NOTICE OF PROJECT COMPLETION
(Developer Projects)
FA S'e,n n ez �l l s,� City Project Ns: 100472
#f/9 334
Regarding contract for WEST FORK RANCH PHASE 6A-PAVING&STREET LIGHTS as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through
M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
Original Contract Price: $437,874.60
Amount of Approved Change Orders: N21
Revised Contract Amount: $437,874.60
Total Cost Work Completed:
4114 0- kPt-td 6 J-z 7
Recommended for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
Accepted ` Date
_Director,
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
!Z
Asst. City Manager Department of TPW Const. Services
CPN#,&��t— D to
Project Manager -------
Risk Management S. Can �-
v j OFFICIAL RECORD
D.O:E. Brotherton
Water V. Gutzier -- ' CITY SECRETARY
CFS I-4anie orales/Scanned ❑ FT.WORTH,TX
The P occeding pcoble have been Contacted concerning the request
for final payment&have released this project for such payment.
Rev.9/22/16 Clearance Conducted Ry Etta Bac _ +
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name WEST FORK RANCH PHASE 6A
Contract Limits
Project Type PAVING&ST LIGHT
City Project Numbers 100472
DOE Number 0472
Estimate Number 1 Payment Number 1 For Period Ending 6/16/2017
CD
City Secretary Contract Number Contract Time 18(rD
Contract Date Days Charged to Date 138
Project Manager NA Contract is 100.00 Complete
Contractor GILCO CONTRACTING,INC.
6331 SOUTHWEST BLVD.
BENBROOK, TX 76132-1063
Inspectors LAYER / MATTEGAT
Monday,June 12,2017 Page 1 of 4
City Project Numbers 100472 DOE Number 0472
Contract Name WEST FORK RANCH PHASE 6A Estimate Number I
Contract Limits Payment Number I
Project Type PAVING&ST LIGHT For Period Ending 6/16/2017
Project Funding
PAVING&STREET SIGNS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 6"CONC PVMT 9138 SY $33.20 3303,381.60 9138 $303,381.60
2 6"LIME TREATMENT 10052 SY $2.90 $29,150.80 10052 $29,150.80
3 HYDRATED LIME 180.93 TN $153.28 $27,732.95 180.93 $27,732.95
4 BARRIER FREE RAMP 6 EA $1,900.00 $11,400.00 6 $11,400.00
5 TRAFFIC CONTROL DETAILS 3 EA $500.00 $1,500.00 3 $1,500.00
6 REMOVE STREET BARRICADES&CONNECT 3 EA $500.00 $1,500.00 3 $1,500.00
TO EX
7 CONSTRUCT STD HEADER&INSTALL 1 EA $2,000.00 $2,000.00 1 $2,000.00
BARRICADE
8 REFL RAISED MARKER 20 EA $35.00 $700.00 20 $700.00
9 4"CONC SIDEWALK 286 SF $35.00 $10,010.00 286 $10,010.00
10 STREET NAME BLADES 5 EA $245.00 $1,225.00 5 $1,225.00
Sub-Total of Previous Unit $388,600.35 $388,600.35
ST LIGHT
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 RDWY ILLUM ASSEMBLY 12 EA $2,355.00 $28,260.00 12 $28,260.00
2 INSTALL MAST ARM 40'-48' 12 EA $1,085.00 $13,020.00 12 $13,020.00
3 6-6-6 TRIPLEX ALUM ELEC CONDUCTOR 765 LF $2.30 $1,759.50 765 $1,759.50
4 2"CONDT PVC SCH 80 765 LF $8.15 $6,234.75 765 $6,234.75
Sub-Total of Previous Unit $49,274.25 $49,274.25
Monday,June 12,2017 Page 2 of 4
City Project Numbers 100472 DOE Number 0472
Contract Name WEST FORK RANCH PHASE 6A Estimate Number I
Contract Limits Payment Number I
Project Type PAVING&ST LIGHT For Period Ending 6/16/2017
Project Funding
Contract Information Summary
Original Contract Amount $437,874.60
Change Orders
Total Contract Price $437,874.60
Y/ Date /�- Total Cost of Work Completed $437,874.60
Contractor / Less %Retained $0.00
Date �l z��' Net Earned $437,874.60
Earned This Period $437,874.60
Inspection Supervisor
Retainage This Period $0.00
Date 417 Less Liquidated Damages
P ject Man er
Days @ /Day $0.00
GDate Z� I� LessPavement Deficiency $0.00
Assn
ss. 'rector/TPW-Infrastructure Design an Cons uctibn Less Penalty $0.00
Z—) Date 7 Less Previous Payment $0.00
Director/ ontracting Department Y Plus Material on Hand Less 15% $0.00
Balance Due This Payment $437,874.60
Monday,June 12,2017 Page 3 of
City Project Numbers 100472 DOE Number 0472
Cont►•act Name WEST FORK RANCH PHASE 6A Estimate Number I
Conti-act Limits Payment Number I
Project Type PAVING&ST LIGHT For Period Ending 6/16/2017
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors LAYER / MATTEGAT Contract Date
Contractor GILCO CONTRACTING,INC. Contract Time 180 CD
6331 SOUTHWEST BLVD. Days Charged to Date 138 CD
BENBROOK, TX 76132-1063 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $437,874.60
Less %Retained $0.00
Net Earned $437,874.60
Earned This Period $437,874.60
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $437,874.60
Monday,June 12,2017 Page 4 of 4
Liberty Interchange Corporate Center
Mutual 450 Plymouth Road,Suite 400
Plymouth Meeting,PA 19462-1644
SURETY Ph.(610)832-8240
CONSENT OF SURETY TO FINAL PAYMENT
TO: Pulte Homes of Texas,LP
4800 Regent Blvd.,Suite 100,Irving,TX 75063
City of Fort Worth
200 Texas Street,Fort Worth,TX 76102
RE: Bond Number 022056013
Principal: Gilco Contracting,Inc.
Obligee: Pulte Homes of Texas,LP and the City of Fort Worth
Contract Number: Contract Date: September2016
Contract/Project Description:
West Fork Ranch Phase 6A-Paving,Street Lighting and Street Sign Improvements
Water Project#59601-0600430-100472-001580,Sanitary Sewer Project#59607-0700430-100472-001380,City Project#100472, File#'s X-23761 and W-2424
In accordance with the provisions of the contract between the Obligee and the Principal described above,
LIBERTY MUTUAL INSURANCE COMPANY, a Massachusetts stock insurance company, as Surety (the "Surety"),
on the Principal's bond number 022056013 (the "Bond") hereby consents to the final payment to
the Principal by the Obligee and agrees that final payment to the Principal shall not relieve the Surety of any of its
obligations to Obligee as set forth in the Bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand and seal this 12th day of May
2017
LIBERTY MUTUAL INSURANCE COMPANY
(Suret ) - " `
L161
W
By: (Seal)
Del.ene Marshall,Attorney-in-Fact
LMIC-3100 Rev.03/04
Y
THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND.
This Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated.
t Certificate No.7662991
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS:That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire,that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly
organized under the laws of the State of Indiana(herein collectively called the"Companies'),pursuant to and by authority herein set forth,does hereby name,constitute and appoint,
Don E Cornell'Kelly A Westbrook'Ricardo J Reyna'Bobbi Morales'Sophinie Hunter'Tina McEwan•V. DeLene Marshall
all of the city of Dallas state of TX each individually if there be more than one named,its true and lawful attorney-in-fact to make,execute,seal,acknowledge
and deliver,for and on its behalf as surety and as its act and deed,any and all undertakings,bonds,recognizances and other surely obligations,in pursuance of these presents and shall
be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons.
IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
theretothis 10th dayof March 2017
Rf
�t°r iNst,�
The Ohio Casualty Insurance Company
y �
�; r' G F• V t '�
Liberty Mutual Insurance Company m
7979 } 1912 1991 s =
w West/American Insurance Company N
U! 3y '"gat=•� sy J'--nctr.>5= '+rn..,:^ �7 �
d
= STATE OF PENNSYLVANIA ss David M.Carey,Assistant Secretary
COUNTY OF MONTGOMERY _
On this 10th day of March 2017 before me personally appeared David M.Carey,who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance v}—
U N Company,The Ohio Casualty Company,and West American Insurance Company,and that he,as such,being authorized so to do,execute the foregoing instrument for the purposes >W
p2 therein contained by signing on behalf of the corporations by himself as a duly authorized officer. O
� L E
N > IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at King of Prussia,Pennsylvania,on the day and year first above written. O
N PAs, COMMONWEALTH OF PENNSYLVANIA Q M
oiµaNw�gtF{{ Notarial Seal 0 d
Teresa Pasteila,Notary Public By: —
C L of I Upper MerionTwp.,Montgomery County Teresa Pastella,Notary Public
�� My Commission Expires March 28,2021 3
VP ♦ E
r O yDrARY �y�' Member.Pennsylvania Association of Notarios IL
t0
CThis Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual 0 p
tU y Insurance Company,and West American Insurance Company which resolutions are now in full force and effect reading as follows:
OS
W ARTICLE IV-OFFICERS-Section 12.Power of Attorney.Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President,and subject O r-
01-
0)
0) to such limitation as the Chairman or the President may prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute,seal, y
O S acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attorneys-in-Fact,subject to the limitations set forth in their respective
E 6 powers of attorney,shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so 'Ry m
0 m executed,such instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attorney-in-fact under >c
4 the provisions of this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or authority. N
C ARTICLE XIII—Execution of Contracts—SECTION 5.Surety Bonds and Undertakings.Any officer of the Company authorized for that purpose in writing by the chairman or the president, E
> ;v and subject to such limitations as the chairman or the president may prescribe,shall appoint such attomeys-in-fact,as may be necessary to act in behalf of the Company to make,execute, L M
O seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in their O o
Z v respective powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so _
executed such instruments shall be as binding as if signed by the president and attested by the secretary. O
Certificate of Designation—The Presidentof the Company,acting pursuant to the Bylaws of the Company,authonzes David M.Carey,Assistant Secretary to appoint such attorneys-in- ~r
fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety
obligations.
Authorization—By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company,wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds,shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do
hereby certify that the original power of attorney of which the foregoing is a full,true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and
has not been revoked. 1
IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this day of . 20
o.�K11 INSU . T`iNS utrq it"s
y'tib 4ICR9Y "Yn .J w�(t`rf7fv�fF�(-•fi CSC•dpi Ci29>��F� 1��'� {
0 1919 > 1912 ° 1991 By:
Renee C.Llew ssistant Secretary
J/y`r'Y`Att,FS'<?C 1 JJ�i)�s:rtniF>•-�sy��' y '7r�a:1� Y
153 of 300
LMS-1 2873022017
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Rob Taylor, Project
Coordinator of Gilco Contracting, Inc., known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Paving and Street Light Improvements to serve:
West Fork Ranch, Ph. 6A
BY Rob Taylor
Subscribed and sworn before me on this 1 lth of May 2017.
Notary Public
Tarrant County, TX
MARY PANNELL
1�pY PSN �
_; �=Notary Public,State of Texas
Comm. Expires 10-19-2018
Notary ID 5144239
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Ab Grantges,
Contract Mgr, Of Burnsco construction, Inc., known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
West Fork Ranch 6A - Water, Sanitary Sewer and Storm Drain
BY
Ab Grantges, on ract Manager
Subscribed and sworn before me on this date 19th of June, 2017.
*Notary Public
=t0b
4EIA MG6IUIEN
Tarrant County, Texas ;Notary Public, state of TexasF Comm.Expires 06-26-2018 Notary ID 125446481
tPutte
May 11, 2017
Mr. Dale Gilreath
Gilco Contracting, Inc.
6331 Southwest Blvd.
Benbrook,Texas 76132
Re: West Fork Ranch, Ph. 6A
Paving,and Street Light Improvements
CoFW Project No. 100472
CoFW File No. X-23761 and W-2424
Dear Mr. Gilreath:
This letter will document that Pulte Homes of Texas confirms that Gilco Contracting, Inc. has completed
the Work associated with the above-referenced contract in an appropriate time frame,subject to
completion of any warranty or maintenance work as identified and required by the City of Fort Worth,
and that no liquidated damages will be assessed by Pulte Homes of Texas in connection with the Work.
Pulte Homes of Texas
Curt M. Millward
Manager of Land Development
Pulte Group
Cc: Patrick Buckley, City of Fort Worth
May 15, 2017
City of Fort Worth
CFA Administration
1000 Throckmorton St.
Fort Worth, TX 76102
RE: Final Waiver of Lien; Paving& Street Lights Improvements to serve West Fork
Ranch Phase 6A
City Project#100472
File No. W-2424
File No. X-23761
The purpose of this letter is to acknowledge that we have been paid in full by Pulte
Homes of Texas, LP for the public improvements constructed to serve West Fork Ranch,
Phase 6A in Fort Worth, Texas. As a result,we hereby waive,release and relinquish all
rights to assert any claim or demand for lien in connection with this project.
Please feel free to contact me with any questions you may have.
Sincerely,
Rob Taylor
Project Coordinator
6331 Southwest Blvd.
Benbrook, Texas 76132
Office: 817.735.1600
Fax: B 17.735.1613
FORTWORTHREV:0212210'
r
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
11)PROJECT INFORMATION Date: 16 19 2017
Name of Contractor Project Name
Gilco Contracting West Fork Ranch Phase 6A
DOE Inspector Project Manager
William Mattegat Aaron Long s
DOENumber JProjectDifficully Type of Contract
CPN 100472 10 Simple Q Routine Q Complex ❑ Water❑ waste water[] Storm Drainage[Z] Pavement
Initial Contract Amount Final Contract Amount
$437,874.60 $437,874.60
In PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts LI
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
L
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Superv'sor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
n F The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
FORTWORTH REV 8,20,16
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Gilco Contracting West Fork Ranch Phase 6A
Inspector City Project Number
William Mattegat 100472
CONSMICh071 Components Project Manager
❑ Water❑ Waste Water❑ Storm Drainage[2] Pavement Aaron Long
Initial Contract Amount ProjectDifJiculty
$437,874.60 Q Simple Routine Q Complex
Final Contract Amount Date
$437,874.60 16192017
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 N
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 2 20 10
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 N
12 After Hours Response 5 N
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 363
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 363
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 388
Rating(ITS/MS] * 100%) 363 / 388 = 94%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%_Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector Signature Contractor Signature
L
Inspector's Supervisor S' ature
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 8851 Camp Bowie West Blvd. •Fort Worth,TX 76116 • (817)392-8306
FORTWORTH rev 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: West Fork Ranch phase 6A
PROJECT NO.: 100472 CONTRACTOR: Gilco Contracting
DOE NO.:
PERIOD FROM:01/26/17 TO: 06/16/17 FINAL INSPECTION DATE: 16-Jun-17
WORK ORDER EFFECTIVE:1/26/2017 CONTRACT TIME: 180 0 WR* CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS
THIS
PERIOD
PREVIOUS
PERIOD
TOTALS
TO DATE 13 8 13 8