HomeMy WebLinkAboutIR 10045 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 10045 To the Mayor and Members of the City Council August 29, 2017 r Page 1 of 1 i SUBJECT: Public Art Projects Status Report rn Yg7'3 The City of Fort Worth's investment in public art enhances the experience of living, working and visiting our great city. It adds to our unique sense of place and community pride by reflecting who we are, in terms of our history, environment and future aspirations. Since 2004, when public art funding first became available, through this Fiscal Year 2017, a total of 86 commissioned and acquired artworks will have been completed, with budgets totaling $11,304,545.08. A detailed project list by funding source titled, Fort Worth Public Art Completed Projects August 2017, is attached. By the end of Fiscal Year 2018, a total of 103 public art projects will be completed, as indicated in the attached list titled, Fort Worth Public Art Project Delivery Plan August 2017. The Fort Worth Public Art Project Funding Overview August 2017, outlines the total allocations from each funding source; number of projects completed with total expenditures; number of current and planned projects with appropriations, as well as funds remaining to be appropriated based on the Art Commission's recommended Fort Worth Public Art Fiscal Year 2018 Annual Work Plan, to be presented to City Council on September 26,2017. Commissioning public artworks of the highest quality that resonate with the community involves a processoverseen by the Fort Worth Art Commission that engages individual City Council members and community stakeholders in planning, artist selection and design review in accordance with the guidelines in the Fort Worth Public Art Master Plan. Aspects of public art projects that differ from other capital improvement projects the City undertakes that may impact project delivery schedules are: • Artists design one-of-a-kind, site-based projects, which requires time for research, community engagement and revisions • Artists' engineers and fabricators must often solve complex technical challenges to achieve the vision • Installation of public art often involves specialized subcontractors • Public art projects are dependent upon construction schedules of the City's capital improvement project and/or other public entities who have jurisdiction over the site Streamlining the project implementation process is a key recommendation in the Fort Worth Public Art MasterPlan Update, developed by consultants Barbara Goldstein and Jessica Cusick with City Council, Art Commission and community input. This new process will expedite project delivery, as will the recent addition of another public art project manager, as recommended in the plan update. In addition, some pending projects are being revisited to seek opportunities to develop more impactful projects. These will be discussed with individual Council Members and the Art Commission will make a recommendation to the entire City Council in the near future. If you have questions please contact Randle Harwood (817-392-6101)or Martha Peters(817-298-3025). David Cooke City Manager FORT WORTH PUBLIC ART COMPLETED PROJECTS August 2017 2014 Bond COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR (Plan adopted 10/21/2014,M&C G-18339) DISTRICT PROJECT BUDGET COMPLETED FUNDING NOTES None completed at this time 2008 Bond COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR (Plan adopted 10/26/2010,M&C G-17094) DISTRICT PROJECT BUDGET COMPLETED FUNDING NOTES Trinity Uptown Roundabout 2,9 $437,558.00 N/A 2015 (See Also 2004 Bond) Riverside Drive 4 $96,134.00 N/A 2015 North Beach Corridor Visioning 4,7 $23,500.00 N/A 2012 Ryan Place 9 $61,154.05 N/A 2013 2008 Bond Completed Projects Total $618,346.05 $0.00 Total Number of Projects 4 2007 CCN COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR (Plan adopted 10/26/2010,M&C G-17095) DISTRICT PROJECT BUDGET COMPLETED FUNDING NOTES Clearfork Main Street Bridge 3 $163,240.00 N/A 2013 Fire Station No.34 7 $49,990.00 N/A 2010 Hazel Harvey Peace Center Lobby 8 $73,931.00 N/A 2009 Hazel Harvey Peace Commemoration 8 $17,100.00 N/A 2015 Nashville Police Station 8 $207,229.69 N/A 2011 (See Also Public Art Fund) Fire Station No.5 8 $70,750.00 N/A 2013 E.Lancaster Control Boxes 8 $22,000.00 N/A 2017 (See Also Public Art Fund) West Rosedale Street 9 $20,000.00 N/A 2015 (See Also 2004 Bond) Chisholm Trail Parkway(SH121) Citywide $210,898.00 N/A 2015 (See Also 2004 Bond) 2007 CCN Completed Projects Total $835,138.69 $0.00 Total Number of Projects 9 2004 Bond COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR (Plan adopted 5/17/2005,M&C G-14801) DISTRICT PROJECT BUDGET COMPLETED FUNDING NOTES Marine Creek Park Corridor 2 $23,866.00 N/A 2015 (See Also Public Art Fund) Northwest Branch Library,Phase 1&2 2 $90,000.00 N/A 2010,2016 Lebow Channel Watershed(28th Street Bridge) 2 $359,480.19 N/A 2012 Lebow Channel Watershed(Dewey Bridge) 2 $47,000.00 N/A 2014 Fire Station No.11 2,7 $46,880.00 N/A 2009 Fire Station No.41 2,7 $44,536.00 N/A 2008 FORT WORTH PUBLIC ART COMPLETED PROJECTS August 2017 2004 Bond (continued) COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR FUNDING NOTES (Plan adopted 5/17/2005,M&C G-14801) DISTRICT PROJECT BUDGET COMPLETED Trinity Uptown Roundabout 2,9 $406,360.72 N/A 2015 (See Also 2008 Bond) Bomber Heights 3 $38,540.00 N/A 2016 Piedmont Road 3 $3,863.75 N/A 2008 Chickering Road 3 $3,316.00 N/A 2008 Park Enhancements 3,4,5,8 $116,149.72 N/A 2008 East First Street 4 $259,250.00 N/A 2017 North Park YMCA 4 $46,540.00 N/A 2009 Fire Station No.27 5 $109,584.00 N/A 2013 (See Also Public Art Fund) Animal Care and Control Center 5 $13,000.00 N/A 2009 (See Also Public Art Fund) Chisholm Trail Community Center 6 $62,916.00 N/A 2014 (See Also Public Art Fund) Camp Bowie Boulevard Phases 1 and 2 7 $307,639.30 N/A 2009/2016 Realignment of Harley Street 7 $80,465.00 $2,000.00 2013 $2000.00 from Downtown Fort Worth,Inc. Sargent Street 8 $69,635.03 N/A 2013 East Lancaster Corridor Master Plan 8 $10,000.00 N/A 2011 East Rosedale Master Plan 8 $12,000.00 N/A 2015 Rolling Hills Tower 8 $20,000.00 N/A 2011 (See Also Public Art Fund) West Rosedale Street 9 $127,449.81 N/A 2015 (See Also 2007 CCN) West 7th Street Bridge(Design) 9 $34,792.58 N/A N/A Fire Station No.8 9 $47,000.00 N/A 2006 Chisholm Trail Parkway(SH121) Citywide $939,835.68 N/A 2015 (See Also 2007 CCN) 2004 Bond Completed Projects Total $3,320,099.78 $2,000.00 Total Number of Projects 26 Public Art Fund COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR (Plan adopted 5/09/2006,M&CG-15185) DISTRICT PROJECT BUDGET COMPLETED FUNDING NOTES Rosen Park Public Art CID 2 $81,277.00 N/A 2016 Northside Community Center Mural 2 $25,000.00 N/A 2010 Marine Creek Park Corridor 2 $20,000.00 N/A 2015 (See Also 2004 Bond) Aquatic Center at Marine Park 2 $30,300.00 N/A 2013 Northwest Branch Library,Phase 2 2 $5,000.00 N/A 2016 (See Also 2004 Bond) FORT WORTH PUBLIC ART COMPLETED PROJECTS August 2017 Public Art Fund (continued) COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR FUNDING NOTES (Plan adopted 5/09/2006,M&CG-15185) DISTRICT PROJECT BUDGET COMPLETED Vaquero de Fort Worth 2 $25,000.00 $211,000.00 2012 Additional$206,000 from Others and Contract Street Maintenance Fund;$5,000 from 1998 Bond Renovate Rodeo Plaza 2 $263,524.01 $91,292.00 2009 Additional$91,292 from Culture&Tourism Overton Park CID 3 $50,000.00 N/A 2010 (See Also 2008 Bond Current Projects) FWPA Acquisition-Who Rescued Who 3 $28,000.00 N/A 2015 Lake Como Park Master Plan 3 $52,000.00 N/A 2017 Historic Carver Heights/Plaza Circle CID 5 $56,000.00 N/A 2017 Historic Handley Urban Village 5 $62,999.27 N/A 2015 East Lancaster Avenue Public Art Masterplan 5 $20,000.00 N/A 2011 (See Also 2004 Bond) Fire Station 27 5 $3,371.00 N/A 2013 (See Also 2004 Bond) Animal Care and Control Center 5 $100,000.00 N/A 2009 (See Also 2004 Bond) E.Lancaster Control Boxes 5 $6,500.00 N/A 2017 (See Also 2007 CCN) C.P.Hadley Reserve Park CID 6 $50,000.00 $25,000.00 2010 Additional$25,000 from Tim Fleet donation SW Community Center Mural 6 $30,000.00 N/A 2012 Chisolm Trail Community Center 6 $23,200.00 N/A 2014 (See Also 2004 Bond) Thomas Place Community Center CID 7 $51,834.94 N/A 2012 FWPA Acquisition-Pollen(at BRIT) 7 $65,000.00 N/A 2000 Fire Station No.38 7 $60,167.31 N/A 2009 Camp Bowie/Byers Green,Phase 3 7 $82,865.00 N/A 2009/2016 (See Also 2004 Bond) Police Crime Lab CID 8 $56,200.00 N/A 2013 Near Eastside Urban Village 8 $52,500.00 N/A 2013 Berry-Riverside Urban Village 8 $53,300.00 N/A 2013 Shamblee Library 8 $108,038.40 N/A 2008 Rolling Hills Radio Tower 8 $48,695.00 N/A 2011 (See Also 2004 Bond) Hazel Harvey Peace Center 8 $10,000.00 N/A 2009 (See Also 2007 CCN) Nashville Neighborhood Police 8 $43,000.00 N/A 2011 (See Also 2007 CCN) Fairmount Park CID Public Art 9 $56,100.00 $20,000.00 2015 Additional$10,000 from HOA donation;$10,000 Park gaswell revenue Hemphill/Berry Urban Village 9 $40,352.61 N/A 2017 FORT WORTH PUBLIC ART COMPLETED PROJECTS August 2017 Public Art Fund (continued) COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR FUNDING NOTES (Plan adopted 5/09/2006,M&CG-15185) DISTRICT PROJECT BUDGET COMPLETED South Main Urban Village 9 $160,000.00 N/A 2017 Tabachin Ribbon(at Municipal Court) 9 $77,501.50 $42,531.32 2010 Additional$42,531.32 from FWPA Collection Management funds FWPA Acquisition-Here She Stood 9 $40,000.00 N/A 2013 FWPA Acquisition-Woodson Painting 9 $25,660.00 N/A 2014 Miss Molly Sculpture(at City Hall) 9 $22,529.31 N/A 2007 Downtown Parking Garage 9 $395,997.60 $325,219.00 2009 Additional$325,219 from Culture&Tourism Lancaster Corridor,Avenue of Light 9 $163,821.29 $1,748,400.00 2009 Additional$275,000 from Lancaster TIF; $275,000 from Local Development Corp.; $500,000 from Capital Projects Reserve; $500,000 from Street Improvements Fund; $198,400 from HUD EDI grant FWPA Master Plan Update Citywide $120,000.00 N/A 2017 Westside Water Treatment Plant Citywide $123,277.00 N/A 2012 Public Art Fund Completed Projects Total $2,789,011.24 $2,116,150.32 Total Number of Projects 41 COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR Full Funding From Other Sources DISTRICT PROJECT BUDGET COMPLETED FUNDING NOTES Fort Woth Convention Center-Main Ballroom 7 N/A $200,100.00 2005 Convention Center Construction Funds Fort Worth Convention Center-12th Street Lobby 7 N/A $240,000.00 2005 Convention Center Construction Funds Meacham Airport Terminal 2 N/A $239,500.00 2017 Aviation Gas Well Revenue T&P Terminal Commemoration 9 N/A $48,834.00 2011 Lancaster TIF Will Rogers Memorial Center-Equestrian 7 N/A $281,702.00 2011 2010 Certificates of Obligation Western Heritage Parking Garage 7 N/A $266,371.00 2012 2008 Certificates of Obligation Full Funding Other Sources Completed Projects Total $0.00 $1,276,507.00 Total Number of Projects 6 TOTAL PERCENT-FOR-ART FUNDING $7,562,595.76 FULL FUNDING FROM OTHER FUNDING SOURCES $1,276,507.00 PARTIAL FUNDING FROM OTHER FUNDING SOURCES $2,465,442.32 GRAND TOTALALL PROJECT FUNDING $11,304,545.08 GRAND TOTAL NUMBER OF PROJECTS 86 FORT WORTH PUBLIC ART PROJECT DELIVERY PLAN August2017 2014 Bond COUNCIL PERCENT-FOR-ART FUNDING BY (Plan adopted 10/21/2014,M&C G-18339) DISTRICT PROJECT BUDGET OTHERS FY2018 FY2019 FY2020 Trail Driver's Park 2 $75,000.00 N/A Como Community Center 3 $106,000.00 N/A Fire Station 43(Walsh Ranch) 3 $91,050.00 N/A North Beach(at IH 820) 4 $300,000.00 N/A Eugene McCray Community Center Expansion 5 $60,200.00 N/A Handley-Meadowbrook Community Center Expansion 5 $60,200.00 N/A Fire Station 42(Spinks Airport area) 6 $91,050.00 N/A Chisholm Trail Park 6 $76,000.00 N/A Northwest Community Park 7 $138,600.00 N/A Golden Triangle Library 7 $183,000.00 N/A Field Operations Services Facility(North Service Center) Citywide(7) $95,700.00 N/A Eastside Library 8 $65,000.00 $10,000.00 Urban Village 1 (Six Points,Phase 2) 9 $80,000.00 N/A Urban Village 2(TBD) TBD $80,000.00 N/A Transit-Oriented Development(S.Main Underpass) Citywide(9) $300,000.00 N/A Heritage Park Citywide(9) $100,400.00 N/A Public Safety&Municipal Court Building Renovation Citywide(9) $30,000.00 N/A Municipal Vehicle Maintenance Facility(Holly Water Treatment Citywide(9) $200,000.00 Plant) N/A Second Animal Care&Control Facility(Design only) Citywide $46,100.00 (TBD) N/A Iconic Public Artwork Citywide $1,415,700.00 N/A 2014 Bond Current and Planned Projects Totals 20 $3,594,000.00 $10,000.00 2008 Bond COUNCIL PERCENT-FOR-ART FUNDING BY (Plan adopted 10/26/2010,M&C G-17094) DISTRICT PROJECT BUDGET OTHERS FY2018 FY2019 FY2020 Overton Park Phase 2 3 $45,000.00 N/A Ray White* 4 $12,000.00 N/A FORT WORTH PUBLIC ART PROJECT DELIVERY PLAN August2017 2008 Bond(continued) COUNCIL PERCENT-FOR-ART FUNDING BY FY2018 FY2019 FY2020 (Plan adopted 10/26/2010,M&C G-17094) DISTRICT PROJECT BUDGET OTHERS Randol Mill Road* 4 $30,000.00 N/A North Beach Corridor Project 4,7 $504,879.00 N/A Lakeshore Drive* 5 $100,000.00 N/A Parker Henderson Road 5 $205,640.00 N/A Summer Creek Roundabout 6 $152,902.00 N/A Risinger Road* 6 $30,000.00 N/A Avondale-Haslet* 7 $200,000.00 N/A Silver Creek Road* 7 $100,000.00 N/A Old Decatur Road 7 $192,172.00 N/A Belzise Terrace* 8 $205,307.00 N/A 6th Avenue 9 $114,972.00 N/A Ryan Place Phase 2* 9 $10,000.00 N/A 2008 Bond Current and Planned Projects Totals 14 $1,902,872.00 $0.00 2007 CCN COUNCIL PERCENT-FOR-ART FUNDING BY (Plan adopted 10/26/2010,M&C G-17095) DISTRICT PROJECT BUDGET OTHERS FY2018 FY2019 FY2020 Bonnie Brae Street 4 $119,365.00 N/A North Beach Corridor Project 4,7 $364,899.00 N/A (See 2008 Bond) "Stop Six",Stalcup&Ramey 5 $138,218.00 N/A Altamesa 6 $189,827.00 N/A Summer Creek Boulevard* 6 $97,795.00 N/A Summer Creek Master Plan 6 $32,000.00 N/A Montgomery Street 7 $155,858.00 N/A East Rosedale Street(1-35 to 287) 8 $40,000.00 N/A "Ghost"Signs Pilot Project* 8 $75,000.00 N/A East Lancaster Avenue TBD* 8 $89,307.00 N/A Magnolia Avenue 9 $151,557.00 N/A 2007 CCN Current and Planned Projects Totals 11 $1,453,826.00 $0.00 FORT WORTH PUBLIC ART PROJECT DELIVERY PLAN August2017 2004 Bond COUNCIL PERCENT-FOR-ART FUNDING BY (Plan adopted 5/17/2005,M&C G-14801) DISTRICT PROJECT BUDGET OTHERS FY2018 FY2019 FY2020 Lebow Channel Watershed(Brennan Bridge) 2 $53,000.00 N/A Lake Como Park 3 $151,000.00 N/A Precinct Line Road&Bridge 5 $104,000.00 N/A Chapel Creek Boulevard* 3 $82,191.00 N/A Dallas Avenue 5 $45,000.00 N/A East Rosedale Street(Miller to Stalcup) 5 $181,146.50 N/A Summer Creek Blvd.(Roundabout) 6 $91,003.00 N/A Montgomery Street 7 $123,451.00 N/A (See 2007 CCN) FW Community Arts Center Plinths 7 $50,000.00 N/A East Rosedale Street(Guinn School Plaza) 8 $58,000.00 N/A East Rosedale Street(1-35 to 287) 8 $131,146.50 N/A (See 2007 CCN) East Rosedale Street(287 to Miller) 8 $222,644.65 N/A Hemphill/Lamar Connector 8,9 $282,680.00 N/A Westcreek Blvd 9 $212,191.00 N/A Victory Forest Community Center 9 $67,000.00 N/A 2004 Bond Current and Planned Projects Totals 15 $1,854,453.65 $0.00 Public Art Fund COUNCIL PERCENT-FOR-ART FUNDING BY (Plan adopted 5/09/2006,M&CG-15185) DISTRICT PROJECT BUDGET OTHERS FY2018 FY2019 FY2020 Rockwood Park(Gamtex Partnership) 2 $30,500.00 $29,500.00 Walsh Ranch Bridge* 3 $8,000.00 N/A Lake Como Park 3 $80,000.00 N/A (See 2004 Bond Above) East Regional Library CID 4 $80,000.00 N/A 1-30 Monument Public Art Project 4 $205,194.00 $265,000.00 FWPA Acquisition-Natura 5 $80,000.00 N/A Poly Tech/Wesleyan Urban Village 8 $73,000.00 N/A Guinn School Plaza 8 $50,000.00 N/A (See 2004 Bond Above) Six Points Urban Village 9 $80,000.00 N/A FORT WORTH PUBLIC ART PROJECT DELIVERY PLAN August2017 Public Art Fund(continued) COUNCIL PERCENT-FOR-ART FUNDING BY (Plan adopted 5/09/2006,M&CG-15185) DISTRICT PROJECT BUDGET OTHERS FY2018 FY2019 FY2020 West Berry Mural Project 9 $60,000.00 N/A Public Safety Training Center 9 $350,000.00 N/A Hemphill/Lamar Connector 9 $206,545.00 N/A (See 2004 Bond Above) Westcreek Blvd 9 $128,100.00 N/A (See 2004 Bond Above) Water Department Master Plan Citywide $50,000.00 N/A Library Department Master Plan Citywide $50,000.00 N/A Mural Artist-in-Residence* Citywide $15,000.00 N/A Iconic Public Artwork Citywide $850,000.00 N/A (See 2014 Bond Above) Public Art Fund Current and Planned Projects Totals 17 $2,396,339.00 $294,500.00 GRAND TOTALS 77 $11,201,490.65 $304,500.00 *Projects to be discussed with individual Council Members for possible consolidation with other projects to create more impact and align with the Fort Worth Public Art Master Plan Update. FORT WORTH PUBLIC ART PROJECT FUNDING OVERVIEW AUGUST 2017 Percentage of Percentage of Number of Bond funds Bond funds Percentage of Number of Appropriations to Current and Expended on Appropriated to Bond funds to Total Public Art Expended: Completed Current and Planned Planned To be Appropriated Returned to Completed Current and be Funding Source Project Funding Completed Projects Projects Projects Projects to Projects City Projects Planned Projects Appropriated Notes Appropriations to be recommended in 2004 Bond Program $ 5,361,000.00 $ 3,320,099.78 26 $ 1,854,453.65 15 $ 187,646.57 $ 2,000.00 62% 35% 4% the FWPA FY 2018 Annual Work Plan. Appropriations pending possible 2007 Critical Capital Needs Program $ 2,679,000.00 $ 835,138.69 9 $ 1,453,826.00 11 $ 390,035.31 31% 54% 15% consolidation with other projects. Appropriations pending possible 2008 Bond Program $ 3,000,000.00 $ 618,346.05 4 $ 1,902,872.00 14 $ 478,781.95 21% 63% 16% consolidationwith other projects. 2014 Bond Program $ 3,594,000.00 $ - 0 $ 3,594,000.00 20 $ - 0% 100% 0% Amount does not reflect funding for Program Administration and Collection Management.Appropriations to be Public Art Fund recommended in the FWPA FY 2018 Water Fund Allocations for Projects $ 5,606,389.86 $ 2,789,011.24 41 $ 2,396,339.00 17 $ 421,039.62 50% 43% 8% Annual Work Plan. Funding from non-Percent-For-Art sources augments past,current,and planned project budgets. Only six Other Funding Sources completed projects were funded solely Non Percent-For-Art Funding $ 3,739,949.32 $ 3,741,949.32 6 $ 304,500.00 N/A $ - N/A N/A N/A by non-Percent-For-Art funds. TOTALS $ 23,980,339.18 $ 11,304,545.08 86 $ 11,201,490.65 77 $ 1,477,503.45