HomeMy WebLinkAboutContract 49236 CITY SECRETARY
CONTRACT NO.
COMMUNITY FACILITIES AGREEMENT
WITH CITY OVERSIZING PARTICIPATION
Developer Company Name: FG Aledo Development, LLC
QM _
Address,State,Zip Code: 3045 Lackland Dr. ,Fort Worth TX 76116
Phone&Email: 817-731-7595,kgili@sableholdings.com
o �
2017
Authorized Signatory,Title: Kim Gill,President City xt}Rr
CP ctrys"w womqy y a�
Project Name and Brief Morningstar Section5,Phase 2
Description: b Z ► YLd
Project Location: FM 3325 Parker County
Plat Case Number: FP-16-011 Plat Name: Morningstar Development
Mapsco: 710-Z Council District: ETJ City Project Number: 100325
CFA Number: 2016-055 DOE Number: None
To be completed by�:
Received by:_ U' Date:_ ✓ /
City of Fort Worth,Texas OFFICIAL.RECORD
Standard Community Facilities Agreement with City Participation CITY SECRETARY
CFA Official Release Date:07.30.2015
Page 1 of 11 FTS WORTH,TX
COMMUNITY FACILITIES AGREEMENT
WITH CITY OVERSIZING PARTICIPATION
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, FG Aledo Development, LLC , ("Developer"), desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Morningstar Section 5 Phase 2
("Project")within the City of Fort Worth, Texas("City"); and
WHEREAS, the City has reviewed the proposed Improvements and desires to have
the Developer oversize the proposed Improvements to provide capacity for future
development in the area("Oversized Improvements"); and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the collective
Improvements for the Project; and
WHEREAS, the City has reviewed the Project and desires to participate in the
Project in accordance with this Agreement as presented by the Cost Summary Table and
Exhibits attached hereto and authorized by City Council via M&C C-27 5 Z on
Oc--6h-u-1 i,20-L4,, ;and
WHEREAS, The City's cost participation shall be in an amount not to exceed
VA"' 40
("Participation"); and
WHEREAS, the City has requested the Developer to cause, and the Developer
agrees to cause, the design, permitting and construction of the Project for which the City
will, subject to City Council approval, reimburse the Developer for the City's portion of
those costs after City's final acceptance of the Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 200I,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to
comply with all provisions of said Policy in the performance of its duties and obligations
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 2 of 11
hereunder and to cause all contractors hired by Developer to comply with the Policy in
connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section I1,
of the Policy and recognizes that there shall be no reduction in the collateral until the
Project has been completed and the City has officially accepted the Improvements.
Developer further acknowledges that said acceptance process requires the
Developer's contractor(s) to submit a signed affidavit of bills paid signed by its
contractor and consent of surety signed by its surety to ensure the contractor has
paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will
provide in writing that the contractor has been paid in full by Developer for all the
services provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) , Sewer (A-1) , Paving (B) , Storm Drain (B-1) ,^ , Street Lights &
Signs (C) .
E. The Developer shall award all contracts for the construction of community facilities in
accordance with Section I1, paragraph 7 of the Policy and the contracts for the
construction of the public infrastructure shall be administered in conformance with
paragraph 8, Section 11, of the Policy. Developer shall ensure its contractor(s) pays the
then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 3 of 11
(100%) of the contract price of the infrastructure, and a maintenance bond in
the name of the City for one hundred percent (100%) of the contract price of
the infrastructure for a period of two (2) years from the date of final
acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of Chapter
2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other
state-approved form) supplied by the contractor's insurance provider and
bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to
commence construction to the City's Construction Services Division so that
City inspection personnel will be available; to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, to not install or relocate any sanitary sewer, storm drain, or
water pipe unless a responsible City inspector is present and gives his consent
to proceed, and to make such laboratory tests of materials being used as may
be required by the City.
V. To require its contractor to have fully executed contract documents submitted
to the City to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting.No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 4 of 11
G. Developer shall provide, at its expense, unless otherwise agreed to by City, all
engineering drawings and documents necessary to construct the Improvements under this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
1. City shall not be responsible for payment of any costs that may be incurred by Developer
in the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder. City will be responsible for the costs of utility
relocation necessitated by the City's participation in this Agreement.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,fully
indemnify, hold harmless and defend the City, its officers, agents and employees from
all suits, actions or claims of any character, whether real or asserted, brought for or on
account of any injuries (including death) or damages sustained by any persons or to
any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees.
M. The Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and all
claims, suits or causes of action of any nature whatsoever, whether real or asserted,
brought for or on account of any injuries or damages to persons or property, including
death, resulting from or in any way connected with the construction of the
infrastructure contemplated herein, whether or not such iniuries, death or damages
are caused, in whole or in Part, by the alleged negligence of the City of Fort
Worth, its officers, servants, or employees. Further, Developer will require its
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 5 of 11
contractors to indemnify and hold harmless the City for any losses, damages, costs or
expenses suffered by the City or caused as a result of said contractor's failure to
complete the work and construct the improvements in a good and workmanlike
manner,free from defects, in conformance with the Policy, and in accordance with all
plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered
into by the Developer with its contractor along with an assignment of all warranties given
by the contractor, whether express or implied. Further, Developer agrees that all
contracts with any contractor shall include provisions granting to the City the right to
enforce such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows and further apportioned in the
Cost Summary Table below
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the Developer's
share of the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the Developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the City is not
installing the streetlights, inspection fees equal to four percent (4%) of the
Developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs necessary for
Developer's portion of the Project.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in this
Agreement shall terminate if the Improvements are not completed within two
(2) years; provided, however, if construction of the Improvements has started
within the two year period, the Developer may request that the CFA be
extended for one (1) additional year. If the Improvements are not completed
within such extension period, there will be no further obligation of the City to
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 6 of 11
participate. City participation in this CFA shall be subject to the annual
availability of City funds as approved by the City Council.
ii. Subject to paragraph i, above, the City shall reimburse Developer for the
City's costs upon presentation of proper documentation of completion of
installation of the Oversized Improvements.
iii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement
with its contractor or other related agreements.
iv. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if
at the end of two (2) years from the date of this Agreement(and any extension
period)the Improvements have not been completed and accepted.
V. The City may utilize the Developer's financial guarantee to cause the payment
of costs for construction of the Improvements before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails to
pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of supplies
and/or construction, the contractors and/or suppliers may put a lien upon the
property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 7 of 11
COST SUMMARY TABLE
Developer's Cost City's Cost Total Cost
A.Water and Sewer Construction
1. Water $ 176,508.00 $ 63,801.00 $ 240,309.00
2. Sewer $ 102,071.00 $ 102,071.00
Contingency(15%) $ 9,571.00 $ 9,571.00
Water Construction Cost Sub-Total $ 278,579.00 $ 73,372.00 $ 351,951.00
B.TPW Construction
1. Paving $ 278,651.83 $ 278,651.83
2. Storm Drain $ -
3. Street Lights $ 45,620.00 $ 45,620.00
4.Traffic Signal $ -
TPW Construction Cost Sub-Total $ 324,271.83 $ - $ 324,271.83
Total Construction Cost $ 602,850.83 $ 73,372.00 $ 676,222.83
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 5,571.58 $ 1,277.00 $ 6,848.58
D. Water/Sewer Material Testing Fee(2%) $ 5,571.58 $ 1,277.00 $ 6,848.58
Water Construction Fees Sub-Total $ 11,143.16 $ 2,554.00 $ 13,697.16
E. TPW Inspection Fee $ 11,146.07 $ - $ 11,146.07
F. TPW Material Testing Fee $ 5,573.04 $ - $ 5,573.04
G. Street Light Inspection Fee $ 1,824.80 $ - $ 1,824.80
H. Traffic Signal Inspection Fee $ - $ - $ -
l. Street Signs Installation Cost $ - $ - $ -
J.Civil/Geotechnical Engineering&Survey(20%) $ - $ -
TPW Construction Fees Subtotal $ 18,543.91 $ - $ 18,543.91
Total Construction Fees $ 29,687.07 $ 2,554.00 $ 32,241.07
TOTAL PROJECT COST $ 632,537.90 $ 75,926.00 $ 708,463.90
Financial Guarantee Options, choose one Amount Choice
Mark one
Completion Agreement= 100%/Holds Plat $ 632,537.90
The costs stated herein may be based upon construction estimates rather than actual costs. The City's
portion of inspection and material testing fees are directly allocated to the City's accounts for charges and
does not reimburse the Water Inspection and Material Testing Fees to the Developer.The City's
participation estimate shall be limited to the unit prices contained in City of Fort Worth Ordinance No.
19192-06-2010, as amended,("Unit Price Ordinance")or as determined by public competitive bid. The
City's cost participation(excluding inspection and material testing fees)is not a lump sum amount and
may be less than stated above depending upon actual quantities as shown on the Notice of Final
Completion package(`Green sheet')and based on unit prices from the construction contract documents. In
no event shall the City pay more per unit than as determined pursuant to the Unit Price Ordinance or public
competitive bid.
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 8 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
IN Attachment 1 -Changes to Standard Community Facilities Agreement
f Location Map
C Exhibit A:Water Improvements
1 Water Cost Estimate
Exhibit A-1: Sewer Improvements
fel Sewer Cost Estimate
CSI Exhibit B: Paving Improvements
IN Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
D Exhibit C: Street Lights and Signs Improvements
IJ Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 9 of 11
ATTACHMENT"I"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100325
None
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 10 of 11
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in quadruplicate, effective as of the date subscribed by the
City's designated City Manager.
CITY OF FORT WORTH DEVELOPER
FG Aledo Development,LLC
Jesus J. Chapa Name: 1K GRI
Assistant
City Manager Title: President
Date: Date: Ayel-aSr
pZ016
—
ATTEST: (Only if required by
Recommended by: Developer)
Wendy Chi-Babulal, EMBA, P.E. Signature
Development Engineering Manager Name
Water Department`
Johnarm Dougla W. Wiersig, P.E.
Direct Director
Water Department Transportation&Public Works
Department
Approved as to Form &Legality: ATTEST:
pFFp�
Richard A. McCracken 47-7/1[to Mary J. a
Assistant City Attorney City Secr y Z'
M&C No. C-2.745 " S
Date: jok I
Fes- t2yS; a��i.�--J t j 2g5'
City of Fort Worth,Texas LOFFICIALRECFT]X
Standard Community Facilities Agreement with City ParticipationCFA Official Release Date:07.30.2015 CRETPage I1 of I1 RTH,
Contract Compliance Manager:
By signing I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
ate:
Janie S. Morales
Development Manager
OAK
<
7"
CA TION
SECTION 5
PHASE 1 W`s
MORNING
MIST TR.
OLD WEATHERFORD
N.T.S.
OLD WEATHERFORD
PATTERSON
CHAPIN 0
7c�p3
81
Mw 1rS
Underwood
Cemetery—`
ION
2
�ALEDO z
<
UNION PACIFIC R.
WATER NO. 59601-0600430-001580
LOCATION MAP SANITARY SEWER NO. 59607-0700430-001380
MORNINGSTAR STREET/STORM DRAIN NO. W-2389
CY
SECTION 5, PHASE 2 X-IT2355PR0JECT NO. 1003251
WEL,cH Ewouqimpuimo, INC.
CONSULTING ENGINEERS
\ o S>
1 0 ti
mw ?n0,� rc
IU > o
1 t' a
.y l PROP. 8'W
T`
PROP 81"W
PROP. 8"W
1,
yl
!' I
A
I 1
i
t /
EXIST. 8'W
PROP 8"W
I "
SA LILY WAY
f fN PROP. WIN
I f7 i PROP. 8",W \�
ExisT 8'w
I i` EVERLY CT' iF tzsr. ew
0 itIORNINGSTAR ' 1 `
SECTION 5 ,s PHASE 1
I , E`,175r. 8"w
{
PRIMROSE GARDEN CTyj
l� �.
J ��N
PROP. 161Wj EXIST. 8'w 1 12
PROP, 8"W EXIST, B w
HOLLY BAY CT
_ ■ Ex�sr. I�w ��,�-
PIP
100 DEVELOPER'S COST
_8" WATER LINES, FIRE HYDRANTS,
GATE VALVES AND ASSOCIATED
APPURTENANCES
CITY PARTICIPATION
►� 16" WATER UNE, GATE VALVES
AND ASSOCIATED APPURTENANCES
SCALE: 1"=300'
EXHIBIT "A"
WATER NO. 59601-0600430-001580
WATER IMPROVEMENTS SANITARY SEWER NO. 59607-0700430-001380
MORNINGSTAR STREET/STORM DRAIN NO. W-2389
CITY SECTION 5, PHASE 2 X 2355�JECT N0. 100325
WELCH ENGINEERING, I NC.
CONSUL TING ENGINEERS
0
1i W
PROP. 8"S5
a .
PROP. 8"SS
PROP. 8"SS ......... '., `,.... .,/ \\off
SARALILY WAY a /PROP. ess t s•s /
E 5.
� x/st e SS �+ %p-.c
U I y
I ...,. .�.._ t- �,
.. PROP. 8 SSE�St `�
1\
AST
o y
EVE LY CT
\\
y ! I £xrsr 8'55
£xrsr. 8W
`` SECTION 5 PHASE 1 2
{ , PRIMROSE GARDEN CT IA,
!' Exist e'ss
.r r
55
—1 LT !,.�I £X/ST. 8 Ss
I HOLLY BAY CT /
LEXIST. 8-SS \
{ !
{
100% DEVELOPER'S COST
�--- 8" SANITARY SEWER LINES
AND ASSOCIATED APPURTENANCES
EXHIBIT "A-1" SCALE: 1"=300'
WATER NO. 59601-0600430-001580
SANITARY SEWER IMPROVEMENTS SANITARY SEWER NO. 59607-0700430-001380
MORNINGSTAR STREET/STORM DRAIN NO. W-2389
CY
SECTION 5, PHASE 2 Xi 23550JECT N0. 100325
WELCH EWC7 NEF:RH'gG, I NC.
CONSULTING ENGINEERS
°° loz�
it Wog
tt o i
tt
Z
ti \
9
N
SARACILY ,WAY ;K
i I so' Row.
I I { K o.tp
mm
,n
EVERLY Cr 8o
so'R.
0. sr
B-B
o
Li i' 3 MORNINGSTAR I
a SECTION 5 , PHASE -I
l PRIMROSE oGA RDE CT
.cR00 �
I; HOLLY BAY CT
{ sq' R.o.w. t,
100% DEVELOPER'S COST
6" PAVEMENT W/2X CROSS SLOPE
ON 6" LIME SUBGRADE
100% DEVELOPER'S COST
2" TYPE D SURFACE COURSE,
4" TYPE B BASE COURSE
ON 6" LIME SUBGRADE
EXHIBIT "B„ SCALE: 1"=300'
WATER NO. 59601-0600430-001580
PAVING IMPROVEMENTS SANITARY SEWER NO. 59607-0700430-001380
MORNINGSTAR STREET/STORM DRAIN NO. W-2389
CY
SECTION 5, PHASE 2 XI 23550JECT N0. 100325
WF.1,CH ENGINEF; IJNG, INC.
CONSUL TING ENG/NEERS
r
0
z
I ft
SARALILY WAY
I o i it
EVERLY CT \`
I i
MORNINGSTAR
i t SECTION 5 PHASE 1 n
{' PRIMROSE GARDEN CT
%! ( HOLLY BAY CT
i
w�
*-- PROPOSED STREET LIGHT (10090 DEVELOPER'S COST)
-- PROPOSED STREET SIGN (100% DEVELOPER'S COST)
■ -- PROPOSED GROUND BOX (10096 DEVELOPER'S COST)
EXHIBIT "C„ SCALE: 1"=300'
WATER NO. 59601-0600430-001580
STREET LIGHTS SANITARY SEWER NO. 59607-0700430-001380
MORNINGSTAR STREET/STORM DRAIN NO. W-2389
CY
SECTION 5, PHASE 2 Xi 23550JECT NO. 100325
WELCH ENGINEERING, I NC.
CONSUL TING ENGINEERS
00 42 43
DAP-BID PROPOSAL
Page 1 or 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM CONTRACT 5/20/2016
MORNINGSTAR-SECTION 5,PHASE 2 CPN: 100325
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist
Specification Unit of Bid
Item Description Unit Price Bid Value
No. Section No. Measure Quantity
UNIT I:WATER IMPROVEMENTS
1 3311.0161 6"Water Pipe 33 11 12 LF 30 $26.00 $780.0
2 3311.0261 8"Water Pipe 33 11 12 LF 1,607 $29.50 $47,406.5
3 3311.0541 16"Water Pipe 33 11 12 LF 1,404 $65.00 $91,260.0
4 3312.3002 6"Gate Valve 33 1220 EA 1 $850.00 $850.0
5 3312.3003 8"Gate Valve 33 1220 EA 5 $950.00 $4,750.0
6 3312.3006 16"Gate Valve w,/Vault 33 1220 EA 2 $14,000.0 $28,000.0
7 3312.01 17 Connect.to Existing 4"-12"Water Main 33 1225 EA 5 $800.0 $4,000.0
8 3312.0001 Fire Hydrant 33 1240 EA 1 $3,400.0 $3,400.0
9 331 1.0001 Ductile Iron Water Fittings 33 11 11 TON 3 $52400.0 $16,200.0
10 3305.0109 Trench Safety 33 05 10 LF 3,041 $0.4C $1,216.4
11 3312.2003 1"Water Service 33 12 10 EA 38 S780.0C $29,640.0
12 3312.1002 2"Combination Air Valve assembly for Water 34 1230 EA 1 S7,800.0C $7,800.0
13 3312.6002 6"Blow Off Valve 33 1260 EA 1 $5,006.0 $5,006.0
TOTAL UNIT I:WATER IMPROVEMENTS $240,308.90
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43-CONTRACT BIDS DAP MORNINGSTAR-SECTION 5 PHASE 2-201336E2.05.20-16
00 42 43
DAP-BID PROPOSAL
Page 2 or 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM CONTRACT 5/20/2016
MORNINGSTAR-SECTION 5,PHASE 2 CPIs: 100325
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Specification Unit of Bid
Item Description Unit Price Bid Value
No.
Section No. Measure Quantity
UNIT II:SANITARY SEWER IMPROVEMENTS
1 3331.4115 8"Sewer Pipe 33 31 20 LF 1,394 $34.00 $47,396.0
2 3331.41 16 8"Sewer Pipe,CSB Backfill 33 11 10 LF 20 $75.00 $1,500.0
3 3339.1001 4'Manhole 33 39 20 EA 8 $3,600.00 $28,800.0
4 3339.1003 4'Extra Depth Manhole 33 39 20 VF 10 $150.00 $1,500.0
5 3331.3101 4"Sewer Service,Two-way cleanout 3331 50 EA 40 $385,00 $15,400.0
6 3301.0002 Post-CCTV Inspection 3301 31 LF 1,414 $2.80 $3,959.2
7 3301.0101 Manhole Vacuum Testing 3301 30 EA 8 $150.0 $1,200.0
8 3305.0109 Trench Safety 3305 10 LF 1,414 $0.40 $565.6
9 9999.0001 Connect to Existing Sanitary Sewer Main 33 11 10 EA 3 $500.0 $1,500.0
10 3305.0113 Trench Water Stops 3305 10 EA I $250.Oq $250.0
TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $102,070.80
CITY OF FORT w'ORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43-CONTRACT BIDS DAP IMORNINGSTAR-SECTION 5 PHASE 2-201336E2-05-20-16
00 42 43
DAP-BID PROPOSAL
Page 3 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM CONTRACT' 5/20/2016
MORNINGSTAR-SECTION 5,PHASE 2 CPN: 100325
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Specification Unit of Bid
Item Description Unit Price Bid Value
No. Section No. Measure Quantity
UNIT III:DRAINAGE IMPROVEMENTS
N/A
TOTAL UNIT III:DRAINAGE IMPROVEMENT
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43-CONTRACT BIDS DAP MORNINGSTAR-SECTION 5 PHASE 2-201336E2-05.20-16
00 42 43
DAP-BID PROPOSAL
Page 4 oF',
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM CONTRACT 5/20/2016
MORNINGSTAR-SECTION 5,PHASE 2 CPN; 100325
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Specification Unit of Bid
Item Description Section No. MeasureUnit Price Bid Value
No. puantity
UNIT IV:PAVING IMPROVEMENTS
1 3213.0101 6"Cone Pvmt 32 13 13 SY 5,187 $36.00 $186,732.0
2 3211.0501 6"Lime Treatment 32 11 29 SY 5,524 $3.00 $16,572.4
3 3211.0400 Hydrate Lime 32 11 29 TN 82.86 $175.00 $14,500.91
4 9999.0001 6"Temporary Asphalt 32 13 13 SY 2,030 $20.00 $40,600.0
5 3211.0501 6"Lime Treatment 32 11 29 SY 2,162 $3.00 $6.485.8
6 3211.0400 Hydrate Lime 32 11 29 TN 4326 $175.00 $7,570.61
7 3213.0501 Barrier Free Ramp-Type R-1 32 1320 EA 2 $1,000.00 $2,000.0
8 3441.4003 Furnish&s Install Ground Mount Sign Post and Sign 3441 30 EA 6 $650.00 $3,900.0
9 3217.2103 REFL Raised Marker TY lI A-A-4 32 1723 EA 58 $5.00 $290.0
TOTAL UNIT IV: PAVING IMPROVEMENTS $278,651.83
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43-CONTRACTBIDS DAP N1ORNitiGSTAR-SECTION 5 PHASE 2-201336E2-05-20-16
00 42 43
DAP-BID PROPOSAL
Page 5 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM CONTRACT 5/20/2016
MORNINGSTAR-SECTION 5,PHASE 2 CPN: 100325
UNIT PRICE BID Bidder's Application
Project]tem Information Bidder's Proposal
Bidlist Specification Unit of Bid
Item Description Unit Price Bid Value
No.
Section No. Measure Quantity
UNIT V:STREET LIGHTING IMPROVEMENTS
1 9999.0000 Holophane-Columbia Aluminum Pole, Washington- 34 41 20 EA 10 $3,250.00 $32,500.0
13
14.5'luminaire WFL-I00W-4K-AS-B-L5-H-PCS
2 3441.3001 Furnish/Install Rdwy Ilium Foundation TY 7 3441 20 EA 10 $750.00 $7,500.0
3 2605.3015 2 Inch Conduit PVC SCH 80(T) 26 05 33 LF 562 $8.00 $4,496.0
4 3441.3401 #6 Triplex Alum Electric Conductor 3441 10 LF 562 $2.00 $1,124.0
TOTAL UNIT V:STREET LIGHTING IMPROVEMENT $45,620.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER.AWARDED PROJECTS
Form Version April 2,2014 00 42 43-CONTRACT BIDS DAP MORNINGSTAR-SECTION 5 PHASE 2-201336E2-05-20-16
00 42 43
DAP-BID PROPOSAL
Page 6 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM CONTRACT- 5/20/2016
MORNINGSTAR-SECTION 5,PHASE 2 CYN; 100325
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Specification Unit Tid
Item Description Unit Price Bid Value
No. Section No ntity
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS
Non-Applicable
TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENT
CITY OF FONT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2.2014 00 42 43-CONTRACT BIDS DAP MORNINGSfAR-SECTION 5 PHASE 2-201336E2-05-20-16
00 42 43
DAP-BID PROPOSAL
Page 7 or 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM CONTRACT 5/20/2016
MORNINGSTAR-SECTION 5,PHASE 2 CPN: 100325
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Specification Unit of Bid
Item Description unit Price Bid Value
No.
Section No. Measure Quantity
Bid Summary
UNIT I:WATER IMPROVEMENTS $240,308.90
UNIT It:SANITARY SEWER IMPROVEMENTS $102,070.80
UNIT III: DRAINAGE IMPROVEMENTS N/A
UNIT IV: PAVING IMPROVEMENTS $278,651.83
UNIT V:STREET LIGHTING IMPROVEMENTS $45,620.00
Total Construction Bid $666,651.53
Contractor agrees to complete WORK for FINAL,ACCEPTANCE within -it days ' calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43-CONTRACT BIDS DAP NIORNINGSTAR-SECTION 5 PHASE 2-201336E2-05-20-I6
STATE OF TEXAS
COUNTY OF PARKER
Whereas FG Aledo Development, LLC and FWFW Holdings, Inc. are the sole owners of a tract of land out
of the P.J. McClary Survey,Abstract No.907, and situated in Parker County,Texas, and surveyed by
Miller Surveying, Inc.of Hurst, Texas in February of 2016,said tract being a portion of the same tract of
land described in the deed to FG Aledo Development, LLC, recorded as Document No. 2014-10308 in the
Deed Records of Parker County,Texas, and being a portion of the same tract of land described in the
deed to FWFW Holdings, Inc., recorded as Document No. 2014-10303 in said Records and being more
particularly described by metes and bounds as follows:
Beginning at a 1/2 inch "MILLER 5665" capped steel rod found for the northwest corner of Lot 1X, Block
43, Morningstar, an addition to Parker County,Texas according to the plat thereof recorded as
Document No. of the Plat Records of Parker County,Texas,said rod being in the
easterly right-of-way line of Farmer Road (FM 3325);
Thence North 06 degrees 43 minutes 22 seconds West with said right-of-way line a distance of 24.94
feet to a TxDot monument found;
Thence North 00 degrees 33 minutes 35 seconds West continuing with said right-of-way line a distance
of 47.37 feet to a 1/2 inch"MILLER 5665" capped steel rod found for the beginning of a curve to the left
with a radius of 2924.79 feet and whose chord bears North 02 degrees 35 minutes 58 seconds West at
155.80 feet;
Thence northerly continuing with said right-of-way line and with said curve through a central angle of 03
degrees 03 minutes 08 seconds and an arc length of 155.81 feet to a 1/2 inch"MILLER 5665"capped
steel rod found for the end of said curve;
Thence North 05 degrees 47 minutes 11 seconds East continuing with said right-of-way line a distance of
95.33 feet to a 1/2 inch "MILLER 5665" capped steel rod set;
Thence North 89 degrees 32 minutes 11 seconds East a distance of 258.57 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence North 00 degrees 32 minutes 48 seconds West a distance of 10.61 feet to a 1/2 inch"MILLER
5665"capped steel rod set for the beginning of a curve to the left with a radius of 1575.00 feet and
whose chord bears North 00 degrees 38 minutes 19 seconds West at 9.62 feet;
Thence northerly with said curve through a central angle of 00 degrees 21 minutes 00 seconds and an
arc length of 9.62 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the end of said curve;
Thence North 89 degrees 11 minutes 11 seconds East a distance of 185.00 feet to a 1/2 inch "MILLER
5665"capped steel rod set;
Thence South 00 degrees 29 minutes 08 seconds East a distance of 85.26 feet to a 1/2 inch "MILLER
5665"capped steel rod set;
Thence North 88 degrees 46 minutes 43 seconds East a distance of 300.59 feet to a 1/2 inch "MILLER
5665"capped steel rod set;
Thence North 58 degrees 28 minutes 20 seconds East a distance of 200.65 feet to a 1/2 inch "MILLER
5665"capped steel rod set;
Thence North 60 degrees 03 minutes 16 seconds East a distance of 49.20 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence North 64 degrees 39 minutes 14 seconds East a distance of 185.00 feet to a 1/2 inch "MILLER
5665"capped steel rod set;
Thence South 25 degrees 20 minutes 26 seconds East a distance of 12.03 feet to a 1/2 inch "MILLER
5665"capped steel rod set;
Thence North 64 degrees 39 minutes 14 seconds East a distance of 161.51 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence South 14 degrees 49 minutes 08 seconds East a distance of 104.41 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence North 75 degrees 10 minutes 23 seconds East a distance of 184.50 feet to a 1/2 inch "MILLER
5665"capped steel rod set for the beginning of a curve to the left with a radius of 1115.00 feet and
whose chord bears South 15 degrees 40 minutes 12 seconds East at 32.81 feet;
Thence southerly with said curve through a central angle of 01 degrees 41 minutes 10 seconds and an
arc length of 32.81 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the end of said curve;
Thence North 73 degrees 29 minutes 13 seconds East a distance of 125.00 feet to a 1/2 inch "MILLER
5665"capped steel rod set for the beginning of a curve to the left with a radius of 990.00 feet and
whose chord bears South 20 degrees 55 minutes 47 seconds East at 152.47 feet;
Thence southerly with said curve through a central angle of 08 degrees 59 minutes 59 seconds and an
arc length of 152.62 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the end of said curve;
Thence South 25 degrees 20 minutes 46 seconds East a distance of 26.11 feet to a 1/2 inch "MILLER
5665" capped steel rod found in the northerly boundary line of said Morningstar addition;
Thence westerly with the northerly boundary line of said addition along an arc length of the following
calls:
South 64 degrees 39 minutes 14 seconds West a distance of 430.10 feet to a 1/2
inch "MILLER 5665" capped steel rod set;
North 25 degrees 20 minutes 46 seconds West a distance of 54.17 feet to a 1/2 inch
"MILLER 5665"capped steel rod set;
South 64 degrees 39 minutes 14 seconds West a distance of 50.00 feet to a 1/2 inch
"MILLER 5665" capped steel rod set;
South 62 degrees 04 minutes 14 seconds West a distance of 96.76 feet to a 1/2 inch
"MILLER 5665"capped steel rod set;
South 48 degrees 42 minutes 17 seconds West a distance of 92.35 feet to a 1/2 inch
"MILLER 5665" capped steel rod set;
South 41 degrees 38 minutes 54 seconds West a distance of 61.08 feet to a 1/2 inch
"MILLER 5665"capped steel rod set;
North 51 degrees 09 minutes 50 seconds West a distance of 178.01 feet to a 1/2
inch "MILLER 5665" capped steel rod set for the beginning of a curve to the left with
a radius of 710.00 feet and whose chord bears South 35 degrees 21 minutes 45
seconds West at 86.04 feet;
Southwesterly with said curve through a central angle of 06 degrees 56 minutes 51
seconds and an arc length of 86.09 feet to a 1/2 inch "MILLER 5665" capped steel
rod set for the end of said curve;
South 75 degrees 54 minutes 08 seconds West a distance of 14.29 feet to a 1/2 inch
"MILLER 5665"capped steel rod set;
North 59 degrees 40 minutes 50 seconds West a distance of 32.29 feet to a 1/2 inch
"MILLER 5665" capped steel rod set for the beginning of a curve to the left with a
radius of 375.00 feet and whose chord bears North 63 degrees 16 minutes 35
seconds West at 47.04 feet;
Northwesterly with said curve through a central angle of 07 degrees 11 minutes 31
seconds and an arc length of 47.07 feet to a 1/2 inch "MILLER 5665" capped steel
rod set for the end of said curve;
South 23 degrees 05 minutes 41 seconds West a distance of 183.78 feet to a 1/2
inch "MILLER 5665" capped steel rod set;
North 87 degrees 27 minutes 16 seconds West a distance of 335.09 feet to a 1/2
inch "MILLER 5665"capped steel rod set;
North 79 degrees 58 minutes 11 seconds West a distance of 131.36 feet to a 1/2
inch "MILLER 5665"capped steel rod set;
North 67 degrees 27 minutes 53 seconds West a distance of 70.16 feet to a 1/2 inch
"MILLER 5665" capped steel rod set;
Thence South 88 degrees 56 minutes 35 seconds West continuing with said northerly boundary line a
distance of 135.35 feet to the point of beginning and containing 11.637 acres of land, more or less;
005243-1
Developer Awarded Project Agreement
Page I of 4
1 SECTION 00 52 43
2 AGREEMENT
3
4 THIS AGREEMENT,authorized onJ Z0114 is made by and between
5 the Developer, FG ALEDO DEVELOPMENT, LIC, authorized to do business in Texas
6 ("Developer") and D.T.UTILITY CONTRACTORS,INC., authorized to do business in Texas,
7 acting by and through its duly authorized representative,("Contractor").
8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
9 follows:
10 Article 1.WORK
11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
12 Project identified herein.
13 Article 2.PROJECT
14 The project for which the Work under the Contract Documents may be the whole or only a part is
15 generally described as follows:
16 MORNINGSTAR—SECTION 5,PHASE 2
17
18 CITY PROJECT NO.: 100325
19
20 Article 3. CONTRACT TIME
21 3.1 Time is of the essence.
22 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
23 Documents are of the essence to this Contract.
24 3.2 Final Acceptance.
25 The Work will be complete for Final Acceptance within 60 calendar days after the date
26 when the Contract Time commences to run as provided in Paragraph 2.04 of the Standard
27 City Conditions of the Construction Contract for Developer Awarded Projects.
28 3.3 Liquidated damages
29 Contractor recognizes that time is of the essence of this Agreement and that Developer
30 will suffer financial loss if the Work is not completed within the times specified in
31 Paragraph 3.2 above,plus any extension thereof allowed in accordance with Article 10 of
32 the Standard City Conditions of the Construction Contract for Developer Awarded
33 Projects. The Contractor also recognizes the delays, expense and difficulties involved in
34 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not
35 completed on time. Accordingly, instead of requiring any such proof, Contractor agrees
36 that as liquidated damages for delay (but not as a penalty), Contractor shall pay
37 Developer, ONE THOUSAND Dollars ($1,000.00) for each day that expires after the
38 time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter
39 of Acceptance.
CITY OF FORT WORTH MORNINGSTAR—SECTION 5,PHASE 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 100325:
Revised April 2,2014
005243-2
Developer Awarded Project Agreement
Page 2 of 4
40 Article 4.CONTRACT PRICE
41 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract
42 Documents an amount in current funds of: THREE HUNDRED FORTY TWO THOUSAND
43 THREE HUNDRED SEVENTY NINE AND SEVENTY CENT, ($342,379.70).
44 Article 5. CONTRACT DOCUMENTS
45 5.1 CONTENTS:
46 A. The Contract Documents which comprise the entire agreement between Developer and
47 Contractor concerning the Work consist of the following:
48 1. This Agreement.
49 2. Attachments to this Agreement:
50 a. Bid Form(As provided by Developer)
51 1) Proposal Form(DAP Version)
52 2) Prequalification Statement
53 3) State and Federal documents(project specific)
54 b. Insurance ACORD Form(s)
55 c. Payment Bond(DAP Version)
56 d. Performance Bond(DAP Version)
57 e. Maintenance Bond(DAP Version)
58 f. Power of Attorney for the Bonds
59 g. Worker's Compensation Affidavit
60 h. MBE and/or SBE Commitment Form(If required)
61 3. Standard City General Conditions of the Construction Contract for Developer
62 Awarded Projects.
63 4. Supplementary Conditions.
64 5. Specifications specifically made a part of the Contract Documents by attachment
65 or, if not attached, as incorporated by reference and described in the Table of
66 Contents of the Project's Contract Documents.
67 6. Drawings.
68 7. Addenda.
69 8. Documentation submitted by Contractor prior to Notice of Award.
70 9. The following which may be delivered or issued after the Effective Date of the
71 Agreement and, if issued,become an incorporated part of the Contract Documents:
72 a. Notice to Proceed.
73 b. Field Orders.
74 c. Change Orders.
75 d. Letter of Final Acceptance.
76
77
CITY OF FORT WORTH MORNINGSTAR—SECTION 5,PHASE 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO.100325:
Revised April 2,2014
005243-3
Developer Awarded Project Agreement
Page 3 of'4
78 Article 6.INDEMNIFICATION
79 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
80 expense, the city, its officers, servants and employees, from and against any and all
81 claims arising out of, or alleged to arise out of, the work and services to be performed
82 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
83 under this contract. This indemnification provision is specifically intended to operate
84 and be effective even if it is alleged or proven that all or some of the damages being
85 sought were caused,in whole or in part, by any act,omission or negligence of the city.
86 This indemnity provision is intended to include, without limitation, indemnity for
87 costs,expenses and legal fees incurred by the city in defending against such claims and
88 causes of actions.
89
90 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
91 the city,its officers,servants and employees,from and against any and all loss,damage
92 or destruction of property of the city,arising out of,or alleged to arise out of,the work
93 and services to be performed by the contractor, its officers, agents, employees,
94 subcontractors, licensees or invitees under this contract. This indemnification
95 provision is specifically intended to operate and be effective even if it is alleged or
96 proven that all or some of the damages being sought were caused, in whole or in part,
97 by any act,omission or negligence of the city.
98
99 Article 7. MISCELLANEOUS
100 7.1 Terms.
101 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of
102 the Construction Contract for Developer Awarded Projects.
103 7.2 Assignment of Contract.
104 This Agreement, including all of the Contract Documents may not be assigned by the
105 Contractor without the advanced express written consent of the Developer.
106 7.3 Successors and Assigns.
107 Developer and Contractor each binds itself, its partners, successors, assigns and legal
108 representatives to the other party hereto, in respect to all covenants, agreements and
109 obligations contained in the Contract Documents.
110 7.4 Severability.
111 Any provision or part of the Contract Documents held to be unconstitutional, void or
112 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
113 remaining provisions shall continue to be valid and binding upon DEVELOPER and
114 CONTRACTOR.
115 7.5 Governing Law and Venue.
116 This Agreement, including all of the Contract Documents is performable in the State of
117 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
118 Northern District of Texas, Fort Worth Division.
CITY OF FORT WORTH MORNINGSTAR—SECTION 5,PHASE 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 100325:
Revised April 2,2014
005243-4
Developer Awarded Project Agreement
Page 4 of 4
119
120 7.6 Authority to Sign.
121 Contractor shall attach evidence of authority to sign Agreement, if other than duly
122 authorized signatory of the Contractor.
123
124 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple
125 counterparts.
126
127 This Agreement is effective as of the last date signed by the Parties("Effective Date").
128
Contractor: Developer:
D.T.UTILITY CONTRACTORS, FG ALEDO DEVELOPMENT,LLC
INC.
By: By:
(Signature) (Signature)
(Printed Name) (Printed Name)
Title: Title:
Company Name: D.T.UTILITY Company name: FG ALEDO
CONTRACTORS,INC. DEVELOPMENT,LLC.
Address: 2619 CAUSBIE ROAD Address: 3045 LACKLAND BLVD.
City/State/Zip: WEATHERFORD,TX City/State/Zip: FORT WORTH,TEXAS 76116
76087
Date Date
129
CITY OF FORT WORTH MORNINGSTAR—SECTION 5,PHASE 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 100325:
Revised April 2,2014
005243-1
Developer Awarded Project Agreement
Page I of 4
1 SECTION 00 52 43
2 AGREEMENT
3 `��Sfi ZU>
4 THIS AGREEMENT,authorized on is made by and between
5 the Developer, FG ALEDO DEVELOPMENT, LLC, authorized to do business in Texas
6 ("Developer") and CONATSER CONSTRUCTION TX, LP., authorized to do business in
7 Texas,acting by and through its duly authorized representative,("Contractor").
8 Developer and Contractor,in consideration of the mutual covenants hereinafter set forth,agree as
9 follows:
10 Article 1.WO RK
11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
12 Project identified herein.
13 Article 2.PROJECT
14 The project for which the Work under the Contract Documents may be the whole or only a part is
15 generally described as follows:
16 MORNINGSTAR—SECTION 5,PHASE2
17
18 CITY PROJECT NO.: 100325
19
20 Article 3.CONTRACT TIME
21 3.1 Time is of the essence.
22 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
23 Documents are of the essence to this Contract.
24 3.2 Final Acceptance.
25 The Work will be complete for Final Acceptance within 100 calendar days after the date
26 when the Contract Time commences to run as provided in Paragraph 2.04 of the Standard
27 City Conditions of the Construction Contract for Developer Awarded Projects.
28 3.3 Liquidated damages
29 Contractor recognizes that time is of the essence of this Agreement and that Developer
30 will suffer financial loss if the Work is not completed within the times specified in
31 Paragraph 3.2 above,plus any extension thereof allowed in accordance with Article 10 of
32 the Standard City Conditions of the Construction Contract for Developer Awarded
33 Projects. The Contractor also recognizes the delays, expense and difficulties involved in
34 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not
35 completed on time. Accordingly, instead of requiring any such proof, Contractor agrees
36 that as liquidated damages for delay (but not as a penalty), Contractor shall pay
37 Developer ONE THOUSAND Dollars ($1,000.00) for each day that expires after the
38 time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter
39 of Acceptance.
CITY OF FORT WORTH MORNINGSTAR—SECTION 5,PHASE 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO.:100325
Revised April 2,2014
005243-2
Developer Awarded Project Agreement
Page 2 of 4
40 Article 4. CONTRACT PRICE
41 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract
42 Documents an amount in current funds of TWO HUNDRED SEVENTY EIGHT
43 THOUSAND,SIX HUNDRED FIFTY ONE AND EIGHTY THREE CENTS,($278,651.83).
44 Article 5. CONTRACT DOCUMENTS
45 5.1 CONTENTS:
46 A. The Contract Documents which comprise the entire agreement between Developer and
47 Contractor concerning the Work consist of the following:
48 1. This Agreement.
49 2. Attachments to this Agreement:
50 a. Bid Form(As provided by Developer)
51 1) Proposal Form(DAP Version)
52 2) Prequalification Statement
53 3) State and Federal documents (project specific)
54 b. Insurance ACORD Form(s)
55 c. Payment Bond(DAP Version)
56 d. Performance Bond(DA P Version)
57 e. Maintenance Bond(DAP Version)
58 f. Power of Attorney for the Bonds
59 g. Worker's Compensation Affidavit
60 h. MBE and/or SBE Commitment Form(If required)
61 3. Standard City General Conditions of the Construction Contract for Developer
62 Awarded Projects.
63 4. Supplementary Conditions.
64 5. Specifications specifically made a part of the Contract Documents by attachment
65 or, if not attached, as incorporated by reference and described in the Table of
66 Contents of the Project's Contract Documents.
67 6. Drawings.
68 7. Addenda.
69 8. Documentation submitted by Contractor prior to Notice of Award.
70 9. The following which may be delivered or issued after the Effective Date of the
71 Agreement and, if issued,become an incorporated part of the Contract Documents:
72 a. Notice to Proceed.
73 b. Field Orders.
74 c. Change Orders.
75 d. Letter of Final Acceptance.
76
77
CITY OF FORT WORTH MORNINGSTAR—SECTION 5,PHASE 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NOA00325
Revised April 2,2014
005243-3
Developer Awarded Project Agreement
Page 3 of 4
78 Article 6. INDEMNIFICATION
79 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
80 expense, the city, its officers, servants and employees, from and against any and all
81 claims arising out of,or alleged to arise out of, the work and services to be performed
82 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
83 under this contract. This indemnification provision is specifically intended to operate
84 and be effective even if it is alleged or proven that all or some of the damages being
85 sought were caused, in whole or in part, by any act,omission or negligence of the city.
86 This indemnity provision is intended to include, without limitation, indemnity for
87 costs,expenses and legal fees incurred by the city in defending against such claims and
88 causes of actions.
89
90 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
91 the city,its officers,servants and employees,from and against any and all loss,damage
92 or destruction of property of the city,arising out of,or alleged to arise out of,the work
93 and services to be performed by the contractor, its officers, agents, employees,
94 subcontractors, licensees or invitees under this contract. This indemnification
95 provision is specifically intended to operate and be effective even if it is alleged or
96 proven that all or some of the damages being sought were caused, in whole or in part,
97 by any act,omission or negligence of the city.
98
99 Article 7. MISCELLANEOUS
100 7.1 Terms.
101 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of
102 the Construction Contract for Developer Awarded Projects.
103 7.2 Assignment of Contract.
104 This Agreement, including all of the Contract Documents may not be assigned by the
105 Contractor without the advanced express written consent of the Developer.
106 7.3 Successors and Assigns.
107 Developer and Contractor each binds itself, its partners, successors, assigns and legal
108 representatives to the other party hereto, in respect to all covenants, agreements and
109 obligations contained in the Contract Documents.
110 7.4 Severability.
111 Any provision or part of the Contract Documents held to be unconstitutional, void or
112 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
113 remaining provisions shall continue to be valid and binding upon DEVELOPER and
114 CONTRACTOR.
115 7.5 Governing Law and Venue.
116 This Agreement, including all of the Contract Documents is performable in the State of
117 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
118 Northern District of Texas,Fort Worth Division.
CITY OF FORT WORTH MORNINGSTAR—SECTION 5,PHASE 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO.:100325
Revised April 2,2014
005243-4
Developer Awarded Project Agreement
Page 4 of 4
119
120 7.6 Authority to Sign.
121 Contractor shall attach evidence of authority to sign Agreement, if other than duty
122 authorized signatory of the Contractor.
123
124 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple
125 counterparts.
126
127 This Agreement is effective as of the last date signed by the Parties("Effective Date").
128
Contractor: Developer:
CONATSER CONSTRUCTION TX, FG ALEDO DEVELOPMENT,LLC
L.P.
oe
B OI By: �Ao
(Si ture) (Signature)
BROCK HUGGINS
(Printed Name) (Printed Name)
Title: PRESIDENT Title: PPOR
Company Name: CONATSER Company name: FG ALEDO
CONSTRUCTION TX,L.P. DEVELOPMENT,LLC.
Address: P.O. Box 15448 Address: 3045 LACKLAND BLVD.
City/State/Zip:FORT WORTH,TX City/State/Zip:FORT WORTH,TEXAS 76116
76119
C Jk& OWL za
Date Date
129
CITY OF FORT WORTH MORNINGSTAR—SECTION 5,PHASE 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO.:100325
Revised April 2,2014
0052434-1
Developer Awarded Project Agreement
Page i of 4
1 SECTION 00 52 43
2 AGREEMENT
3
4 THIS AGREEMENT, authorized on !f �� is made by
5 and between the Developer,FG ALEDO DEVELOPMENT,LLC-,authorized to do business in
6 Texas 4"Developer")and BEAN ELECTRIC,INC.-, authorized to do business in Texas,acting
7 by and through its duly authorized representative,("Contractor").
8 Developer and Contractor,in consideration of the mutual covenants hereinafter set forth,agree as
9 follows:
10 Article 1.WORK
11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
12 Project identified herein.
13 Article 2.PROJECT
14 The project for which the Work under the Contract Documents may be the whole or only a part is
15 generally described as follows:
16 MORNINGSTAR—SECTION 5,PHASE 2
17
18 CITY PROJECT NO.: 100325
19
20 Article 3. CONTRACT TIME
21 3.1 Time is of the essence.
22 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
23 Documents are of the essence to this Contract.
24 3.2 Final Acceptance.
25 I The Work will be complete for Final Acceptance within-90 calendar days- after the date
26 when the Contract Time commences to run as provided in Paragraph 2.04 of the Standard
27 City Conditions of the Construction Contract for Developer Awarded Projects.
28 3.3 Liquidated damages
29 Contractor recognizes that time is of the essence of this Agreement and that Developer
30 will suffer financial loss if the Work is not completed within the times specified in
31 Paragraph 3.2 above,plus any extension thereof allowed in accordance with Article 10 of
32 the Standard City Conditions of the Construction Contract for Developer Awarded
33 Projects. The Contractor also recognizes the delays, expense and difficulties involved in
34 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not
35 completed on time. Accordingly, instead of requiring any such proof, Contractor agrees
36 that as liquidated damages for delay (but not as a penalty), Contractor shall pay
37 Developer, ONE THOUSAND Dollars ($1,000.00) for each day that expires after the
38 time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter
39 of Acceptance.
CITY OF FORT WORTH MORNINGSTAR—SECTION 5,PHASE r4 AmWar A6~1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTSC ITY PROJECT NO.:I00325_fhwN A*eef
Revised August 30,2013April 2.2014
005243-4-2
Developer Awarded Project Agreement
Page 2 of 4
40 Article 4.CONTRACT PRICE
41 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract
42 Documents an amount in current funds of: FORTY FIVE THOUSAND SIX HUNDRED
43 TWENTY DOLLARS AND NO CENTS,($45,620.00).
44 Article 5.CONTRACT DOCUMENTS
45 5.1 CONTENTS:
46 A. The Contract Documents which comprise the entire agreement between Developer and
47 Contractor concerning the Work consist of the following:
48 1. This Agreement.
49 2. Attachments to this Agreement:
50 a. Bid Form(As provided by Developer)
51 1) Proposal Form(DAP Version)
52 2) Prequalification Statement
53 3) State and Federal documents(project specific)
54 b. Insurance ACORD Form(s)
55 c. Payment Bond(DAP Version)
56 d. Performance Bond(DAP Version)
57 e. Maintenance Bond(DAP Version)
58 f. Power of Attorney for the Bonds
59 g. Worker's Compensation Affidavit
60 h. MBE and/or SBE Commitment Form(If required)
61 3. Standard City General Conditions of the Construction Contract for Developer
62 Awarded Projects.
63 4. Supplementary Conditions.
64 5. Specifications specifically made a part of the Contract Documents by attachment
65 or, if not attached, as incorporated by reference and described in the Table of
66 Contents of the Project's Contract Documents.
67 6. Drawings.
68 7. Addenda.
69 8. Documentation submitted by Contractor prior to Notice of Award.
70 9. The following which may be delivered or issued after the Effective Date of the
71 Agreement and, if issued, become an incorporated part of the Contract Documents:
72 a. Notice to Proceed.
73 b. Field Orders.
74 c. Change Orders.
75 d. Letter of Final Acceptance.
76
77
CITY OF FORT WORTH MORNINGSTAR—SECTION 5,PHASE 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTSCM PROJECT NO.:100325 A*eef Xr
Revised Avgw4 30,2013Al2ril 2,2014
0052434-3
Developer Awarded Project Agreement
Page 3 of 4
78 Article 6.INDEMNIFICATION
79 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
80 expense, the city, its officers, servants and employees, from and against any and all
81 claims arising out of, or alleged to arise out of,the work and services to be performed
82 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
83 under this contract. This indemnification provision is specifically intended to operate
84 and be effective even if it is alleged or proven that all or some of the damages being
85 sought were caused, in whole or in part, by any act,omission or negligence of the city.
86 This indemnity provision is intended to include, without limitation, indemnity for
87 costs,expenses and legal fees incurred by the city in defending against such claims and
88 causes of actions.
89
90 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
91 the city,its officers,servants and employees,from and against any and all loss,damage
92 or destruction of property of the city,arising out of,or alleged to arise out of,the work
93 and services to be performed by the contractor, its officers, agents, employees,
94 subcontractors, licensees or invitees under this contract. This indemnification
95 provision is specifically intended to operate and be effective even if it is alleged or
96 proven that all or some of the damages being sought were caused, in whole or in part,
97 by any act,omission or negligence of the city.
98
99 Article 7. MISCELLANEOUS
100 7.1 Terms.
101 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of
102 the Construction Contract for Developer Awarded Projects.
103 7.2 Assignment of Contract.
104 This Agreement, including all of the Contract Documents may not be assigned by the
105 Contractor without the advanced express written consent of the Developer.
106 7.3 Successors and Assigns.
107 Developer and Contractor each binds itself, its partners, successors, assigns and legal
108 representatives to the other party hereto, in respect to all covenants, agreements and
109 obligations contained in the Contract Documents.
110 7.4 Severability.
111 Any provision or part of the Contract Documents held to be unconstitutional, void or
112 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
113 remaining provisions shall continue to be valid and binding upon DEVELOPER and
114 CONTRACTOR.
115 7.5 Governing Law and Venue.
116 This Agreement, including all of the Contract Documents is performable in the State of
117 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
118 Northern District of Texas,Fort Worth Division.
CITY OF FORT WORTH MORNINGSTAR—SECTION 5,PHASE 2gfto4 Rrejeei AWmq
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTSCITY PROJECT NO.:100325-fkwoq Prejee4�v
Revised August'�13April2.2014
0052434-4
Developer Awarded Project Agreement
Page 4 of 4
119
120 7.6 Authority to Sign.
121 Contractor shall attach evidence of authority to sign Agreement, if other than duly
122 authorized signatory of the Contractor.
123
124 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple
125 counterparts.
126
127 This Agreement is effective as of the last date signed by the Parties("Effective Date").
128
Contractor: Developer:
FG ALEDO DEVELOPMENT,LLC
BEAN EL CT L C.
B By: r1411
(Signature) (Signature)
(Printed Name) (Printed Name)
Title: )Mla President Title: &I
Company Name: BEAN Company name: FG ALEDO
ELECTRICAL,INC. DEVELOPMENT,LLC.
Address: 821 E.Enon Address:3045 LACKLAND BLVD.
City/State/Zip: City/State/Zip:
FORT WORTH,TX 76140 FORT WORTH,TEXAS 76116
(�- ZS r2 ��y r ��Vv- /, 701,G
Date Date
129
CITY OF FORT WORTH MORNINGSTAR—SECTION 5,PHASE 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTSCITY PROJECT NO.:100325PWFf ArqjM At
Revised August?^,2013Aorril2.2014
M&C Review Page 1 of 2
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA FoRTI
COUNCIL ACTION: Approved on 10/11/2016
REFERENCE ** 06MORNINGSTAR SECTION 5
DATE: 10/11/2016 NO.: C-27952 LOG NAME: PHASE 2 WATER
PARTICIPATION
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of a Community Facility Agreement with FG Aledo Development,
LLC, with City Participation in the Amount of$75,926.00 for Oversizing a Twelve-Inch
Water Main to a Sixteen-Inch Water Main in the Area North Along Farmer Road to Serve
the Morningstar Development and Future Development in the Surrounding Area, in the
City of Fort Worth Extraterritorial Jurisdiction (West of COUNCIL DISTRICT 3)
RECOMMENDATION:
It is recommended that the City Council authorize execution of a Community Facilities Agreement with FG
Aledo Development, LLC, with City participation in the amount of$75,926.00 for costs related to oversizing
a twelve-inch water main to a sixteen-inch water main in the area north along Farmer Road (F.M. 3325)to
serve the Morningstar Development and future development in the surrounding area in the City of Fort
Worth Extraterritorial Jurisdiction.
DISCUSSION:
FG Aledo Development, LLC, the developer of Morningstar Section 5 Phase 2 (Developer), is executing a
Community Facilities Agreement (CFA)for construction of public infrastructure including water, sewer
paving and street light improvements, to serve the Morningstar Development located in the City of Fort
Worth Extraterritorial Jurisdiction (ETJ) located west of Council District 3.
City staff has determined that the water main requires oversizing to serve future development in the
surrounding area. The Water Department is participating in the Developer's project to oversize
approximately 1,404 linear feet of water main from a twelve-inch water main to a sixteen-inch water main to
serve the future anticipated growth in the area. The City's cost participation to oversize the water main is
estimated to be in the amount of$75,926.00, as shown on the table below.
Construction City Cost Developer Cost Total Cost
Water Construction $63,801.00 $176,508.00 $240,309.00
Sewer Construction $ 0.00 $102,071.00 $102,071.00
Paving Construction $ 0.00 $278,652.00 $278,652.00
Street Lights $ 0.00 $ 45,620.00 $ 45,620.00
Construction Subtotal $63,801.00 $602,851.00 $666,652.00
15 Percent Contingency $ 9,571.00 $ 0.00 $ 9,571.00
Totals $73,372.00 $602,851.00 $676,223.00
Inspection Fee(2 percent)Water $ 1,277.00 $ 3,531.00 $ 4,808.00
Material Testing Fee(2 percent)Water $ 1,277.00 $ 3,531.00 $ 4,808.00
Inspection Fee 2 percent Sewer $ 0.00 $ 2,042.00 $ 2,042.00
Material Testing Fee(2 percent)Sewer $ 0.00 $ 2,042.00 $ 2,042.00
Inspection Fee 4percent)Paving $ 0.00 $ 11,147.00 $ 11,147.00
Material Testing Fee(2 percent)Paving $ 0.00 $ 5,574.00 $ 5,574.00
Inspection Fee(4 percent)Street Lights $ 0.00 $ 1,825.00 $ 1,825.00
Construction Fees Sub-Total $ 2,554.00 $ 59,692.00 $ 32,246.00
Total Water Project Cost $75,926.00 $632,543.00 $708,469.00
The costs stated herein are based upon public bid construction estimates rather than actual cost. The
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22540&councildate=10/11/2016 7/5/2017
M&C Review Page 2 of 2
reimbursement of the participation, excluding inspection and material testing fees, is not a lump-sum
amount and may be less than stated above depending upon actual quantities from the Notice of Final
Completion Package, commonly referred to as the Green Sheet Package.
This project is located in Extraterritorial Jurisdiction, Mapsco 710Z and 760C.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available as appropriated in Project P00001 in the Fiscal
Year 2016 Water&Wastewater Capital Improvement Plan. The adopted Water& Wastewater Capital
Improvement Plan includes an appropriation of$9,400,000.00 for programmable Community Facility
Agreement Projects. Of the original appropriation, $8,057,733.00 is available to fund future individual
projects.
TO
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year Chartfield 2
FROM
Fund Department Account Project Program Activity Budget Reference# Amount
ID I ID Year (Chartfield 2)
Submitted for City Manager's Office by: Jesus J. Chapa (5804)
Originating Department Head: John Carman (8246)
Additional Information Contact: Wendy Chi-Babulal (8242)
Julie Westerman (2677)
ATTACHMENTS
Morningstar Sec 5 Ph 2 Form 1295.pdf
MorningstarPh5 Sec2 MC exhibit.pdf
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22540&councildate=10/l1/2016 7/5/2017
CERTIFICATE OF INTERESTED PARTIES FORM 1295
iof1.
Complete Nos.1-4 and 6 it there are interested parties. OFFICE USE ONLY
Complete Nos 1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number:
of business. 2016-115299
FU Aledo Development, 1_1-C
Fort.Worth,TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 09/22/201.6
being filed.
City of Fort Worth Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a
description of the services,goods,or other property to be provided under the contract.
100325
Morningstar Section 5-2,developing lots
Nature of interest
4
Name of Interested Party City,State;Country(place of business) (check applicable)
Controlling intermediary
FWFW HOldings Fort Worth,TX l.Jnited States X
Southwest[tank F ort Worth,TX United States X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct.
t�arn�e�: SHARLA J. NEWKIRK
:°;' ��=Notary Public,State of Texas
"•' +� Comm,Expires 02.05-2020
'4i ai, ;
°j�,,,,,,,��1� Notary ID 5452690
Signature of a thorn-ed agent of contracting business entity
AFFIX NOTARY STAMP/SLAL. ABOVE- /f
Swr r o and subscribed before me,by the said _ this the_p`p� day of .,.t
2t� ,to certify which,witness my hand and seal of office.
Signature of cer add inistering oath Printed name of officer administering oath Title of officer r4dininisteiing oath
I ornns provided by t exas Ethics Corninission www.ethics.state.tx.us Version V1.0.277