Loading...
HomeMy WebLinkAboutContract 47349-CO4 FORT WORTH® City of Fort Worth CITY SECRETARY CONTRACTN0. 4U�9—&�4 � '�✓ Change Order Request Breakdown Project Namel N. Beach Street from Fossil Creek to NE Loop 820 City Sec# 47349 Client Project#(s)l 02238 Change Order Submittal# ® Date 1 8/18/2017 Dept. TIPW Water Sewer Contract Time Totals CD Original Contract Amount $5,675,296.15 $89,335.52 $82,214.26 $5,846,845.93 541 Extras to Date $85,480.00 $0.00 $0.00 $85,480.00 7 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $5;760;76::15; $5,932,325.93 548 Amount of Proposed Change Order $017.439 x $0:00 ;;_' $U00; $81,743.79 7 Revised Contract Amount $5;842;519 94 _ $89;33552 n¢$$2;21416 $6,014,069.72 555 Original Funds Available for Change Orders $488,154.00 $6,250.00 $5,750.00 $500,154.00 Remaining Funds Available for this COu-$402;674 00{ :`$6;250;00 $5i75I100= $414,674.00 Additional Funding(if necessary) g :%? r :: a_ '•t *` ' CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.86W MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) :°=$7;308;557:41` Increased quantities are needed to lower the existing Haltom City water line to allow sufficient cover while constructing the driveways on the east side of Beach. 18810117 OFFICIAL RECORD d c�� ysECA�A�t CITY SECRETARY FT. WORTH,TX PORP WORTH City of Fort worth -� 1 Change Order Additions Project Name N.Beach Street from Fossil Creek to NE Loop 820 City Sec# 47349 Client Project# 02238 Change Order Submittal# ® Date 811 812 0 1 7 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost I o a emp Asphalt Paving Repair 5 Trench Safety T/PW 90.00 LF 1.06 6 Ductile Iron Water Fittings wl Restraint T1PW 0.50 TN 8,500.00 8 12"PVC Water Pipe,CSS Backfill 7/PW 90.00 LF 165.00 9 Fire Hydrant T/P 1.00 EA 4,250.00 10 Connect to Existing Water Main T/PW 2.00 EA 4,780.00 11 Remove 33"Storm Line T/PW 216.00 LF $13.80 16 Furnish and Install Electrical Service Pedestal T/PW 2.00 EA 4,150.00 183 Type A 2401480 Electrical Service for Streetlights T/PW 1.00 EA $6,700.00 33 11"Concrete Pvmt T/PW 11.00 SY 63.62 32 8"Lime Treatment T/PW 411.00 SY 2.32 26 Unclassified Excavation by plan T/PW 137.00 C 6.25 T/PW $81,743.79 Water $0.00 Sewer $0.00 Sub Total Additions $81,743.79 r L.--(l,A—A.d.V;+;— D—1 of 1 FOx�TH City of Fort Worth Change Order Deletions Project Name N.Beach Street from Fossil Creek to NE Loop 820 City Sec# 47349 Client Project# 02238 Change Order Submittal# ® Date 8/18/2017 DELETIONS ITEM DESCRIPHON DEPT Qty Unit Unit Cost I ota T/PW $0.00 Water $0.00 Sewer $0.00 Sub Total Deletions CFW Change Order Approval St-COApp09 Pagel of 3 Routinq Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Projects/02238 — N. Beach Street from NE Loop 820 to Fossil Creek/Contractor/Change Orders/Change Order Breakdown template co4 - water to tpw 8.18.2017.xlsm Attachments(0) No Attachments have been added to this form. CFW Change Order Approval St-COApp09 Page 2 of 3 FORT WORTH. City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 4— – Change Order No.: St-COApp09 �— Date Started: 2017-08-18 -- City Sec. No.: 47349 Date Due:F201-7-10-07 Project Name: N. Beach Street from NE Loop 820 to Fossil Creek 02238 DOE Numbers: Project Numbers: 7237 Project Widen N. Beach Street to-a 6-lane divided arterial street with Description: paving, drainage, sidewalks, water, sewer, traffic signal, illumination, landscape and irrigation improvements Project Manager:!Michael Weiss City Inspector: Tom Miller Contractor: 1JLB Contracting, LLC COUNCIL ACTION (If Required): r- ®�_ _ — M&C Log Name: 20N. Beach Street Change Order 4 - 02238 M&C Number: C-28322 M&C Date:12017-08-15 COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 81,743.79 34014 0200431 5740010 02238 02- 7 i I`I Total Cost: $ 81,743.79 Total Requested Days: 7 Approval Status: C17 Change Order Approval St-COApp09 Page 3 of 3 !Approved: Yes Comments: User: Aaron Perez Date: 2017-08-18 2:31 PM Approved: Yes Comments: User: Michael Weiss Date: 2017-08-18 2:36 PM Approved: Yes Comments: User: Martin Phillips Date: 2017-08-18 3:06 PM Approved: Yes Comments: User: Kim Arnold of FORT Date: 2017-08-21 4:38 PM U _ Approved: Yes Comments: "t User: Doug Wiersig Date: 2017-08-22 11:07 AM �X 0y: Approved: Yes M8�J. KS � Comments: YS User: Doug Black Date: 2017-08-23 5:29 PM Approved: Yes M&Q_. ^� Comments: User: Jay Chapa 1295:-4'7'V Date: 2017-08-24 10:30 AM Action Required: I OFFICIAL RICORD CITY SECRETARY FT.WORTH,TX M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FORT14'O�R71I COUNCIL ACTION: Approved on 8/15/2017 REFERENCE20N. BEACH STREET DATE: 8/15/2017 NO.; **C-28322 LOG NAME: CHANGE ORDER 4- 02238 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Change Order No. 4 to City Secretary Contract No. 47349 with JLB Contracting, LLC, in the Amount of$81,743.79 and the Addition of 7 Days, Thereby Increasing the Total Contract Amount to$6,014,069.72 for the Construction of North Beach Street from Fossil Creek Boulevard to NE Loop 820 (2014 BOND PROGRAM) (COUNCIL DISTRICT 4) RECOMMENDATION: It is recommended that the City Council authorize the execution of Change Order No.4 to City Secretary Contract No. 47349 with JLB Contracting, LLC, in the amount of$81,743.79 and the addition of 7 days, thereby increasing the total contract amount to$6,014,069.72 for the construction of North Beach Street from Fossil Creek Boulevard to NE Loop 820. DISCUSSION: On December 15, 2015, Mayor and Council (M&C C-27574), the City Council authorized the execution of a contract with JLB Contracting, LLC, in the amount of$5,846,845.93 for the reconstruction of North Beach Street as a six-lane divided arterial street from Fossil Creek Boulevard to NE Loop 820 as provided for in the 2014 Bond Program. Change Order No. 4 will provide funding in the amount of$81,743.79 to lower 90 feet of existing 12- inch waterline, provide temporary asphalt pavement repair, remove 216 feet of existing 33-inch storm drain pipe and provide two additional traffic signal electrical service pedestals, and one streetlight electrical service pedestal along North Beach Street. Change Order No. 4 also includes seven additional construction days being added to the contract. Previous Change Orders included: Change Order No. 1 was administratively approved in the amount of$74,930.00 for the haul off of excavated material, adjusting existing irrigation lines and providing temporary business access signs during construction. Change Order No. 2 was administratively approved in the amount of$7,250.00 for the removal of existing 36-inch storm drain pipe. Change Order No. 3 was administratively approved in the amount of$3,300.00 for the connection of existing storm drain pipe to the new storm drain system. The project is scheduled to be completed in September 2017. M/WBE OFFICE—JLB Contracting, LLC agrees to maintain its initial MBE commitment of 22%that it made on the original contract and extend and maintain that same MBE commitment of 22%to all prior change orders up to and inclusive of this Change Order No. 4. Therefore JLB Contracting, LLC remains in compliance with the City of Fort Worth BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous MBE Commitment form executed by an authorized http://apps.cfwnet.org/council_packet/mc review.asp?ID=24905&councildate=8/15/2017 8/18/2017 M&C Review Page 2 of 2 representative of its company. This project is included in the 2014 Bond Program. Available resources within the General Fund will be used to provide interim financing for these expenses until debt is issued. Once debt associated with this project is sold, bond proceeds will reimburse the General Fund, in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the Bond Election (Ordinance No. 21241-05-2014) and the subsequent actions taken by the Mayor and City Council. The Project is located in COUNCIL DISTRICT 4. FISCAL INFORIVIATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as appropriated, of the 2014 Bond Fund. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project Program f Activity Budget Reference# Amount ID I I ID I Year (Chartfield 2) Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Douglas Wiersig (7801) Additional Information Contact: Mike Weiss (8485) ATTACHMENTS 1295 Form N. Beach.pdf Map N. Beach CO 4.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=24905&councildate=8/15/2017 8/18/2017 MAYOR AND COUNCIL COMMUNICATION MAP 20N BEACH CHANGE ORDER 4 MAP - 02238 1. _HERITEAGE LI—TRACL —1 Z 'T l /: – "(� 4 Eld KROGER O (1'-t ) 1__ Si t I EN.TE t - _ Cy = � �-f C -_ _ A. Es J - r� "� - SIG 81 TARRANT _ -HARMAN O T O pSON �� 1 -� �I IT UMMERFIELIDS ,�_}�j� SIDEWALKS EXTEND NORTH TO111J L J 1 WESTERN CENTER BOULEVARD _ r4F i�C r _ �r ate: `�N�1] •, 377 BASSWOOD, �- -LIE : Fye tt `x� _ -WEVRER r Q �- w� - - ' �'o?''o OA}� \.. j SANSOM 4 _tl_ GREEK ,� C 1 0-0 —p- SAND HE q 'lop IH.82 Ij - f UO�Utd 4 MCLE�N _ A t — 4 HAHI ME HAM -MEACH M uP _ c 377 I •� ORA ] ^ '",a� bj1�F — _NpD14E , 1 DOWNING «3' .� E '`f{V"I ATE MINAL MSF 6.d=�FI 183 _ 0 1500 3000 000 _ " ' NORTH BEACH STREET : VH,20 TO FOSSIL CREEK BLVD) ' Cop�nlyM 1015 Ciy d FoA� Uneudwdaed npmducda+�a vtdatwn d applu6la laws CITY PROJECT#02238 Thk pmdnd 6 kr trdormadaul purposes and ffW not haw Gem pmpamd far a b aultade for kyal,anpkwadntr,a aunmy&t0 purposes, t dao rot mpmaent m on4he9mund eumey wd mpmeanp Q*dw appodmate mkWe famttrar dptops�/Paowdadu. lir C°y d Fat Nfwth auumea ra maponebilty for lr aacumcy d said data. Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 1;,;��*el 41,(?s- / A/AI(twl", Name of Employee/Signature &&Z,a"e i4 Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos.1.4 and 6 it there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-234651 JLB Contracting,LLC Fort Worth,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party tot the contract for which the arms 0711112017 being filed. City of Fort Worth Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or Identify the contract,and plidvide a description of the services,goods,or other property to be provided under the contract. 02238-N.Beach Street North Beach Street-NE Loop 820 to Fossil Creek-Change Order 4 4 Nature of Interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling intermediary Davis,Sam Fort Worth,TX United States X Cabaza,Aaron Austin,TX United States X 5 Check only it there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,undernal pe ty of perjury,that the above disclosure is true and correct. Signature of authorized spent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE - . . Sworn to and subscn d before me,by the said ��c1 "� S this the day of 20 to certi which,witness my hand and seal of office. V it W Si natut of ofhcer administers o h Printed name of officer administe ing oath Title of officer ad nistering oath Forms ro ' ed by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.W3