"ENGINEER"), for a PROJECT generally described as: Design of Meandering Road from
East Gate of NASJRB to River Oaks Blvd/SH 183.
Article 1 QM 1 2 3 4
Scope of Services RECEIVED o
The Scope of Services is set forth in Attachment A. JUL 25 20117 0
aCITY OF FORT W r
`Q C�1 SECRETgRY rH
Article II �s b
� Z � Wd
Compensation
The ENGINEER's compensation shall be in the amount of$1,000,000.00 as
set forth in Attachment B.
Article III
Terms of Payment OFFICIAL RECORD
CITY SECRETARY
Payments to the ENGINEER will be made as follows: Ike WORTH,TX
A. Invoice and Payment
(1) The Engineer shall provide the City sufficient documentation, including but not
limited to meeting the requirements set forth in Attachment D to this
AGREEMENT, to reasonably substantiate the invoices.
(2) The ENGINEER will issue monthly invoices for all work performed under this
AGREEMENT. Invoices are due and payable within 30 days of receipt.
(3) Upon completion of services enumerated in Article I, the final payment of any
balance will be due within 30 days of receipt of the final invoice.
(4) In the event of a disputed or contested billing, only that portion so contested
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 1 of 17
will be withheld from payment, and the undisputed portion will be paid. The
CITY will exercise reasonableness in contesting any bill or portion thereof. No
interest will accrue on any contested portion of the billing until mutually
resolved.
(5) If the CITY fails to make payment in full to ENGINEER for billings contested
in good faith within 60 days of the amount due, the ENGINEER may, after
giving 7 days' written notice to CITY, suspend services under this
AGREEMENT until paid in full. In the event of suspension of services, the
ENGINEER shall have no liability to CITY for delays or damages caused the
CITY because of such suspension of services.
Article IV
Obligations of the Engineer
Amendments to Article IV, if any, are included in Attachment C.
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B. Standard of Care
The ENGINEER shall perform its services:
(1) with the professional skill and care ordinarily provided by competent
engineers practicing in the same or similar locality and under the same or
similar circumstances and professional license; and
(2) as expeditiously as is prudent considering the ordinary professional
skill and care of a competent engineer.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise the
CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 2 of 17
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that could
affect the total PROJECT cost and/or execution. These conditions and
cost/execution effects are not the responsibility of the ENGINEER.
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on-site representatives or otherwise, do not make the ENGINEER
or its personnel in any way responsible for those duties that belong to the
CITY and/or the CITY's construction contractors or other entities, and do not
relieve the construction contractors or any other entity of their obligations,
duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for
coordinating and completing all portions of the construction work in
accordance with the Contract Documents and any health or safety
precautions required by such construction work. The ENGINEER and its
personnel have no authority to exercise any control over any construction
contractor or other entity or their employees in connection with their work or
any health or safety precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress
or quality of the completed work on the PROJECT or to determine, in general,
if the work on the PROJECT is being performed in a manner indicating that
the PROJECT, when completed, will be in accordance with the Contract
Documents, nor shall anything in the Contract Documents or the agreement
between CITY and ENGINEER be construed as requiring ENGINEER to
make exhaustive or continuous on-site inspections to discover latent defects
in the work or otherwise check the quality or quantity of the work on the
PROJECT. If the ENGINEER makes on-site observation(s) of a deviation
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 3 of 17
from the Contract Documents, the ENGINEER shall inform the CITY.
(3) When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth
in the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate PROJECT
cost or schedule. Therefore, the ENGINEER makes no warranty that
the CITY's actual PROJECT costs, financial aspects, economic
feasibility, or schedules will not vary from the ENGINEER's opinions,
analyses, projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the Contract
Documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests,or encumbrances;or that there are not other matters
at issue between the CITY and the construction contractor that affect the
amount that should be paid.
H. Record Drawings
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 4 of 17
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
I. Minority Business and Small Business Enterprise (MBE)(SBE)
Participation
In accord with the City of Fort Worth Business Diversity Ordinance No.
20020-12-2011, as amended, the City has goals for the participation of
minority business enterprises and/or small business enterprises in City
contracts. Engineer acknowledges the MBE and SBE goals established for
this contract and its accepted written commitment to MBE and SBE
participation. Any misrepresentation of facts (other than a negligent
misrepresentation) and/or the commission of fraud by the Engineer may
result in the termination of this Agreement and debarment from participating
in City contracts for a period of time of not less than three (3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers and
records of the ENGINEER involving transactions relating to this contract.
ENGINEER agrees that the CITY shall have access during normal working
hours to all necessary ENGINEER facilities and shall be provided adequate
and appropriate work space in order to conduct audits in compliance with the
provisions of this section. The CITY shall give ENGINEER reasonable
advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in order
to conduct audits in compliance with the provisions of this article together with
subsection (3) hereof. CITY shall give subconsultant reasonable advance
notice of intended audits.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 5 of 17
(3) ENGINEER and subconsultant agree to photocopy such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for the
cost of copies at the rate published in the Texas Administrative Code in effect
as of the time copying is performed.
K. INSURANCE
(1) ENGINEER'S INSURANCE
a. Commercial General Liability—the ENGINEER shall maintain commercial
general liability (CGL) and, if necessary, commercial umbrella insurance
with a limit of not less than $1,000,000.00 per each occurrence with a
$2,000,000.00 aggregate. If such Commercial General Liability insurance
contains a general aggregate limit, it shall apply separately to this
PROJECT or location.
i. The CITY shall be included as an insured with all rights of defense
under the CGL, using ISO additional insured endorsement or a
substitute providing equivalent coverage, and under the
commercial umbrella, if any. This insurance shall apply as primary
insurance with respect to any other insurance or self-insurance
programs afforded to the CITY. The Commercial General Liability
insurance policy shall have no exclusions or endorsements that
would alter or nullify: premises/operations, products/completed
operations, contractual, personal injury, or advertising injury, which
are normally contained within the policy, unless the CITY
specifically approves such exclusions in writing.
ii. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the commercial general
liability or commercial umbrella liability insurance maintained in
accordance with this agreement.
b. Business Auto—the ENGINEER shall maintain business auto liability and,
if necessary, commercial umbrella liability insurance with a limit of not less
than$1,000,000 each accident. Such insurance shall cover liability arising
out of"any auto", including owned, hired, and non-owned autos,when said
vehicle is used in the course of the PROJECT. If the engineer owns no
vehicles, coverage for hired or non-owned is acceptable.
i. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the business auto liability or
commercial umbrella liability insurance obtained by ENGINEER
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 6 of 17
pursuant to this agreement or under any applicable auto physical
damage coverage.
c. Workers' Compensation —ENGINEER shall maintain workers
compensation and employers liability insurance and, if necessary,
commercial umbrella liability insurance with a limit of not less than
$100,000.00 each accident for bodily injury by accident or $100,000.00
each employee for bodily injury by disease, with $500,000.00 policy limit.
i. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by workers compensation and
employer's liability or commercial umbrella insurance obtained by
ENGINEER pursuant to this agreement.
d. Professional Liability—the ENGINEER shall maintain professional liability,
a claims-made policy, with a minimum of $1,000,000.00 per claim and
aggregate. The policy shall contain a retroactive date prior to the date of
the contract or the first date of services to be performed, whichever is
earlier. Coverage shall be maintained for a period of 5 years following the
completion of the contract. An annual certificate of insurance specifically
referencing this project shall be submitted to the CITY for each year
following completion of the contract.
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that the ENGINEER has obtained all
required insurance shall be attached to this AGREEMENT prior to its
execution.
b. Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, subject to any defense provided by the policy, as its
interests may appear. The term CITY shall include its employees, officers,
officials, agents, and volunteers as respects the contracted services.
c. Certificate(s) of insurance shall document that insurance coverage
specified in this agreement are provided under applicable policies
documented thereon.
d. Any failure on part of the CITY to attach the required insurance
documentation hereto shall not constitute a waiver of the insurance
requirements.
e. A minimum of thirty (30) days notice of cancellation or material change in
coverage shall be provided to the CITY. A ten (10) days notice shall be
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 7 of 17
acceptable in the event of non-payment of premium. Notice shall be sent
to the respective Department Director(by name), City of Fort Worth, 1000
Throckmorton, Fort Worth, Texas 76102.
f. Insurers for all policies must be authorized to do business in the State of
Texas and have a minimum rating of A:V or greater, in the current A.M.
Best Key Rating Guide or have reasonably equivalent financial strength
and solvency to the satisfaction of Risk Management.
g. Any deductible or self insured retention in excess of$25,000.00 that would
change or alter the requirements herein is subject to approval by the CITY
in writing, if coverage is not provided on a first-dollar basis. The CITY, at it
sole discretion, may consent to alternative coverage maintained through
insurance pools or risk retention groups. Dedicated financial resources
or letters of credit may also be acceptable to the CITY.
h. Applicable policies shall each be endorsed with a waiver of subrogation in
favor of the CITY as respects the PROJECT.
i. The CITY shall be entitled, upon its request and without incurring expense,
to review the ENGINEER's insurance policies including endorsements
thereto and, at the CITY's discretion; the ENGINEER may be required to
provide proof of insurance premium payments.
j. Lines of coverage, other than Professional Liability, underwritten on a
claims-made basis, shall contain a retroactive date coincident with or prior
to the date of the contractual agreement. The certificate of insurance shall
state both the retroactive date and that the coverage is claims-made.
k. Coverages, whether written on an occurrence or claims-made basis, shall
be maintained without interruption nor restrictive modification or changes
from date of commencement of the PROJECT until final payment and
termination of any coverage required to be maintained after final
payments.
I. The CITY shall not be responsible for the direct payment of any insurance
premiums required by this agreement.
m. Sub consultants and subcontractors to/of the ENGINEER shall be required
by the ENGINEER to maintain the same or reasonably equivalent
insurance coverage as required for the ENGINEER. When sub
consultants/subcontractors maintain insurance coverage, ENGINEER
shall provide CITY with documentation thereof on a certificate of
insurance.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 8 of 17
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent consultant
and not as a subcontractor, agent, or employee of the CITY. The doctrine
of respondeat superior shall not apply.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications, as required,
at its own cost and expense. However, if design changes are required due to
the changes in the permitting authorities' published design criteria and/or
practice standards criteria which are published after the date of this
Agreement which the ENGINEER could not have been reasonably aware of,
the ENGINEER shall notify the CITY of such changes and an adjustment in
compensation will be made through an amendment to this AGREEMENT.
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 9 of 17
Article V
Obligations of the City
Amendments to Article V, if any, are included in Attachment C.
A. City-Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services.The CITY will be responsible for all acts of the
CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land, easements, rights-of-way, and
access necessary for the ENGINEER's services or PROJECT construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches, drawings,
specifications, proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in writing
decisions required by the CITY in a timely manner in accordance with the
project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 10 of 17
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of such
materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is
a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification and Claims
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and
provisions providing for contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third-Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering services
performed. Only the CITY will be the beneficiary of any
undertaking by the ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third-party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third-party beneficiary rights under this Agreement.
(4) Nothing contained in this Section H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
I. CITY's Insurance
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 11 of 17
(1) The CITY may maintain property insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY will ensure that Builders Risk/installation insurance is maintained at
the replacement cost value of the PROJECT. The CITY may provide
ENGINEER a copy of the policy or documentation of such on a certificate of
insurance.
(3) The CITY will specify that the Builders Risk/Installation insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
J. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
K. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
General Legal Provisions
Amendments to Article VI, if any, are included in Attachment C.
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 12 of 17
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not responsible for damages or delay in performance
caused by acts of God, strikes, lockouts, accidents, or other events beyond
the control of the ENGINEER that prevent ENGINEER's performance of its
obligations hereunder.
D. Termination
(1) This AGREEMENT may be terminated
a.) for convenience only by the City on 30 days'written notice.
b.) by either the CITY or the ENGINEER for cause if either party fails
substantially to perform through no fault of the other and the
nonperforming party does not commence correction of such
nonperformance within 5 days of written notice or thereafter fails to
diligently complete the correction.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Cost of reproduction of partial or complete studies, plans,
specifications or other forms of ENGINEER'S work product;
b.) Out-of-pocket expenses for purchasing electronic data files and other
data storage supplies or services;
C.) The time requirements for the ENGINEER'S personnel to document
the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all termination expenses. The
CITY'S approval will be obtained in writing prior to proceeding with termination
services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay, or
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 13 of 17
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors, and
ENGINEER's compensation will be made.
F. Indemnification
In accordance with Texas Local Government Code Section 271.904, the
ENGINEER shall indemnify or hold harmless the CITY against liability
for any damage committed by the ENGINEER or ENGINEER's agent,
consultant under contract, or another entity over which the ENGINEER
exercises control, other than liability for damage to the extent caused
by or resulting from an act of negligence, intentional tort, intellectual
property infringement, or failure to pay a subcontractor or supplier. CITY
is entitled to recover its reasonable attorney's fees in proportion to the
ENGINEER's liability.
G. Assignment
Neither party shall assign all or any part of this AGREEMENT without the prior
written consent of the other party.
H. Interpretation
Limitations on liability and indemnities in this AGREEMENT are business
understandings between the parties and shall apply to all the different theories
of recovery, including breach of contract or warranty, tort including negligence,
strict or statutory liability, or any other cause of action, except for willful
misconduct or gross negligence for limitations of liability and sole negligence
for indemnification. Parties mean the CITY and the ENGINEER, and their
officers, employees, agents, and subcontractors.
1. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date: 12.22.2016
Page 14 of 17
J. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality,
or unenforceability will not affect any other provision, and this AGREEMENT
shall be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I.
shall survive termination of this AGREEMENT for any cause.
K. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in any
way affect this AGREEMENT and the work hereunder, and shall observe and
comply with all orders, laws ordinances and regulations which may exist or
may be enacted later by governing bodies having jurisdiction or authority for
such enactment. No plea of misunderstanding or ignorance thereof shall be
considered. ENGINEER agrees to defend, indemnify and hold harmless CITY
and all of its officers, agents and employees from and against all claims or
liability arising out of the violation of any such order, law, ordinance, or
regulation, whether it be by itself or its employees.
Article VII
Attachments, Schedules and Counterparts
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, which supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. This Agreement may be
executed in one or more counterparts and each counterpart shall, for all purposes, be
deemed an original, but all such counterparts shall together constitute but one and the
same instrument. The following attachments and schedules are hereby made a part of this
AGREEMENT:
Attachment A - Scope of Services
Attachment B - Compensation
Attachment C -Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E - Location Map
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 15 of 17
BY: BY:
CITY OF FORT WORTH ENGINEER
Lamb-Star Engineering, L.P.
ay apa John L b, P.E.
Assistant City Manager PriesidehV
Date:_`:l 714 Date: & 7 — 1'k - Zv
APPROVAL RECOMMENDED:
By: ZZD" Li.
Doug rersig, P.E.
Director, Transportation & Public Works
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Clint Hoover, P.E., S nior Project Engineer,
Contract Compliance Manager, Department of
Transportation and Public Works
APPROVED AS TO FORM AND LEGALITY
By:
Doug lack
Assistant City Attorney
City of Fort Worth.Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 16 of 17
Form 1295 No. 2,n t :� - 2 l 3 D S'3
ATTEST:
M&C No.: C - Z$2 f 0
ary J. Ka i r
ly V
City Secret M&C Date:
FONT�L
* �2
CAS
EOFFICIAL RECORD
City of Fort Worth,Texas ECR�ANYStandard Agreement for Engineering Related Design Services .p�/Revised Date:12.22.2016 ORTH, T A
Page 17 of 17
ATTACHMENT "A"
Scope for Meandering Road Improvements Task Order Contract
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
OBJECTIVE
The objective of the project completed under the Task Order agreement is to improve
vehicular, pedestrian, and bicycle safety on Meandering Road from Roberts Cut Off Road to
the east entrance of the Naval Air Station Joint Reserve Base, Fort Worth. The anticipated
scope of services for this project shall include (but not be limited to) route studies and
schematic design, minor bridge layouts,minor roadway design,routine bridge inspection,
traffic engineering studies,traffic signal timing, street and pedestrian illumination design,
traffic signal design,bicycle and pedestrian facility design,storm water analysis and design,
boundary and topographic surveys,environmental analysis and design,right of way
acquisition support,easement acquisition support, geotechnical exploration and design,
subsurface utility exploration, pavement design,water design,sanitary sewer design,
construction phase assistance,and any potential federal and/or state environmental
permits.
WORK TO BE PERFORMED
ENGINEER hereby agrees to perform planning, project management and design services
on a task order basis as may be requested by the CITY during the term of this
AGREEMENT for the Planning, Environmental Clearance, Final Design, and Construction of
Meandering Road.
Work under this agreement will be performed on a Work Authorization basis. The CITY will
request services for each Work Authorization. The ENGINEER shall prepare scope, fee and
schedule as necessary to perform the services requested for each Work Authorization within
10 working days of the CITY's request.
Each Work Authorization shall include scope for services as Attachment"A". This scope will
outline tasks required to complete the Work Authorization. For each task the scope shall
include a detailed description of the task, outline any assumptions, and list the required
deliverables.
Each Work Authorization shall include Attachment" B" detailing the compensation for the
Work Authorization. Compensation will be based upon hours agreed to by the CITY and the
ENGINEER for each Work Authorization. The fee will include an estimate of reimbursable
expense and sub-consultant costs for each Work Authorization.
If the Work Authorization requires a schedule, it shall be attached as Attachment"D".
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.2012
Page 1 of 1
ATTACHMENT B
COMPENSATION
Design Services for
Meandering Road
City Project No. 100873
Time and Materials with Rate Schedule Project
I. Compensation
A. The ENGINEER shall be compensated for personnel time, non-labor expenses,
and subcontract expenses in performing services for this project for an amount not
to exceed $1,000,000, unless amended. CITY and ENGINEER will agree upon
compensation for each Task Order prior to starting work.
i. Personnel Time. Personnel time shall be compensated based upon the Task
Order compensation agreement with between the CITY and ENGINEER.
ii. Non-Labor Expenses. Non-labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non-labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent(10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 1 of 4
B-1
ATTACHMENT B
COMPENSATION
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 2 of 4
B-2
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount %
Prime Consultant
Lamb-Star Engineering Roadway Planning, Design $640,000 64%
L.P. Survey, and Utilities (Estimate)
Proposed MBE/SBE Sub-Consultants
Multatech Hydraulic Studies and $150,000 15%
Drainage (Estimate)
HVJ Geotechnical Studies $20,000 2%
(Estimate)
Othon, Inc. Traffic Engineering $40,000 4%
(Estimate)
Non-MBE/SBE Consultants
Berg-Oliver Environmental Studies $40,000 4%
Associates, Inc. (Estimate)
MSA Professional Roadway Design, Intersection $110,000 11%
Services, INC. DBA Studies (Estimate)
Ourston
TOTAL $1,000,000 100%
Project Number& Name Total Fee MBE/SBE Fee MBE/SBE
Meandering Road $ 1,000,000 $150,000 15%
City MBE/SBE Goal = 0% Consultant Committed Goal = 15
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 3 of 4
B-3
N4&C Review Page 1 of 2
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA Fra
TWoRm
COUNCIL ACTION: Approved on 6/20/2017
DATE: 6/20/2017 REFERENCE C-28290 LOG NAME: 20MEANDERING ROAD
NO.: RECONSTRUCTION
CODE: C TYPE: NOW PUBLIC NO
CONSENT HEARING:
SUBJECT: Authorize Execution of an Engineering Services Agreement with Lamb-Star Engineering,
L.P., for an Amount Not to exceed $1,000,000.00 for the Design of Meandering Road from
East Gate of NASJRB to River Oaks Blvd/SH 183 (COUNCIL DISTRICT 7)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of an Engineering Services Agreement with
Lamb-Star Engineering, L.P., for an amount not to exceed $1,000,000.00 for the Design of Roadway
Improvements on Meandering Road from East Gate of NASJRB to River Oaks Blvd/SH 183.
DISCUSSION:
Meandering Road is one of the primary roadways that provides access to the Naval Air Station Fort Worth,
Joint Reserve Base (NAS Fort Worth, JRB) for military personnel. Meandering Road serves as a vital
connection to the east gate entrance of the base through the cities of Fort Worth and River Oaks. This 1.4
mile connection of roadway was identified in the Planning Livable Military Communities Study recently
conducted by North Central Texas Council of Governments (NCTCOG) as a candidate for near-term
reconstruction due to the capacity demand accessing the base, security and safety needs of the base,
deteriorating pavement conditions, confusing intersections and lengthy vehicle back-ups during military
reserve and national guard training weekends.
Over the past 18 months, local government and military partners have worked to develop preliminary
design concepts for reconstruction of Meandering Road to increase westbound capacity with additional
roadway capacity, intersection improvements, street lights and bicycle and pedestrian enhancements.
NCTCOG has programmed $1,000,000.00 in the Dallas-Fort Worth Transportation Improvement Program
(TIP) to complete the full Plans, Specification and Engineering (PS&E) design and environmental clearance
of ultimate improvements along Meandering Road/LTjg Barnett Road.
To effectively move this improvement forward, the City of Fort Worth was asked to lead this design and
environmental clearance effort working in close coordination with the City of River Oaks, Tarrant County,
NAS Fort Worth and the NCTCOG through a Local Project Advance Funding Agreement (LPAFA) with
TxDOT in the amount of$1,000,000.00, which was authorized by Mayor and Council Communication (M&C
C-27708), Resolution No. 4625-05-2016.
Conceptual cost estimates for the reconstruction of Meandering Road range from $10 to $15 million.
The Regional Transportation Council (RTC) has committed that the NCTCOG, working with funding
partners, will fund the right-of-way acquisition and construction improvements following completion of
design and environmental by the City (see attached letter from RTC). Funding to support construction and
any needed right of way will come from regional funding sources other than the City of Fort Worth given that
the primary goal of the project is a regional effort to serve the military facility.
M/WBE OFFICE— Lamb-Star Engineering, L.P., is in compliance with TxDOT's DBE goal of zero percent
based on the project's Federal funding, type of work, location, overall and item cost estimate values,
subcontracting opportunities, certified DBE firms in vicinity of the project location, and the size of the
project.
Lamb-Star Engineering, L.P., was selected for this project on the basis of a Request for Qualifications
(RFQ) advertised by Transportation and Public Works in the Fort Worth Star-Telegram on February 16 and
February 23, 2017 specifically relating to the Meandering Road project. Firms were invited to submit their
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=24757&councildate=6/20/2017 7/19/2017
M&C Review Page 2 of 2
qualifications for performing engineering professional services based on a set of criteria regarding the
design and construction of Meandering Road. Lamb-Star Engineering, L.P., met or exceeded the criteria set
forth in the RFQ with their submittal.
The portion of the project within the Fort Worth City Limits is located in COUNCIL DISTRICT 7, Mapsco
60Q, 60R, and 61N.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are appropriated in the current capital budget of the Grants
Capital Projects Federal Fund. It is the Department's responsibility to verify the available of funding in the
project prior to the initiation of services.
TO
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year (Chartfield 2)
FROM
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year (Chartfield 2)
Submitted for City Manager's Office by: Jay Chapa (5804)
Originating Department Head: Douglas Wiersig (7801)
Additional Information Contact: Todd Estes (5448)
Clint Hoover(6573)
ATTACHMENTS
1295 Form Meandering .pdf
Map Meandering Road 1.pdf
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=24757&councildate=6/20/2017 7/19/2017
CERTIFICATE OF INTERESTED PARTIES � FORM 1295
6 loll
Complete Nos.1-d and 6 it there are interested parties. OFFICE USE ONLY
Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number:
of business. 2017-213053
Lamb-Star Engineering,LP
Plano,TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 05/2412017
being filed.
The City of Fort Worth Date Ackno ed d:
g Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a
description of the services,goods,or other property to be provided under the contract.
100873
Engineering Design Services
Nature of interest
4 Name of Interested Party City,State,Country(place of business) (check applicable)
Controlling Intermediary
Starnater,Carl Fort Worth,TX United States X
Lamb,John Piano,TX United States X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct.
Jana Hb6i sky
�^ �.,+�n t'uMic,tiirh ot7r
-\I\ '1t .n+nficioeMCttfi7M3
51 na Of authorized agent of contracting business entity
AFFIX NOTARY STAMP/SEAL ABOVE '^
Sworn to and subscribed before me,by the said n - �1 r�3 this the day of � t t
20_11_,,to certify which,witness my hand and seal of office. JMT
Jcnc.,
Signature of officer administering oapn Printed name of officer administering oatK Title of officer administering oath
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883