HomeMy WebLinkAboutOrdinance 22807-08-2017 Ordinance No. 22807-08-2017
AN ORDINANCE INCREASING APPROPRIATIONS IN THE AMOUNT OF$280,000.00 IN
THE WATER AND SEWER DPN FUND, FROM AVAILABLE FUNDS, FOR REPAIR AND
REPAINTING OF THE SEMINARY HILL ELEVATED STORAGE TANK AND INTERIOR
COATING REPLACEMENT OF THE WILLOW SPRINGS ELEVATED STORAGE TANK;
PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE
OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH;
AND PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS:
SECTION 1.
That in addition to those amounts allocated to the various City departments for Fiscal Year 2016-2017 in the
Budget of the City Manager, there shall also be increased appropriations in the amount of$280,000.00 in the
Water and Sewer DPN Fund,from available funds,for the repair and repainting of the Seminary Hill Elevated
Storage Tank and interior coating replacement of the Willow Springs Elevated Storage Tank.
SECTION 2.
That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void
for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair
the remaining portions, sections, or parts of sections of this ordinance,which said remaining provisions shall
be and remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance 22394-09-2016 and all other ordinances and
appropriations amending the same except in those instances where the provisions of this ordinance are in
direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of
said prior ordinances and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance shall take effect upon adoption.
APPROVED AS TO FORM AND LEGALITY: CITY SECRETARY
Douglas W Black ary J.
Sr. Assistant City Attorney
ADOPTED AND EFFECTIVE: August 1, 2017
MAYOR AND COUNCIL COMMUNICATION MAP
60SH EAN DWSCETREHAB-DUN HAM E
r �=
' O
CIO ..-
ll-
UJ
.err !yT :-.�M1��Y 4, �.R � ,' �.� , •• � +
- w;
• I. 7 a _ --
, w
AVONDALE HASLET RD"
Ok ' +K
WILLOW SPRINGS
• 4 f COMPOSITE
ELEVATED TANK
8i'
FORTWORTH
A A 1 • • A . .
• A : A
i awl POW; SAVnimca l�t;�:<!lieer wr�tr
w NOW:*1mrm RZ9 !'AM wr4� wts "kid MRO tawx
mw km mm low's pow,
AM
Calf! ! • t� + ,¢jig., ".
®� I'r""! /'"iPIN
ltlE IFS" it"" EIFL [r+M! moi.
�! ice'° l�•+�rr. 1ii11! t 0,
�� p,i►wx„E`"'��+! :rim! R�� �* � l�±I� �� �!�►'; i111�'�1 !+' �>�a
PAM
�� • �'� �'JIF:� irwlN•�li� I�/MG�EM� �>� „� �� � / !�li K�tdij
kms•- 111 `' �
E Ems"±rim F+ x [t
WPAM
ao ; I ,
-J%K
Van" 1mr4P
"K Ica 1PAW
1�"
.rim ;"r"/�" t i7 ! 4 - t '3F eE !�
Aw Md
ilk
til t +!° E 41L�r6iit lid �: MRS:wjft LOW
mw
am mm,
Q _
. ! iii WAX
_5
.w
tib ultra tai # KlaMG>!�r
1■f�i yRy� �' I" C " . I�,_'�yI�y,r {•NII , t " ■MW
COM tom.' ism
mold IFNA
iii � �.�.��.y71�I CiMi� � } � t``f.illf" NR`'_ i)!s?Rtlf F • !w��
4NSike@ lwA� now
�,�!►.;'� G�� ..:rS F�¢a:� C- � • Lodi
*amu �� ice"'.!E1► ) GA4
$,='�'d..;� i�+ICi kiT"lli,G li['!r � ,;{�, ;, • �,..���Ilt �htt� t�
� t _fit �U�FaAR
tr x��
. t i
J
iris ���" Et�lli�•_ ��MI�R `�',�r � � �
AMA
WAS
., . . .
►. c•. 1 +111� �� y ;ice �
f�llll +ii Lll a� "Willi t % a / l a►� !�r!i71t IiIRR - !! w .
.�.. aii �lMt�illlit•!� tin
Lr"w�
Dam ' 11
Oslo E E�MIMI"'I r* ice!jet 'l tz3v" 'lp ts7,i�ii
W.f
- • !ltl! NO
_ ill, r tat'•i' i111 EFII ice'
f . E "M.� !>I�ylrlNlii kepi:
PAM
Wavle �ir�€.d 14 "1 '� its mat *. •
tib r €4M!
ON NMI.
111 [�t tw
FORTWORTH
+F TIMI
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 8/1/2017 - Ordinance No. 22807-08-2017 & Resolution No.
4808-08-2017
DATE: Tuesday, August 1, 2017 REFERENCE NO.: **C-28305
LOG NAME: 60SHESANDWSCETREHAB-DUNHAME
SUBJECT:
Authorize Execution of an Engineering Agreement with Dunham Engineering, Inc., in the Amount of
$200,000.00 for Engineering Services for the Repair and Repainting of the Seminary Hill Elevated Storage
Tank and Interior Coating Replacement of the Willow Springs Elevated Storage Tank, Provide for
Additional Project Costs, Adopt Reimbursement Resolution Expressing Official Intent to Reimburse
Expenditures with Proceeds of Future Debt and Adopt Appropriation Ordinance (COUNCIL DISTRICTS 4
and 7)
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached resolution expressing official Intent to reimburse expenditures with proceeds of
future debt for repair and repainting of the Seminary Hill Elevated Storage Tank and interior coating
replacement of the Willow Springs Elevated Storage Tank;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water and Sewer DPN Fund in the amount of$280,000.00; and
3. Authorize execution of an engineering Agreement with Dunham Engineering, Inc., in the amount of
$200,000.00 for engineering services for repair and repainting of the Seminary Hill Elevated Storage
Tank and interior coating replacement of the Willow Springs Elevated Storage Tank. (City Project
No. 100886)
DISCUSSION:
The Seminary Hill 2 Million Gallon (2 MG) Elevated Storage Tank, located at 2700 W. Gambrell Street,
was built in 1947 and last rehabilitated in 1999. The Willow Springs Composite 2 MG Elevated Tank,
located at 2200 Avondale Haslet Road, was built in 2010. Both tanks provide potable water storage and
fire protection for areas in South and far North West Fort Worth respectively. The existing coating system
for both tanks is in need of replacement as required to protect the structural steel from erosion.
In February 2017, a Request for Qualifications (RFQ) was issued for several Water Department Projects
including the potable water Storage Tank Rehabilitation Project. In March 2017, a total of six proposals
were received from engineering consultants for the tank rehabilitation project. A Staff selection committee
recommended Dunham Engineering, Inc., to provide the necessary design services for the Seminary Hill
Elevated Storage Tank- Repair and Repainting. When a partial coating system failure occurred on the
interior of the Willow Springs Composite Elevated Storage Tank, this work was added to the project.
This project is anticipated to be included in a future revenue bond issue for the Water and Sewer Fund.
Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation
Logname: 60SHESANDWSCETREHAB-DUNHAME Page 1 of 3
authority authorized under the Direct Purchase Note (DPN) Program will be used to provide interim
financing for this project until debt is issued. To the extent resources other than the Water and Sewer
portfolio are used to provide interim financing, the Water and Sewer Fund will be charged interest that is
equivalent to the overall rate of return being earned by the City portfolio (currently approximately one-
percent annually). Should the City's portfolio not support the liquidity needed to provide an interim short-
term financing source, another funding source will be required, which could mean issuance of securities
under the DPN Program or earlier issuance of Water and Sewer revenue bonds than is currently planned.
Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and
Sewer Fund or any fund providing temporary cash to fund the project.
The City Council adopted the Water Department's Fiscal Year 2016-2020 Five-Year Capital Improvement
Plan on February 2, 2016 Mayor and Council Communication (M&C G-18662). This City Council adopted
plan includes this specific project, with funding identified through the DPN Program to be reimbursed with
future revenue bonds. In accordance with the provisions of the Financial Management Policy Statements,
Staff anticipates presenting revenue-supported debt issuances to the City Council for consideration within
the next three years. This debt must be issued within approximately three years to provide reimbursement
for these expenses. If that does not occur, the costs will no longer be reimbursable by issuing tax-exempt
debt and the funding source will have to be made whole through other budgetary methods. Adoption of
this resolution does not obligate the City to sell bonds, but preserves the ability to reimburse the City from
tax-exempt bond proceeds.
This engineering Agreement is a portion of the overall project that includes project management,
inspection, contingencies and construction cost with an overall budget of$2,280,000.00.
Design is anticipated to begin in September 2017 and be complete by February 2018. Construction is
anticipated to begin in June 2018 and be complete by March 2019.
In addition to the engineering fee, $80,000.00 is needed for inspection, project management and project
contingencies. This project will have no impact on the Water Department's operating budget when
complete.
M/WBE OFFICE— Dunham Engineering, Inc., is in compliance with the City's BDE Ordinance by
committing to 12 percent SBE participation. The City's goal on this project is 12 percent.
This project is located in COUNCIL DISTRICTS 4 and 7
FISCAL INFORMATION /CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations and adoption of the
attached appropriation ordinance, funds will be available in the Water and Sewer DPN Fund for the
Seminary Hill Elevated Storage Tank and the Willow Springs Composite Elevated tank Project as depicted
below:
FFund� Existing Additional Project
Appropriations F' Appropriations Total*
rWater
& Sewer DPN
Fund & $0.00 $280,000.00 $280,000.00
11
Project Total $0.00 ( $280,000.00 $280,000.00
* Numbers rounded for presentation purposes
Logname: 60SHESANDWSCETREHAB-DUNHAME Page 2 of 3
TO
rtment ccoun Project Program ctivity Budget Reference # moun
r7!1�paID
ID Year Chartfield 2
FROM _ _
Fund Department �oun Project Program ctivity Bud etg R9 ;ncfere # mounYear harteld 2)
CERTIFICATIONS:
Submitted for City Manager's Office by: Jay Chapa (5804)
Originating Department Head: Kara Shuror (8819)
Additional Information Contact: Dena Johnson (7866)
Logname: 60SHESANDWSCETREHAB-DUNHAME Page 3 of 3