CITY SECRETARYw3/� CONTRACT N0. �_ CITY SECRETARY D.O.E. FILE FORTWORTH CONTRACTOR'S BONDING CO. CONSTRUCTION'S COPY CLIENT DEPARTMENT PROJECT MANUAL FOR THE CONSTRUCTION OF RECENED Trinity Park Road and Parking Improvements JL 1, X11 CON FORT WORTH City Project No.02735 MY SECRETARY Betsy Price David Cooke Mayor City Manager Richard Zavala Director, Park and Recreation Department Prepared for The City of Fort Worth Park and Recreation Department 2017 ix�rs p. ��,cicy By: Neel-Schaffer, Inc. NEEL mSCHAFFER Solutions you can build upon Texas Reg. No. F-2687 FOtFFIC.IAL RECORD CY IICRETARY FT.WORTH,'ITC FC►RT WORTHe City of Fort Worth Standard Construction Specification Documents Adopted September 2011 000000-1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 2 SECTION 00 00 00 TABLE OF CONTENTS Division 00- General Conditions 00 05 10 Mayor and Council Communication 00 05 15 Addenda 0011 13 Invitation to Bidders 0021 13 Instructions to Bidders 0035 13 Conflict of Interest Affidavit 00 41 00 Bid Form 00 42 43 Proposal Form Unit Price 00 43 13 Bid Bond 00 43 37 Vendor Compliance to State Law Nonresident Bidder 00 45 14 Bidder's Statement of Qualifications 00 45 26 Contractor Compliance with Workers'Compensation Law 00 45 40 Minority Business Enterprise Goal 00 45 41 Small Business Enterprise Goal 00 52 43 Agreement 0061 13 Performance Bond 0061 14 Payment Bond 0061 19 Maintenance Bond 00 61 25 Certificate of Insurance 00 72 00 General Conditions 00 73 00 Supplementary Conditions Division 01 - General Requirements 01 1100 Summary of Work 01 2500 Substitution Procedures 01 31 19 Preconstruction Meeting 01 31 20 Project Meetings 01 3216 Construction Progress Schedule 01 3233 Preconstruction Video 01 3300 Submittals 01 35 13 Special Project Procedures 01 45 23 Testing and Inspection Services 01 50 00 Temporary Facilities and Controls 01 55 26 Street Use Permit and Modifications to Traffic Control 01 57 13 Storm Water Pollution Prevention Plan 01 58 13 Temporary Project Signage 01 60 00 Product Requirements 01 66 00 Product Storage and Handling Requirements 01 70 00 Mobilization and Remobilization 01 7123 Construction Staking and Survey 01 74 23 Cleaning 01 77 19 Closeout Requirements 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised February 2,2016 000000-2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 2 Division 02- Existing Conditions 0241 13 Selective Site Demolition 0241 14 Utility Removal/Abandonment 0241 15 Paving Removal Division 03- Concrete 03 30 00 Cast-In-Place Concrete Division 26-Electrical 26 05 33 Raceways and Boxes for Electrical Systems Division 31 -Earthwork 31 1000 Site Clearing 3123 16 Unclassified Excavation 31 24 00 Embankments 31 25 00 Erosion and Sediment Control 31 37 00 Riprap Division 32-Exterior Improvements 32 11 23 Flexible Base Courses 32 11 29 Lime Treated Base Courses 32 11 33 Cement Treated Base Courses 32 12 16 Asphalt Paving 3213 13 Concrete Paving 32 13 20 Concrete Sidewalks,Driveways and Barrier Free Ramps 32 16 13 Concrete Curb and Gutters and Valley Gutters 32 17 23 Pavement Markings 3291 19 Topsoil Placement and Finishing of Parkways 32 92 13 Hydro-Mulching, Seeding,and Sodding Division 33- Utilities 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 33 49 40 Storm Drainage Headwalls and Wingwalls Division 34- Transportation 34 41 30 Aluminum Signs 3471 13 Traffic Control Appendix Construction Details Geotechnical Report GC-6.07 Wage Rates END OF SECTION CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised February 2,2016 C-28231 C CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos,1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-183876 Raydon, Inc. Breckenridge,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party tot the contract for which the form is 03/28/2017 being filed. City of Ft.Worth Date Acknowledd: I/ i;),Al 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. CO2735 Road&Parking Improvements for Trinity Park Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary 5 Check only if there is NO Interested Party. X 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct, ,NdNNI„� r• SHELLEY ANNE JACKSON �Y L Notary Public,State of i®xas \-ftw, Comm.Expires 01-20.2020 �Of N,�rr Notary ID 13050365 Signature f authorized agent bf contracting business entity AFFIX NOTARY STAMP/SEAL ABOVEM&C0.03X& Sw and subscribed before me,by the said vm-day ,this the of w&, 21 ,to certify which,witness my hand and seal of office. Signature o offic I administering oath Printed name oJofficer administering oath Tide of offic r administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883 M&C Review Page 1 of 3 official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA Fo> „ COUNCIL ACTION: Approved on 5/9/2017 -Ordinance No. 22716-05-2017 DATE: 5/9/2017 REFERENCE NO.: **C-28231 LOG NAME: 80TRINITYPARK RD&PARKING CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Transfer of Funds from the Special Purpose Fund to the Special Donations Capital Projects Fund, Authorize Execution of Construction Contract with Raydon, Inc., in the Amount of$425,181.80 for Road and Parking Improvements in Trinity Park and Provide for Additional Project Costs and Contingencies in the Amount of$61,521.16 for a Total Construction Cost of$486,702.96 and Adopt Appropriation Ordinance (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council: 1. Authorize a transfer in the amount of$90,000.00 from the Special Purpose Fund to the Special Donations Capital Projects Fund for the purpose of funding road and parking improvements in Trinity Park; 2. Adopt the attached appropriation ordinance increasing the receipts and appropriations in the Special Donations Capital Projects Fund in the amount of$90,000.00; and 3. Authorize the City Manager to execute a construction contract with Raydon, Inc., in the amount of $425,181.80 for road and parking improvements at Trinity Park. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize the award and execution of a construction contract with Raydon, Inc., in the amount of$425,181.80 for the construction of road and parking improvements in Trinity Park. Total appropriations are summarized below: Project Appropriations Source MBC Current Proposed Total Appropriations 39302 - Gas Well Revenue G-18586 $475,552.96 $475,552.96 30105 - Special Donations Capital Projects Fund $90,000.00 $90,000.00 Total $565,552.96 On September 29, 2015, (M&C G-18586)the City Council authorized and appropriated the Park and Recreation Department's(PARD) Fiscal Year 2016 Gas-Related Revenue and Park Mitigation Fees Project Expenditure Plan in the amount of$1,515,847.85. As part of this plan, $472,839.78 in bonus and $2,713.18 in mitigation, totaling $475,552.96 was appropriated for Trinity Park. As part of the recommendation in this M&C, the PARD is requesting an additional $90,000.00 in Special Donations Capital Project Funds received from Mayfest contract payments to leverage current project funds in order to award construction contract and cover administrative costs during construction.(inspection, labs, contingencies). http://apps.cfwnet.org/council_packet/mc review.asp?ID=24543&councildate=5/9/2017 5/10/2017 M&C Review Page 2 of 3 On August 16, 2016, (M&C C-27875) the City Council authorized the execution of a Professional Services Agreement with Neel-Schaffer, Inc., in the amount of$78,850.00 for the design and preparation of construction documents for road and parking improvements at Trinity Park. Upon completion of the design, development plans and construction documents, the project was advertised for bids on February 9, 2017 and February 16, 2017 in the Fort Worth Star-Telegram. On March 9, 2017, the following bids were received and tabulated: Bidder Base Bid Total Raydon, Inc. $425,181.80 Advanced Paving $513,144.00 The Fain Group, Inc. $516,601.00 H.D. Cooks Roak Solid, Inc. $530,368.50 Fort Worth Civil Constructors, $657,709.00 LLC Improvements include the removal and re-use(as base material) of existing asphalt on Trinity Park Court, miscellaneous replacement of concrete curb and gutter, placement of HMAC paving for Trinity Park Court and construction of new asphalt parking lot with miscellaneous concrete curb and gutter. There will be no annual maintenance impact for this project. Construction is anticipated to commence in June-2017 and be completed by September 2017. Contract time is 90-calendar days. M/WBE OFFICE: Raydon, Inc., is in compliance with the City's BDE Ordinance by committing to 11 percent MBE participation. The City's MBE goal on this project is 10 percent. The park is located in COUNCIL DISTRICT 9. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of the Special Donations Capital Projects Fund and the PACS Gas Lease Capital Project Legacy Fund. TO Fund I Department I Account I Project I Program I Activity Budget I Reference# ID ID I Year Chartfield 2 Amount http://apps.cfwnet.org/council_packet/mc review.asp?ID=24543&councildate=5/9/2017 5/10/2017 M&C Review Page 3 of 3 FROM Fund Department Account Project Program Activity Budget Reference# Amount ID I ID I I Year Chartfield 2 Submitted for City Manager's Office by: Susan Alanis (8180) Originating Department Head: Richard Zavala (5704) Additional Information Contact: Scott Penn (5750) ATTACHMENTS 80TRINITYPARK RD PARKING 30105 A017r.docx Trinity Park Form 1295.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=24543&councildate=5/9/2017 5/10/2017 00 11 13-1 INVITATION TO BIDDERS Page 1 of 2 1 SECTION 00 1113 2 INVITATION TO BIDDERS 3 RECEIPT OF BIDS 4 Sealed bids for the construction of Trinity Park Road and Parking Improvements,Project 5 No. CO2735 will be received by the City of Fort Worth Purchasing Office: 6 7 City of Fort Worth 8 Purchasing Division 9 1000 Throckmorton Street 10 Fort Worth,Texas 76102 11 until 1:30 P.M. CST,Thursday,MARCH 9, 2017, and bids will be opened publicly and read 12 aloud at 2:00 PM CST in the Council Chambers. 13 14 GENERAL DESCRIPTION OF WORK 15 The major work will consist of the(approximate)following: Asphalt Road and Parking with 16 Cement Stabilization and a Box Culvert with Wing Walls. There is a Concrete Paving Alternate. 17 18 PREQUALIFICATION 19 The improvements included in this project must be performed by a contractor who is pre- 20 qualified by the City at the time of bid opening. The procedures for qualification and pre- 21 qualification are outlined in the Section 00 21 13—INSTRUCTIONS TO BIDDERS. 22 23 DOCUMENT EXAMINATION AND PROCUREMENTS 24 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City 25 of Fort Worth's Purchasing Division website at http://www.fortworthg_ov.org/purchasing/and 26 clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site.The 27 Contract Documents may be downloaded,viewed, and printed by interested contractors and/or 28 suppliers. The contractor is required to fill out and notarize the Certificate of Interested 29 Parties Form 1295 and the form must be submitted to the Project Manager before the 30 contract will be presented to the City Council. The form can be obtained at 31 httus://www.ethics.state.tx.us/tec/1295-Info.htm . 32 33 34 PREBID CONFERENCE 35 A prebid conference may be held as described in Section 00 21 13 -INSTRUCTIONS TO 36 BIDDERS at the following location,date, and time: 37 DATE: February 21, 2017 38 TIME: 9:00 AM 39 PLACE: Park and Recreation Department—Conference Room#1,4200 S. Freeway, Suite 40 2200,Fort Worth,Texas 76115 41 LOCATION: [Provide general description of room location] 42 43 44 CITY'S RIGHT TO ACCEPT OR REJECT BIDS 45 City reserves the right to waive irregularities and to accept or reject bids. 46 47 48 CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised December 23,2015 00 11 13-2 INVITATION TO BIDDERS Page 2 of 2 1 [Use the following paragraph if required for State or Federal Funding] 2 FUNDING 3 Any{Contract){or)(Contracts}awarded under this INVITATION TO BIDDERS{is){are) 4 expected to be funded from revenues generated from{user fees}{bonds){grants}{etc)and 5 dedicated by{(Resolution)}of{(OWNER'S Administrative Board))to the work under this 6 INVITATION TO BIDDERS. 7 8 INQUIRIES 9 All inquiries relative to this procurement should be addressed to the following: 10 Attn: Scott Penn,City of Fort Worth Park and Recreation Department II Email: Scott.Penn@fortworthtexas.gov 12 Phone: 817.392.5750 13 AND/OR 14 Attn: Jim Amick,P.E.,Neel-Schaffer,Inc. 15 Email: Jim.Amick@Neel-Schaffer.com 16 Phone: 817-870-2422 17 18 ADVERTISEMENT DATES 19 February 9,2017 20 February 16,2017 21 22 END OF SECTION CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised December 23,2015 002113-1 INSTRUCTIONS TO BIDDERS Page 1 of 9 1 SECTION 00 2113 2 INSTRUCTIONS TO BIDDERS 3 [Text in Blue is for information or guidance. Remove all blue text in the project final document.] 4 1. Defined Terms 5 6 1.1.Terms used in these INSTRUCTIONS TO BIDDERS,which are defined in Section 00 72 7 00-GENERAL CONDITIONS. 8 9 1.2.Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 10 meanings indicated below which are applicable to both the singular and plural thereof. 11 12 1.2.1.Bidder: Any person,firm,partnership,company,association,or corporation acting 13 directly through a duly authorized representative, submitting a bid for performing 14 the work contemplated under the Contract Documents. 15 16 1.2.2. Nonresident Bidder: Any person,firm,partnership,company, association,or 17 corporation acting directly through a duly authorized representative,submitting a 18 bid for performing the work contemplated under the Contract Documents whose 19 principal place of business is not in the State of Texas. 20 21 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 22 (on the basis of City's evaluation as hereinafter provided)makes an award. 23 24 2. Copies of Bidding Documents 25 26 2.LNeither City nor Engineer shall assume any responsibility for errors or misinterpretations 27 resulting from the Bidders use of incomplete sets of Bidding Documents. 28 29 2.2.City and Engineer in making copies of Bidding Documents available do so only for the 30 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant 31 for any other use. 32 33 3. Prime Bidder Qualification Requirements 34 35 3.1.The City will evaluate all submitted bids based on criteria and qualifications. 00 45 14 36 Bidder's Statement of Qualifications is to be submitted and received by the Parks and 37 Community Service Department Project Manager no later than 5:00 P.M,,five(5)City 38 business days after the bid opening daze,exclusive of the bid opening date. 39 40 3.1.1.The Prime Bidder,as general contractor or sub-contractor,must demonstrate 41 similar project scope experience on three(3)projects within the last three(3)years. 42 All subcontractors intended for use on this project shall also demonstrate similar 43 project scope experience necessary to successfully perform on their respective 44 portion of work on this project. 45 3.1.2.The Prime Bidder must provide a list the surety company(s)which issued bonds 46 for projects listed above.Additionally,the Prime bidder shall list the surety 47 company intended for use on this project. 48 3.1.3.The Prime Bidder must submit a current certified financial statement prepared by- 49 an independent Certified Public Accountant. CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised May 27,2015(PACs) 0021 13.2 INSTRUCTIONS TO BIDDERS Page 2 of 9 1 2 3.2.The City reserves the right to reject any or all bids and waive any or all formalities. 3 The City will award one contract with a combination of base bids and/or alternates 4 which is most advantageous to the City. 5 b 3.3.Additional requirements for qualification may be required within various sections of the 7 Contract Documents. 8 9 4. Examination of Bidding and Contract Documents,Other Related Data,and Site 10 11 4.1.Before submitting a Bid,each Bidder shall: 12 13 4.1.1. Examine and carefully study the Contract Documents and other related data 14 identified in the Bidding Documents(including"technical data"referred to in 15 Paragraph 4.2. below).No information given by City or any representative of the 16 City other than that contained in the Contract Documents and officially 17 promulgated addenda thereto,shall be binding upon the City. 18 19 4.1.2.Visit the site to become familiar with and satisfy Bidder as to the general, local and 20 site conditions that may affect cost,progress,performance or furnishing of the 21 Work. 22 23 4.1.3. Consider federal,state and local Laws and Regulations that may affect cost, 24 progress,performance or furnishing of the Work. 25 26 4.1.4. <Include this Paragraph if federal*Assistance is being provided for this Contract, 27 otherwise delete>Be advised,City, in accordance with Title VI of the Civil Rights 28 Act of 1964,78 Stat.252,42 U.S.C.2000d to 2000d-4 and Title 49,Code of 29 Federal Regulations,Department of Transportation,Subtitle A,Office of the 30 Secretary,Part 21,Nondiscrimination in Federally-assisted programs of the 31 Department of Transportation issued pursuant to such Act,hereby notifies all 32 bidders that it will affirmatively insure that in any contract entered into pursuant to 33 this advertisement,minority business enterprises will be afforded full opportunity to 34 submit bids in response to this invitation and will not be discriminated against on 35 the grounds of race,color,or national origin in consideration of award. 36 37 4.1.5. Study all: (i)reports of explorations and tests of subsurface conditions at or 38 contiguous to the Site and all drawings of physical conditions relating to existing 39 surface or subsurface structures at the Site(except Underground Facilities)that 40 have been identified in the Contract Documents as containing reliable "technical 41 data"and(ii)reports and drawings of Hazardous Environmental Conditions, if any, 42 at the Site that have been identified in the Contract Documents as containing 43 reliable "technical data." 44 CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Na 02735 Revised May 27,2015(PACS). 0021 13-3 INSTRUCTIONS TO BIDDERS Page 3 of 9 1 4.1.6.Be advised that the Contract Documents on file with the City shall constitute all of 2 the information which the City will furnish. All additional information and data 3 which the City will supply after promulgation of the formal Contract Documents 4 shall be issued in the form of written addenda and shall become part of the Contract 5 Documents just as though such addenda were actually written into the original 6 Contract Documents.No information given by the City other than that contained in 7 the Contract Documents and officially promulgated addenda thereto,shall be 8 binding upon the City. 9 10 4.1.7. Perform independent research, investigations,tests, borings,and such other means 11 as may be necessary to gain a complete knowledge of the conditions which will be 12 encountered during the construction of the project. 4n request,City may provide 13 each Bidder access to the site to conduct such examinations,investigations, 14 explorations,tests and studies as each Bidder deems necessary for submission of a 15 Bid. Bidder must fill all holes and clean up and restore the site to its former 16 conditions upon completion of such explorations, investigations,tests and studies. 17 18 4.1.8.Determine the difficulties of the Work and all attending circumstances affecting the 19 cost of doing the Work,time required for its completion,and obtain all information 20 required to make a proposal.Bidders shall rely exclusively and solely upon their 21 own estimates,investigation,research,tests,explorations,and other data which are 22 necessary for full and complete information upon which the proposal is to be based. 23 It is understood that the submission of a proposal is prima-facie evidence that the 24 Bidder has made the investigation, examinations and tests herein required.Claims 25 for additional compensation due to variations between conditions actually 26 encountered in construction and as indicated in the Contract Documents will not be 27 allowed. 28 29 4.1.9. Promptly notify City of all conflicts,errors,ambiguities or discrepancies in or 30 between the Contract Documents and such other related documents.The Contractor 31 shall not take advantage of any gross error or omission in the Contract Documents, 32 and the City shall be permitted to make such corrections or interpretations as may 33 be deemed necessary for fulfillment of the intent of the Contract Documents. 34 35 4.2. Reference is made to Section 00 73 00—Supplementary Conditions for identification of: 36 37 4.2.1.those reports of explorations and tests of subsurface conditions at or contiguous to 38 the site which have been utilized by City in preparation of the Contract Documents. 39 The logs of Soil Borings, if any,on the plans are for general information only. 40 Neither the City nor the Engineer guarantee that the data shown is representative of 41 conditions which actually exist. 42 43 4.2.2. those drawings of physical conditions in or relating to existing surface and 44 subsurface structures(except Underground Facilities)which are at or contiguous to 45 the site that have been utilized by City in preparation of the Contract Documents. 46 CITY OF FORT WORTH Trinity Park Road and Parking improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised May 27,2015(PACs) 0021 13-4 INSTRUCTIONS TO BIDDERS Page 4 of 9 1 4.2.3.copies of such reports and drawings will be made available by City to any Bidder 2 on request. Those reports and drawings may not be part of the Contract 3 Documents,but the "technical data"contained therein upon which Bidder is entitled 4 to rely as provided in Paragraph 4.02.of the General Conditions has been identified 5 and established in Paragraph SC 4,02 of the Supplementary Conditions. Bidder is 6 responsible for any interpretation or conclusion drawn from any"technical data"or 7 any other data, interpretations,opinions or information. 8 9 4.3.The submission of a Bid will constitute an incontrovertible representation by Bidder(i) 10 that Bidder has complied with every requirement of this Paragraph 4,(ii)that without 11 exception the Bid is premised upon performing and furnishing the Work required by the 12 Contract Documents and applying the specific means,methods,techniques,sequences or 13 procedures of construction(if any)that may be shown or indicated or expressly required 14 by the Contract Documents,(iii)that Bidder has given City written notice of all 15 conflicts,errors, ambiguities and discrepancies in the Contract Documents and the 16 written resolutions thereof by City are acceptable to Bidder,and when said conflicts, 17 etc.,have not been resolved through the interpretations by City as described in 18 Paragraph 6.,and(iv)that the Contract Documents are generally sufficient to indicate 19 and convey understanding of all terms and conditions for performing and furnishing the 20 Work, 21 22 4.4.The provisions of this Paragraph 4, inclusive,do not apply to Asbestos,Polychlorinated 23 biphenyls(PCBs),Petroleum,Hazardous Waste or Radioactive Material covered by 24 Paragraph 4.06. of the General Conditions,unless specifically identified in the Contract 25 Documents. 26 27 5. Availability of Lands for Work,Etc. 28 29 5.1.The lands upon which the Work is to be performed,rights-of-way and easements for 30 access thereto and other lands designated for use by Contractor in performing the Work 31 are identified in the Contract Documents. All additional lands and access thereto 32 required for temporary construction facilities,construction equipment or storage of 33 materials and equipment to be incorporated in the Work are to be obtained and paid for 34 by Contractor. Easements for permanent structures or permanent changes in existing 35 facilities are to be obtained and paid for by City unless otherwise provided in the 36 Contract Documents. 37 38 5.2.Outstanding right-of-way,easements,and/or permits to be acquired by the City are listed 39 in Paragraph SC 4.01 of the Supplementary Conditions.In the event the necessary right- 40 of-way,easements,and/or permits are not obtained,the City reserves the right to cancel 41 the award of contract at any time before the Bidder begins any construction work on the 42 project. 43 44 5.3. The Bidder shall be prepared to commence ponstructon without all executed right-of- 45 way,easements,and/or permits,and shall submit a schedule to the City of how 46 construction will proceed in the other areas of the project that do not require permits 47 and/or easements. 48 49 6. Interpretations and Addenda 50 CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised May 27,2015(PLCs) 0021 13-5 INSTRUCTIONS TO BIDDERS Page 5 of 9 l 6.1.All questions about the meaning or intent of the Bidding Documents are to be directed to 2 City in writing on or before 2 p.m.,the Monday prior to the Bid opening. Questions 3 received after this day may not be responded to.Interpretations or clarifications 4 considered necessary by City in response to such questions will be issued by Addenda 5 delivered to all parties recorded by City as having received the Bidding Documents. 6 Only questions answered by formal written Addenda will be binding. Oral and other 7 interpretations or clarifications will be without legal effect. 8 9 Address questions to: 10 11 City of Fort Worth 12 1000 Throckmorton Street 13 Fort Worth,TX 76102 14 Attn: Scott Penn,Park and Recreation Department 15 Fax: <Insert Department fax#> 16 Email: Scott.Penn@fortwotthtexas.gov 17 Phone: 817-392-5750 18 19 20 6.2.Addenda may also be issued to modify the Bidding Documents as deemed advisable by 21 City. 22 23 6.3.Addenda or clarifications may be posted via Buzzsaw at<Insert bink to Documents>. 24 25 6.4.A prebid conference may be held at the time and place indicated in the Advertisement or 26 INVITATION TO BIDDERS. Representatives of City will be present to discuss the 27 Project. Bidders are encouraged,to attend and participate in the conference. City will 28 transmit to all prospective Bidders of record such Addenda as City considers necessary 29 in response to questions arising at the conference. Oral statements may not be relied 30 upon and will not be binding or legally effective. 31 32 7. Bid Security 33 34 7.1.Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 35 (5)percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 36 the requirements of Paragraphs 5.01 of the General Conditions. 37 38 7.2.The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 39 have been satisfied.. If the Successful Bidder fails to execute and deliver the complete 40 Agreement within 10 days after the Notice of Award,City may consider Bidder to be in 41 default,rescind the Notice of Award,and the Bid Bond of that Bidder will be forfeited. 42 Such forfeiture shall be City's exclusive remedy if Bidder defaults, The Bid Bond of all 43 other Bidders whom City believes to have a reasonable chance of receiving the award 44 will be retained by City until final contract execution. 45 46 8. Contract Times 47 The number of days within which,or the dates by which,Milestones are to be achieved in 48 accordance with the General Requirements and the Work is to be completed and ready for 49 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 54 attached Bid Form. 51 CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised May 27,2015. (FACS) 0021 13-6 INSTRUCTIONS TO BIDDERS Page 6 of 9 1 9. Liquidated Damages 2 Provisions for liquidated damages are set forth in the Agreement. 3 4 10. Substitute and "Or-Equal"Items 5 The Contract, if awarded,will be on the basis of materials and equipment described in the 6 Bidding Documents without consideration of possible substitute or"or-equal' items. 7 Whenever it is indicated or specified in the Bidding Documents that a"substitute"or"or- b equal'item of material or equipment may be furnished or used by Contractor if acceptable to 9 City,application for such acceptance will not be considered by City until after the Effective 10 Date of the Agreement. The procedure for submission of any such application by Contractor 11 and consideration by City is set forth in Paragraphs 6.05A.,6.05B.and 6.05C.of the General 12 Conditions and is supplemented in Section 0125 00 of the General Requirements. 13 14 11. Subcontractors,Suppliers and Others 15 16 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No.20020- 17 12-2011 (as amended),the City has goals for the participation of minority business 18 and/or small business enterprises in City contracts. A copy of the Ordinance can be 19 obtained from the Office of the City Secretary,The Bidder shall submit the MBE and 20 SBE Utilization Form,Subcontractor/Supplier Utilization Form,Prime Contractor 21 Waiver Form and/or Good Faith Effort Form with documentation and/or Joint 22 Venture Form as appropriate.The Forms including documentation must be received 23 by the City no later than 2:00 P.M.CST,on the second business days after the bid 24 opening date.The Bidder shall obtain a receipt from the City as evidence the 25 documentation was received.Failure to comply shall render the bid as non- 26 responsive. 27 28 11.2. No Contractor shall be required to employ any Subcontractor, Supplier,other person 29 or organization against whom Contractor has reasonable objection. 30 31 12. Bid Form 32 33 12.1. The Bid Form is included with the Bidding Documents;additional copies may be 34 obtained from the City. 35 36 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form 37 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 38 the Bid Form.. A Bid price shall be indicated for each Bid item,alternative,and unit 39 price item listed therein. In the case of optional alternatives,the words"No Bid," 40 "No Change,"or"Not Applicable"may be entered.Bidder shall state the prices, 41 written in ink in both words and numerals,for which the Bidder proposes to do the 42 work contemplated or furnish materials required.All prices shall be written legibly. 43 In case of discrepancy between price in written words and the price in written 44 numerals,the price in written words shall govern. 45 46 12.3. Bids by corporations shall be executed in the corporate name by the president or a 47 vice-president or other corporate officer accompanied by evidence of authority to 48 sign. The corporate seal shall be affixed. The corporate address and state of 49 incorporation shall be shown below the signature. 50 CITY OF FORT WORTH Trinity Park Road and Parking improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised May 27,2015(PACS) 002113-7 INSTRUCTIONS TO BIDDERS Page 7 of 9 1 12.4. Bids by partnerships shall be executed in the partnership name and signed by a 2 partner,whose title must appear under the signature accompanied by evidence of 3 authority to sign. The official address of the partnership shall be shown below the 4 signature. 5 6 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 7 member and accompanied by evidence of authority to sign. The state of formation of 8 the firm and the official address of the firm shall be shown. 9 10 12.6. Bids by individuals shall show the Bidder's name and official address. 11 12 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 1.3 indicated on the Bid Form. The official address of the joint venture shall be shown. 14 15 12.8. All names shall be typed or printed in ink below the signature. 16 17 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda,the numbers of 18 which shall be filled in on the Bid Form. 19 20 1.2.10. Postal and e-mail addresses and telephone number for communications regarding the 21 Bid shall be shown. 22 23 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 24 Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance 25 to State Law Non Resident Bidder. 26 27 13. Submission of Bids 28 Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, 29 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 30 addressed to City Manager of the City,and shall be enclosed in an opaque sealed envelope, 31 marked with the City Project Number,Project title,the name and address of Bidder,and 32 accompanied by the Bid security and other required documents. If the Bid is sent through the 33 mail or other delivery system,the sealed envelope shall be enclosed in a separate envelope 34 with the notation"BID ENCLOSED" on the face of it. 35 36 14. Modification and Withdrawal of Bids 37 38 14.1. Bids addressed to the City Manager and filed with the Purchasing Office cannot be 39 withdrawn prior to the time set for bid opening. A request for withdrawal must be 40 made in writing by an appropriate document duly executed in the manner that a Bid 41 must be executed and delivered to the place where Bids are to be submitted at any 42 time prior to the opening of Bids..After all Bids not requested for withdrawal are 43 opened and publicly read aloud,the Bids for which a withdrawal request has been 44 properly filed may,at the option of the City,be returned unopened. 45 46 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 47 time set for the closing of Bid receipt. 48 CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised May 27,2015(PACS) 0021 13-8 INSTRUCTIONS TO BIDDERS Page 8 of 9 1 15. Opening of Bids 2 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 3 abstract of the amounts of the base Bids and major alternates(if any)will be made available 4 to Bidders after the opening of Bids. 5 6 16. Bids to Remain Subject to Acceptance 7 All Bids will remain subject to acceptance for the time period specified for Notice of Award 8 and execution and delivery of a complete Agreement by Successful Bidder. City may,at 9 City's sole discretion,release any Bid and nullify the Bid security prior to that date. 10 11 17. Evaluation of Bids and Award of Contract 12 13 17.1. City reserves the right to reject any or all Bids, including without limitation the rights 14 to reject any or all nonconforming,nonresponsive,unbalanced or conditional Bids 15 and to reject the Bid of any Bidder if City believes that it would not be in the best 16 interest of the Project to make an award to that Bidder,whether because the Bid is 17 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 18 meet any other pertinent standard or criteria established by City. City also reserves 19 the right to waive informalities not involving price,contract time or changes in the 20 Work with the Successful Bidder. Discrepancies between the multiplication of units 21 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 22 between the indicated sum of any column of figures and the correct sum thereof will 23 be resolved in favor of the correct sum. Discrepancies between words and figures 24 will be resolved in favor of the words. 25 26 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 27 among the Bidders,Bidder is an interested party to any litigation against City, 28 City or Bidder may have a claim against the other or be engaged in litigation, 29 Bidder is in arrears on any existing contract or has defaulted on a previous 30 contract,Bidder has performed a prior contract in an unsatisfactory manner,or 31 Bidder has uncompleted work which in the judgment of the City will prevent or 32 hinder the prompt completion of additional work if awarded. 33 34 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers,and 35 other persons and organizations proposed for those portions of the Work as to which 36 the identity of Subcontractors, Suppliers,and other persons and organizations must 37 be submitted as provided in the Contract Documents or upon the request of the City. 38 City also may consider the operating costs,maintenance requirements,performance 39 data and guarantees of major items of materials and equipment proposed for 40 incorporation in the Work when such data is required to be submitted prior to the 41 Notice of Award. 42 43 17.3. City may conduct such investigations as City deems necessary to assist in the 44 evaluation of any Bid and to establish the responsibility,qualifications,and financial 45 ability of Bidders,proposed Subcontractors, Suppliers and other persons and 46 organizations to perform and furnish the Work in accordance with the Contract 47 Documents to City's satisfaction within the prescribed time. 48 49 17.4. Contractor shall perform with his own organization,work of a value not less than SO 35%of the value embraced on the Contract,unless otherwise approved by the City. 51 CITY OF FORT WORTH Trinity Park Road and Packing Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised May 27,2015(PACS) 0021 13-9 INSTRUCTIONS TO BIDDERS Page 9 of 9 1 17.5. If the Contract is to be awarded,it will be awarded to lowest responsible and 2 responsive Bidder whose evaluation by City indicates that the award will be in the 3 best interests of the City. 4 5 17.6. Pursuant to Texas Government Code Chapter 2252.001,the City will not award 6 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 7 the lowest bid submitted by a responsible Texas Bidder by the same amount that a 8 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 9 comparable contract in the state in which the nonresident's principal place of 10 business is located. 11 12 17.7. A contract is not awarded until formal City Council authorization.If the Contract is 13 to be awarded,City will award the Contract within 90 days after the day of the Bid 14 opening unless extended in writing. No other act of City or others will constitute 15 acceptance of a Bid.Upon the contractor award a Notice of Award will be'issued by 16 the City. 17 18 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 19 20 18. Signing of Agreement 21 When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the 22 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 23 Contractor shall sign and deliver the required number of counterparts of the Agreement to 24 City with the required Bonds, Certificates of Insurance,and all other required documentation. 25 City shall thereafter deliver one fully signed counterpart to Contractor. 26 27 28 29 END OF SECTION CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised May 27,2015(PACS) 00 35 13 BID FORM Page 1 of 1 SECTION 44 35 13 CONFLICT OF INTEREST AFFIDAVIT Each bidder, offeror, or respondent(hereinafter also referred to as"you")to a City of Fork Worth(also referred to as"City's procurement are required to complete Conflict of Interest Questionnaire(the attached CIQ Form)and Local Government Officer Conflicts Disclosure Statement(the attached CIS Form) below pursuant to state law. This affidavit will certify that the Bidder has on file with the City Secretary the required documentation and is eligible to bid on City Work. The referenced forms may also be downloaded from the website links provided below. http://www.ethics.state.ty,.us/forms/CIQ.gdf http://u j.ethics.state.tn_us/forms/CIS.Ddf CIQ Form is on file with City Secretary CIQ Form is being provided to the City Secretary 01 CIS Form is on File with City Secretary 0 CIS Form is being provided to the City Secretary BIDDER: p Company Name Here Qc> By: Printed Name Here 1 Address Here r� 00, & 7 Signature Address Here or Space :r�'�� Y City, State Zip Code Here Title: Title Here��exksy, n/1 END OF SECTION CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Form Revised 20120327 00 410000 43 13 00 42 4300 43 3700 4512_00 3513 Bid Proposal Workbook REVISED 4 00 41 00 BID FORM Page 1 of 3 SECTION 00 4100 BID FORM TO: The Purchasing Manager cto:The Purchasing Division 1000 Throckmorton Street City of Fort Worth,Texas 76102 FOR: Trinity Park Road and Parking Improvements City Project No.: 02735 pp Units/Sections: �11l;il i�!'leu:n,,e Here or 'Space i"'1-n—a 1, Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted,to enter into an Agreement with City in the form included in the Bidding Documents to perform and fumish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS,including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association,organization,or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt,fraudulent,collusive,or coercive practices in competing for the Contract. For the purposes of this Paragraph: a."corrupt practice"means the offering,giving,receiving,or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b_"fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process to the detriment of City(b)to establish Bid prices at artificial non-competitive levels,or(c)to deprive City of the benefits of free and open competition. c. "collusive practice"means a scheme or arrangement between two or more Bidders,with or without the knowledge of City,a purpose of which is to establish Bid prices at artificial,non-competitive levels. CITY OF FORT WORTH Trinity Park Road and Parking improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Form Revised 20150821 00 410000 43 13_00 42 43_00 43 3700 451200 35 13—Bid Proposal Workbook REVISED 4 004100 BID FORM Page 2 of 3 d. "coercive practice'means harming or threatening to harm,directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Asphalt&Concrete Paving-Street b. mist s;m r iVpe here rul"!3r_.Es C. Us1 t%:arts tfp e h—era cl d, Us4 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 90 or 180 days after the date when the the Work{and/or achievement of Milestones}within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid_ a. This Bid Form,Section 00 4100 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder,Section 00 43 37 e. MWBE Forms(optional at time of bid) f. Prequalification Statement,Section 00 45 12 g. Conflict of Interest Affidavit,Section 00 35 13 *If necessary,CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 62. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Fonn Revised 20150621 00 410000 43 1300 42 4300 43 37_00 4512_00 35 13 Bid Proposal Workbook REVISED 4 00 41 00 BID FORM Page 3 of 3 subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 6.3. Evaluation of Alternate Bid Items Total Base Bid(Asphalt,90 Days) Additive Alternate(Concrete,Additional 90 Days) r11 1 7. Bid Submittal 9. This Bid is submitted on Month Day,Year by the entity named below. Respectfully submitted, Receipt is acknowledged of the Initial following Addenda: Addendum No. 1: (Signature) Addendum No.2: Addendum No.3: Y4�Y1 ,s Addendum No.4: (Printed Name) Title: A�l ser�r M ayia-- Company: -ornpany Narne He'eka' ", Tit9C— Corporate Seal: Address: Address Here Address Here or Space"�zecj"--n e:'Pl.f ;T( City, State Zip Code dere L� State of Incorporation: State Email: t c r EmaiS Address Here r a111QV,A —�r�'i a�vt G 5 � ,F►� Phone: Your Phone Numb(--2r Here --773:-4&:K9 END OF SECTION CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Form Revised 20150821 00 410000 43 13_00 42 43_00 43 37_00 45 12_00 35 13—Bid Proposal Workbook REVISED 4 004243 BIDPROPOSAL him I of 3 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Itt m infnxmafi® Bid9ds P,%Nnaa idlid Item 4ftificarioa Unit of Bid Na ul—s"i0rto6 Sectioallo_ Meamxxe Q,mnt* UnitPrice BidYai>ie BASE M-LHV11T 1 ASPHALT ROAflS 1 Furnish aid Instal Pf4ed S- (Street 2) 015813 EA 1 2 Remove 6U'CRAP,HeadwaftNftgwaft and Erosion 31 low LS i _ °►• �`' Protection Staeet 6) 3 Remove IS-HDPE F%ka(Sheet 6) 3110 OD LS 1 ���✓`=' `== 4 Tree Removal(Sheet 6) 311000 EA 4 =' 5 2"Rigid PVC Schedule 40 Conduit(Sheets 14-15) 26 05 33 LF 250 WnphV-riotAppSed Thermopbsfc Rettec live Pavement 321723 LF 2900 `z- 8 Marifts -100 MIL-,CYeWwydT II Beads Street 8 � �ik� 7 Hot AppLed Themplasfic Reese Pa mnent Markkngs 321723 EA 1 Lett Arrow Symbol W1Type 11 Beads-100 MIL ireet 8) lam✓ s HM Apphad 7termoAfaMCFk4kmfiw PavtaneM Wiaddngs 321723 EA 1 ONLY-W rypelt Buds-100 MIL 8 Cj ✓ 9 Striping-Hot Apptled Thermoplastic Reflective Pavement 321723 LF 12 Maddngs-100 MIL-24'va to VdType 11 Beads(Sheet 8) -y Furnish&Insult Ground Mounted Afu niruun Sign&Post ` i0Assembly-31TRi-1 Sheet B) 344130 EA 1 Furnish&Install Ground Mounted Aluminum Sign&Post 11 344130 EA 1 —R3-5L Sheet 8) 12 Type if-A-AV Raised Pavem M Markers(Sheet 8) 321723 EA 39 71J`�= 13 8'x 5'Reinforced Conde Box Cudvet(Street 7) 334110 LF 32 - 14 W x S Box Culvert Wmg V11aRs(Sheet 7) 334940 EA 2 j,-7 15 tY Thick Rock ROW(3hee17) 3137 OO SY 50 'F `:`-' 7��� 16 Metal Beam Guard Feruce(Street 7) TxDOT 540 LF 260 � �' 7` 17 MobNzation(Sheet 2) 017000 LS i 18 Ste Cfearalg(Sheet 6) 311000 LS 1 `= Stormwafer PaNuffon Prevention Plan ami Erosion Control 19 �rrptt (Site" 3125LS 1 19 9b,0- /4-750" 20 Traft Contral Plan and Impiementahm(Sheet 2) 347113 LS 1 21 Unctassitied Excavation(Sheets 11,25) 312316 CY 810 22 I&Tbardanent(Shed 25) 312400 CY i40 23 Bermt4a Seeding by HydF0MtfiWM9(Street 8) 329213 SY 60 1 !cu 24 Bermuda Black Sodding(Sheets 7-8) 329213 SY 460 25 Remove Curb&Gutter(Sheets Z 6.8) 0241 i5 LF 300 �p 1 26 Remove Concrete{DriVew4&Ehow)(Sheet 6) 024115 SY 50 f 27 Ir Reinfamd Con=*Pavement(Street 8) 321313 SY 50 ,7� 7, 28 T xT Reinforced Concrete Box CWed(sheet 7) 3341-10 LF 13 j 29 Coustruuc bm Ctonge Aftwa ve($25,000)(Sheet 2) 007200 LS 1 $25,00000 325,0W-00 30 Fierobie Base Course(Sheet 2) 321123 CY 100 31 2-Type D PG 76-22 Asphalt Pavement(Sheet 8) 321216 SY 4674 32 Cement Stat>Tzed in place recy ded Subgrade(Sheet 8) 321133 SY 4830 33 Centent(Sheet 8) 321133 Ton 80 34 Concrete Curb&Gutter(Sheets 2,7,8) 321613 LF 300 ,e4 t 2 G8' TUTAL SASE BID-UNIT•I ASPHALT ROADS(Items f- 34 cm oaFoxn�ox771 rtimtyParkRaadmldPar�tmpn>�eats SrAMLARD C01)MMM0111 SPE0KCA7701.00,-DIM M Pmjw Mx 02735 Fon Rerised20120120 00 41 QQ 004313 00424 3_904337 00 45 L 0035 i3 HidPmp—mI'W db—kREVISED4 004?43 BID PROPOSAL Page2of3 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID Bidder`s Application Pr6eet Um In&mwfion Bidder's ftq*sal idles Item i Spedficadon unit of Bid No. Dmcdptim Section No- MeasumQuantin unitprice Bid Value BASE BID- 2 ASPHALT PAR#EM LOT 35 Furnish and Iristatt Project EAW{ fad 2) 015813 EA 1 `�- 36 r Real PVC Schedub 40 Conduit(Street 16) 260533 LF 230 37 Stnpaxa-Hot Appy Tlrmnopl stic Reflective Pavement 321723 LF 1370 Markings-100 MIL-4'WIft H Heads 18) �1 �✓ 7ti 38 Fire Lane M 18 321723 LF 1120 J4 39 HotAppfied AEA �e HstrG$eads akChve Pa CSFB 18�n� 321723 EA 3 &1-7• 40 Able PadmV Sign WUM Fine Advisory Panel 344130 EA 214) •"'' 41 (Sheet���ng SignWith Van Aecessd�te Panel 344130 EA 1 42 Concrete VAwel Stens(Sheet 18) 033000 FA 39 y`` 43 Bermuda Seeding by Hydmmulct ft(Sheet 19) 329213 SY 550 ,z4e- 1 Z LC15 _ ' 44 Bermuda Block Sodding(Sheet 19) 329213 SY 1070 , To 45 Concrete Sidewalir(Sheet i8) 321320 SF 310 ti-6 0 46 Ftetftb Base Course(Sheet 18) 321123 Gy 40 47 Undassibd Excavation(Shea 21) 312316 CY 490 d"" 48 Embanim it(Shed21) 312400 CY 170 49 rType d PG 76-22 Asptrall Pavement(Shed 18) 321215 SY 2900 50 6"Cement Stabif¢ed in place recycled Subgrade 321133 SY 2900 (Sheet 18) 1 b:g'r 82 51 Cermet(Std 18) 321133 Ton 50 ed 52 Sawtooth Concrete Curb 8 GuOer(Sheet 18) 321613 LF 100 • 7 &P 53 Cw=ale Curb 6 Gutter(Sheet 18) 321613 LF 450V7 TOTAL BASE BIB-UWr 2 ASPHALT PAfMNG LOT 1 3 . —- ALTERNATE 7-CONCRETE ROADWAYS(in r'reu of Eterrrs 30 34 54 UrmlassWed lavation(Sheets 24-25) 312316 CY 410 55 Embar*mert(Streets 24-25) 3124M CY 190 56 Bermuda Seeding by Hydrunmtching(Sheets 12-14) 329213 SY 160 57 Hemida Block Sodit(Sheer 12-15) 329213 SY 620 © ,0-J to. 58 Remove Curb 8 Gutter(Sheet6) 02 41 15 LF 1755 3,6-0 lV 59 Remove Concrete(Second€nvexvay&Valley Gutter) 02 41 15 SY 50 tw (Sheet 6) 60 Reinforced Concrete Pavement(Sheets 12-15) 321313 SY 4740 .L{ S' 7 61 3 x€i'Reaftmed Come Box Culvert(Sheet 7) 33 41 10 IF 2 62 Construction Change Allowance($25,000)(Sheet 2) 007200 LS 1 $25,000.00 $25,000.00 63 W X G'Add-On Corsets Crab(Sheets 1213) 321313 LF 2080 -7-2) "- 64 t ane Treahnerd-Feng Malarial(6 inch Suigrade-30 321129 SY 5140 "CP �' •' tB/SY)(Sheds 12-15) 65 tame(Sheets 12-15) 321129 Ton 90 ) �F . TOTAL ALTERNATE f-CONCRETE ROADWAYS(t 5� 56�e , 1-2 �c CFIY OF FORE WORM EnnitS Falk$oad aad Par�g Impmemeats STANDARD CONSTRUcnoa sPECIRCAMIDN DOCLEAENn Pmjeet\I0.07-735 FOM Revised 20120120 004100 004313 0042.13004337 0045 f_003513 Hid Pmp..�IVLI e-.bmkREV1SM4 004Z43 BMPROPMAL Nr3oO SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID Bidder`s Application Project ft=Wimmatiou B,d&Ws ftopmg Bidtist bm D—ripS�fit�an Unit of Bid No. "'°n s wo �,teame Quantity unigPrice Bid vatne ALTERNATE 2-CONCRETE PARKING LOT(in Tiers of Umm 49-53 66 UncWssified ExcavMon(Sheet 21) 312316 CY 67 Embadmient(Sheet 21) 312400 L'Y 68 G Rei*xmd Concrete Pavement(Sheet 18) 321313 SY 3150 69 Saw6oxith 6-X 6-Add-On Contxete Curb(Sheet 18) 321313 LF 40D , 70 6-X 6•Add-0n Concmh--Curb(S et 18) 321313 LF 450 %j o 11 Lime Tleabli d-E ng N (6 HICK Subgfade-30 le r LB(SY) Sheet 18 32112s sY 3300lI 1, : 72 Lhne Sheet 18) 32 i 129 Ton 60 TOTAL ALTERNATE 2-COKCRFM PARKING LOT burns 3548 66-72 J TOTAL BASE Bit)-ASPHALT((hems 14M J391 Ri TOTAL ALTERNATE-CONCRETE(Items 129,35.48 54r . 7 Firm OF SECTION C[tY OF FORT WORTH Trinity Perk Road and Pwk ng tmpm,�nrn STANDARD CONSTRUCIION'SPE_Ci CA-flON DOCUMM ProiectXm 02735 Form ReVoed20120110 004100 004313 004243 004337 0045 L 003513 13idProposslWockbwkREVLSED4 0043 13 BID BOND Page 1 of 1 SECTION 00 43 13 BID BOND KNOW ALL BY THESE PRESENTS: That we, (Bidder Name) Raydon, Inc. hereinafter called the Principal, and (Surety Name) Washington International Insurance Company a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety, are held and firmly bound unto the City, hereinafter called the Obligee, in the sum of Four Hundred Twenty Five Thousand One Hundred Eighty One and 80/100 Dollars ($ 425181.80) the payment of which sum will be well and truly made and the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns,jointly and severally, firm by these presents. WHEREAS, the Principal has submitted a proposal to perform work for the following project of the Obligee, identified as Trinity Park Road and Parking Improvements 0 NOW, THEREFORE, if the Obligee shall award the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with the Obligee in accordance with the terms of such proposal, then this bond shall be null and void. If the Principal fails to execute such Contract in accordance with the terms of such proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal, this bond shall become the property of the Obligee, without recourse of the Principal and/or Surety, not to exceed the penalty hereof, and shall be used to compensate Obligee for the difference between Principal's Total Bid Amount and the next selected Bidder's Total Bid Amount. SIGNED this day of 2017. By: Raydon, Inc. (Signature and Title of Principal) *By: Washington International Insurance Company (Signature of Attorney-of-Fact) *Attach Power of Attorney (Surety) for Attorney-in-Fact Impressed Surety Seal Only END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20110627 Copy of 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook BID Form Bid Bond Surety Department KNOW ALL MEN BY THESE PRESENTS, That we, Raydon, Inc., as Principal, hereinafter called the Principal, and the Washington International Insurance Company, a Corporation created and existing under the laws of the State of New Hampshire, whose principal office is in Schaumburg, IL, as Surety, hereinafter called the Surety, are held and firmly bound unto the City of Fort Worth, Texas, as Obligee, hereinafter called the Obligee, in the sum of Five Percent (5%) of the Greatest Amount Bid ($-----5%0---------), for the payment of which sum, well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these presents. Whereas, the Principal has submitted a bid for Trinity Park Road & Parking Improvements #02735 NOW THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or contract documents with good and sufficient surety for the faithful performance of such contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 9th day of March, 2017. Attest: Ra don Inc. (Priv . al) r. By: ,' By &,! e (SEAL) Witness: Washington International Insurance Company By i Kevin J. Dunn;Attorney-in-Fact (SEAL) Form S-3266-4 Printed in U.S.A. 12-70 NAS SURETY GROUP NORTH AMERICAN SPECIALTY INSURANCE COMPANY WASHINGTON INTERNATIONAL INSURANCE COMPANY GENERAL POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS,THAT North American Specialty Insurance Company,a corporation duly organized and existing under laws of the State of New Hampshire,and having its principal office in the City of Manchester,New Hampshire,and Washington International Insurance Company,a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City of Schaumburg,Illinois,each does hereby make,constitute and appoint: W.LAWRENCE BROWN,TRACY TUCKER, KEVIN J.DUNN and STEVEN TUCKER JOINTLY OR SEVERALLY Its true and lawful Attorney(s)-in-Fact,to make,execute,seal and deliver,for and on its behalf and as its act and deed,bonds or other writings obligatory in the nature of a bond on behalf of each of said Companies,as surety,on contracts of suretyship as are or may be required or permitted by law,regulation,contract or otherwise,provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the amount of: FIFTY MILLION($50,000,000.00)DOLLARS This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of Directors of both North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held on the 91h of May,2012: "RESOLVED,that any two of the Presidents,any Managing Director,any Senior Vice President,any Vice President,any Assistant Vice President, the Secretary or any Assistant Secretary be,and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named in the given Power of Attorney to execute on behalf of the Company bonds,undertakings and all contracts of surety,and that each or any of them hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is FURTHER RESOLVED,that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile,and any Such Power ofAttorney or certificate bearing such facsimile signatures or facsimile seal shall be binding upon the Company when so affixed and in the future with regard to any bond,undertaking or contract of surety to which it is attached." ���•��"G1LI..... �� t ' .0 �pteumwaa�µyy �yQ�friPOggtH.s,PG'4 QNPFiPOAC $2,•' F:�v By �<r..•Go CeR9T;boy Steven P.Anderson,Senior Vice President of Washington International Insurance Company Z'. SEAL &Senior Vice President of North American specialty Insurance Company elQ; Cm g ��6A'AMPsr`¢•�� 'Z•' •O �. By David M.Layman,Vice President of Washington Internaliomd Insurance Company u1 &Vice President of North American Specialty Insurance Company IN WiTNESS WHEREOF,North American Specialty Insurance Company and Washington international Insurance Company have caused their official seals to be hereunto affixed,and these presents to be signed by their authorized officers this26th day of June 12012 . North American Specialty Insurance Company Washington international Insurance Company State of Illinois County of Cook ss: On this 26th day of June 201 before me,a Notary Public personally appeared Steven P.Anderson ,Senior Vice President of Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and David M.Layman, Vice President of Washington international Insurance Company and Vice President of North American Specialty Insurance Company, personally known to me,who being by me duly sworn,acknowledged that they signed the above Power of Attorney as officers of and acknowledged said instrument to be the Voluntary act and deed of their respective companies. I"OFPtCtALSEAL" �Q �t �0 A""o DONNA D.SKLEN5 Notary Public,State of Illinois Donna D.Sklens,Notary Public NY Commission Expires 10l060I5 I, Jeffrey Goldberg • the duly elected Assistant Secretary of North American Specialty insurance Company and Washington International Insurance Company,do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said North American Specialty Insurance Company and Washington International Insurance Company,which is still in full force and effect. 1N WITNESS WHEREOF,I have set my hand and affixed the seals of the Companies this 9th day of March 20 17 . Jeffrey Goldberg,Vice President&Assistant Secretary of Washington international Insurance Company&North Amerimn Specialty Insurance Company a.wpw-n r..ar.1r. - - i ��r✓Irr��wr+�,� - - imrrrl�r�f—- - - —.-_.. __. 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page 1 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that,in order to be awarded a contract as tow bidder, nonresident bidders(out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction,improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located_ The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications.The failure of nonresident bidders to do so will automatically disqualify that bidder.Resident bidders must check the box in Section B. A. Nonresident bidders in the State of Styes o;r our principal place of business, are required to be 0/o Here percent lower than resident bidders by State taw. A copy of the statute is attached. Nonresident bidders in the State of Sesta Hier c�&a3.i<,our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. BIDDER: Company me Her Xy�Printe lei Address Here 3" �j Address Here or Space ` a�'Zi i c�e-, (Signature) City,State Zip Code Here Title: Title Here Date: y ) END OF SECTION CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Form Revised 20110627 00 410000 43 13_00 42 43_00 43 3700 45 12_00 35 13—Bid Proposal Workbook REVISED 4 00 45 14 BIDDERS STATEMENT OF QUALIFICATIONS Page 1 of SECTION 00 45 14 BIDDER'S STATEMENT OF QUALIFICATIONS Firm Name: ;111 Qc9 c__ Date Organized: ❑ PARTNERSHIP ;&I CORPORATION Address: V® tra^7 State: Zip: Telephone Number: 9)7-77F,- ky-2 j Fax Number: 92-7—^ 7& Number of years in business under present name: Former name(s)of organization: CLASSIFICATION: General ❑Building ❑Electrical ❑Plumbing ❑HVAC ❑Utilities ❑Earthwork ❑Paving ❑Other LIST A MINIMUM OF THREE SIMILAR COMPLETED PROJECTS WITHIN LAST THREE YEARS PROJECT NAME AND LOCATION NAME/TELEPHONE NUMBER OF OWNER NAME/TELEPHONE NUMBER OF SURETY AMOUNT OF CONTRACT COMPLETION DATE SCOPE OF WORK DESCRIPTION PROJECT NAME AND LOCATION CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised August 17,2012 RAYDON INC. PO Box 671 Breckenridge, Texas 254-559-5012 local 817-773-4601 References for parks completed with Brian Smith as Project Manager Parks at Texas Star The project included the construction of a baseball stadium, t ball fields, and youth soccer fields, concrete flatwork, brick work, steel structure, lighting, irrigation, landscaping, iron work, utilities, and decorative concrete. McCormick park The project included the construction of concrete trails, bridge, pavilion, underground utilities, and site furnishings. 1501 Pipeline Road; Euless, Texas Owner contact Ray McDonald, Director of Parks 817-685-1669 Euless splash park Construct and install a zero depth water play ground 600 S. Main Street, Euless, Texas Owner contact Ray McDonald, Director of Parks 817-685-1669 Harmon Park, Sylvania Ct. Fort Worth, Texas soccer fields Delga Park, 1001 Nixxon St. Fort Worth, Texas baseball field, concrete work, chain link fencing West Community Park, West Loop 820, Fort Worth, soccer fields, road, parking lot, chain link, irrigation, grassing, utilities Sandy Lane Park, Fort Worth baseball field, grassing, creek stabilization Hallmark Park, Fort Worth, soccer field improvements Owner contact Scott Penn, Senior Landscape architect, 817-871-5750 Wooldridge park phase 1 River Oaks, Texas Owner contact Marvin Gregory, City Manager, 817-626-5421 ext.324 Wooldridge Park phase 2 Design and build a BMX track in River Oaks, Texas Owner contact Marvin Gregory, City Manager, 817-626-5421 Ed Collett Park, West Vickory, Fort Worth, Texas. Owner; Fort Worth Parks and Community Services Contact; Scott Penn 817-999-0261 This job included a new parking lot, reworking of a baseball field, trails and exercise equipment, under ground utilities, and pavilion. Cost; $280,000.00 CP Hadley Park Ocean dr. Fort Worth, Texas Owner; Fort Worth Parks and Community Services Contact; Eric Seabock 817-480-4403 This project included over a mile of trails, grading, pavilion and park equipment, three bridges, retaining walls, and under ground utilities. Cost; $278,000.00 Rolling Hills Soccer complex Joe B. Rushing Rd. Fort Worth, Texas Owner; Fort Worth Parks and Community Services Contact; Joel MacElhany 817-392-5745 This project includes a 72000 sf parking lot, seven soccer fields, side walks, Equipment, irrigation, grassing, and a cricket pitch. Cost; under construction (approx. $800,000.00) Falcon Ridge Park Academy street, Fort Worth, Texas Owner; Fort Worth Parks and Community Services Contact; Carlos 817-999-0259 This project included Trails, excavation, playground equipment, and park benches Cost; $195,000.00 Golf Course Renovations at Meadowbrook Golf Course Fort Worth, Tx. Owner; Fort Worth Parks and Community Services Contact; Carlos 817-999-0259 This project included a dam, retaining wall, excavation, leveling, top soil, grassing. Quanah Park Fort Worth, Tx. Owner; Fort Worth Parks and Community Services Contact; Joel MacElhany 817-392-5745 This job included sidewalks, solar lighting, road work, and site furnishings Cost; Albany City Park Owner; City of Albany Contact; Billy 325-762-0297 This job included; sidewalks, playground renovation, 2 pavillions, baseball field, skate park, basketball court, parking lot, and site furnishings Burl Wilkes Park Owner; City of Arlington Contact; Jason Landrem , 817-713-5858 This project included; sidewalks, playground boarder and surfacing, pavillion, skate park, landscaping, park furnishings Marrow Bone Springs Park Owner; City ofArlington Contact; Jason Landrem 817-713-5858 This job included; grading, grassing, erroision control Z-Boaz Park Parking Lot Owner; City of Fort Worth Contact; Scott Penn, 817-999-0261 This job includes; parking lot cubs and gutter, drainage, grassing, sidewalks and approach River Legacy Park in progress Owner; City of Arlington, Tx Contact; Eric Seebock, 817-308-9025 This job includes; excavation and embankment of approx. 20,000 cy, Side walks, drainage, erosion, gabion baskets Bimbo Baseball Field Owners Bimbo Bakery Contact; Tim Conn, 918-706-6697 This job included the rework of a baseball field Z-Boaz Dog Park Phase II Owner; City of Fort Worth, Tx. Contact; Scott Penn, 817-999-0261 This job includes, grading, sidewalks, fencing, grassing, building a tank, landscaping, stone entry Unity Arch Owner; City of Arlington Texas Contact; De'Onna Garner, 817-459-6937 This job includes, grading, foundation for art sculpture, block and stone walls, decomposed walking path, drainage, lighting, landscaping and irrigation. Lake Worth Ball Park In Progress Owner; City of Lake Worth This job includes, 42" drain pipe, retaining wall, sidewalks and flat work, grassing, and fencing JT Hinkle Park /Coventry Hills Park Owner City of Fort Worth Texas Contact: Tonda Rice 2 parks to include grading, sidewalks, drainage and landscaping Current./Pre-vious Major Projects—Ra}-dont. Inc Name Address General Amount Scone of Work Baird ISD Baird,TX Gallagher Const 588,366.00 Site Werk-2016 ACU Football Stadium Abilene.TX Hoar Construction 5837,601.00 Site Work-Current Stanley Ford Abilene,TX Pharr Construction 5805,664.00 Site'Wlork -Current Hendrick Hospice Abilene,TX imperial Construction S518,158.00 Site Work-Current Texas Tech HSC Abilene,TX imperial Construction S306,000.00 Site Work-Current Abilene Walmart Abilene.TX MW Builders 5999,401.00 Site Work-2016 Utilities Bonham Elementary Abilene, TX Crowe Group 5962,301.00 Site Work-Current Bowie Elementary Abilene, TX Crowe Group S666,4[4.37 Site Work-2015 New Facility Abilene,TX BWd S2.139,741.00 Site Work-2015 Southlake Estates Abilene,TX McLeod Property 5385,570.00 Site Work-Current Development Maddux Road Mineral Wells,TX Parker County 59981581.70 Site Work-2015 Parker County Breckenridge WWTP Breckenridge,TX Pepper Lawson 51,000,341.66 Site Work-2015 Hamby WWTP Abilene,TX Pepper Lawson $4,346,889.00 Site Work-2015 Hendrick Medical Abilene,TX Imperial Construction S368,722.00 Site Work-2015 Plaza Eastland Municipal Eastland,TX TXDOTT Aviation S 1,086,676.00 Site Work-2015 Airport Division Wylie Kindergarten Abilene,TX Crowe Group $637,180.00 Site Work-2014 Breckenridge Breckenridge, TX Crossland Const $686,390.00 Site Work-2014 Walmart Stamford Walmart Stamford,TX Crossland Const 5545,000.00 Site Work-2014 Street Improvements Merkel,TX Jacob R. Martin $1,135,110.00 Site Work-2012 ACU Student Center Abilene,TX Hoar Construction. 5369,066.00 Site Work-2012 School of Nursing Abilene,TX Hoar Construction 5620,136.00 Site Work-2012 Abilene Bone& Abilene,TX Crowe Group 5530,872.00 Site Work--2013 .Joint City Park Albany,TX City of Albany 5654.895.2=1 Site Work-2012 Improvements Sant"s Club 8226-7 Abilene, TX S R P Construction S 1.750,000.00 Site Work-2013 Gardendale L.IviP Gardendale,TX Lyness Construction 5760,760.00 Site Work--2012 Haskell 1SD Haskell, TX W.B. Kibler 5176,438.00 Site Work-2011 Additions Mchilu ry University Abilene,TX Raydon,Inc. $1,099,135,00 Site Work-2012 Stadium Addition References: Jeff Luther Construction Contact; Don Mark Nickson (325)676-8294 Imperial Construction Contact: Chad Barnard (817)341-8886 The Crowe Group Contact:Jed Crowe (325)676-0132 Hoar Construction Contact: Sean Carle (512)439-5069 Jacob& Martin Contact: Ken Martin (3 25)695-1070 00 45 14 BIDDER'S STATEMENT OF QUALIFICATIONS Page 2 of 5 NAME/TELEPHONE NUMBER OF OWNER NAME/TELEPHONE NUMBER OF SURETY AMOUNT OF CONTRACT COMPLETION DATE SCOPE OF WORK DESCRIPTION PROJECT NAME AND LOCATION NAME/TELEPHONE NUMBER OF OWNER NAME/TELEPHONE NUMBER OF SURETY AMOUNT OF CONTRACT COMPLETION DATE SCOPE OF WORK DESCRIPTION PROJECT NAME AND LOCATION NAME/TELEPHONE NUMBER OF OWNER NAME/TELEPHONE NUMBER OF SURETY AMOUNT OF CONTRACT COMPLETION DATE SCOPE OF WORK DESCRIPTION PROJECT NAME AND LOCATION CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised August 17,2012 00 45 14 BIDDER'S STATEMENT OF QUALIFICATIONS Page 3 of 5 NAME/TELEPHONE NUMBER OF OWNER NAME/TELEPHONE NUMBER OF SURETY AMOUNT OF CONTRACT COMPLETION DATE SCOPE OF WORD DESCRIPTION 2. LIST CONSTRUCTION SUPERINTENDENT'S NAME AND CONSTRUCTION EXPERIENCE: 3. LIST ALL LABOR SUBCONTRACTORS (attach additional pages as needed) SUBCONTRACTOR NAME TRADE PREVIOUS PROJECT EXPERIENCE/CONTACT NAME/TELEPHONE NUMBER A. B. C. SUBCONTRACTOR NAME CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised August 17,2012 00 45 14 BIDDER'S STATEMENT OF QUALIFICATIONS Page 4 of 5 TRADE PREVIOUS PROJECT EXPERIENCE/CONTACT NAME/TELEPHONE NUMBER A. B. C. SUBCONTRACTOR NAME TRADE PREVIOUS PROJECT EXPERIENCE/CONTACT NAME/TELEPHONE NUMBER A. B. C. SUBCONTRACTOR NAME TRADE PREVIOUS PROJECT EXPERIENCE/CONTACT NAME/TELEPHONE NUMBER A. B. C. SUBCONTRACTOR NAME TRADE PREVIOUS PROJECT EXPERIENCE/CONTACT NAME/TELEPHONE NUMBER A. B. C. CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised August 17,2012 004514 BIDDER'S STATEMENT OF QUALIFICATIONS Page 5 of 5 Notes 1. The Prime Bidder selected for this project shall submit Letters Of Intent executed between the Prime Bidder and any and all subcontractors to be utilized on this project within five working days of being recognized as the overall qualified low Prime Bidder by the City. Subsequent substitution of sub-contractors must be approved by the City. 2. Prime Bidder shall include financial statement in this submittal. CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised August 17,2012 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page i of 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 4 Pursuant to Texas Labor Code Section 406.096(a),as amended,Contractor certifies that it 5 provides worker's compensation insurance coverage for all of its employees employed on City 6 Project No.02735.Contractor further certifies that,pursuant to Texas Labor Code,Section 7 406.096(b),as amended,it will provide to City its subcontractor's certificates of compliance with 8 worker's compensation coverage- 9 10 CONTRACTOR: 12 B 13 Companyease Priv 14 ,. - 15 �� ,� � Signature: 16 Address 17 18 - ►z � i1� ��� Title: -C=�' u�-�cQ �'-� 19 City/State/Zip L-,4:Z4 (Please Print) 20 21 22 THE STATE OF TEXAS § 23 24 COUNTY OF TARRANT § 25 26 BE ORE ME,the undersigned authority,on this day personally appeared 27known to me to be the person whose name is 28 subscribed to the foregoing instrument,and acknowledged to me that he/she executed the same as 29 the act and deed of for the purposes and 30 consideration therein expressed and in the capacity therein stated. 31 32 GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 33 M(Jlf[ ,201-7 34 35 - % ROSALBA SAMAN IEGO 37 .- M Notary ID 130744667 Notary Public in and for the tate of Texas ;fib= y 38 ,+, � _�, +�,� Expires July 19,2020 39 END OF SECTION 40 CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised July 1,2011 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 4 Pursuant to Texas Labor Code Section 406.096(a),as amended,Contractor certifies that it 5 provides worker's compensation insurance coverage for all of its employees employed on City 6 Project No. 02735. Contractor further certifies that,pursuant to Texas Labor Code,Section 7 406.096(b),as amended,it will provide to City its subcontractor's certificates of compliance with 8 worker's compensation coverage. 9 10 CONTRACTOR: 11 / 12 I f✓• By: ELG f2T�S 13 Com( 'p�a ease Print) 14 15 V�� ✓O/r Signature: � 16 Address 17 18 bye(1k?1VViAPeT--X 104 Title: _ 19 City/State/Zip T (Please Print) 20 21 22 THE STATE OF TEXAS § 23 24 COUNTY OF TARRANT § 25 26 BtntMrsi uthority,on this day personally appeared 27 c ,known to me to be the person whose name is 28 subscribed to the foreg Pand t a da�knowledged to me that he/she executed the same as 29 the act and deed of V' for the purposes and 30 consideration therein expressthe capacity therein stated. 31 32 GIV I,n MY HAND SEAL OF OFFICE this day of 33 !Y , 34 35 E,., �. SHELLEY ANNE JACKSON 36 O�, Notary Public,State of Texas 37 Comm.Expires 01-20-2Wt y Public inInd f r the State of Texas .." Notary ID 130503659 38 39 END OF SECTION 40 CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised July 1,2011 004540-1 Minority Business Enterprise Specifications Page 1 of 2 1 SECTION 00 45 40 2 Minority Business Enterprise Specifications 3 [Text in Blase is for information or guidance.Remove all Blue text in the project final document] 4 [This document is to be printed on "pink"paper in its final form] 5 APPLICATION OF POLICY 6 If the total dollar value of the contract is greater than $50,000, then a MBE subcontracting goal is 7 applicable. 8 9 POLICY STATEMENT 10 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority 11 Business Enterprises (MBE) in the procurement of all goods and services. All requirements and 12 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. 13 14 MBE PROJECT GOALS 15 The City's MBE goal on this project is 10% of the total bid value of the contract (Base bid applies to 16 Parks and Community Services). 17 18 Note: If both MBE and SBE subcontracting goals are established for this project, then an Offeror 19 must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. 20 21 COMPLIANCE TO BID SPECIFICATIONS 22 On City contracts $50,000 or more where a MBE subcontracting goal is applied,Offerors are required to 23 comply with the intent of the City's Business Diversity Enterprise Ordinance by one of the following: 24 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation,or 25 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation,or 26 3. Good Faith Effort documentation,or; 27 4. Prime Waiver documentation. 28 29 SUBMITTAL OF REOUIRED DOCUMENTATION 30 The applicable documents must be received by the Purchasing Division, within the following times 31 allt)L:aLecl. in order for the entire bid to be considered to the 32 defiver the M11E docunwritatlotii ira persOn to Clic approprinte employee of the purchasing divi:;ion 33 obtain a date{timc re'Capt. Such receipt shatlf be evidenec! that the Ciiy received the €iocumentat on in time allocuted. A faxed arid/or emailed copy will not be accepted. 35 1. Subcontractor Utilization Form,if received no later than 2:00 p.m., on the second City business goal is met or exceeded: day after the bid opening date, exclusive of the bid opening date. 2. Good Faith Effort and received no later than 2:00 p.m., on the second City business Subcontractor Utilization Form,if day after the bid opening date, exclusive of the bid opening participation is less than statedgoal: date. 3. Good Faith Effort and received no later than 2:00 p.m., on the second City business Subcontractor Utilization Form,if no day after the bid opening date, exclusive of the bid opening MBE participation: date. 4. Prime Contractor Waiver Form, received no later than 2:00 p.m., on the second City business if you will perform all day after the bid opening date, exclusive of the bid opening contracting/supplier work: date. 36 CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised June 9,2015 004540-2 Minority Business Enterprise Specifications Page 2 of 2 1 5. Joint Venture Form,if goal is met received no later than 2:00 p.m., on the second City business or exceeded. day after the bid opening date, exclusive of the bid opening date. 2 FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE 3 WILL RESULT IN THE BID BEING CONSIDERED NON-RESONSIVE TO SPECIFICATIONS. 4 FAILURE TO SUBMIT THE REQUIRED MBE DOCUMENTATION WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE.A SECOND FAILURE WILL RESULT IN THE OFFEROR 5 BEING DISQUALIFIED FOR A PERIOD OF ONE YEAR.THREE FAILURES IN A FIVE YEAR 6 PERIOD WILL RESULT IN A DISQUALIFICAITON PERIOD OF THREE YEARS. 7 Any Questions,Please Contact The N WBE Office at(817)212-2674. 8 END OF SECTION 9 10 11 CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised June 9,2015 ATTACHMENT IA Page 1 of 4 FORT WORTH City of Fort Worth Minority Business Enterprise MBE Subcontractors/Suppliers Utilization Form OF7R COMPANY NAME: Check applicable block to describe Offeror C «��C_ ., M!WlDBE JAI NON-MNV/DBE PROJECT � � 7JE 0'(' je (96,CQ CA.v-CX BI ..D.^,ATE PmeL k-A wi C-( LTVI,�15�)1 zc-)V<E�-Y44-Q-0, 35_C71 City's MBF Project Goal hr's MBE Project Commitment: PROJECT NUMBER '?7�� Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Purchasing Division no later than 2:00 p.m. on the second City business day after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the MBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications. MBEs listed toward meeting the project goal must be located in the six (6) county marketplace at the time of bid or the business has a Sign cant Business Presence in the Marketplace. Marketplace is the geographic area of Tarrant, Dallas, Denton,Johnson, Parker, and Wise counties. Prime contractors must identify by tier level of all subcontractors/suppliers. Tier means the level of subcontracting below the prime contractor/consultant i.e. a direct payment from the prime contractor to a subcontractor is considered 1 st tier, a payment by a subcontractor to its supplier is considered 2"d tier. The prime contractor is responsible to provide proof of payment of all tiered subcontractors identified as a MBE and counting those dollars towards meeting the contract committed goal. 4 ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located within the Marketplace, that have been determined to be a bondafide minority business enterprise by the North Central Texas Regional Certification Agency(NCTRCA) or other certifying agencies that the City may deem appropriate and accepted by the City of Fort Worth. If hauling services are utilized, the Offeror will be given credit as long as the MBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The MBE may lease trucks from another MBE firm, including MBE owner-operated, and receive full MBE credit. The MBE may lease trucks from non-MBEs, including owner-operated, but will only receive credit for the fees and commissions earned by the MBE as outlined in the lease agreement. Rev.2/10/15 FORTWORTH ATTACHMENT 1A Page 3 of 4 Offerors are nxpxFed W identify ALL regardless of status: i-e_. May and ngn4ffiEs. MBE firms are to be fisted first,use additional sheets N necessary_ Ftease note that arty coed MBEs wiN be counted to meet an MBE goal- NCTRCA N SUBCONTRACTORISUPPLIER Company Name T n Detail Detail Address Te honetFax e M B U Subcontracting PurchasedSupplies DollarAmount Email r e B B E E E Contact Pelson -7 Ful ❑ � gv �� SeVt�,e ® ❑ FOR_..TwORTH ATTACHMENT 1A Page 3 of 4 Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority,and non-MBEs. MBE firms are to be €fisted first,use additional sheets if necessary. Please note that only certified MBEs will be counted to meet an MBE goal. NCTRCA N SUBCONTRACTORISUPPLIER ° Company Name T n Detail Detail Address i Subcontracting Supplies Telephone/Fax ' B B B Work Purchased Dollar Amount Email E E Contact Person E ❑ ❑ Rev.2/10115 Page 4&A Total Dollar Amount of MBE Subcontractors/Suppliers $ )) `` '' ii O Total Dollar Amount of Non-MBE Subcontractors/Suppliers $ ) C1 L-� (i •12 � TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORSISUPPLIERS $ s The Offeror will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office through the submittal of a Request for Approval Change/Addition form. Any unjustified change or deletion shall be a material breach of contract and may in debarment in accord with the procedures outlined in the ordinance. The Offeror shall submit a de= explanation of how the requested change/addition or deletion will affect the committed MBE goal. If the explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon reqs„ complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and any special arrangements with MBEs. The Offeror also agrees to allow an audit and/or examination of aiy books, records and files held by their company. The Offeror agrees to allow the transmission of interviews w � owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contrail tt� will substantiate the actual work performed by the MBE(s) on this contract, by an authorized officer or empkroe of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the cortract or debarment from City work for a period of not less than three (3) years and for initiating action under Federa, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a mate breach of the contract and may result in a determination of an irresponsible Offeror and debarment participating in City work for a period of time not less than one(1) year. c9--� A orized Signature Printed Signature Title Contact Hanve T'Rfe(if dist) company Nailne Telephone and/or Fax Address E-mail Address CIV/state/zip Date 3s �r Rev_21 G� °r LETTER OF INTENT 03/09/2017 Sleepers Erosion control Inc, 9940 Tanglevine Dr Dallas Texas M214-549-6766 Chris Sleeper, This is a letter to inform your company that Raydon Inc. intends to use you as a subcontractor on the "Trinity Park Road and Parking Improvements" project for the City of Fort Worth. The following item is what is to be purchased; erosion control, swppp, grassing and guard fence. Total price from Quote is $36,948.00 PLEASE SIGN AND RETURN ASAP If you have any questions please call me at 817-7734601 Thank You, Brian Smith Project Manager, Raydon Inc. RAYDON INC. Sleeper's Erosion Control Inc. PLEASE SIGN AND RETURN LETTER OF INTENT 03/09/2017 G-Rod Construction, 1204 Old Base Road Aurora Texas Guillermo Rodrigues M682-518-4145 Guillermo Rodrigues, This is a letter to inform your company that Raydon Inc. intends to use you as a subcontractor on the "Trinity Park Road and Parking Improvements" project for the City of Fort Worth. The following item is what is to be purchased; Asphalt paving with Silvia`s Trucking being used as a second teir MBE sub. Total price from Quote is $5000.00 PLEASE SIGN AND RETURN ASAP If you have any questions please call me at 817-773-4601 Thank You, Brian Smith Project Manager, Raydon Inc. h az�e�, GRod Cons ction, LLC RAYDON INC. PLEASE SIGN AND RETURN 004541-1 SMALL BUSINESS ENTERPRISE GOAL Page 1 of 2 1 SECTION 00 45 41 2 SMALL BUSINESS ENTERPRISE GOAL 3 [Text in Blue is for information or guidance.Remove all Blue text in the project final document] 4 [This document is to be printed on "pink"paper in its final form] 5 APPLICATION OF POLICY 6 If the total dollar value of the contract is $50,000 or more, then a SBE subcontracting goal is 7 applicable. 8 9 POLICY STATEMENT 10 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Small 11 Business Enterprises (SBE) in the procurement of all goods and services. All requirements and 12 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. 13 14 SBE PROJECT GOAL 15 The City's SBE goal on this project is <Insert project goal percentage>%of the base bid(Base bid 16 applies to Parks and Community Services). 17 18 Note: If both MBE and SBE subcontracting goals are established for this project, then an 19 Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed 20 responsive. 21 22 COMPLIANCE TO BID SPECIFICATIONS 23 On City contracts$50,000 or more where a SBE subcontracting goal is applied Offerors are required 24 to comply with the intent of the City's Business Diversity Enterprise Ordinance by one of the 25 following: 26 1. Meet or exceed the above stated SBE goal through SBE subcontracting participation,or 27 2. Meet or exceed the above stated SBE goal through SBE Joint Venture participation,or 28 3. Good Faith Effort documentation,or; 29 4. Prime Waiver documentation. 30 31 SUBMITTAL OF REQUIRED DOCUMENTATION 32 The applicable documents must be received by the Purchase Division, within the followinu times 33 allocated, in order for the entire bid to be considered re�porisive to the spFuifications. The 6fred 34 i e i ` t MvM n iw n zsf tr A the appropriate emplii 'of-the pure 35 diVision and obtain s datOthue receipt. Such reocipt sli0l be e-,vidence that the City receiv 36 documerltation.in the lime allocated. A, x_ deandlgr mqt4apy will not be accepted. 1. Subcontractor Utilization Form, it goal is receivut no later than 290 p.m.,on the-m.,.oml City business met or exceeded: day after the bid opening date, exclusive of the bid opening date. 2. Good Faith Effort and Sub"intrur:ter received no later than 2:00 p.m.,on the second City business Utilization Form,if participation is less than days after the bid opening date,exclusive of the bid opening stated goal, date. _ 3. Good Faith Effort and Subcontractor received no later than 2:00 p.m.,on the second City business Utilization Form,if no MBE participation: days after the bid opening date,exclusive of the bid opening _ date. 4. Prime Contractor Waiver Form,if firm received no later than 2:00 p.m.,on the second City business will perform all subcontracting/supplier work: days after the bid opening date,exclusive of the bid opening date. 37 CITY OF FORT WORTH Trinity Park Road and Packing Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised June 9,2015 004541-2 SMALL BUSINESS ENTERPRISE GOAL Page 2 of 2 1 5. Joint Venture Form,if goal is met or received no later than 2:00 p.m.,on the second City business exceeded: days after the bid opening date, exclusive of the bid opening date. 2 3 FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE 4 ORDINANCE WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO 5 SPECIFICATIONS. 6 FAILURE TO SUBMIT THE REQUIRED MBE DOCUMENTATION WILL RESULT IN 7 THE BID BEING CONSIDERED NON-RESPONSIVE.A SECOND FAILURE WILL 8 RESULT IN THE OFFEROR BEING DISQUALIFIED FOR A PERIOD OF ONE YEAR. 9 THREE FAILURES IN A FIVE YEAR PERIOD WILL RESULT IN A 10 DISQUALIFICATION PERIOD OF THREE YEARS. 11 Any questions,please contact the M/WBE Office at(817) 212-2674 12 13 END OF SECTION CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised June 9,2015 005243-1 Agreement Page 1 of 5 1 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on May 9, 2017 is made by and between the City of Forth 4 Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, 5 ("City"), and Raydon, Inc., authorized to do business in Texas, acting by and through its duly 6 authorized representative, ("Contractor"). 7 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article 1.WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2.PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: 15 Trinity Park Road and Parking Improvements 16 Project Number CO2735 17 Article 3. CONTRACT TIME 18 3.1 Time is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to this Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within 90 to 180 days after the date when 23 the Contract Time commences to run as provided in Paragraph 2.03 of the General 24 Conditions. 25 3.3 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that City will 27 suffer financial loss if the Work is not completed within the times specified in Paragraph 28 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the 29 General Conditions. The Contractor also recognizes the delays, expense and difficulties 30 involved in proving in a legal proceeding the actual loss suffered by the City if the Work 31 is not completed on time. Accordingly, instead of requiring any such proof, Contractor 32 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay 33 City Six Hundred Fifty Dollars ($650.00) for each day that expires after the time 34 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of 35 Acceptance. CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CO2735 Revised January 6,2017 00 52 43-2 Agreement Page 2 of 5 36 Article 4. CONTRACT PRICE 37 City agrees to pay Contractor for performance of the Work in accordance with the Contract 38 Documents an amount in current funds of Four Hundred Twenty Five One Hundred Eighty One 39 Dollars and 80/100 ($425,181.80). 40 Article 5. CONTRACT DOCUMENTS 41 5.1 CONTENTS: 42 A. The Contract Documents which comprise the entire agreement between City and 43 Contractor concerning the Work consist of the following: 44 1. This Agreement. 45 2. Attachments to this Agreement: 46 a. Bid Form 47 1) Proposal Form 48 2) Vendor Compliance to State Law Non-Resident Bidder 49 3) Prequalification Statement 50 4) State and Federal documents(project specific) 51 b. Current Prevailing Wage Rate Table 52 c. Insurance ACORD Form(s) 53 d. Payment Bond 54 e. Performance Bond 55 f. Maintenance Bond 56 g. Power of Attorney for the Bonds 57 h. Worker's Compensation Affidavit 58 i. MBE and/or SBE Commitment Form 59 j. Form 1295 Certification No. 101 60 3. General Conditions. 61 4. Supplementary Conditions. 62 5. Specifications specifically made a part of the Contract Documents by attachment 63 or, if not attached, as incorporated by reference and described in the Table of 64 Contents of the Project's Contract Documents. 65 6. Drawings. 66 7. Addenda. 67 8. Documentation submitted by Contractor prior to Notice of Award. 68 9. The following which may be delivered or issued after the Effective Date of the 69 Agreement and, if issued, become an incorporated part of the Contract Documents: 70 a. Notice to Proceed. 71 b. Field Orders. 72 c. Change Orders. 73 d. Letter of Final Acceptance. 74 75 CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CO2735 Revised January 6,2017 00 52 43-3 Agreement Page 3 of 5 76 Article 6. INDEMNIFICATION 77 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 78 expense, the city, its officers, servants and employees, from and against any and all 79 claims arising out of, or alleged to arise out of, the work and services to be performed 80 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 81 under this contract. This indemnification provision is specifically intended to operate 82 and be effective even if it is alleged or proven that all or some of the damages being 83 sought were caused, in whole or in part, by any act, omission or negligence of the city. 84 This indemnity provision is intended to include, without limitation, indemnity for 85 costs, expenses and legal fees incurred by the city in defending against such claims and 86 causes of actions. 87 88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 89 the city,its officers,servants and employees,from and against any and all loss,damage 90 or destruction of property of the city,arising out of,or alleged to arise out of,the work 91 and services to be performed by the contractor, its officers, agents, employees, 92 subcontractors, licensees or invitees under this contract. This indemnification 93 provision is specifically intended to operate and be effective even if it is alleged or 94 proven that all or some of the damages being sought were caused, in whole or in part, 95 by any act,omission or negligence of the city. 96 97 Article 7. MISCELLANEOUS 98 7.1 Terms. 99 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 100 have the meanings indicated in the General Conditions. 101 7.2 Assignment of Contract. 102 This Agreement, including all of the Contract Documents may not be assigned by the 103 Contractor without the advanced express written consent of the City. 104 7.3 Successors and Assigns. 105 City and Contractor each binds itself, its partners, successors, assigns and legal 106 representatives to the other party hereto, in respect to all covenants, agreements and 107 obligations contained in the Contract Documents. 108 7.4 Severability. 109 Any provision or part of the Contract Documents held to be unconstitutional, void or 110 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 111 remaining provisions shall continue to be valid and binding upon CITY and 112 CONTRACTOR. 113 7.5 Governing Law and Venue. 114 This Agreement, including all of the Contract Documents is performable in the State of 115 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 116 Northern District of Texas,Fort Worth Division. CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CO2735 Revised January 6,2017 00 52 43-4 Agreement Page 4 of 5 117 7.6 Other Provisions. 118 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is 119 classified, promulgated and set out by the City, a copy of which is attached hereto and 120 made a part hereof the same as if it were copied verbatim herein. 121 7.7 Authority to Sign. 122 Contractor shall attach evidence of authority to sign Agreement, if other than duly 123 authorized signatory of the Contractor. 124 125 CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CO2735 Revised January 6,2017 005243-5 Agreement Page 5 of 5 126 IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple 127 counterparts. 128 129 This Agreement is effective as of the last date signed by the Parties("Effective Date"). 130 Contractor: Raydon, Inc. City of Fort Worth B . nis Susan Al, By: ssistant City Manager gnature) Date Attest: (Printed Name) City Secretary (Seal) �0F FQ/... Title Address: ?. �D� Z71 M&C #C-28231 Date: May 9, 2017 Ci /State/ /%Ce� l�r CAS ty zov-r Approved as to Form and Legality: TS-/7 Date Douglas W. Black Assistant City Attorney 131 132 133 APPROV O \ 134 J 135 136 137 ichard Zavala 138 RECTOR, 139 Park and Recreation Department 140 OFFICIAL RECORD CITY SECRETARY VT,'WORMTX CITY OF FORT WORTFI T nity Park Road and rovements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CO2735 Revised January 6,2017 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. N e of Employee Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature 006113-1 PERFORMANCE BOND Page 1 of 2 Bond No. S914-9178 1 SECTION 00 6113 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, Raydon, Inc. ,known as 9 "Principal"herein and Washington International Insurance Company ,a corporate 10 surety(sureties,if more than one)duly authorized to do business in the State of Texas,known as I 1 "Surety"herein(whether one or more),are held and firmly bound unto the City of Fort Worth,a 12 municipal corporation created pursuant to the laws of Texas,known as"City"herein,in the penal 13 SUM of, Four Hundred Twenty Five Thousand One Hundred Eighty One and 80/100 Dollars 1.4 ($425,181.80 ),lawful money of the United States,to be paid in Fort Worth, 15 Tarrant County,Texas for the payment of which sum well and truly to be made,we bind 16 ourselves,our heirs,executors,administrators,successors and assigns,jointly and severally, 17 firmly by these presents. 18 WIM AS,the P 'ncjpal has entered into a rtain written contract with the City 19 awarded the` y of u{ — , 20"which Contract is hereby referred to and 19 awarded the W 20 made a part hereof for all purposes as if fully set forth herein,to furnish all materials,equipment 21 labor and other accessories defined by law,in the prosecution of the Work,including any Change 22 Orders,as provided for in said Contract designated as Trinity Park Road and Parking 23 Improvements,Project No,02735. 24 NOW,THEREFORE,the condition of this obligation is such that if the said Principal 25 shall faithfully perform it obligations under the Contract and shall in all respects duly and 26 faithfully perform the Work,including Change Orders,under the Contract,according to the plans, 27 specifications,and contract documents therein referred to,and as well during any period of 28 extension of the Contract that may be granted on the part of the City,then this obligation shall be 29 and become null and void,otherwise to remain in full force and effect. 30 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in 31 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 32 Worth Division. CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised July 1,2011 0061 l3-2 PERFORMANCE BOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code,as amended,and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 IN WITNESS WHEREOF,the Principal and the Surety have I 1&D and SEALED 5 this strument by dul authorized agents and officers on this the ''11�� f day of 6 M ,20 7 PRINCIPAL: 8 Raydon, Inc. 9 10 11 BY 12 7 Signature 13 ATTEST: 14 15 Darrell Shortes, President 16 (Principal)Secretary Name and Title 17 18 Address: P.O.Box 671 19 Breckenridge,TX 76424 2 211 rr u 22 Witness as to Prin ipal 23 SURETY: 24 Washington International Insurance Company 25 26 27 BY: 28 Si a e 29 30 Kevin J. Dunn, Attorney-in-Fact__ 31 Name and Title 32 33 Address: 1450 American Lane,Suite 1100 34 _� Schaumburg,IL 60173 35 36 37 1 e as to t Telephone Number: 600-336-0753 38 39 40 41 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 42 from the by-laws showing that this person has authority to sign such obligation. If 43 Surety's physical address is different from its mailing address,both must be provided. 44 The date of the bond shall not be prior to the date the Contract is awarded. 45 CITY OF FORT WORTH Trinity Part Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised July 1,2011 006114-1 PAYMENT BOND Page 1 of 2 Bond No. S914-9178 1 SECTION 00 6114 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALI,BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, Raydon, Inc. , known as 9 "Principal' herein, and Washington International Insurance Company — a 10 corporate surety (sureties), duly authorized to do business in the State of Texas, known as 11 "Surety" herein(whether one or more),are held and firmly bound unto the City of Fort Worth,a 12 municipal corporation created pursuant to the laws of the State of Texas,known as"City"herein, 13 In the penal slim Of Four Hundred Twenty Five Thousand One Hundred Eighty One and 80/100 Dollars 14 ($ 425,181.80 ), lawful money of the United States, to be paid in Fort Worth, 15 Tarrant County,Texas,for the payment of which sum well and truly be made, we bind ourselves, 16 our heirs,executors, administrators, successors and assigns,jointly and severally,firmly by these 17 presents: 18 WHE AS, Principal has entered into a ertain written Contract with City,awarded the 19 ay of , 20�, which Contract is hereby referred to and 20 made a part hereof for all purposes as if fully set forth herein,to furnish all materials,equipment, 21 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 22 said Contract and designated as Trinity Park Road and Parking Improvements,Project No.02735. 23 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 24 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 25 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 26 the Contract,then this obligation shall be and become null and void, otherwise to remain in full 27 force and effect. 28 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 29 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 30 accordance with the provisions of said statute. 31 CITY OF PORT WORTH Trinity Park Road and Packing Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised July 1,2011 0061 14-2 PAYMENTBOND Page 2 of'2 1 IN WITNFSS WHEREOF,the Principal and Surety have each S:IT"M SEALED 2 this 'nstrument by duly aut rized agents and officers on this the day of 3 4 PRINCIPAL: Raydon, Inc. ATTEST: BY: i nature Darrell Shortes, President (Principal)Secretary Name and Title L Address: P.O.Box 671 s)uw(�,aC � Breckenridge,TX 76424 Witness as tonc' al SURETY: Washington International Insurance Company ATTEST: BY: �- K igna e Kevin J. Dunn, Attorney-In-Fact (Surety)Secretary Name and Title Address: 1450 American Lane,Suite 1100 Schaumburg,IL 60173 JtWas fO r Telephone Number: e00-33e-0753 5 6 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 7 bylaws showing that this person has authority to sign such obligation. If Surety's physical S address is different from its mailing address,both must be provided. 9 10 The date of the bond shall not be prior to the date the Contract is awarded. 11 END OF SECTION 12 CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised July 1,2011 0061 19-1 MAINTENANCE BOND Page I of 3 Bond No. S914-9178 1 SECTION 00 6119 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Raydon, Inc. ,known as 9 "Principal'herein and Washington International Insurance Company ,a corporate surety 10 (sureties,if more than one)duly authorized to do business in the State of Texas,known as 11 "Surety"herein(whether one or more),are held and firmly bound unto the City of Fort Worth,a 12 municipal corporation created pursuant to the laws of the State of Texas,known as"City"herein, 13 in the sum of Four Hundred Twenty Five Thousand One Hundred Eighty One and 80/100 Dollars 1.4 ($ 425.181.80 ),lawful money of the United States,to be paid in Fort Worth, 15 Tarrant County,Texas,for payment of which sum well and truly be made unto the City and its- 16 successors,we bind.ourselves,our heirs,executors,administrators,successors and assigns,jointly 17 and severally,firmly by these presents. 18 19HEREAS e Principal has entered into a certain wr1 n contract with the City awarded 20 the day of � � ,20 ,,which Contract is hereby 21 referred to and a made part hereof for all purposes as if fully set forth herein,to furnish all 22 materials,equipment labor and other accessories as defined by law,in the prosecution of the 23 Work,including any Work resulting from a duly authorized Change Order(collectively herein,..,... 24 the"Work") as provided for in said contract and designated as Trinity Park Road and Parking 25 Improvements,Project No.02735;and 26 27 WHEREAS,Principal binds itself to use such materials and to so construct the Work iib 28 accordance with the plans,specifications and Contract Documents that the Work is and will 29 remain free from defects in materials or workmanship for and during the period of two(2)years 30 after the date of Final Acceptance of the Work by the City("Maintenance Period"); and 31 32 WHEREAS,Principal binds itself to repair or reconstruct the Work in whole or in part 33 upon receiving notice from the City of the need therefor at any time within the Maintenance 34 Period. CITY OF FORT WORTH Trinity Park Road and Parking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised July 1,2011 006119-2 MAINTENANCE BOND Page 2 of 3 i 2 NOW THEREFORE,the condition of this obligation is such that if Principal shall 3 remedy any defective Work,for which timely notice was provided by City,to a completion 4 satisfactory to the City,then this obligation shall become null and void;otherwise to remain in 5 full force and effect. 6 7 PROVIDED,HOWEVER, if Principal shall fail so to repair or reconstruct any timely 8 noticed defective Work,it is agreed that the City may cause any and all such defective Work to 9 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and 10 the Surety under this Maintenance bond;and 11 12 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in 13 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 14 Worth Division;and 15 16 PROVIDED FURTHER,that this obligation shall be continuous in nature and 17 successive recoveries may be had hereon for successive breaches. 18 19 20 C1TY OF FORT WORTH Trinity Pack Road and Packing Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised July 1,2011 006119-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF,the Principal and the Surety have c GNED and SEALED this 2 instrurAent by duly authorized agents and officers on this the day of 3 ,20U. 4 5 PRINCIPAL: 6 PAydon, Inc. 7 8 9 BY: 10 Signature 11 ATTEST: 12 13 Darrell Shortes, President 14 (Principal)Secretary Name and Title 15 16 Address: P.o.Box 671 17 Breckenridge,TX 76424 18 19 20 Witness as to P `ncip 1 21 SURETY: 22 Washington International Insurance Company 23 24 25 BY: 26 Sign to 27 28 Kevin J. Dunn, Attomey-In-Fact 29 ATTEST: Name and Title 30 31 A Address: 1450 American Lane,Suite 1100 32 (S �Secretary Schaumburg,IL 60173 _ 33 34 35as to Telephone Number: 800-338-0753 36 37 *Note: I signed by an officer of the Surety Company,there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address, both must be provided. 40 The date of the bond shall not be prior to the date the Contract is awarded. 41 CITY OF FORT WORTH Trinity Park Road and Perking Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No.02735 Revised July 1,2011 NAS SURETY GROUP NORTH AMERICAN SPECIALTY INSURANCE COMPANY WASHINGTON INTERNATIONAL INSURANCE COMPANY WESTPORT INSURANCE CORPORATION GENERAL POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS,TI IAT North American Specialty Insurance Company,a corporation duly organized and existing under laws of the State of New Hampshire,and having its principal office in the City of Manchester,New Hampshire and Washington International Insurance Company a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City of Schaumburg, Illinois,and Westport Insurance Corporation,organized under the laws of the State of Missouri,and having its principal office in the City of Overland Park,Kansas each does hereby make,constitute and appoint: W.LAWRENCE BROWN,TRACY TUCKER,KEVIN J.DUNN and STEVEN TUCKER JOINTLY OR SEVERALLY Its true and lawful Attomey(s)-in-Fact,to make,execute,seal and deliver,for and on its behalf and as its act and deed,bonds or other writings obligatory in the nature of a bond on behalf of each of said Companies,as surety,on contracts of suretyship as are or may be required or permitted by law,regulation,contract or otherwise,provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the amount of: ONE HUNDRED TWENTY FIVE MILLION(5125,000,000.00)DOLLARS This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of Directors of North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held on March 24,2000 and Westport Insurance Corporation by written consent of its Executive Committee dated July 18,2011. "RESOLVED,that any two of the President,any Senior Vice President,any Vice President,any Assistant Vice President, the Secretary or any Assistant Secretary be,and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named in the given Power of Attorney to execute on behalf of the Company bonds,undertakings and all contracts of surety,and that each or any of them hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is FURTI IER RESOLVED,that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile,and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be binding upon the Company when so affixed and in the future with regard to any bond,undertaking or contract of surety to which it is attached." ttONq"Z I j aQc . " iRwiy)R\ p �T •s' Bye ,vim« 'ey z .• F.� SEAL F,tyoms_• Steven n arson, eee P-r—esident of Washington aInsurance Company &Senior Vice President or North American Specialty Insurance CompanySEAL n O, �1�+13R 1973 turd t9 t &Senior Vice President orW/rsJtpart Insurance Corporation MW. �e.�� 1 1 G .NAM.... • �` �•a J q��iyl4ipN M•��aL\�\� y......... a By r Mike A.Ito,Senior Vice President or Washington International Insurance Company &Senior Vice President or North American Specialty Insurance Company &Senior Vice President or Westport Insurance Corporation IN WITNESS WHEREOF,North American Specialty Insurance Company,Washington International Insurance Company and Westport Insurance Corporation have caused their official seals to be hereunto affixed,and these presents to be signed by their authorized officers this this 11th day of June 20 14 . North American Specialty Insurance Company Washington International Insurance Company State of Illinois Westport Insurance Corporation County of Cook SS: On this 1 Ith day of June 2014 before me,a Notary Public personally appeared Steven P.Anderson ,Senior Vice President of Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and Senior Vice President of Westport Insurance Corporation and Michael A.Ito Senior Vice President of Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and Senior Vice President of Westport Insurance Corporation,personally known to me,who being by me duly sworn,acknowledged that they signed the above Power of Attorney as officers of and acknowledged said instrument to be the voluntary act and deed of their respective companies. OFFICIAL SEAL M KENNY • t ` 3i� NOTARY PUBLIC,STATE OF IWNOIS M.Kenn Notary Publ is W WMMISSiON EXPIRES 12104/2017 y' 1, Jeffrey Goldberg the duly elected Vice President and Assistant Secretary of North American Specialty Insurance Company,Washington International Insurance Company ind Westport Insurance Corporation do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said North American Specialty Insurance Company,Washington International Insurance Company and Westport Insurance Corporation which is still in full force and effect. P �,��1— y �, �--'-' IN WITNESS WHEREOF,I have set rn affixed hand and axed the seals of the Companies this da of 20 Jeffrey Goldberg,Vice President&Assistant Secretary of Washington International Insurance Companv& North American Specialty Insurance Company&Vice President&Assistant Secretary of Westport Insurance Corporation IMPORTANT NOTICE AVISO IMPORTANTE In order to obtain information or make a complaint: Para obtener informacion o para someter un queja: You may contact Jim Carpenter, Vice President - Puede comunicarse con Jim Carpenter,Vice Claims,at 1-800-338-0753. President- Claims,at 1-800-338-0753. You may call Washington International Insurance Usted puede llamr at numero de telefono gratis de Company and/or North American Specialty Washington International Insurance Company Insurance Company's toll-free number for and/or North American Specialty Insurance information or to make a complaint at: Company's para informacion o para someter una queja at: 1-800-338-0753 1-800-338-0753 You may also write to Washington International Usted tambien puede escribir a Washington Insurance Company and/or North American International Insurance Company and/or North Specialty Insurance Company at the following American Specialty Insurance Company at: address: 1400 American Lane, Suite 1100 1400 American Lane,Suite 1100 Schaumburg,IL 60173 Schaumburg,IL 60173 You may contact the Texas Department of Insurance Puede escribir at Departmento de Seguros de Texas to obtain information on companies, coverages, rights para obtener informacion acerca de companias, or complaints at: coberturas, derechos o quejas at: 1- 800-252-3439 1- 800-252-3439 You may write the Texas Department of Insurance: Puede escribir at Departmento de Seguros de Texas: P.O. Box 149104 P.O. Box 149104 Austin,TX 78714-9104 Austin,TX 78714-9104 Fax: (512) 475-1771 Fax: (512)475-1771 Web: http://www.tdi.state.tx.us Web: http://www.tdi.state.tx.us E-mail: E-mail: ConsumerProtectionC&tdi.state.tx.us ConsumerProtection( tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS O RECLAMOS: Should you have a dispute concerning your premium or Si tiene una disputa concerniente a su prima o a un about a claim you should first contact the Washington reclamo,debe comunicarse con el Washington International Insurance Company and/or North International Insurance Company and/or North American Specialty Insurance Company. If the American Specialty Insurance Company primero. Si dispute is not resolved, you may contact the Texas no se resuelve la disputa,puede entonces comunicarse Department of Insurance. con el Departmento de Seguros de Texas. ATTACH THIS NOTICE TO YOUR POLICY: UNA ESTE AVISO A SU POLIZA: This notice is for information only and does not become Este aviso es solo para proposito de infromacion y no se a part or condition of the attached document. converte en parte o condicion del documento adjunto. Client#: 1331501 RAYDOINC DATE(MMIDDIYYYY) ACORD,. CERTIFICATE OF LIABILITY INSURANCE 06/30/2017 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER,THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. _....._.... IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(iss)must be endorsed.If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER 'NAMICT E Karrye Baldwin USI Southwest Dallas/CL PHONE -- -�_ VAX (eyc No,Ell 214 443-3100 „lAfc�No 214 443-3900 2711 N Haskell Ave Suite 2000 E-MAIL ADS: karrye.baidwln@usi.com Dallas,TX 75204 -- -- - -- ------ 214 __214 443.3100 ___ INSURER(Sl AFFORDING COVERAGE NAIC IN INSURER A: me Zurich American Insurance Compa ;16535 -INSURED' INSURER e:American Guarantee&Liability 128247 Raydon,Inc. INSURER C PO Box 671 INSURER o Breckenridge,TX 76424 : INSURER E INSURER F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. IN RR COMMETYPE RCIAL JADOLsUT3R - _--�.. POLI Y EFF POLIO EXP _.__ _ _ _. ... _. _- -- __ __ ___ _ _ tNSR MYVD i ._._..._.. POLICY NUMBER.._._ L �Y??y MMroQ � LIMITS __ – A X � CP0019808601 710112017!07/0112015 EACH OCCURRENCE Ts1,000,000 --� -__._..._.. . C ? RENTED GLAIM9MADE X�OCCUR Pt�ISa axurranca� 00,004 X PD Ded.25,000 MEOEXP� PERsoNAL a ov IPeNJUF921v�s 1000 000 �m GEN`L AGGREGATE LIMIT APPLIES PER GENERALAGGREGATE $2,000,000 PRO- ._.�._ POLICY[Xi JECT LOC F PRODUCTS COMPIOP AGO $2 000 OOO OTHER: 5 AUTOMOBILE LIABILITY COMB{NED SINGLE LIMIT 3 A BAP019808901 7101/2017`07/01/201&(E $1,000,000 _X ANY AUTO :BODILY INJURY(Per person) ?$ ALL OWNED -�SCHEDULED AUTOS .__ AUTOS I =BODILY INJURY(Per arsadenE) ^� X NDN'WNED PROPERTY DAMAGE i HIRED AUTOS X AUTOS ,jeer�Ccrderrtl..M S ( S B X UMBRELLA LIAR X OCCUR AUCO23083301 7/011201707/01/201 S EACH OCCURRENCE. S51000A EXCESS LIAR CLAIMS-MADE� i AGGREGATE, _ – $5.000.000_ 1 DED RETENTION$ A WORKERS COMPENSATION ' :WCO198O8701 7/0112017071011201$X ;PER OTH-I AND EMPLOYERS'LIABILITY YIN' _ ANY PROPRIETORIPARTNER)EXECUTiVE�� N/A tE.L,EACHACCIDENT $1,000,000 OFFICERtMEMBER EXCLUDED? ( ----�—" (Mandatory In NH) { E L,DISEASE_EA EMPLOYEE!$1,000 000 It yes,dasc:nbe under E L.DISEASE•POLICY LIMIT $1,000,000 DESCRIPTION OF OPERATIONS b6low.– A Leased/Rented CP0019808601 7/01/2017 07/01/2015 $400,000 Limit Equipment $1,000 Deductible I DESCRIPTION OF OPERATIONS I LOCATIONS i VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space Is required) The General Liability and Auto Liability policies Include an automatic Additional Insured endorsement that provides Additional Insured status to the Certificate Holder,only when there is a written contract or written agreement between the named Insured and the Certificate Holder and with regard to work performed on behalf of the named insured. (See Attached Descriptions) CERTIFICATE HOLDER CANCELLATION City of Fort Worth SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 1000 Throckmorton St. ACCORDANCE WITH THE POLICY PROVISIONS. Fort Worth,TX 76102 AUTHORIZED REPRESENTATIVE Z 1988.2014 ACORD CORPORATION.All rights reserved. ACORD 25(2014101) 1 of 2 The ACORD name and logo are registered marks of ACORD #8209488791M20948835 KZBHD DESCRIPTIONS (Continued from Rage 1) The General Liability,Auto Liability and Workers Compensation policies provide a Blanket Waiver of Subrogation In favor of the same,when required by written contract. The General Liability and Auto Liability policies contain a special endorsement with"Primary and Noncontributory"wording. The policies include an endorsement providing that 30 days notice of cancellation will be given to the Certificate Holder by the Insurance Carrier. SAGITTA 25.3(2014101) 2 of 2 #S209488791M20948835