HomeMy WebLinkAboutIR 10045 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 10045
To the Mayor and Members of the City Council August 29, 2017
r Page 1 of 1
i
SUBJECT: Public Art Projects Status Report
rn
Yg7'3
The City of Fort Worth's investment in public art enhances the experience of living, working and visiting our great city.
It adds to our unique sense of place and community pride by reflecting who we are, in terms of our history,
environment and future aspirations.
Since 2004, when public art funding first became available, through this Fiscal Year 2017, a total of 86 commissioned
and acquired artworks will have been completed, with budgets totaling $11,304,545.08. A detailed project list by
funding source titled, Fort Worth Public Art Completed Projects August 2017, is attached.
By the end of Fiscal Year 2018, a total of 103 public art projects will be completed, as indicated in the attached list
titled, Fort Worth Public Art Project Delivery Plan August 2017.
The Fort Worth Public Art Project Funding Overview August 2017, outlines the total allocations from each funding
source; number of projects completed with total expenditures; number of current and planned projects with
appropriations, as well as funds remaining to be appropriated based on the Art Commission's recommended Fort
Worth Public Art Fiscal Year 2018 Annual Work Plan, to be presented to City Council on September 26,2017.
Commissioning public artworks of the highest quality that resonate with the community involves a processoverseen
by the Fort Worth Art Commission that engages individual City Council members and community stakeholders in
planning, artist selection and design review in accordance with the guidelines in the Fort Worth Public Art Master
Plan. Aspects of public art projects that differ from other capital improvement projects the City undertakes that may
impact project delivery schedules are:
• Artists design one-of-a-kind, site-based projects, which requires time for research, community engagement
and revisions
• Artists' engineers and fabricators must often solve complex technical challenges to achieve the vision
• Installation of public art often involves specialized subcontractors
• Public art projects are dependent upon construction schedules of the City's capital improvement project
and/or other public entities who have jurisdiction over the site
Streamlining the project implementation process is a key recommendation in the Fort Worth Public Art MasterPlan
Update, developed by consultants Barbara Goldstein and Jessica Cusick with City Council, Art Commission and
community input. This new process will expedite project delivery, as will the recent addition of another public art
project manager, as recommended in the plan update.
In addition, some pending projects are being revisited to seek opportunities to develop more impactful projects.
These will be discussed with individual Council Members and the Art Commission will make a recommendation to the
entire City Council in the near future.
If you have questions please contact Randle Harwood (817-392-6101)or Martha Peters(817-298-3025).
David Cooke
City Manager
FORT WORTH PUBLIC ART COMPLETED PROJECTS
August 2017
2014 Bond COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR
(Plan adopted 10/21/2014,M&C G-18339) DISTRICT PROJECT BUDGET COMPLETED FUNDING NOTES
None completed at this time
2008 Bond COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR
(Plan adopted 10/26/2010,M&C G-17094) DISTRICT PROJECT BUDGET COMPLETED FUNDING NOTES
Trinity Uptown Roundabout 2,9 $437,558.00 N/A 2015 (See Also 2004 Bond)
Riverside Drive 4 $96,134.00 N/A 2015
North Beach Corridor Visioning 4,7 $23,500.00 N/A 2012
Ryan Place 9 $61,154.05 N/A 2013
2008 Bond Completed Projects Total $618,346.05 $0.00
Total Number of Projects 4
2007 CCN COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR
(Plan adopted 10/26/2010,M&C G-17095) DISTRICT PROJECT BUDGET COMPLETED FUNDING NOTES
Clearfork Main Street Bridge 3 $163,240.00 N/A 2013
Fire Station No.34 7 $49,990.00 N/A 2010
Hazel Harvey Peace Center Lobby 8 $73,931.00 N/A 2009
Hazel Harvey Peace Commemoration 8 $17,100.00 N/A 2015
Nashville Police Station 8 $207,229.69 N/A 2011 (See Also Public Art Fund)
Fire Station No.5 8 $70,750.00 N/A 2013
E.Lancaster Control Boxes 8 $22,000.00 N/A 2017 (See Also Public Art Fund)
West Rosedale Street 9 $20,000.00 N/A 2015 (See Also 2004 Bond)
Chisholm Trail Parkway(SH121) Citywide $210,898.00 N/A 2015 (See Also 2004 Bond)
2007 CCN Completed Projects Total $835,138.69 $0.00
Total Number of Projects 9
2004 Bond COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR
(Plan adopted 5/17/2005,M&C G-14801) DISTRICT PROJECT BUDGET COMPLETED FUNDING NOTES
Marine Creek Park Corridor 2 $23,866.00 N/A 2015 (See Also Public Art Fund)
Northwest Branch Library,Phase 1&2 2 $90,000.00 N/A 2010,2016
Lebow Channel Watershed(28th Street Bridge) 2 $359,480.19 N/A 2012
Lebow Channel Watershed(Dewey Bridge) 2 $47,000.00 N/A 2014
Fire Station No.11 2,7 $46,880.00 N/A 2009
Fire Station No.41 2,7 $44,536.00 N/A 2008
FORT WORTH PUBLIC ART COMPLETED PROJECTS
August 2017
2004 Bond (continued) COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR FUNDING NOTES
(Plan adopted 5/17/2005,M&C G-14801) DISTRICT PROJECT BUDGET COMPLETED
Trinity Uptown Roundabout 2,9 $406,360.72 N/A 2015 (See Also 2008 Bond)
Bomber Heights 3 $38,540.00 N/A 2016
Piedmont Road 3 $3,863.75 N/A 2008
Chickering Road 3 $3,316.00 N/A 2008
Park Enhancements 3,4,5,8 $116,149.72 N/A 2008
East First Street 4 $259,250.00 N/A 2017
North Park YMCA 4 $46,540.00 N/A 2009
Fire Station No.27 5 $109,584.00 N/A 2013 (See Also Public Art Fund)
Animal Care and Control Center 5 $13,000.00 N/A 2009 (See Also Public Art Fund)
Chisholm Trail Community Center 6 $62,916.00 N/A 2014 (See Also Public Art Fund)
Camp Bowie Boulevard Phases 1 and 2 7 $307,639.30 N/A 2009/2016
Realignment of Harley Street 7 $80,465.00 $2,000.00 2013 $2000.00 from Downtown Fort Worth,Inc.
Sargent Street 8 $69,635.03 N/A 2013
East Lancaster Corridor Master Plan 8 $10,000.00 N/A 2011
East Rosedale Master Plan 8 $12,000.00 N/A 2015
Rolling Hills Tower 8 $20,000.00 N/A 2011 (See Also Public Art Fund)
West Rosedale Street 9 $127,449.81 N/A 2015 (See Also 2007 CCN)
West 7th Street Bridge(Design) 9 $34,792.58 N/A N/A
Fire Station No.8 9 $47,000.00 N/A 2006
Chisholm Trail Parkway(SH121) Citywide $939,835.68 N/A 2015 (See Also 2007 CCN)
2004 Bond Completed Projects Total $3,320,099.78 $2,000.00
Total Number of Projects 26
Public Art Fund COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR
(Plan adopted 5/09/2006,M&CG-15185) DISTRICT PROJECT BUDGET COMPLETED FUNDING NOTES
Rosen Park Public Art CID 2 $81,277.00 N/A 2016
Northside Community Center Mural 2 $25,000.00 N/A 2010
Marine Creek Park Corridor 2 $20,000.00 N/A 2015 (See Also 2004 Bond)
Aquatic Center at Marine Park 2 $30,300.00 N/A 2013
Northwest Branch Library,Phase 2 2 $5,000.00 N/A 2016 (See Also 2004 Bond)
FORT WORTH PUBLIC ART COMPLETED PROJECTS
August 2017
Public Art Fund (continued) COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR FUNDING NOTES
(Plan adopted 5/09/2006,M&CG-15185) DISTRICT PROJECT BUDGET COMPLETED
Vaquero de Fort Worth 2 $25,000.00 $211,000.00 2012 Additional$206,000 from Others and Contract
Street Maintenance Fund;$5,000 from 1998
Bond
Renovate Rodeo Plaza 2 $263,524.01 $91,292.00 2009 Additional$91,292 from Culture&Tourism
Overton Park CID 3 $50,000.00 N/A 2010 (See Also 2008 Bond Current Projects)
FWPA Acquisition-Who Rescued Who 3 $28,000.00 N/A 2015
Lake Como Park Master Plan 3 $52,000.00 N/A 2017
Historic Carver Heights/Plaza Circle CID 5 $56,000.00 N/A 2017
Historic Handley Urban Village 5 $62,999.27 N/A 2015
East Lancaster Avenue Public Art Masterplan 5 $20,000.00 N/A 2011 (See Also 2004 Bond)
Fire Station 27 5 $3,371.00 N/A 2013 (See Also 2004 Bond)
Animal Care and Control Center 5 $100,000.00 N/A 2009 (See Also 2004 Bond)
E.Lancaster Control Boxes 5 $6,500.00 N/A 2017 (See Also 2007 CCN)
C.P.Hadley Reserve Park CID 6 $50,000.00 $25,000.00 2010 Additional$25,000 from Tim Fleet donation
SW Community Center Mural 6 $30,000.00 N/A 2012
Chisolm Trail Community Center 6 $23,200.00 N/A 2014 (See Also 2004 Bond)
Thomas Place Community Center CID 7 $51,834.94 N/A 2012
FWPA Acquisition-Pollen(at BRIT) 7 $65,000.00 N/A 2000
Fire Station No.38 7 $60,167.31 N/A 2009
Camp Bowie/Byers Green,Phase 3 7 $82,865.00 N/A 2009/2016 (See Also 2004 Bond)
Police Crime Lab CID 8 $56,200.00 N/A 2013
Near Eastside Urban Village 8 $52,500.00 N/A 2013
Berry-Riverside Urban Village 8 $53,300.00 N/A 2013
Shamblee Library 8 $108,038.40 N/A 2008
Rolling Hills Radio Tower 8 $48,695.00 N/A 2011 (See Also 2004 Bond)
Hazel Harvey Peace Center 8 $10,000.00 N/A 2009 (See Also 2007 CCN)
Nashville Neighborhood Police 8 $43,000.00 N/A 2011 (See Also 2007 CCN)
Fairmount Park CID Public Art 9 $56,100.00 $20,000.00 2015 Additional$10,000 from HOA donation;$10,000
Park gaswell revenue
Hemphill/Berry Urban Village 9 $40,352.61 N/A 2017
FORT WORTH PUBLIC ART COMPLETED PROJECTS
August 2017
Public Art Fund (continued) COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR FUNDING NOTES
(Plan adopted 5/09/2006,M&CG-15185) DISTRICT PROJECT BUDGET COMPLETED
South Main Urban Village 9 $160,000.00 N/A 2017
Tabachin Ribbon(at Municipal Court) 9 $77,501.50 $42,531.32 2010 Additional$42,531.32 from FWPA Collection
Management funds
FWPA Acquisition-Here She Stood 9 $40,000.00 N/A 2013
FWPA Acquisition-Woodson Painting 9 $25,660.00 N/A 2014
Miss Molly Sculpture(at City Hall) 9 $22,529.31 N/A 2007
Downtown Parking Garage 9 $395,997.60 $325,219.00 2009 Additional$325,219 from Culture&Tourism
Lancaster Corridor,Avenue of Light 9 $163,821.29 $1,748,400.00 2009 Additional$275,000 from Lancaster TIF;
$275,000 from Local Development Corp.;
$500,000 from Capital Projects Reserve;
$500,000 from Street Improvements Fund;
$198,400 from HUD EDI grant
FWPA Master Plan Update Citywide $120,000.00 N/A 2017
Westside Water Treatment Plant Citywide $123,277.00 N/A 2012
Public Art Fund Completed Projects Total $2,789,011.24 $2,116,150.32
Total Number of Projects 41
COUNCIL PERCENT-FOR-ART OTHER FUNDING YEAR
Full Funding From Other Sources DISTRICT PROJECT BUDGET COMPLETED FUNDING NOTES
Fort Woth Convention Center-Main Ballroom 7 N/A $200,100.00 2005 Convention Center Construction Funds
Fort Worth Convention Center-12th Street Lobby 7 N/A $240,000.00 2005 Convention Center Construction Funds
Meacham Airport Terminal 2 N/A $239,500.00 2017 Aviation Gas Well Revenue
T&P Terminal Commemoration 9 N/A $48,834.00 2011 Lancaster TIF
Will Rogers Memorial Center-Equestrian 7 N/A $281,702.00 2011 2010 Certificates of Obligation
Western Heritage Parking Garage 7 N/A $266,371.00 2012 2008 Certificates of Obligation
Full Funding Other Sources Completed Projects Total $0.00 $1,276,507.00
Total Number of Projects 6
TOTAL PERCENT-FOR-ART FUNDING $7,562,595.76
FULL FUNDING FROM OTHER FUNDING SOURCES $1,276,507.00
PARTIAL FUNDING FROM OTHER FUNDING SOURCES $2,465,442.32
GRAND TOTALALL PROJECT FUNDING $11,304,545.08
GRAND TOTAL NUMBER OF PROJECTS 86
FORT WORTH PUBLIC ART PROJECT DELIVERY PLAN
August2017
2014 Bond COUNCIL PERCENT-FOR-ART FUNDING BY
(Plan adopted 10/21/2014,M&C G-18339) DISTRICT PROJECT BUDGET OTHERS FY2018 FY2019 FY2020
Trail Driver's Park 2 $75,000.00 N/A
Como Community Center 3 $106,000.00 N/A
Fire Station 43(Walsh Ranch) 3 $91,050.00 N/A
North Beach(at IH 820) 4 $300,000.00 N/A
Eugene McCray Community Center Expansion 5 $60,200.00 N/A
Handley-Meadowbrook Community Center Expansion 5 $60,200.00 N/A
Fire Station 42(Spinks Airport area) 6 $91,050.00 N/A
Chisholm Trail Park 6 $76,000.00 N/A
Northwest Community Park 7 $138,600.00 N/A
Golden Triangle Library 7 $183,000.00 N/A
Field Operations Services Facility(North Service Center) Citywide(7) $95,700.00 N/A
Eastside Library 8 $65,000.00 $10,000.00
Urban Village 1 (Six Points,Phase 2) 9 $80,000.00 N/A
Urban Village 2(TBD) TBD $80,000.00 N/A
Transit-Oriented Development(S.Main Underpass) Citywide(9) $300,000.00 N/A
Heritage Park Citywide(9) $100,400.00 N/A
Public Safety&Municipal Court Building Renovation Citywide(9) $30,000.00
N/A
Municipal Vehicle Maintenance Facility(Holly Water Treatment Citywide(9) $200,000.00
Plant) N/A
Second Animal Care&Control Facility(Design only) Citywide $46,100.00
(TBD) N/A
Iconic Public Artwork Citywide $1,415,700.00 N/A
2014 Bond Current and Planned Projects Totals 20 $3,594,000.00 $10,000.00
2008 Bond COUNCIL PERCENT-FOR-ART FUNDING BY
(Plan adopted 10/26/2010,M&C G-17094) DISTRICT PROJECT BUDGET OTHERS FY2018 FY2019 FY2020
Overton Park Phase 2 3 $45,000.00 N/A
Ray White* 4 $12,000.00 N/A
FORT WORTH PUBLIC ART PROJECT DELIVERY PLAN
August2017
2008 Bond(continued) COUNCIL PERCENT-FOR-ART FUNDING BY FY2018 FY2019 FY2020
(Plan adopted 10/26/2010,M&C G-17094) DISTRICT PROJECT BUDGET OTHERS
Randol Mill Road* 4 $30,000.00 N/A
North Beach Corridor Project 4,7 $504,879.00 N/A
Lakeshore Drive* 5 $100,000.00 N/A
Parker Henderson Road 5 $205,640.00 N/A
Summer Creek Roundabout 6 $152,902.00 N/A
Risinger Road* 6 $30,000.00 N/A
Avondale-Haslet* 7 $200,000.00 N/A
Silver Creek Road* 7 $100,000.00 N/A
Old Decatur Road 7 $192,172.00 N/A
Belzise Terrace* 8 $205,307.00 N/A
6th Avenue 9 $114,972.00 N/A
Ryan Place Phase 2* 9 $10,000.00 N/A
2008 Bond Current and Planned Projects Totals 14 $1,902,872.00 $0.00
2007 CCN
COUNCIL PERCENT-FOR-ART FUNDING BY
(Plan adopted 10/26/2010,M&C G-17095) DISTRICT PROJECT BUDGET OTHERS FY2018 FY2019 FY2020
Bonnie Brae Street 4 $119,365.00 N/A
North Beach Corridor Project 4,7 $364,899.00 N/A (See 2008 Bond)
"Stop Six",Stalcup&Ramey 5 $138,218.00 N/A
Altamesa 6 $189,827.00 N/A
Summer Creek Boulevard* 6 $97,795.00 N/A
Summer Creek Master Plan 6 $32,000.00 N/A
Montgomery Street 7 $155,858.00 N/A
East Rosedale Street(1-35 to 287) 8 $40,000.00 N/A
"Ghost"Signs Pilot Project* 8 $75,000.00 N/A
East Lancaster Avenue TBD* 8 $89,307.00 N/A
Magnolia Avenue 9 $151,557.00 N/A
2007 CCN Current and Planned Projects Totals 11 $1,453,826.00 $0.00
FORT WORTH PUBLIC ART PROJECT DELIVERY PLAN
August2017
2004 Bond COUNCIL PERCENT-FOR-ART FUNDING BY
(Plan adopted 5/17/2005,M&C G-14801) DISTRICT PROJECT BUDGET OTHERS FY2018 FY2019 FY2020
Lebow Channel Watershed(Brennan Bridge) 2 $53,000.00 N/A
Lake Como Park 3 $151,000.00 N/A
Precinct Line Road&Bridge 5 $104,000.00 N/A
Chapel Creek Boulevard* 3 $82,191.00 N/A
Dallas Avenue 5 $45,000.00 N/A
East Rosedale Street(Miller to Stalcup) 5 $181,146.50 N/A
Summer Creek Blvd.(Roundabout) 6 $91,003.00 N/A
Montgomery Street 7 $123,451.00 N/A (See 2007 CCN)
FW Community Arts Center Plinths 7 $50,000.00 N/A
East Rosedale Street(Guinn School Plaza) 8 $58,000.00 N/A
East Rosedale Street(1-35 to 287) 8 $131,146.50 N/A (See 2007 CCN)
East Rosedale Street(287 to Miller) 8 $222,644.65 N/A
Hemphill/Lamar Connector 8,9 $282,680.00 N/A
Westcreek Blvd 9 $212,191.00 N/A
Victory Forest Community Center 9 $67,000.00 N/A
2004 Bond Current and Planned Projects Totals 15 $1,854,453.65 $0.00
Public Art Fund
COUNCIL PERCENT-FOR-ART FUNDING BY
(Plan adopted 5/09/2006,M&CG-15185) DISTRICT PROJECT BUDGET OTHERS FY2018 FY2019 FY2020
Rockwood Park(Gamtex Partnership) 2 $30,500.00 $29,500.00
Walsh Ranch Bridge* 3 $8,000.00 N/A
Lake Como Park 3 $80,000.00 N/A (See 2004 Bond Above)
East Regional Library CID 4 $80,000.00 N/A
1-30 Monument Public Art Project 4 $205,194.00 $265,000.00
FWPA Acquisition-Natura 5 $80,000.00 N/A
Poly Tech/Wesleyan Urban Village 8 $73,000.00 N/A
Guinn School Plaza 8 $50,000.00 N/A (See 2004 Bond Above)
Six Points Urban Village 9 $80,000.00 N/A
FORT WORTH PUBLIC ART PROJECT DELIVERY PLAN
August2017
Public Art Fund(continued) COUNCIL PERCENT-FOR-ART FUNDING BY
(Plan adopted 5/09/2006,M&CG-15185) DISTRICT PROJECT BUDGET OTHERS FY2018 FY2019 FY2020
West Berry Mural Project 9 $60,000.00 N/A
Public Safety Training Center 9 $350,000.00 N/A
Hemphill/Lamar Connector 9 $206,545.00 N/A (See 2004 Bond Above)
Westcreek Blvd 9 $128,100.00 N/A (See 2004 Bond Above)
Water Department Master Plan Citywide $50,000.00 N/A
Library Department Master Plan Citywide $50,000.00 N/A
Mural Artist-in-Residence* Citywide $15,000.00 N/A
Iconic Public Artwork Citywide $850,000.00 N/A (See 2014 Bond Above)
Public Art Fund Current and Planned Projects Totals 17 $2,396,339.00 $294,500.00
GRAND TOTALS 77 $11,201,490.65 $304,500.00
*Projects to be discussed with individual Council Members for
possible consolidation with other projects to create more impact
and align with the Fort Worth Public Art Master Plan Update.
FORT WORTH PUBLIC ART PROJECT FUNDING OVERVIEW
AUGUST 2017
Percentage of Percentage of
Number of Bond funds Bond funds Percentage of
Number of Appropriations to Current and Expended on Appropriated to Bond funds to
Total Public Art Expended: Completed Current and Planned Planned To be Appropriated Returned to Completed Current and be
Funding Source Project Funding Completed Projects Projects Projects Projects to Projects City Projects Planned Projects Appropriated Notes
Appropriations to be recommended in
2004 Bond Program $ 5,361,000.00 $ 3,320,099.78 26 $ 1,854,453.65 15 $ 187,646.57 $ 2,000.00 62% 35% 4% the FWPA FY 2018 Annual Work Plan.
Appropriations pending possible
2007 Critical Capital Needs Program $ 2,679,000.00 $ 835,138.69 9 $ 1,453,826.00 11 $ 390,035.31 31% 54% 15% consolidation with other projects.
Appropriations pending possible
2008 Bond Program $ 3,000,000.00 $ 618,346.05 4 $ 1,902,872.00 14 $ 478,781.95 21% 63% 16% consolidationwith other projects.
2014 Bond Program $ 3,594,000.00 $ - 0 $ 3,594,000.00 20 $ - 0% 100% 0%
Amount does not reflect funding for
Program Administration and Collection
Management.Appropriations to be
Public Art Fund recommended in the FWPA FY 2018
Water Fund Allocations for Projects $ 5,606,389.86 $ 2,789,011.24 41 $ 2,396,339.00 17 $ 421,039.62 50% 43% 8% Annual Work Plan.
Funding from non-Percent-For-Art
sources augments past,current,and
planned project budgets. Only six
Other Funding Sources completed projects were funded solely
Non Percent-For-Art Funding $ 3,739,949.32 $ 3,741,949.32 6 $ 304,500.00 N/A $ - N/A N/A N/A by non-Percent-For-Art funds.
TOTALS $ 23,980,339.18 $ 11,304,545.08 86 $ 11,201,490.65 77 $ 1,477,503.45