Loading...
HomeMy WebLinkAboutContract 49518 CITY SECRETARY c/ CONTRACT NO. d Developer and Project Information Cover Sheet: Developer Company Name: Quail Valley Devco I, LLC I Address, State,Zip Code:J8401 N. Central,Dallas,TX 75225 Phone&Email: 214-292-3410, cyeager@republicpropertygroupl.com Authorized Signatory,Title: Clint Yeager,Vice President Project Name: Walsh Ranch—Quail Valley Phase 2C On Site Brief Description: Water, Sewer Project Location: Plat Case Number: FP-16-144 Plat Name: Walsh Ranch-Quail Valley-Phase 2C Mapsco: 761G I Council District: 3 City Project Number: 100855 CFA Number: 2017-028 DOE Number: None To be completed by tall. Received by: Date: X234 S6 P� 8s r �+ O,o � [01MMIL RECOR® * �c99ECRETARY9` tib ORTH,TX �9 S b E ZINV� City of Fort Worth,Texas Standard Community Facilities Agreement-Walsh Ranch—Quail Valley Phase 2C On Site CFA Official Release Date: 01.03.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Quail Valley Devco I, LLC , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements")related to a project generally described as Walsh Ranch- Quail Valley Phase 2C On Site ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Proj ect. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Walsh Ranch—Quail Valley Phase 2C On Site CFA Official Release Date: 01.03.2017 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) ©, Paving (B) ©, Storm Drain(B-1) ©, Street Lights & Signs (C) 0. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured,licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Walsh Ranch—Quail Valley Phase 2C On Site CFA Official Release Date: 01.03.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Walsh Ranch—Quail Valley Phase 2C On Site CFA Official Release Date: 01.03.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Walsh Ranch—Quail Valley Phase 2C On Site CFA Official Release Date: 01.03.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Walsh Ranch—Quail Valley Phase 2C On Site CFA Official Release Date: 01.03.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLAND City of Fort Worth,Texas Standard Community Facilities Agreement-Walsh Ranch—Quail Valley Phase 2C On Site CFA Official Release Date: 01.03.2017 Page 7 of 11 Cost Summary Sheet Project Name: Walsh Ranch-Quail Valley Phase 2C Off-On Site CFA No.: 2017-028 City Project No.: 100855 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 323,999.75 2.Sewer Construction $ 353,364.00 Water and Sewer Construction Total $ 677,363.75 B. TPW Construction 1.Street $ 925,391.00 2.Storm Drain $ 222,153.00 3.Street Lights Installed by Developer $ - 4. Signals $ - TPW Construction Cost Total $ 1,147,544.00 Total Construction Cost(excluding the fees): $ 1,824,907.75 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 13,547.28 D. Water/Sewer Material Testing Fee(2%) $ 13,547.28 Sub-Total for Water Construction Fees $ 27,094.56 E. TPW Inspection Fee(4%) $ 45,901.76 F. TPW Material Testing(2%) $ 22,950.88 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 68,852.64 Total Construction Fees: $ 95,947.20 Choice Financial Guarantee Options, choose one Amount Mark one Bond=100% $ 1,824,907.75 Completion Agreement=100%/Holds Plat $ 1,824,907.75 x Cash Escrow Water/Sanitary Sewer=125% $ 846,704.69 Cash Escrow Paving/Storm Drain=125% $ 1,434,430.00 Escrow Pledge Agreement=125% $ 2,281,134.69 City of Fort Worth, Texas Standard Community Facilities Agreement-Walsh Ranch—Quail Valley Phase 2C On Site CFA Official Release Date: 01.03.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Quail Valley Devco I,LLC Jesus J. Chapa i" Assistant Ci an5er Date: l S �l`� Name: Clint Ye Title: Vice President Recommended by: Date: S' ' .5- , `r7 �)�:� L L ATTEST: (Only if required by Developer) Wendy C Babulal,EMBA,P.E. Development Engineering Manager Water Department Signature Name: Dou 6"er ,P.E. Direc Contract Compliance Manager: Transportation&Public Works Department By signing, I acknowledge that I am the Approved as to Form &Legality: person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting . requirements. Richard A. McCracken Assistant City Attorney M&C No. m �'� /Li Date: $11067 Name: Form 1295: N /4— Title: AT ��®F FoR�GL y J. Kayser City SecretaryaS" OFFICIAL ROCORD CITY SECRETARY City of Fort Worth,Texas FTN MONT TX Standard Community Facilities Agreement-Walsh Ranch—Quail Valley Phase 2C On Site CFA Official Release Date: 01.03.2017 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment © Attachment 1 - Changes to Standard Community Facilities Agreement 0 Location Map FA Exhibit A: Water Improvements nX Water Cost Estimate 0 Exhibit A-1: Sewer Improvements FX Sewer Cost Estimate nXX; Exhibit B: Paving Improvements FA Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate ❑' Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Walsh Ranch—Quail Valley Phase 2C On Site CFA Official Release Date: 01.03.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100855 None City of Fort Worth,Texas Standard Community Facilities Agreement-Walsh Ranch—Quail Valley Phase 2C On Site CFA Official Release Date: 01.03.2017 Page 11 of 11 i IOLD WEATHERFORD ROADS J i PHASE 1 C PHASE 1 B WALS VE I\� PHASE 1A— �2 PHASE 2A o ` Cq U' NORTH PROJECT SITE - INTER W ` STATE6 _ = - _ 20 Z \ > INTERSTATE 30 Z W LOCATION MAP 0 N.T.S. 0 M O O O M O M O d' a / Y S K O N S COVER SHEET F LLEY - PHASE 2C - ON-SITE o March 7, 2017 N O 0 HUITT-AALARS W HLi LLJ f ZW Fn LLJ LLJ J - Q � QQ � Q ® W 04 �J Q Q '('j4 U U W \ \\ Z 2 � 22T -- -= Q 2 Lu W r \ \ L CE8 � 2W ( QW fnaN 1 ? W m Z a W LULU2 W W W Q1- 3, Ui a W N Z J Q a J Q N) n n m DO W U U' 00 Q \ R N n N Z/_ W J W J / N> W w n Q o W W ^ 0 8 ,�� w R a n 0 a W N Q Li J U) �_ L D .� J J N o 1 O p N ^ 0 G e `L= CD O^ Q NWU ^Ld WCp m ^b U- 8 W Z W U \W n \�\ffo Lull3 U = J 10 O fif Y p \ W a a F. W q� O FLO- Of \ pp O a J N // \ _ \ O / LO / \ N _ � \ \ O N o z_ W Q LO O / Qf Y ✓ // 0 uj \ - \ w --' _ Cl) w r WQN Lu 0- } � T w wLai ..L Lai LLAE o z a ? �v o \ o Q � O g U Q 2 C N a Q O : O R O 00 m a F-n o = Q d 00 ST0� N Q' O a C) N a z w w `t a0 Z I 0 It C) O r " O o O n x / 0' 2 C14 > O g Q B � O a Q 00 �I- x C) `t O U j^ 2 CL oU m O Q � � o' / 0 a o o � �, w � 2 `riP 00^, b � " o � a _ C—)n O 0 QC Of 41 a Cu cgs rn )' L-4N 'Its Op ¢ O Q 2 >- LU I a n o zzQ = It 2 3: = C-) U O a Q Q / z 22 >c >C g UO N x O G4 Q :2W 0_ Q. W W , x ^O a p o J I Q e} o s 0 C CL g 00 O Y i U i Lu F- A asrvAl o ^J (� J � N I— m W w I in Q N W m (.9 _ ~ I_ Q L = za C.) Q LU X � Z IIS,, w wQw2 Q VARIABLE I Q z o WWIDTH > o 0 o R.O.W. z Q 3< io r� �_y = Jv W O � O C5 3 O 0 > ? 3 ON UI ^ 0 N 0 m M -II O aI m m 0/ ~ N O N Lij STREET A o I / � NN N O o GOI 0 O N O W V I J M N O a, ��� 3,, BSB a a W I J o > rn l/O zLd 0 N o `° O ^ U a O N o 0 N j a_ 4 �. !r i N / 0 Oco F- I Q 50 2 ro O ROY, n N w 29. 0 B,B o \ N o O o O !r Q Y W H r \ \�� U) \ \II p J / / o _ ~ U y N r W N ti LLI ON / z a � -- / U , Z = / U O to O — x O > / � x W Cl) Ulu 2 O �O N 1. m � CD t o W) m Z v !! ca2 IL o N N N U � J 11 1 z ro U) V 04 Z Q U o N N ''a NLO W w Z Q CL_ - N J J �M J U U U 2 Z cr- > >s C) = U ^ x x cr- w N N N W U o x U N o� NU N CL ~� U 11) N oa n O U m (0of N 0 U i N m Y Z J U 02 N x a Z Z-) N N U 1 aOt ok� U2 o "� 2F x > Z O I N �.,,. N Z a � 00 OQ d U N o > _ 0 o ` \ 1 ^ AvAIWJ HoMw jw7VA ` $ LU ' m^» _ w z LU ? J \ cnU �. cnC.4 \ m «� \ / < LLJ 5 / \ E x « _ » LuZL � -J ® uj -J ouj > g w _j m �:5)l O ko �Q) �@ ®7 \ (0 Q. ��k < -c 5 R)k 2 aRV- k pq / mm , © . _ q �q \ ®® Lij ®k / / R$ u § \ C4 Li m ƒ §o �\ qq / • » bb \ k \ �\ m § © y � ��2 ° \_ACL � ERS j � %k §q 0 � Q. 20 \ ! §R � b\ " \ G y qm X22 0 - � �\ \ � � LLJ - / LL, , © Q. Rb « ® ~Of Uzi\- \ (X. " %\ 2 ® ) 2 \ � - ®m > mQ m . ± \. � R §� b m _ (f) LO � Rk -i• - AA §§ ko ® . 00 qm o� ' §§ -j / \L� \ V) (L ® # \� � R� 2 ■ ■ \ �` ui� �7 ujb7 Luk * \ 11/4/2016 00 42 43 DAP-BID PROPOSAL Page 1 of5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 2C UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Unit of Specification Section Bid Description Unit Price Bid Value No. Measure I No. Quantity UNIT 1:WATER IMPROVEMENTS 1 3311.0261 8"PVC Water Pipe — LF 33 11 12 2,795_—_ $32.00 $89,440.00 2 3311.0244 8"Water Pipe,CLSM Backfill LF 33 11 10,33 11 12 80 $38.00 $3,040.00 3 3311.0461 12"PVC Water Pipe LF 3311 12 2,428 $42.00 $101,976.00 4 3311.0447 12"Water Pipe,CLSM Backfill LF 33 11 10,33 11 12 20 $52.00 $1,040.00 5 3312.2003 1"Water Service EA 33 12 10 40 $900.00 $36,000.00 6 3312.2003 1 Irrigation Service — EA _ 331210 -_2 — X90000 __ $1 800 00 __ ___ 7 3312.2003 2'Irrigation Service EA 33 12 10 3 $900.00 $2,700.00 8 3305 0116 Concrete Encasement for Utility Pipes — CY— 33 05 10 _y 4 $150.00 _ t r$600.00 9 3312.3003 8"Gate Valve EA 33 12 20 17- $1,150.00__-_ $19,550.00 10 3312.3005 12"Gate Valve — EA 33 12 20 — 13 $2 000.00 . $26 OOOAO_ _ - 11 3311.0001 Ductile Iron Water Fittings w/Restraint t TON33 11 11 3„ n;$4,000_00 $10,000,00 12 3312.0001 Fire Hydrant EA 33 12 40 6 _ $4,200.00 $25,200.00 13 3305.0109 Trench Safety LF 33 05 10 5,323 _._._$1_25 $6,653.75 14 15 16 17 ------------ - ----- —--- - ---- -- --—- 18 19 20 21 _._..--- -- _.___ ----- --.._...-------- 22 ----22 23 24 25 26 27 28 29 30 31 32 33 34 35 .T 36 37 38 39 40 41 42 - _.. 43 44 45 TOTAL UNIT I:WATER IMPROVEMENTS $323,999.75 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE 2A Form Version September 1,2015 HZ PROJECT 8303061.03 11/4/2016 00 42 43 DAP-BID PROPOSAL Page 2 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 2C UNIT PRICE BID Bidder's Application Project Item Infonnation Bidders Proposal Bidlist Item Unit of Specification Section Bid No. Description Measure No. Quantity Unit Price Bid Value UNIT It:SANITARY SEWER IMPROVEMENTS 1 3331.4115 8"Sewer Pipe LF 33 11 10,33 31 _.12 33 31 20 v 4,438 $36.00 $159,750.00 2 3331.4116 8"Sewer Pipe,CSS Backfill LF 3311 10, _ -_ --- _-__._-_- ___ -- -____.._.__-_12,33_31 20-__ -- 160 _ $56.00 $8 960.00 3 3331.3101 4"Sewer Service EA 3331 50 40 $650.00 $26,000.00 4 3305.3002 8"Sewer Carrier PieLF 33 05 24 120 $36.00 $4,320.00 5 3305 1103 20 Casing By Other Than Open Cut LF 33 05 22 120 $260.06 $31,200.00 - - - -- -. ...- - 6 3339.1001 4'Manhole EA 33 39 10,33 39 20 26 $3,200.00 $83,200.00 7 3339.1003 4'Extra Depth Manhole VF 33 39 10,33 39 20 60 $195.00 $11,700.00 8 3339.0001 Epoxy Manhole Liner VF 33 39 60 70 $175.00 $12,320.00 9 3301 0101 Manhole Vacuum Testing EA 3301 30 26 $100.00 $2 600 00 - 10 3301 0002 Post CCN Inspection LF —3301 31 4,438 y $2.00 -„r$8,876.00 11 3305 0109 Trench Safety LF 33 05 10 4 438 _-__$1.00 $4 438.00 12 13 4- 15 - -- --- ------ --- --------— _.._ .. -- - -- - _- - --- ---------- 16 17 18 19 __---.__- --__---. ---------- 20 ------20 ............... -.. _._. .. . -....... - 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 . .------- 36 37 38 _ 39 40 41 42 TOTAL UNIT It:SANITARY SEWER IMPROVEMENTS $353,364.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE 2A Foran Version September 1,2015 HZ PROJECT 8303061.03 11/4/2016 00 42 43 DAP-BID PROPOSAL Page 3 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 2C UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Unit of Specification Section Bid Description Unit Price Bid Value No. Measure No. Quantity UNIT III:DRAINAGE IMPROVEMENTS 1 3341.0201 21"RCP,Class III LF 3341 10 268 $45.00 $12,060.00 2 3341 0205 24 RCP Class III LF 3341 10 1,423 $50.00 $71 150.00 3 .,., 3341 0302 30 RCP Class III -.- _._LF_ 3341 10 40 $62,.00 x $2.480,00 4-. 4 3341.0309 36"RCP Class III s LF 3341 10 232 $82.00 $19,024.00 5 3341.1305 6x6 Box Culvert LF 3341 10 _ 98 $300.00 $29,400.00 6 3349.5001 10 Curb Inlet3 EA 3 490 3 2 __..� __ - $2,600_00 y---,_$7 800._00 7 3349 5002 15'Curb Inlet EA 33 49 20 12 $3,000.00 ___$43,20Q.00 8 3349 0001 4 Storm Junction Box EA 33 49 10 3 $4,000.00 $12 000 00 9 9999.0002 24"TXDOT SET P-CD Concrete Headwall 1 pipe EA 00 00 00 1 $2,000.00 $2,000.00 10 9999.0003 36"TXDOT SET P-CD Concrete Headwall, 1 pipe EA 00 00 00 1 $3,500-00 $3,500.00 _11 3137 0104 Medium Stone Ri ra-d - SY 31 3700 182 $75_00 $13,650.00 P Pr -y _. -12 - 3301.0002 Post CCTV Inspection - LF__.. 33 01 31 1,963 �_- _ $2.00__—_33 926,0 13 3305.0109 Trench Safety LF 33 05 10 1,963 $1.00 $1,963.00 14 15 16 17 18 19 20 22 23 24 - 25 26 --27 ----- -- ----- --- -- - .._._ -- - -- - -- _. 28 29 30 31 32 33, 34 35 - 36 37 38 39 40 41 42 43 ---- ------- --- ------ ------------------- ---------- ---- -- ---- -------------------- 44 45 TOTAL UNIT III:DRAINAGE IMPROVEMENTS1 $222,153.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE 2A Form Version September I,2015 HZ PROJECT R303061.03 11/4/2016 004243 DAP-BID PROPOSAL Page 4 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 2C UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Unit of Specification Section Bid Description Unit Price I Bid Value No. Measure No. Quantity UNIT IV:PAVING IMPROVEMENTS 1 0241.1000 Remove Conc Pvmt SY 02 41 15 15 $20.00 $300.00 _ _. -.__ _. ----- —--- —— _._._ 2 3213.0101 6"Conc Pvmt SY 32 13 13 10,833 $32.50 $352,072.50 3 vm "9999 0004 7 5Conc Pt SY_ 00 00 00 7 531 _�:... . f_...,.. _ ..__. ,. ..._ _. $36.50 .F _$_274,881.50 4 3216.0101 6"Conc Curb and Gutter LF 32 16 13 _ 58 $20.00 $1,160.00 5 3211.0501 6"Lime Treatment SY 3211 29 14,534 $2.50 $36,335.00 6_ 3211.0502 8 Lime Treatment _ _ SY 3211 29 7,983 $3.00.$23 949 00 7 3211.0400 Hydrated Lime(32 lbs/sy) TN 3211 29 233 $210.00 $48,825.00 8 3211 0400 Hydrated Lime(42 lbs/sy) ..._ .__. TN 3211 29 — 168 —, $210,00 $35,196.00 9 3213 0506 Barrier Free Ramp Type P-1 EA 32 13 20 40 $1,200:.00 m..- $48,000.00 10 3213 0504 Barrier Free Ramp Type M-2 EA 32 13 20 5 $1,300.00 . $6,500.00 11 3213.0302 5"Conc Sidewalk SF 32 13 20 7,W_4 $4.00 $31,912.00 12 9999.0005 Type III Barricade EA 00 00 00 5 $800.00 $4,000.00 13 9999.0006 Street Header LF 00 00 00 20 $153.00 $3 060.00 14 3441 4003 Furnish/Install Alum Sign Ground Mount City Std EA 3441 30 14 650_00 $9 100 00 15 9999.0007 14"Sleeve - LF- 00 00 00 840 $60.00 $50,400.00 16 17 18 19 _ __._. ------ .. ------------ _- � 20 11— ., . . 21 22 23 24 25 26 _ 27._ _._-.-.._ -- ._ _ - --- ------ ----------- ._._w.....- —•. 28 29 - 30 31 32 33 -__ ----- _-__ ______ . . .._.___ ----._._-__—.--_._--- ___.._ 34 ---------- 3 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT IV:PAVING IMPROVEMENTS $925,391.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE 2A Form Version September 1,2015 HZ PROJECT R303061.03 11/4/2016 00 42 43 DAP-BID PROPOSAL Page 5 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 2C UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Unit of Specification Section Bid Description Unit Price Bid Value No. Measure No. Quantity Bid Summary UNIT I:WATER IMPROVEMENTS $323,999.75 UNIT It:SANITARY SEWER IMPROVEMENTS A� $353,364.00 UNIT III:DRAINAGE IMPROVEMENTS $222,153.00 UNIT IV:PAVING IMPROVEMENTS $925,391.00 Total Construction Bidi $1,824,907.75 Contractor agrees to complete WORK for FINAL ACCEPTANCE calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE 2A Form Version September 1,2015 HZ PROJECT R303061.03