HomeMy WebLinkAboutContract 47940-FP2 Department of TP &W Const.Services
CPN# 7Z D to
Project Manager �
-1
Risk Managerment Ganad TWORTH,
CITY SECRETARY ff��
D.O.E. Brotherton CONTRACT NO. �v!
CFA Morales/Scanned 5
Gutzler/Scanned 71
The Proceeding people have been Contacted
concerning the request for final payment& have ,TION AND PUBLIC WORKS
released this project for such payment. :PROJECT COMPLETION 59 66 1 — 1 063-$
)eveloper Projects)
Clearance Conducted l3yQ"wM9rQR4 C_ity Project NO 100328
Regarding contract 100328 for HERITAGE GLEN MEDICAL PARS as required by the WATER DEPARTMENT
as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete. EL
is
&
JUN
7 r'j $80,063.00
Original Contract Price: `
1..., j
Amount of Approved Change Orde Ns
Revised Contract Amount:
Total Cost Work Completed: $80,063.00
G� 11
Recommended for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
(Lz ��/t 6
Accepted Date
Asst. Director, WATER DEPARTMENT
Asst. City Manager Date
Comments:
OFFICIAL REICIwORD,
CITY SECRITARY
FT.WORTH,TX
Rev.9/22/16
ULLM -Ne/ IL- G V LIMi6JUN 27 2017 1U)
5—quoi -- 7 003- 8
City Project Numbers 100328
DOE Number 0328
Contract Name HERITAGE GLEN MEDICAL PARK Estimate Number I
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 4/13/2017
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors DICKINSON / CAZORLA Contract Date
Contractor SOLID ROCK Contract Time 120 CD
664 MANOR DR Days Charged to Date 120 CD
ARGYLE, TX 76226 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $80,063.00
Less %Retained $0.00
Net Earned $80,063.00
Earned This Period $80,063.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $80,063.00
Tuesday,April 18,2017 Page 4 of 4
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name HERITAGE GLEN MEDICAL PARK
Contract Limits
Project Type WATER&SEWER
City Project Numbers 100328
DOE Number 0328
Estimate Number 1 Payment Number 1 For Period Ending 4/13/2017
CD
City Secretary Contract Number Contract Time 12GD
Contract Date Days Charged to Date 120
Project Manager NA Contract is 100.00 Complete
Contractor SOLID ROCK
664 MANOR DR
ARGYLE, TX 76226
Inspectors DICKINSON / CAZORLA
Tuesday,April 18,2017 Page 1 of 4
City Project Numbers 100328 DOE Number 0328
Contract Name HERITAGE GLEN MEDICAL PARK Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 4/13/2017
Project Funding
WATER
Item Description of Items Estimated Estimated Completed Completed
No. P Unit Unit Cost P P
Quanity Total Quanity Total
--- -------- __
1 TRENCH SAFETY 76 LF $2.00 $152.00 76 $152.00
2 DUCTILE IRON WATER FITTINGS 0.063 TN $7,206.35 $454.00 0.063 $454.00
W/RESTRAINT
3 CONNECTION TO EXISTING 4"-12"WATER 2 EA $2,500.00 $5,000.00 2 $5,000.00
MAIN
4 12"CUT IN GATE VALVE 2 EA $3,400.00 $6,800.00 2 $6,800.00
5 12"X 6"TAPPING SLEEVE&VALVE 1 EA $5,500.00 $5,500.00 1 $5,500.00
6 6"WATER PIPE,SELECT BACKFILL 16 LF $40.00 $640.00 16 $640.00
7 FIRE HYDRANT 1 EA $5,140.00 $5,140.00 1 $5,140.00
8 1"WATER SERVICE 1 EA $2,500.00 $2,500.00 1 $2,500.00
9 2"WATER SERVICE 1 EA $3,000.00 $3,000.00 1 $3,000.00
Sub-Total of Previous Unit $29,186.00 $29,186.00
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No.
Quanity Total Quanity Total
1 TRENCH SAFETY 459 LF $1.00 $459.00 459 $459.00
2 8"SEWER PIPE 391 LF $55.00 $21,505.00 391 $21,505.00
3 4'MANHOLE 3 EA $5,500.00 $16,500.00 3 $16,500.00
4 4'DROP MANHOLE 1 EA $3,500.00 $3,500.00 1 $3,500.00
5 4'EXTRA DEPTH MANHOLE 9 VF $165.00 $1,485.00 9 $1,485.00
6 POST CCTV INSPECTION 106 LF $3.00 $318.00 106 $318.00
7 MANHOLE VACUUM TESTING 4 EA $100.00 $400.00 4 $400.00
8 6"SEWER SERVICE 2 EA $1,400.00 $2,800.00 2 $2,800.00
9 8"SEWER PIPE,SELECT BACKFILL 391 LF $10.00 $3,910.00 391 $3,910.00
Sub-Total of Previous Unit $50,877.00 $50,877.00
Tuesday,April 18,2017 Page 2 of 4
City Project Numbers 100328 DOE Number 0328
Contract Name HERITAGE GLEN MEDICAL PARK Estimate Number I
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 4/13/2017
Project Funding
Contract Information Summary
Original Contract Amount $80,063.00
Change Orders
Total Contract Price $80,063.00
��� Date ��rsTotal Cost of Work Completed $80,063.00
Cont&C or _ Less %Retained $0.00
-
D Net Earned $80,063.00
te�
Inspection Supervisor Earned This Period $80,063.00
Retainage This Period $0.00
Date 1 7 Less Liquidated Damages
Proj ct Manager
+� Days @ /Day $0.00
C Date �! I LessPavement Deficiency $0.00
Asst. it ctor/TPW-Infrastructure Design and Construction Less Penalty $0.00
CDate /za/�� Less Previous Payment $0.00
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $80,063.00
Tuesday,April 18,2017 Page 3 of 4
SURETEC INSURANCE COMPANY
9737 Great Hills Trail, Suite 320, Austin, Tx 78759
OWNER ❑
ARCHITECT ❑
CONSENT OF SURETY CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
OTHER ❑
BOND NO.: 4406395
TO OBLIGEE: Castle Equity LLC
(Name and Address) 751 Kroger Drive,Suite 124 CONTRACT FOR: Water,Sewer&
Fort Worth,TX 76244 Storm Sewer, Utility Work
PROJECT: Heritage Glen Office Park Lot 1 &2 CONTRACT DATED: June 21,2016
(Name and address) North Beach&Heritage Glen
Fort Worth,TX 76244
PRINCIPAL: Rock Solid,Inc.
At the request of the Obligee and the Principal indicated above, (Insert name and address of Surety)
SureTec Insurance Company, 9737 Great Hills Trail, Suite 320, Austin, TX 78759
, SURETY,
on bond of Rock Solid,Inc.,664 Manor Drive,Argyle,TX 76226
(Insert name and address of Contractor)
,CONTRACTOR,
and conditioned on the representation by Obligee that all Contract provisions relating to the payment
of final payment under the Contract have been satisfied by Principal as of the date of final payment,
and that no claims by Obligee or any third party are known or believed by Obligee or its
representatives to exist as of the date of final payment, representations as to the truth and accuracy
of the foregoing conditions being deemed to have been made by Obligee in connection with this
request for Consent of Surety, hereby approves of the final payment to the Principal,and agrees that
final payment in accordance with the terms hereof shall not relieve the Surety of its obligations to
(Insert name and address of Obligee)
Castle Equity, LLC, 751 Kroger Drive, Suite 124, Fort Worth, TX 76244
OBLIGEE,
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: April 4,2017
(Insert in writing the month followed by the numeric date and year.)
Su
`Signature O1z resentative)
Attest: Kirk D. Dryer,Attor ey-in-Fa
(Seal): (Printed name and t
roA#: 4221060
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company'), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston,Harris County, Texas, does by these presents
make,constitute and appoint
Frank Swingle,Warren Gravely,Jr.,Ed Veale,Chris W.Peterie,Matthew B.Elmore,Kirk D.Dreyer
its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute,acknowledge
and deliver any and all bonds,recognizances,undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for:
Four Million Dollars and no/100($4,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President,sealed with the corporate
seal of the Company and duly attested by its Secretary,hereby ratifying and confirming all that the said Attorney-in-Fact may do in the
premises. Said appointment shall continue in force until 05/18/2017 and is made under and by authority of the following
resolutions of the Board of Directors of the SureTec Insurance Company:
Be it Resolved,that the President, any Vice-President, any Assistant Vice-President,any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute,acknowledge and
deliver,any and all bonds,recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved,that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 206 of April,
1999.)
In Witness Whereof,SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seal
to be hereto affixed this 21st day of March,A.D.2013.
�xNunnunvao-�y SURETEC INSURANCE COMPANY
SUFiANe
�� X q By:
Lu m i D� John ox Jr: resident
tY.:t rp Za
State of Texas ss:
County of Harris
On this 21st day of March,A.D.2013 before me personally came John Knox Jr.,to me known,who,being by me duly sworn,did depose and say,that he
resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the
Board of Directors of said Company;and that he signed his name thereto by like order.
JACQUELYN MALDONADO
Notary Public VVV
state of Texas
OFYMy Comm.Exp.511812017 3acq elyrl Maldonado,Notary Public
My commission expires May 18,2017
1,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney,executed by said Company,which is still in full force and effect;and furthermore,the resolutions of the Board of Directors,set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston,Texre as this day of_ ( 1 A.D.
Bt Beaty,Assistant ec'reta�y__
Any instrument issued in excess of the penalty stated above is totally void and without any validity.
For verification of the authority of this power you may call(713)512-0600 any business day between$:0o'am and 5:00prn CST.
_
SureTec Insurance Company
THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION
Statutory Complaint Notice/Filing of Claims
To obtain information or make a complaint:You may call the Surety's toll free telephone number for information or to make a
complaint or file a claim at: 1-866-732-0099.You may also write to the Surety at:
SureTec Insurance Company
9737 Great Hills Trail, Suite 320
Austin,Tx 78759
You may contact the Texas Department of Insurance to obtain information on companies,coverage,rights or complaints at 1-800-252-
3439.You may write the Texas Department of Insurance at
PO Box 149104
Austin,TX 78714-9104
Fax#: 512-490-1007
Web:http://w���v.tdi.state.tx.us
Email:ConswnerProtection@tdi.texas.gov
PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim,you should contact the
Surety first. If the dispute is not resolved,you may contact the Texas Department of Insurance.
Texas Rider 06042014 1
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me,the undersigned authority,a notary public in the state
and county aforesaid,on this day personally appeared Heather Cook,
President Of Rock Solid Inc.,known to me to be a credible person,who
being by me duly sworn,upon his oath deposed and said;
That all persons,firms,associations,corporations,or other
organizations furnishing labor andlor materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
City Project#100328; CFA#2016-051/Heritage Glen Office Park
BY tir L7%'
Subscribed and sworn before me on this date 27th of March, 2017.
THOMAS TODAR
:Notary Public,State of Texas
v
Notary Public ; t comm.Expires 04-01-2020
Tarrant County, Texasfill , Notary ID 130603300
li
I
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Heritage Glen Medical Park
PROJECT NUMBER: 100328
DOE NUMBER:
WATER
PIPE LAID SIZE TYPE OF PIPE LF
FIRE HYDRANTS: 1 VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
l`� Qty
'211
En
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
8" PVC 391
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817) 392-7941 •Fax: (817)392-7845
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 4/17/2017
Name of Contractor Project Name
Solid Rock,LLC Heritage Glen Medical Park
DOE Inspector Project Manager
Adilda Cazorla Aaron Lon
DOE Number Project D ffculhv Type of Contract
CP# 100328 O Simple QQ Routine Q Complex [71 Water 2] Waste Water Storm Drainage0 Pavement
Initial Contract Amount Final Contract Amount
$80,063.00 $80,063.00
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) J (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism J 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution U PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Pa ments 4 Resolution of Utility Conflicts y
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS& SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fat: (817) 392-7845
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Rock Solid,Inc Heritage Glen Medical Park
DOE Inspector DOE Number
Adilda Cazorla CP# 100328
DOEInspector Project Manager
❑✓ Waterer Waste Water❑ Storm Drainage❑ Pavement Aaron Long
Initial Contract Ansount ProjectDffculty
O Simple QQ Routine Q Complex
Final Contract Amount Date
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 N
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 N
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 N
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 366
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 366
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 388
Rating([TS I MS] * 100%) 366 / 388 = 94%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector / Signature Contractor /,41/
Signature DOE Inspector's Supervisor
✓�o�����
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
E � The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817) 392-7941 •Fax: (817)392-7845
FORTWORTH rev 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Heritage Glen Medical Park
PROJECT NO.: 100328 CONTRACTOR: Solid Rock,LLC
DOE NO.:
PERIOD FROM; TO: FINAL INSPECTION DATE: 14-Feb-17
WORK ORDER EFFECTIVE:9/12/2016 CONTRACT TIME: 120Q WRQ CD
DAY OF DAYS CHARGED REASON FOR DAYS DAY OF DAYS CHARGED REASON FOR DAYS
MONTH DURING CREDITED MONTH DURING CREDITED
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS
THIS
PERIOD 0
PREVIOUS
120
PERIOD
TOTALS
120
TO DATE
*REMARKS:
A
CONT CTOR DATE S CTO DATE
_ ENGINEERING DEPARTMENT
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817) 392-7941 •Fax: (817)392-7845