HomeMy WebLinkAboutContract 48283-FP2 FO RT WO RT H. CIN SECRETARY�?U
, _
--.•.1 CONTRACT N0. 3r`I
TRANSPORTATION AND PUBLIC WORKS
NOTICE OF PROJECT COMPLETION
(Developer Projects)
-�/ //n City Project Ns: 100326
V"1 t 4 l &11 )qt tau
Regarding contract 100326 for MORNINGSTAR SECTION 6,PHASE 2 as required by the
TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Contract Price: $347,462.50
Amount of Approved Change Orders: NQ
Revised Contract Amount:
Total Cost Work Completed: $347,462.50
Record ended for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
Accepted y Date
Asst. Director, TRANSPORTATION & PUBLIC WORKS
Asst. City Manager Department f T W Const. Services Date
CPN# Da ?
Project anager 4
Risk Management S. Cana
Comments: D.O.E. Brotherton —'
Water V. Gutzier �
CFA J ie b rales/Scanne ❑ OFFICIAL RECORD
The oceeding people have been Contacted concerning the request
CITY SECRETARY
Pr
for final payment&have released this project for such payment. FT.WORTHS TX
Rev.9/22/16 Clearance Conducted By Etta Bac
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name MORNINGSTAR SECTION 6 PHASE 2
Contract Limits
Project Type PAVING
City Project Numbers 100326
DOE Number 0326
Estimate Number I Payment Number I For Period Ending 5/17/2017
CD
City Secretary Contract Number Contract Time 10aD
Contract Date Days Charged to Date 251
Project Manager NA Contract is 100.00 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors LAYER / HOUSTON
Wednesday,May 17,2017 Page I of 4
City Project Numbers 100326 DOE Number 0326
Contract Name MORNINGSTAR SECTION 6 PHASE 2 Estimate Number I
Contract Limits Payment Number 1
Project Type PAVING For Period Ending 5/17/2017
Project Funding
PAVING
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 6"CONC PVMT 8133 SY $35.50 $288,721.50 8133 $288,721.50
2 6"LIME TREATMENT 8662 SY $3.00 $25,986.00 8662 $25,986.00
3 HYDRATE LIME 130 TN $175.00 $22,750.00 130 $22,750.00
4 4"CONCRETE SIDEWALK 300 SF $5.00 $1,500.00 300 $1,500.00
5 BARRIER FREE RAMP 2 EA $1,000.00 $2,000.00 2 $2,000.00
6 FURNISH&INSTALL GROUND MOUNT SIGN 8 EA $650.00 $5,200.00 8 $5,200.00
POST AND SIGN
7 REFL RAISED MARKER 116 EA $5.00 $580.00 116 $580.00
8 STREET BARRICADE 29 LF $25.00 $725.00 29 $725.00
Sub-Total of Previous Unit $347,462.50 $347,462.50
Wednesday,May 17,2017 Page 2 of 4
City Project Numbers 100326 DOE Number 0326
Contract Name MORNINGSTAR SECTION 6 PHASE 2 Estimate Number I
Contract Limits Payment Number I
Project Type PAVING For Period Ending 5/17/2017
Project Funding
Contract Information Summary
Original Contract Amount $347,462.50
Chante Orders
Total Contract Price $347,462.50
�Al Date 6 S ^ Total Cost of Work Completed $347,462.50
Contracto Less %Retained $0.00
Net Earned $347,462.50
Date W
Ins ctio� ervi or Earned This Period $347,462.50
aw
� Retainage This Period $0.00
DateV Less Liquidated Damages
Pro ect Ma a r
/� Days @ /Day $0.00
VI Date Z LessPavement Deficiency $0.00
AnczI�j
PW--brfr structure Design and/ ons ruction Less Penalty $0.00
C-J `^ Date -7t 3 Less Previous Payment $0.00
Director/ ontracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $347,462.50
Wednesday,May 17,2017 Page 3 of 4
City Project Numbers 100326 DOE Number 0326
Contract Name MORNINGSTAR SECTION 6 PHASE 2 Estimate Number I
Contract Limits Payment Number I
Project Type PAVING For Period Ending 5/17/2017
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors LAYER / HOUSTON Contract Date
Contractor CONATSER CONSTRUCTION TxLP Contract Time 100 CD
5327 WICHITA ST Days Charged to Date 251 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $347,462.50
Less %Retained $0.00
Net Earned $347,462.50
Earned This Period $347,462.50
Retainage This Period $0.00
Less Liquidated Damages
0 Days $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $347,462.50
Wednesday,May 17,2017 Page 4 of 4
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Construction TX, LP, known to me to be a credible person, who
being by me duly sworn, upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
MORNINGSTAR, SECTION 6,PHASE 2
PAVING IMPROVEMENTS
DOE#: N/A
CFA PRJ#: N/A
CITY PROJCT #: N/A
CITY OF FORT WORTH
STATE OF TEXAS
CONATS CONSTRUCTION TX, LP
Brock Huggins
Subscribed and sworn to before me this 17'' day of May, 2017.
20 " Notary Public in Tarrant County, Texas
5 ErRTHA GIANULIS
N NpiOfY PUbga,State pf Texas
i;z rc MY Gornmisoon EX I
z�,• � Ares
`!ptember 18, 2019
p
CONSENT OF OWNER ❑❑
SURETY COMPANY ARCHITECT
TO FINAL PAYMENT SURETYOCONTRACTOR
Conforms with the American Institute of OTHER
Architects, AIA Document G707
Bond No 0201470
PROJECT:
(name, address)Morningstar Section 6, Phase 2
Fort Worth,TX
TO (Owner)
FG ALEDO DEVELOPMENT LLC&THE CITY OF ARCHITECT'S PROJECT N0:
FORT WORTH CONTRACT FOR:
3045 Lackland Blvd. Paving Improvements for Morningstar-Section 6, Phase 2
Fort Worth TX 76116 _J CONTRACT DATE:
CONTRACTOR: CONATSER CONSTRUCTION TX, L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here Insert name and address of Surety Company)
BERKLEY INSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bond of (here insert name and address of Contractor)
CONATSER CONSTRUCTION TX, L.P.
5327 Wichita St.
Fort Worth TX 76119-6035 , CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here Insert name and address of Owner)
FG ALEDO DEVELOPMENT LLC&THE CITY OF FORT WORTH
3045 Lackland Blvd.
Fort Worth TX 76116 , OWNER,
as set forth in the said Surety Company's bond,
IN WITNESS,WHEREOF,
the Surety Company has hereunto set its hand this 17th day of May,2017
BERKLEY INSURANCE COMPANY
Surety Company
Attest, �
(Seal): Signature of Authorized Representative
_Robbi Morales _ Attorney-in-Fact
Title
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
No.BI-72808
POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON,DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
roorganized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT,has made, constituted
and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell; Vena DeLene
- OMarshall, Sophinie Hunter; Robbi Morales; Kelly A. Westbrook; or Tina McEwan of Aon Risk Services Southwest, Inc. of
cvDallas, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal,
acknowledge and deliver any and all bonds and undertakings,with the exception of Financial Guaranty Insurance,providing that no
cd -single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the same extent as if such bonds
shad been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own
proper persons.
E
This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
owithout giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010:
E c RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief
Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
o Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to
execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
3 corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
n attorney-in-fact and revoke any power of attorney previously granted;and further
RESOLVED,that such power of attorney limits the acts of those named therein to the bonds,undertakings,recognizances, or
other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner
and to the extent therein stated;and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and
0c° further
on
n .E RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
• : R power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
0 3 other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as
7 though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
operson or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
Y c
o IN WITNESS WHEREOF, the Comp ny has caused these presents to be signed and attested by its appropriate officers and its
o b corporate seal hereunto affixed thisday of 2016.
Attest: Berkley Insurance Company
o (Seal) By f GGl ISnioir
o Ira S. Lederman after
Executive Vice President& Secretary V President
o. v
WARNING:THIS POWER INVALID IF NOT PRINTED ON BLUE"BERKLEY"SECURITY PAPER,
d o STATE OF CONNECTICUT)
N ) ss:
o COUNTY OF FAIRFIELD
Z'u� 2016, by Ira S. Lederman and
� ,� Sworn to before me, a Notary Public in the State of Connecticut, this 2 day o ,
r. � Jeffrey M. Hafter who are sworn to me to be the Executive Vice President and Secretary, and e Senior Vice President,
r. N respectively, of Berkley Insurance Company.MARIAC.RUNDBAKEN
d NOTARY PUBLIC r�r/�ld�
° MY COMMISSION EXPIRES Notary Public, State of Connecticut
APRIL 30,2019
`E CERTIFICATE
I, the undersigned, Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY CERTIFY that the foregoing is a true, correct
d v and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded and that the authority of the
Attorney-in-Fact set forth therein,who executed the bond or undertaking to which this Power of Attorney is attached,is in full force and effect as
of this date.
Given under my hand and seal of the Company,this 17 thday of May
(Seal)
Vincent P.Torte
FORTWORTHREV:02,22,07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 6/13/2017
Name of Contractor Project Nante
Conatser Construction TX,L.P. Morningstar Section 6 Phase 2
DOE Inspector Project Manager
Garey Houston Pat Buckley
DOENumber rojectDiculty Type of Contract
100326 10 Simple OO Routine_ O Complex ❑Water ❑Waste Water ❑ Storm Drainage [A Pavement
Initial ContractAmount Final ContractAmount
$347,462.50 $347,462.50
H)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
CEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector y 2 Clarity&Sufficiency of Details V
3 Accuracy of Measured Quantities k1 3 Applicability of Specific t/
4 Display Of Professionalism N 4 Accuracy of Plan Quantities k
5 Citizen Complaint Resolution If PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs ti 1 Knowledge And/Or Problem Resolution y
ADMINISTRATION 2 Availability of Project Manager y
1 Change Order Processing Time y 3 Communication Y
2 Timliness of Contractor Payments y 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe 4/
HI)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
(a The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
n CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Conatser Construction TX,L.P. Morningstar Section 6 Phase 2
DOE Inspector DOE Number
Garey Houston 100326
DOE Inspector Project Manager
❑water ❑waste Water ❑Storm Drainage 0 Pavement Pat Buckley
Initial Contract Amount Project Dii ficidty
$347,462.50 O Simple OO Routine O Complex
Final Contract Amount Date
$347,462.50 6/13/2017
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 1 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 448
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 448
II1)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(ITS/MS] * 100%) 448 / 448 = 100%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector _f Signature Contractor
Signature DOE Inspector's Supervisor � � �
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORDS
__^ The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
FoRTWORTH rev 03/05/07
�l���
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO. 1
NAME OF PROJECT: Morningstar Section 6 Phase 2
PROJECT NO.: 100326 CONTRACTOR: Conatser Constrction
DOE NO. N/A
PERIOD FROM 09/12/16 TO: 06/13/17 FINAL INSPECTION DATE: 13-Jun-17
WORK ORDER EFFECTIVE 9/12/2016 CONTRACT TIME 100 O WD O CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGDURINED
CREDITED MONTH DURING CREDITED
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS 0 0 0 0 269 269
PERIOD
PREVIOUS 0 0 0 0 0 0
PERIOD
TOTALS 0 0 0 0 269 269
TO DATE
*REMARKS:
CONTRACTOR DATE INSPEOUR DATE
ENGINEERING DEPARTTIENT
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845