Contract 38708-CO3
FORT Wo�mxm City of Fort worth CITY SEMAN"I Change Order Request COWRACT NO• � Project Namel 36 Inch Water Main Extension Along Trinity Railway Express City Sec No. 38708 Project No.(s) P265-605140035287 I DOE No. 5509 City Pro.No. 00352 Project Description 36-inch Water Main Extension Along Trinity Railway Express ROW From Tarrant Main St to State HWY 360ffrinity Blvd Intersection Contractorl S.J.Louis Construction of Texas, Ltd Change Order# 0 Date: 8/21/2013 City Project Mgr. Rakesh Chaubey City Inspector I David Johnson Phone Number: 817-392-6051 Phone Number: 817-392-8455 Dept. Water Totals Contract Time (Calendar Days) Original Contract Amount $3,209,344.50 $3,209,344.50 Extras to Date $146,830.50 $146,830.50 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $3,356,175.00 $3,356,175.00 270 Amount of Proposed Change Order $382,195.90 $382,195.90 01 500 Revised Contract Amount $3,738,370.90 $3,738,370.90 1,750 Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding(if necessary) $382,195.901 1 $382,195.90 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 16.48% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+259/6) $4,011,680.63 A'101!1411 01 IN"M IN 011016N.WK During construction of the TRE Water Main, it was determined that the entity from whom the City had acquired an easement to construct a portion of the water main was a lessee and not the legal owner of the land. Consequently, work was suspended pending resolution of the matter. Subsequent protracted easement negotiations with the actual owner ultimately necessitated redesign of portions of the project. r r-4 N C> Change Order No. 3 will provide for the increased and additional pay item quantities that are necessary due C-2 to the redesigned scope consisting of revised pipe rade and elevation, increased material and labor costs La and revisions to the proposed meter station and electrical work. a o Staff concurs with the contractor's re �� onal calendar days due to the fact that no LU coA�bys curved on the proje Ju y 00 0 W 0 Maliy J. ai ecretaryX °°°°°°.0° X It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Now >. 4 • n. S.J.Louis Construction of Texas,Ltd Pete Stahl " �` ?! ate CoVftOw$u _ M&C Number C-26409 M&C Date Approved 8/20/2013 'Foo RT WORTH City of Fort Worth Change Order Additions Project Name 36 Inch Water Main Extension Along Trinity Railway Express City Sec No. 38708 Project No.(s) P265-605140035287 DOE No. 5509 City Pro.No. 00352 Project 36-inch Water Main Extension Along Trinity Railway Express ROW From Tarrant Main St to State HWY 360/Trinity Blvd Description Intersection Contractor S.J.Louis Construction of Texas,Ltd Change Order# 0 Date: 8/21/2013 City Project Mgr. I Rakesh ChauFey City Inspector FDavid Johnson ADDITIONS ffEM DEPT Oty Unlit JUnk Cost Total 8 8"PVC by Open Cut Water 70.00 LF $30.00 $2,100.00 9 36"Butterfly Valve w/vault Water 1.00 EA $47,000.00 $47,000.00 10 24"Gate Valve w/vault Water 2.00 EA $22,200.00 $44,400.00 18 Remove&Salvage Existing 24"Gate Valve Water 1.00 EA $3,750.00 $3,750.00 29 Trench Safety System Water 590.00 LF $0.01 $5.90 31 1 Exploratory Excavation Water 1.00 EA $750.00 $750.00 33 Hydromulch Seeding Water 590.00 LF $1.00 $590.00 45a Meter Station-Revised Vault Construction&Concrete Work Water 1.00 LS $112,000.00 $112,000.00 46a Meter Station-Revised Yard Piping,Valves,Appurtenances Water 1.00 LS $305,100.00 $305,100.00 47a Meter Station-Revised Electrical&Talemetry Water 1.00 LS $168,000.00 $168,000.00 54 Changes-Crew cost for Elevation,Grade,Alignment Changes Water 1.00 LS $30,000.00 $30,000.00 55 2"Combination ARV Water 1.00 EA $16,000.00 $16,000.00 56 Cut&Plug Existing 24"Water Line Water 2.00 EA $2,500.00 $5,000.00 Water $734,695.90 Additions Sub Total 1 $734,695.90 Page 2 of 4 FORT W(�RT_H City of Fort worth Change Order Deletions Project Name 36 Inch Water Main Extension Along Trinity Railway Express City Sec No. 38708 Project No.(s) P265-605140035287 DOE No. 5509 City Pro.No. 00352 Project Description 36-inch Water Main Extension Along Trinity Railway Express ROW From Tarrant Main St to State HWY 360/Trinity Blvd Intersection Contractor F S.J. Louis Construction of Texas,Ltd Change Order#=3 Date 8/21/2013 City Project Mgr. I Rakesh Chaubey City Inspector David Johnson DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 13 10'Gate Valve Water 1.00 EA $1,500.00 $1,500.00 35 Concrete Encasement(18"Sewer) Water 10.00 LF $100.00 $1,000.00 45 Meter Station-Vault Construction&Concrete Work Water 1.00 LS $65,000.00 $65,000.00 46 Meter Station-Yard Piping,Valves,Appurtenances Water 1.00 LS $125,000.00 $125,000.00 47 Meter Station-Electrical&Talemetry Water 1.00 LS $160,000.00 $160,000.00 Water $352,500.00 Page 3 of 4 Deletions Sub Total $352,500.00 MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 M&C Review Page 1 of 2 Official site of the City of Fort Worth, Texas FORT WORTH CITY COUNCILAGENDA ' COUNCIL ACTION: Approved on 8/20/2013 DATE: 8/20/2013 REFERENCE NO.: **C-26409 LOG NAME: 6036WP4CO3-SJL CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Change Order No. 3 to City Secretary Contract No. 38708 in the Amount of$382,195.90 for a Total Contract Amount of$3,738,370.90 with S.J. Louis Construction of Texas, Ltd., for Thirty-Six Inch Water Main Extension Along Trinity Railway Express Right-of-Way from Tarrant Main Street to the State Highway 360/Trinity Boulevard Intersection (COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council authorize the execution of Change Order No. 3 to City Secretary Contract No. 38708 with S.J. Louis Construction of Texas, Ltd., in the amount of $382,195.90 for a thirty-six inch water main extension along the Trinity Railway Express right-of-way from Tarrant Main Street to the State Highway 360/Trinity Boulevard Intersection, thereby, increasing the contract amount to $3,738,370.90. DISCUSSION: On January 13, 2009, (M&C C-23278)the City Council authorized the execution of a contract in the amount of$3,209,344.50 with S.J. Louis Construction, of Texas, Ltd., for a 36-inch water main extension along the Trinity Railway Express right-of-way from Tarrant Main Street to the State Highway 360/Trinity Boulevard Intersection (TRE Water Main). The contract was subsequently revised by two change orders in the amount of$146,830.50 (Change Order No. 1: $40,100.50; M&C C-23949, December 8, 2009 and Change Order No. 2: $106,730.00; M&C C-24350, July 20, 2010). During construction of the TRE Water Main, it was determined that the entity from whom the City had acquired an easement to construct a portion of the water main was a lessee and not the legal owner of the land. Consequently, work was suspended pending resolution of the matter. Subsequent protracted easement negotiations with the actual owner ultimately necessitated redesign of portions of the project. Change Order No. 3 will provide for the increased and additional pay item quantities that are necessary due to the redesigned scope consisting of revised pipe grade and elevation, increased material and labor costs and revisions to the proposed meter station piping valves and electrical work. M/WBE Office- S.J. Louis Construction of Texas, Ltd., agrees to maintain its initial M/WBE commitment of 14 percent that it made on the original contract and extend and maintain that same M/WBE commitment of 14 percent to all prior change orders up to and inclusive of this Change Order No. 3. Therefore, S.J. Louis Construction of Texas, Ltd., remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. The project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. http://apps.cfwnet.org/council_packet/mc—review.asp?ID=1 8845&councilda... 8/21/2013 M&C Review Page 2 of 2 TO Fund/Account/Centers FROM Fund/Account/Centers P265 541200 605140035283 $382.195.90 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: S. Frank Crumb (8246) Additional Information Contact: Rakesh Chaubey (6051) ATTACHMENTS 6036WP4CO3-SJL MAP.pdf http://apps.cfwnet.org/council_packet/mc_review.asp?ID=18845&councilda... 8/21/2013 Contractor's Modification Request Project Name Proposal No. Date 36"Water Main Extension Along Trinity Railway Express R.O.W. Part 4-From Tarrant Main to SH360&Trinity Blvd. CMR-5,Revised June 6,2013 Response Required By Transmitted By Rakesh Chaubey Adam Lunsford City of Fort Worth,Texas Lead Estimator/Project Manager Department of Engineering Signature 1000 Throckmorton Street Fort Worth,TX 76102 (817)392-6529 e. i tion of Work This proposal represents the changes made to the construction plans for the above referenced project. The revised plans dated June 8,2012 have been used for preparing the additional costs described below. These changes have been discussed with the City of Ft.Worth and this proposal is the third revision to this proposal. Per our meeting on May 2,2013,these numbers should be considered acceptable by the City of Ft.Worth. Please process a project change order as soon as possible so materials can be ordered and this work can be scheduled. In addition,due to the significant delay in the construction of this project,please adjust the Contract time to reflect a proposed substantial completion date of Februray 15,2014 and a Final completion date of April 15,2014. Please note,these dates are based on an executed change order being issued by the end of May,2013. Lastly,with the exception of the new/proposed 36"butterfly valve vault,this proposal is based on using the old/original details from bid time. If appropriate,please authorize this proposal with a signature and fax back to our office. 36"Water Main Extension Alone Trinity Railway Express R.O.W.-Part 4 Project Changes per Revised Plans Dated June 8,2012 Miami F_xtension Adjuatme Item tyo. 17 Unit Unit Yice , 3!;" 3 Water Pipe Installed in Trench 6,670 6,670 0 $220.00 $0.00 Changes •Crew.Cost for Elevalion,Grade,Alignment 36"Concrete AW-V 6303 Water Pipe Installed in Tunnel 2a (Including Tunnel) 550 550 0 LF $1,025.00 $0.00 3a 24"Concrete AWWA C303 Water Pipe Installed in Trench 425 425 0 LF $210.00 $0.00 4a 16"Concrete AWWA C303 Water Pipe Installed in Trench 25 25 0 LF $100.00 $0.00 5 42"Casing by Opencut 12 12 0 LF $200.00 $0.00 6 12"PVC by Opencut 20 20 0 LF $50.00 $0.00 7 10"PVC by Opencut 80 80 0 LF $40.00 $0.00 8 8"PVC by Opencut 40 110 70 LF $30.00 $2,100.00 9 36"Butterfly Valve w/Vault 5 6 1 EA $47,000.00 $47,000.00 10 24"Gate Valve w/Vault 8 10 2 EA $22,200.00 $44,400.00 11 Vault for Existing 24"Gate Valve 1 1 0 EA $6,750.00 $0.00 12 12"Gate Valve 3 3 0 EA $1,800.00 $0.00 13 10"Gate Valve 1 0 (1) EA $1,500.00 ($1,500.00) 14 8"Gate Valve 1 1 0 EA $1,050.00 $0.00 15a Concrete Pressure Pipe Fittings 1 1 0 LS $1.00 $0.00 New-1 2"Comb.ARV 1 1 EA $16,0 $16,000.00 16 4"Comb.ARV 2 2 0 EA $20,000.00 $0.00 17 8"Blow-off Valve w/Vault 2 2 0 EA $5,700.00 $0.00 18 Remove&Salvage Existing 24"Gate Valve 3 4 1 EA $3,750.00 $3,750.00 19 Remove&Salvage Existing 10"Gate Valve 2 2 0 EA $750.00 $0.00 New-2 Cut&Plug Existing 24"Water Line 2 2 EA $2,500.00 $5,000.00 20 Cut&Plug Existing 10"Water Line 3 3 0 EA $1,500.00 $0.00 21 Additional Depth of Water Line 200 200 0 LF $10.00 $0.00 22 24"Rock Riprap 580 580 0 CY $50.00 $0.00 23 Remove&Dispose Existing Concrete Blow-off Assembly 1 1 0 LS $1,500.00 $0.00 24 SWPPP 1 1 0 LS $15,000.00 $0.00 25 Pavement-5"Min.Reinf.Concrete on 2:27 Concrete Base 200 200 0 LF $100.00 $0.00 SJ.Liaise Com,traction of Teras Ltd. P.O.Box 834 Mansfield,Texas 76063 (817)477-0320 Ojfrce(817)477-0552 Fax Contractor's Modification Request 26 Pavement-2"Min.HMAC on 2:27 Concrete Base 20 20 0 LF $100.00 $0.00 27 Concrete Pavement Repair per TXDOT Spec. 56 56 0 SY $75.00 $0.00 28 Gravel Drive Repair(6"Flexbase) 80 80 0 SY $10.00 $0.00 29 Trench Safety System 7,250 7,840 590 LF $0.01 $5.90 30 Railroad Flagman 20 20 0 DAY $800.00 $0.00 31 Exploratory Excavation 5 6 1 EA $750.00 $750.00 32 Traffic Control 1 1 0 LS $3,000.00 $0.00 33 Hydromulch Seeding 6,850 7,440 590 LF $1.00 $590.00 34 Cathodic Protection 1 1 0 LS $45,000.00 $0.00 35 Concrete Encasement(18"Sewer) 10 0 (10) LF $100.00 ($1,000.00) 36 Concrete-Type B 20 20 0 CY $100.00 $0.00 37 Concrete-Type E 20 20 0 CY $100.00 $0.00 38 Fill Material-Ballast Stone 100 100 0 CY $25.00 $0.00 39 Tracking Balls 12 12 0 EA $15.00 $0.00 40 Pipeline Markers 24 24 0 1 EA $35.00 $0.00 41 Modify Existing 2"ARV 1 1 0 EA $2,000.00 $0.00 42 Modify Existing 4"ARV 9 9 0 EA $2,000.00 $0.00 43 Demolition of Existing Meter Station 1 1 0 LS $5,000.00 $0.00 44 Meter Station-Site Prep.,Grading,Dressing,Fence,Misc. 1 1 0 LS $50,000.00 $0.00 Changes-Misc.Material Increase 16"Dia.to 24"Dia.,Etc. $O.Oa / 45 Meter Station-Vault Construction&Concrete Work 1 ^ ° $65,000.00 9 � ( Pipe&Fittings)(Includes DIP in Vaults) 1 1 LS $26,000.00 1 Changes-Cost Increase for 24"BF w1 Electric Actuator vs/ V f 16" prirignal 1 1 LS $6.,400:00' I / Changes-Crew Cost Adjustment for Larger Pipe,Vaults, Etc. 1 1 LS 525,000.00 46 Meter Station Yarm Piping,Valves,Appurtenances $125 00000 , SO00 Changes-Delete Two(2)16"Gate Valves w1 Vaults 2 0 (21 EA $9.000.00 {$'I6 000.601 Changes-Delete 24"x 16"Tapping'Sleeve&Service t 0 (1) EA $6,00000 (S6 000 0vi Changes-Grand Prairie 24"Sangre Check Valve&Vault 1 1 EA $25,000-00_ $25,000.00 Changes-Grand Prairie 24"Gate Valve(Direct Bury) 1 1 EA $17,000,00 $17.000.00 Changes-24'Concrete AWWA(303 Water Pipe Installed in Trench _ 510 510 LF % $210:00 $107,900,,00' Changes-Hanson Pipe Material Changes(24') 1 1 LS $45,000;00 $45.000-00 Changes : ~ i ge -Crew CostAdjus+rnenl for New Pipe 1 1 LS 00' 47 Meter Station Ele4.._ vlcmc".:p $160,000.00 $0.00 Ghsnpes. nal Cost of Electrical Work and Material lrrcreasas 1 1 C.S S8.00000 48 Meter Station-Transfer of Services,Test&Commission I 1 $0.00 et Change: $382,195.90 Previousl f lM +fid Charig'e Order Pro posats David Johnson i CMR# Description Date Processed Approved i Paid on Est. Amount 2 Removal of Existing 30"Storm Drain 9/24/09 Yes-No.1 N/A Yes $40,100.50 3 Trinity Blvd.Tunnel Extension 4/9/12 No ? No $26,599.62 4 Hwy.360 Tunnel Issue w/Existing SS Line 2/23110 No Yes-2/23/10 Yes $106,730.00 Total Previous Change,Orders: $173,430.12 Grand Total All Change Orders to Date: $555,626.02 If acceptable,please provide an authorization signature below and return one(1)copy to our office. This change will require an extension of contract time as described above. YC' { Les V.Whitman,S.J.Louis Construction of Texas Ltd. &J.Louis Cacd►wcdon of Teras Ltd P.O.Box 834 Mansfield,Teras 76063 (817)477-0320 Office(817)477-0552 Fax Zt ontracror•s moa ricanon Aequesr A' Proposal No. Dale s6"water Main Extension Along Trinity Railway Express R.O.W. Part 4-From Tarrant Main to SH360&Trinity Blvd. CMR-5,Revised June 6,2013 Response Required By Transmitted By Rakesh Chaubey Adam Lunsford City of Fort Worth,Texas Lead Estimator/Project Manager Department of Engineering Signature 1000 Orth,TX 61 Street Fort Worth,TX 76102 (817)392-6529 escrf tion of Work This proposal represents the changes made to the construction plans for the above referenced project. The revised plans dated June 8,2012 have been used for preparing the additional costs described below. These changes have been discussed with the City of Ft.Worth and this proposal is the third revision to this proposal. Per our meeting on May 2,2013,these numbers should be considered acceptable by the City of Ft.Worth. Please process a project change order as soon as possible so materials can be ordered and this work can be scheduled. In addition,due to the significant delay in the construction of this project,please adjust the Contract time to reflect a proposed substantial completion date of Februray 15,2014 and a Final completion date of April 15,2014. Please note,these dates are based on an executed change order being issued by the end of May,2013. Lastly,with the exception of the new/proposed 36"butterfly valve vault,this proposal is based on using the old/original details from bid time. If appropriate,please authorize this proposal with a signature and fax back to our office. 3611 Water Main Extension Alone Trinity Railway Express R.O.W.-Part 4 Project Changes per Revised Plans Dated June 8,2012 36"Concrete AW WA C303 Water Pipe inshted in Tmnch 6,670 5,670 0 $220.00 $0.00 s - 9 B 00 36"Concrete A'OMA.'-303 Water Pipe Installed it Tunnel 2e (Including Tunnel) 550 550 0 $1,025.00 $0.00 3e 24"Concrete AWYYA. ,X.3 Water Pipe Installed In Trench 425 425 0 $210.00 $0.00 4a 16"Concrete AW WA C303 Water Pipe Installed in Trench 25 25 0 LF $100.00 $0.00 5 42"Casing by Opencut 12 12 0 LF $200.00 $0.00 6 12"PVC by Opencut 20 20 0 LF , $50.00 $0.00 7 10"PVC by Opencut 80 80 0 LF $40.00 $0.00 8 8"PVC by Opencut 40 110 70 LF $30.00 $2,100.00 9 36"Butterfly Valve w/Vault 5 6 1 EA $47,000.00 $47,000.00 10 24"Gate Valve w/Vault 8 10 2 EA $22,200.00 $44,400.00 11 Vault for Usting 24"Gate Valve I 1 0 EA $6,750.00 $0.00 12 12"Gate Valve 3 3 0 EA $1,800.00 $0.00 13 10"Gate Valve 1 0 (1) EA $1,500.00 ($1,500.00) 14 8"Gate Valve 1 1 0 EA $1,050.00 $0.00 15a Concrete Pressure Pipe Fittings 1 1 0 LS $1.00 $0.00 NEW 11;4 2r6Co t A Vt- a�r y sw ,�`-E i �' EA� $ 6 000 00 y .�(00 OA sys'4F h .4 .r�f%4<. .`1`.� 18 4"Comb.ARV 2 2 0 EA $20,000.00 $0.00 17 8"Blow-off Valve w/Vault 2 2 0 EA $5,700.00 $0.00 18 Remove&Salvage E dst;ing 24"Gate VaAe 3 4 1 EA $3.750.00 $3,750.00 19 Remove&Salvage Existing 10"Gate Valve 2 2 0 EA $750.00 $0.00 " rx,a;�, '4,.ur..r.� ,.,.z." .,o� sir};� NeWc_2 u Ira ng1 4 ?tet pP �4�; ? . S o:Q 4r$S HCl U0k . 20 Cut&Plug Existing 10"Water Line 3 13 0 EA $1,500.00 $0.00 21 Additional Depth of Water Line 200 200 0 LF $10.00 $0.00 22 24"Rode Riprap 580 580 0 CY $50.00 $0.00 23 Remove&Dispose Existing Concrete Blow-oBAssembly 1 1 0 LS $1,500.00 $0.00 24 1SWPPP 1 1 'u LS $15,000.00 $0.00 25 (Pavement-5"Min.ReW.Concrete on 217 Concrete Base } 200 J 200 a LF $100.00 $0.00 y " SJ.Lona Cenatraaron of Teras Ltd _ P.O.Box 834 ManaJPe/d,T"m 76063 (817)477-0320 Offlce(817)477-0552 Fax uonrracror's imalicanon Kell pavement-2"Min.HMAC on 2:27 Concrete Base 20 20 0 LF $100.00 $0.00 27 Concrete Pavement Repair perTXDOT Spec. 56 56 0 SY $75.00 $0,00 28 Gravel Drive Repair(6"Flexbase) 80 80 0 SY $10.00 $0.00 29 Trench Safety System 7,250 7,640 590 LF $0.01 $5.90 30 Railroad Flagman 20 20 0 DAY $800,00 $0,00 31 Exploratory Excavation 5 6 1 EA $750.00 $750.00 32 Trak Control 1 1 0 LS $3,000.00 $0.00 33 Hydromulch Seeding 6,850 7,440 590 LF $1.00 $590.00 34 Cathodic Protection 1 1 0 LS $45,000.00 $0.00 35 Concrete Encasement(18"Sewer) 10 0 (10) LF $100.00 ($1,000.00) 36 Concrete-TypeB 20 20 0 CY $100.00 $0.00 37 Concrete-TypeE 20 20 0 CY $100,00 $0.00 38 Fill Material-Ballast Stone 100 100 0 CY $25.00 $0.00 39 Tracking Balls 12 12 0 EA $15.00 $0.00 40 Pipeline Markers 24 24 0 EA $35.00 $0.00 41 Modify Existing 7 ARV 1 1 0 EA $2,000.00 $0.00 42 Modify Existing 4"ARV 9 9 0 EA $2,000.00 $0.00 43 Demolition of Existing Meter Station 1 1 0 LS $5,000.00 $0.00 44 Meter Station-Site Prep.,Grading,Dressing,Fence,Misc. 1 1 0 LS $50,000.00 $0.00 45 Meter Station-Vault Construction&Concrete Work 1 1 0 LS $65,000.00 $0.00 ri0© 46 Meter Station-Yard Piping,Valves,Appurtenances 1 0 _S $125,000.00 ADO 47 Meter Station-Electrical&Talemetry 0 I-S $160,000.00 $0.00 . p 0 0 48 Meter SIrefion-Tmnsfw of Services,"rest&ConnrnsWon 1 1 0 ..S $1.00 $0,00 A. ,- 2 Removal of Existing y Sttnmi Drain 9124/09 yes-No.1 N/A Yes $40,100.50 2 Trinity Stud.Tunnel Extension 4/9/12 No ? No $26,599.62 4 Hwy.360 Tunr v issuowi Existing SSJlw 2/23110 No e .2'23x`10 Yepal 1,•y„M `3(.00 ills s If acceptable,pleau provide an authorhadon signature below and return one(1)copy to our office. This change will require an extension of contract time as described above. c �LC3 V.Wni"anh§J.Louis Consrructlon of 1'exas Ltd SJ.Louls Cons&ucdon ojTc=Ltd P.O.Bax 834 MansJkld,Texas 76063 (817)477-0320 Of ee(817)477-0357 Fax Ac���unsford From: Adam Lunsford Sent: Thursday, June 06, 2013 6:07 PM To: Sholola,Tony(Tony.S holola@fortworthgov.org); Sholola,Tony (Tony.Sholola@fortworthtexas.gov) Cc: Pete Stahl; Justin Whitman Subject: TRE- Revised Proposal and Additional Information Attachments: doc20130606164516.pdf Tony, Per your request,please see the attached revised proposal which includes a$5,000.00 reduction in cost. This adjustment is based on using 24" DIP spool pieces in the meter vault and adjacent butterfly vault. In our discussions you asked for some additional information that summarizes the changes and reasoning for the additional costs included in this CMR. Let us start by pointing out that there are numerous,significant changes to the Meter Station work. First of all,between additional 24"gate valves and a 24"check valve,this accounts for about $87,000.00. Another major item is the additional 24"yard piping that was added. There is now over 500 LF of additional 24" B303 pipe that is loaded with specials and fittings. This accounts for about$162,000.00. We have provided you with backup from Hanson which shows the significant cost associated with these materials. Given all of the fittings,etc.,there is a major installation and welding costs associated with all of this work. About$47,000.00 is associated with the increase in pipe diameter for the meter vault and adjacent butterfly vault. There is$8,000.00 of additional electrical work. A few other major items include the additional 36" butterfly valve&vault at$47,000.00. There were five (5) in the original contract and now there are six(6). We should take this opportunity to point out that in our meeting weeks ago, SJL agreed to provide you with the large butterfly valve vaults like the ones used on Eastside. After receiving pricing from our subcontractor,Guzman Construction,we have realized this will cost us a significant amount of money. SJL will hold up our agreement to do this. There is also a new 2"ARV @ $16,000.00 and we have included only$30,000.00 for additional labor,equipment,and fuel costs associated with plan changes including the alignment,grade,and existing pipe removal. SJL has provided the included pricing in good faith to make sure this project moves forward. We hope the above information helps provide a snapshot of the changes. Please note that the pricing included has been reduced significantly from our previous proposals and this was done given our valued relationship with the City of Ft.Worth. Let us know if you have any other questions or require any additional information. Thanks, Adam Lunsford Lead Estimator 1