Developer and Project Information Cover Sheet:
[Developer Company Name: Victory at Bassood,LLC
r
Address, State,Zip Code: 8001 LBJ Freeway, Suite 400,Dallas TX 75251
� � 3
1
1 �
Phone&Email: ' 972-707-9555,kris@ve-re.com
Authorized Signatory,Title: Tony Ramji,Manager
Project Name: Victory at Basswood
,
-- - i
i
Brief Description: I Water, Sewer,Paving, Storm Drain
Project Location: SEC intersection of Blue mound Road and Basswood Boulevard
I
Plat Case Number: FP-16-095Plat Name: Victory at Basswood Lots 1-10,Block 1
Mapsco: 34-V Council District- 12 City Project Number: 100725 i
CFA Number: F 2017-021 DOE Number: <DOE#>
i
�_............--........---....-- -... ._._.......__.......... -------...-- --—--- --._..._...-- -._...._.._.....__........_......_..._.._._............_.—......--..........._........---..._.......
—...— ...---..._.J
To be completed b staff.-
Received
taff /11V'h!7?
Received by: Date: 7
3456�
®v1PICIAI•RECORD 8
Ci'f seepti a
Q RECEIVED
WOOHITX
r NUG 1 4 2017 N
\N09"
CIV
p CIN OF FORM WO
CIV SECwA'RY
�a
City of Fort Worth,Texas 9 g ti E 2
Standard Community Facilities Agreement-Victory at Basswood
CFA Official Release Date: 01.03.2017
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Victory at Basswood, LLC, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements")related to
a project generally described as Victory at Basswood ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Victory at Basswood
CFA Official Release Date: 01.03.2017
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said constiuction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) 0, Sewer(A-1) FA, Paving (B) M, Storm Drain(B-1) ®;, Street Lights & Signs
(C) Fl.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Victory at Basswood
CFA Official Release Date: 01.03.2017
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Victory at Basswood
CFA Official Release Date: 01.03.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with,the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in whole or in part,
by the allezed nezlizence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Victory at Basswood
CFA Official Release Date: 01.03.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Victory at Basswood
CFA Official Release Date: 01.03.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Victory at Basswood
CFA Official Release Date: 01.03.2017
Page 7 of 11
Cost Summary Sheet
Project Name: Victory at Basswood
CFA No.: 2017-021 City Project No.: 100725
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 186,288.00
2.Sewer Construction $ 75,148.00
Water and Sewer Construction Total $ 261,436.00
B. TPW Construction
1.Street $ 205,430.50
2.Storm Drain $ 355,311.00
3.Street Lights Installed by Developer $ -
4. Signals $ -
TPW Construction Cost Total $ 560,741.50
Total Construction Cost(excluding the fees): $ 822,177.50
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 5,228.72
D. Water/Sewer Material Testing Fee(2%) $ 5,228.72
Sub-Total for Water Construction Fees $ 10,457.44
E. TPW Inspection Fee(4%) $ 22,429.66
F. TPW Material Testing(2%) $ 11,214.83
G. Street Light Inspsection Cost $ -
H. Signals Inspection Cost $
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 33,644.49
Total Construction Fees: $ 44,101.93
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond= 100% $ 822,177.50 x
Completion Agreement=100%/Holds Plat $ 822,177.50
Cash Escrow Water/Sanitary Sewer=125% $ 326,795.00
Cash Escrow Paving/Storm Drain=125% $ 700,926.88
Letter of Credit= 125%w/2yr expiration period $ 1,027,721.88
City of Fort Worth,Texas
Standard Community Facilities Agreement-Victory at Basswood
CFA Official Release Date: 01.03.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
> Victory at Bassw d,LLC
Jesus J. Chapa
Assistant Ci Manager
Date: /'j��/ 7 Nam ony amji
Title. anager
Recommended by:
Date: q"t I q ( I-*-
_� ATTEST: (Only if required by Developer)
Wendy Chi- a ulal, EMBA, P.E.
Development Engineering Manager
WatDepartment
Signature
Name:
Douiersig, P.E.
Dire 6 Contract Compliance Manager:
Transportation&Public Works Department
By signing, I acknowledge that I am the
Approved as to Form &Legality: person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Richard A. McCracken
Assistant City Attor
M&C No. NIDA A 2
Date: $��'/1-7 Name:
Form 1295: N�14' Title:
A *TEST �iA FOR
MCi '♦ OFFICIAL IECOItp
�XAS CITY 811CW'ARV
City of Fort Worth,Texas FT' wonif, YX
Standard Community Facilities Agreement-Victory at Basswood
CFA Official Release Date: 01.03.2017
Page 9 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
Location Map
FA Exhibit A: Water Improvements
Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit 13-1: Storm Drain Improvements
❑ Storm Drain Cost Estimate
❑' Exhibit C: Street Lights and Signs Improvements
El Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Victory at Basswood
CFA Official Release Date: 01.03.2017
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100725
None
City of Fort Worth,Texas
Standard Community Facilities Agreement-Victory at Basswood
CFA Official Release Date: 01.03.2017
Page 11 of 11
--------------------------------------------------------------------------------------------------------------------...--------------------
/
E BAILEY BOSWELL RD
� 2
_ ❑ A
z j
Lu
J
m
BASSWOOD
\ BLVD
PROJECT
BASSWOOD BLVD
LOCATION
wz \� 35W
z
156 Op 81
❑ 7
E McLEROY BLVD N CENTER BLVD
l
❑
N
O
v� ❑ �9R z
z /r o
o
� � o
o Lu
_l
m
E INDUSTRIAL AVE CANTRELL SANSOM RD
U
I
W
Q
U
a
U
E
...............------.-----------------------.----------------------.-----------------------------------------------------------------------' E
U
OWNER/ DEVELOPER: Ii!II PELOTON
SAND SOL.TIONS
0 NORTH 300' VICTORY AT VICTORY AT BASSWOOD 9800 0 HILLWOOD PARKWAY WAYSUITE 250
ml
BASSWOOD 8001 LBJ FREEWAY FORT WORTH,TX 76177
of
SUITE 400 PHONE:817-562-3350
GRAPHIC SCALE DALLAS,TX 75251 (SHEET 1 OF 5) o
DATE:JANUARY,2017
II I
I
'I I
I I I BASSWOOD BOULEVARD
INA --- EX 16"DIP -
r7
I I I
I
I II I
Iz
I I la
U
\OGK 1
EPG GEMH D O03ollo\.) g559
U
H 2
)l O=
N \NS 69jG\.
I i
I -
I III N I I I POTARI LO
ui
I I
III � I I
ito _
II i I°
IIIa
I) a I RESTST NT IL
EIL
UBC III 8"wVN
GNER`��YNNW F—
\APPl
duD 1NSjitR1 GT II I
I II LO filOE w
I— R AD >
LEGEND I -
-- PROPOSED GATE VALVE
001A216005440 ——= v
EXIST GATE VALVE I "S`r19 \
—� OVERLAND 2
II I STREET /
PROPOSED FIRE HYDRANT I
U
E
— -- EXIST FIRE HYDRANT
0
m
' ml
0
EXHI-B-IT-A---WATER- -------------------------------------------------------------------------------------------------->
OWNER/DEVELOPER: 1191 PELOTON
>
�
0 "o�V VICTORY AT 300' I I 1AND SOLUTIONS
VICTORY AT BASSWOOD 9800 HILLWOOD PARKWAY
SUITE 250 2
BASSWOOD 8001 LBJ FREEWAY FORT WORTH,TX 76177
SUITE 400 PHONE:817-562-3350
GRAPHIC SCALE DALLAS,TX 75251 (SHEET 2 OF 5)
DATE:JANUARY,2017
-------------------------------------------------------.....-----------...-----——-----------------—-----------------------------------------
I
i I
I
I ,LBASSWOOD BOULEVARD
6
I
s"SS 6"ss I I Z
\oS 1,�P�j SPS\oNW ( 6"SS I -i to
PGVE M�\A00-P5 93U I I I L)N\GNS-\COR2?GC.
6"SS---/' 6"SS I I I pOTRI LO
LAN
60
6"SS 6"SS I i� ,z
z
O I 6"SS I �
W IIm I I LU
Iy
TRUSS I I s.
\A\N��j�1 P� RRUgS I RESTS E
ER\E NNP 516 I
THAI w
GN DY
ST
l-N p20902 I w I
aN \N �RTG?
I�
KA HIN
LO GE
(— — R AD
OVERLAND
STREET
LEGEND
U�
� —PROPOSED SEWER LINES
ss.—EXIST SEWER LINES
a
U
EXHIBIT A1 - WASTEWATER
E
U
OWNER/DEVELOPER: I1!1I PELOTON
NORTH 300' VICTORY AT 1-1111-1LANDSOLUTIONS
VICTORY AT BASSWOOD 9800 HILLWOOD PARKWAY
SUITE 250
BASSWOOD 8001 LBJ FREEWAY FORT WORTH,TX 76177
SUITE 400 PHONE:817-562-3350
GRAPHIC SCALE DALLAS,TX 75251 (SHEET 3OF5) o
DATE:JANUARY,2017 i�
------------------------- --------- ------ ---------- ---------------------------------------------------------------------------
I
I
I
I BASSWOOD BOULEVARD
I
I
I) I I Z
OGK ti P`N v
�O1 6p\N SPT,N
��GH NpO'25 930 I ( o
N 6,Zc�.
PO RI LO
ILAN
I) I "z
Q F
0
w '
I I
Iri —
NKA
„RESTSTONE
F�
-( I tG j
I� o
LEGEND
I OVERCAND
STREET
0 8" REINFORCED CONCRETE PAVEMENT
---- 4'WIDE SIDEWALK W
0 00 H.C. RAMPS BY DEVELOPER
a
EXHIBIT B - PAVING
E
U
OWNER/ DEVELOPER: I111I PELOTON
NORTH 300' VICTORY AT IIS LAND SOLUTIONS m
VICTORY AT BASSWOOD 9800 HILLWOOD PARKWAY
SUITE 250
BASSWOOD 8001 LBJ FREEWAY FORT WORTH,TX 76177
SUITE 400 PHONE:817-562-3350
GRAPHIC SCALE DALLAS,TX 75251 (SHEET4 OF 5) o
DATE:JANUARY,2017 11
i;
------—-------------------------------------------------—---------------------------—---------------------—---------—..._
i
i
i
I BASSWOOD BOULEVARD
— _^—
EX 6'x4'RCB 8k8'
24"RCP JUNCTION
BOX
24'RCP
4'x4'DROP
INLET
K
II I x
'O 24"RC
I �
a
MpI NTPNP D3 bIA 1 24"RCP
24'RCP
E 0 59 24"RCP JUNCT N O
FAH\GH SCip20 GSG. I 24"RCP 36 C BOX
\N C. I 24"RCP
4'x4' 36"RCP
JUNCTION
BOX
POTRI LO
LAN
24"RCP
i .
p 24"RCP W
tr IQ J
0 U
2 ( 24"
w 1 10'INLET]RCP N 4'x4'JUCTION
21"RBOX
24'RI U
Y ( 10'INLET 24"RCP
II RESTSTONE
TRAIL
W P\KERRUST� I
GN,UO\Y S\T�OZ�j556 � I
\N GR5 I
I�
KA HIN
LO G
R AD
I�
LEGEND OVERLAND
STREET V
PROPOSED STORM DRAIN INLET
-- -- EXIST STORM DRAIN INLET
: of
--f— PROPOSED STORM DRAIN MANHOLE
: C)
PROPOSED STORM DRAIN HEADWALL
a
U
EXHIBIT B1 - STORM DRAINAGE
E
v�
OWNER/ DEVELOPER: Ii! I PELOTON
0 NORTH '300' VICTORY AT VICTORY AT BASSWOOD 98I'1jj LAND SOlVT1 �I
00 HILLWOOD PARKWAY WAYSUITE 250
m�
BASSWOOD 8001 LBJ FREEWAY FORT WORTH,TX 76177 w
SUITE 400 PHONE:817-562-3350
GRAPHIC SCALE DALLAS,TX 75251 (SHEET 5OF5) 3
DATE:JANUARY,2017li
00 42 43_SpecBook Proposal Form
DAP-BID PROPOSAL
Page 1 of 2
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT I:WATER IMPROVEMENTS
241.1000 Remove Conc Pvmt 0241 15 SY 44 $15.00 $660.00
3201.0616 Conc Pvmt Repair,Arterial/Industrial 32 01 29 SY 44 $15.00 $660.00
3305.0116 Concrete Encasement i -- -5551. 5510_ _... _00
- for Utility Pipes 33 05 10 CY 3 $200.00 $600.00
5555 _ - .5111 .. -
3311.0441 12"Water Pipe 3311 10,33 LF 1673 $35.00 $58,555.00
3312.3005 12"Gate Valve 33 12 20 EA 11 $2,100.00 $23,100.00
-5115 -.--__-- 1515. .. 5151. .. .._.,.._.. _. __._5555..
3311.0241 8"Water Pipe 3311 12 LF 401 $26.00 $10,426.00
_ _ 5151__ _ _ 1111 . .__ 5-- _. 5115 _
3312.2203 2"Water Service 33 12 10 EA 20 $1,600.00 $32,000.00
3312.0001 Fire Hydrant 33 12 40 EA 3 $3,500.00 $10,500.00
,.._ _ 5515_ 1115 __. __ 5551-5511 _5115_ ---5115-_
3311.0141 6"Water Pipe 3311 10,33 LF 197 $23.00 $4,531.00
5,151 _..._._._ _ _ _. � 5515___ . ._.,.. ....
3312.3002 6"Gate Valve 33 12 20 EA 10 $1,000.00 $10,000.00
3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 4 $2,750.00 $11,000.00
. __. 5511_._ _. 5155_ .._._...__ ,_. _ _ 5515-__
3305.0109 Trench Safety 33 05 10 LF 2271 $1.00 $2,271.00
5115_ __. _ 5551.__ _. M
3312.3003 8"Gate Valve 33 12 20 EA 1 $1,300.00 $1,300.00
3312.4114 16"x 12"Tapping Sleeve&Valve 33 12 25 EA 1 $10,000.00 $10,000.00
5151_ 5555__ _ __. _ __ _.._ _. -_.. 5155
3312.0117 Connection to Existing 4'-12"Water Main 33 12 25 EA 1 $1,700.00 $1,700.00
. _ _ .__ . _. ._._.._ 5151__ .. .._ .
3305.0005 12"Waterline Lowering 33 05 12 EA 2 $2,500.00 $5,000.00
3471.0001 Traffic Control 3471 13 MO 1 $3,985.00 $3,985.00
TOTAL UNIT I:WATER IMPROVEMENLTSJ $186,288.00
UNIT If:SANITARY SEWER IMPROVEMENTS
3331.3201 6"Sewer Service 3331 50 EA 10 $27.00 $270.00
3331.4115 8"Sewer Pipe 3331 20 LF 1016 $30.00 $30,480.00
3339.1003 4'Extra Depth Manhole 33 39 10,33 VF 22 $350.00 $7,700.00
5155.. 5551 1551 -
3339.1001 4'Manhole 33 39 20 EA 8 $3,500.00 $28,000.00
__. _ _ _ _ .5515_ .5155 5551,
3301.0101Manhole Vacuum Testing 33 01 30 EA 8 $100.00 $800.00
_ _ _ 5115_._
3305.0202 Imported Embedment/Backfill,CSS 33 05 10 CY 12 $60.00 $720.00
_._ _-.. ,5551.. ..._.___.__... 5555.. .. --5551 5555_._ 5511._
3305.0109 Trench Safety 33 05 10 LF 1026 $1.00 $1,02_6.0_0
3305.0116 Concrete Encasement for Utility Pipes 33 05 10 CY 3 $200.00 $600.00
5155 5151 _ 5551
3301.0002 Post-CCN Inspection 33 01 31 LF 1026 $2.00 $2,052.00
5151_._ 5115 5515 -5,555 1551._1111 _ _ 5555 _ _.._._._.. _ 1155 _ .. 5115,.
9999.0001 Connect to 4'Dia MH 00 00 00 EA 1 $3,500.001 $3,500.00
TOTAL UNIT II:SANITARY SEWER IMPROVEMEtLTSI $75,148.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 Master_QTO_Victory at Basswood.xls
00 42 43_SpecBook Pr.
DAP-BID P.
Pat,
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
UNIT I: PAVING IMPROVEMENTS
0241.1300 Remove Cone Curb&Gutter 0241 15 LF790 $5.00 $3,948.00
3211.0211 6"Lime Treatment 32 11 29 SY 2,414 $9.00 $21,726.00
3213.0103 8"Cone Pvmt 32 13 13 SY 821 $67.50 $55,417.50
3214.0103 6"Cone Pvmt 32 13 13 SY 1,428 $59.40 $84,823.20
3216.0101 6"Cone Curb and Gutter 32 16 13 LF 11401 $5.00 $7,005.00
3217.0201 8"SLD Pvmt Marking HAS(W) 32 17 23 LF 758 $3.00 $2,274.00
3217.2102 REFL Raised Marker TY I-C 32 17 23 EA 39 $10.00 $390.00
3441.4003 Furnish/Install Alum Sign Ground Mount_City Std. 3441 30 EA 1 $1,240.00 $1,240.00
3217.1002 Lane Legend Arrow 32 17 23 EA 2 $843.00 $1,686.00
3217.1004 Lane Legend Only 32 17 23 EA 2 $843.00 $1,686.00
3217.0503 24"SLD Pvmt Marking Paint(W) 32 17 23 LF24 $20.00 $480.00
3213.0301 4"Cone Sidewalk 32 13 20 SF . 2,568 $4.85 $12,454.80
3305.0111 Valve Box Adjustment 33 05 14 EA 1 $300.00 $300.00
3471.0001 Traffic Control 3471 13 MO 2 $6,000.00 $12,000.00
TOTAL UNIT 1: PAVING IMPROVEMENTS1 $205,430.50
UNIT III:STORM DRAIN IMPROVEMENTS
3341.0201 21"RCP,Class 111 3341 10 LF 29 $67.00 $1,943.00
3341.0205 24"RCP,Class III 3341 10 LF 541 $75.00 $40,575.00
3341.0309 36"RCP,Class III 3341 10 LF 677 $120.00 $81,240.00
3341.1302 6x3 Box Culvert 3341 10 LF 559 $305.00 $170,495.00
3349.0001 4'Storm Junction Box 33 49 10 EA 2 $3,500.00 $7,000.00
3349.0005 8'Storm Junction Box 33 49 10 EA 2 $18,000.00 $36,000.00
3349.5001 10'Curb Inlet 33 49 20 E-A 2 $3,500.00 $7,000.00
3305.0112 Concrete Collar 33 05 17 EA 1 $250.00 $250.00
3349.7001 4'Drop Inlet 33 49 20 EA1 $3,300.00 $3,300.00
3305.0109 Trench Safety 3310511 1 0 LF 1808 $1.00 $1,808.00
3349.2007 36"Parallel Headwall, 1 pipe 33 49 40 EA 1 $5,700.00 $5,700.00
TOTAL UNIT III:STORM DRAIN IMPROVEMENTS $355,311.00
Bid Summary
UNIT I:WATER IMPROVEMENTS $186,288.00
UNIT 11:SANITARY SEWER IMPROVEMENTS $75,148.00
UNIT IV: PAVING IMPROVEMENTS $205,430.50
UNIT V:STORM DRAIN IMPROVEMENTS m4i4 v i14 $355,311.00
UNIT VI:STREET LIGHTING IMPROVEMENTS
Total Construction Bid $822,177.50
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 270 calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 Master_QTO_Victory at Basswood.xls