • CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT ---1.46% : MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $7;308,557,41 Change order required to add an item to connect an existing 8"storm drainage pipe to the new storm system at RaceTrac r • FORT�'L i. Kayser,City Se RECENED TEXAS � JUN 2 9 2011 i o My Of fOf � L'fIYS �g S OFFICIAL RECORD CITY SECRETARY FT ,o WORTH,TX FORTWORTH City of Fort Worth Change Order Additions Project Name I N.Beach Street from Fossil Creek to NE Loop 820 City Sec# 47349 Client Project# Fo2238 Change Order Submittal# 0 Date 12/2/2016 ADDITIONS ITEM DESURIF I]ON DEPT Qty Unit Unit Cost I ota new onnect existing at RaceTrac T/PW $3,300.00 Water $0.00 Sewer $0.00 Sub Total Additions $3,300.00 Change Order Additions Page 1 of 1 Fox._ z�H City of Fort worth Change Order Deletions Project Name N.Beach Street from Fossil Creek to NE Loop 820 City Sec# 47349 Client Project# 02238 Change Order Submittal# Date 121212016 DELETIONS ITEM DEbURIP I ION DEPT Qty Unit Unit Cost I ota T/PW $0.00 Water $0.00 Sewer $0.00 Sub Total Deletions Change Order Deletions Page 1 of 1 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this.CO Total Previous Change Orders co# DATE AMQUNT - $ Total O:OO c' CFW Change Order Approval St-COApp08 Page 1 of 3 ko-utin Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Proiects/02238 - N. Beach Street from NE Loop 820 to Fossil Creek/Contractor/Change Orders/Change Order Breakdown template co3 - 8 in SD @ racetrac (003) (revised 6.15.2017).xlsm Attachments(0) No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId=4045&ActiveF... 6/29/2017 CFW Change Order Approval St-COApp08 Page 2 of 3 FORTWORTH,) City of Fort Worth �• Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: Change Order No.: St-COApp08 Date Started: 2017-06-16 City Sec. No.: Date Due:12017-08-05 Project Name:IN. Beach Street from NE Loop 820 to Fossil Creek Project Numbers: 02238 IDOE Numbers: Project Widen N. Beach Street to a 6-lane divided arterial street with Description: paving, drainage, sidewalks, water, sewer, traffic signal, illumination, landscape and irrigation improvements. Project Manager: Michael Weiss —� City Inspector: Tom Miller Contractor: COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date:�- COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW 1$ 3,300.00F 110___� F_ Total Cost: 3,300.00 I Total Requested Days:10 Approval Status: https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&ProcessId=4045&ActiveF... 6/29/2017 CFW Change Order Approval St-COApp08 Page 3 of 3 :Approved: Yes :Comments: User: Aaron Perez !Date: 2017-06-19 1:35 PM I i Approved: Yes ,Comments: ,User: Michael Weiss 'Date: 2017-06-19 3:51 PM jApproved: Yes Comments: ?User: Martin Phillips Date: 2017-06-19 4:47 PM !Approved: Yes Comments: !User: Kim Arnold Date: 2017-06-20 2:40 PM ;Approved: Yes !Comments: !User: Doug Wiersig ;Date: 2017-06-26 4:59 PM jApproved: Yes !.Comments: User: Doug Black ;Date: 2017-06-28 5:46 PM ;Approved: Yes 3Comments: jUser: Jay Chapa !Date: 2017-06-29 9:49 AM i Action Required: https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?Siteld=51500&Processld=4045&ActiveF... 6/29/2017 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Michael Weiss,P.E. Sr.Professional Engineer ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature