Loading...
HomeMy WebLinkAboutContract 49586 CITY SECRETARY L/l CONTRACT N0. Developer and Project Information Cover Sheet: Developer Company Name: Crystal Lake Development, LLC Address, State,Zip Code: 3825 Camp Bowie Blvd, Fort Worth,TX 76107 Phone& Email: 817-665-2321, randy.lockhart@att.net Authorized Signatory,Title: John Cockerham , Pfesident M n roq pan& Project Name: Marine Creek Ranch Section 12 Brief Description: Water, Sewer, Paving, Storm Drain, Street Lights Project Location: South of Cromwell- Marine Creek Road East of Crystal Lake Dr. Plat Case Number: None Plat Name: None Mapsco: 47E Council District: 2 CFA Number: 2017-069 City Project Number: 1006 3-51 To be completed by ff Received by: Date: 3� 5 78 OFFICIAL RECORD j! CITY SECRETARY FT.WORTH,TX Q SEQ woP City of Fort Worth,Texas o`6 8 Z 9 9 V Standard Community Facilities Agreement-Marine Creek Ranch Section 12 CFA Official Release Date: 02.20.2017 Page 1 of 1 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Crystal Lake Development, LLC , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Marine Creek Ranch Section 12 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section Il, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 12 CFA Official Release Date: 02.20.2017 Page 2 of 2 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) 0, Paving (B) N, Storm Drain (B-1) ®, Street Lights & Signs (C) N. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 11, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which, the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent(100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 12 CFA Official Release Date: 02.20.2017 Page 3 of 3 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The- City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 12 CFA Official Release Date: 02.20.2017 Page 4 of 4 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims,suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 12 CFA Official Release Date: 02.20.2017 Page 5 of 5 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 12 CFA Official Release Date:02.20.2017 Page 6 of 6 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 12 CFA Official Release Date: 02.20.2017 Page 7 of 7 Cost Summary Sheet Project Name: Marine Creek Ranch Section 12 CFA No.: 2017-069 City Project No.: An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 250,361.80 2.Sewer Construction $ 273,528.00 Water and Sewer Construction Total $ 523,889.80 B. TPW Construction 1.Street $ 678,907.40 2.Storm Drain $ 271,656.50 3.Street Lights Installed by Developer $ 62,499.56 4. Signals $ - TPW Construction Cost Total $ 1,013,063.46 Total Construction Cost(excluding the fees): $ 1,536,953.26 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 10,477.80 D. Water/Sewer Material Testing Fee(2%) $ 10,477.80 Sub-Total for Water Construction Fees $ 20,955.60 E. TPW Inspection Fee(4%) $ 38,022.56 F. TPW Material Testing(2%) $ 19,011.28 G. Street Light Inspsection Cost $ 2,499.98 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 59,533.82 Total Construction Fees: $ 80,489.42 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,536,953.26 Completion Agreement=100%/Holds Plat $ 1,536,953.26 x Cash Escrow Water/Sanitary Sewer=125% $ 654,862.25 Cash Escrow Paving/Storm Drain=125% $ 1,266,329.33 Letter of Credit=125%w/2yr expiration period $ 1,921,191.58 City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 12 CFA Official Release Date: 02.20.2017 Page 8 of 8 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER _ Crystal Lake Development,LLC Jesus J. Chapa Assistant Cit Manager Date: ::a24:2 e: John Cockerham Recommended by: Title: Manager Date: ` W /201: Wendy hi-Babulal, EMBA, P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department Signature Dougla . Wiersig, P.E. Name: Director Transportation&Public Works Department Contract Compliance Manager: Approved as to Form &Legality: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting Richard A. McCracken requirements. Assistant City Attorney M&C No. aW !k na c Date: Form 1295: NJ�-" Name: Janie Morales OF, tie: Development Manager . ATT— T: 0�� Mdry J. Kayser City Secretary '9S OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement-Marine Creek Ranch Section 12 f.WORTH ,X CFA Official Release Date:02.20.2017 Page 9 of 9 -- Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 -Changes to Standard Community Facilities Agreement Location Map ® Exhibit A: Water Improvements ® Water Cost Estimate �I Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 12 CFA Official Release Date:02.20.2017 Page 10 of 10 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 10063, None City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 12 CFA Official Release Date:02.20.2017 Page 11 of 11 N Yarhs Creek BS ' u k Rorie Jte 10 7 None Ltwk 366 SI TE SS POLL MARIN£ Tarrant Canty College CREEK ►�t carpus RIDGE LAKE SOUTH RIDCf LOCATION MAP MAPSCO NO 47E COUNCIL DISTRICT 2 MARINE CREEK RANCH BLOCK A, LOTS 1X, 2-32 BLOCK B, LOTS 1-28 BLOCK C. LOTS 1X, 2-31 BLOCK D, LOTS 3-16 BLOCK E, LOTS 1-2 BEING 26.703 ACRES OF LAND LOCATED IN THE ALEXANDER F. ALBRIGHT SURVEY, ABSTR4CT NO. 1849 CITY OF FORT WORTH, 7ARR4NT COUNTY, TEXAS OWNER/DEVELOPER: 105 BUILDABLE LOTS, CRYSTAL LAKE 2 PRIVATE OPEN SPACE LOTS DEVELOPMENT, LLC. 3825 CAMP BOWIE BLVD. FORT WORTH, TX 78107 PRELIMINARY PLAT CASE NUMBER: PP-006-033 TEL: (817) 885-2321 CASE NUMBER: FP-16-067 CONTACT: RANDY LOCKHART PHASE AME: MARINE CREEK 12EEK RANCH DATE: 05116/2017 m m a MARINE' CREEK PROJECT �� 2652-07-01 RANCH WN BY A. TAYLOR SECTION 1 ,2 mycoskie+mcinnis+associates DRA civil engineering surveying landscape architecture planning tbpe registration number. f—2759 PLAT INFORMATION 200 east abram CHECKED BY• A. CASCO & VICINITY MAP arlington, texas 78010 �l �+ 817-489-1871 SHEET NO. 1 OF 7 fax: 817-274-8757 ers.mrnatexas.com iV i AtCv X170. i ft \ o � MRTC7 — - =EX. 8" - - - - - - - - - - - - - - - - - - - - — — — — — — — — tx WATER LINE tx uyasronicxA4l�/r f NLWUarawa�+ tx \C \ yax *w ,,,rte `s ` HYDRANT EX. FIRE am t* 7 e e to 1t 12 13 14 15 to 17 1e 19 20 21 22 1 6 LAKE KONAWA DRIVE 5 C B 13 24 2 3 4 5 e 7 e e to 11 12 �\ <Z 25 s 5 14 3 Y 2 V t yFt 2e lx 15 1 '6 2 29 27 2e 25 24 23 T2 21 20 19 16 17 1e B 4 ALMANOR ROAD 2e 5 tx ^ ! 4 5 e 729 e 9 10 11 12 1! t4 6 V +3 70 30 EX. 12" 7 31 >a WATER LINE 29 90 27 31 2e 25 24 ?3 22 21 20 1w to I I I 11 sO i I I CENM?INLL DRIVE I o SII ron�c carr. 3 4 5 e 7 e e 10 11 12 0 j4 15 10 Ot aa""T MEM EX. 10" O "°�,�* WATER LINE 2 am Q Immov aa ar �, .awx HAVW W-4LTY LID 1p..1 PY:e44 agno ofx DR o�t ORTLT L `\ \ �\ NOTE ALL WATER LINES ARE 8" UNLESS OTHERWISE NOTED � LEGEND WATER LINE 200 0 100 200 400 y T FIRE HYDRANT ►� GATE VALVE SERVICES 1 inch = 200 ft. TAPPING SLEEVE AND VALVE DATE: 0511612017 m m a MARINE CREEK PROJECT �: 2652-07-01 RANCH mycoskie+mcinnis+associates DRAWN BY A. TA 110R SECTION 12 civil engineering surveying landscape 8rdi1tBca'm planning tbpe roglslr on number. f-2759 CHECKED BY: A. CASCO WATER 2 0 e a s t a b r a m MIBI "A" arling t texas 76010 817--469-1671 SHEET NO: 2 OF 7 fax: 817-274-8757 www.m m a t a x a e.a 0 m H O O O O O O O O O O N 00 O O O O O O O O 00 0 O O O O O O O Ln U r14 J � 0) m (.0 O 00 00 r14 tD tDO� 00 00 M Ln F- ^ O N 00 -1 M 06LLM 0 N 2 LLr w O Oq O O O O O O O O -zt tD O O O O O O N tD 00 -4 Lr) O O rl 00 Ln 00 N 00 lzt tz 00 M Z J O 00 00 � 0 � r, � O -1 a--I N W O z 00 00 w Ln ON m lD n O .-I N W 4ct W N Q 3 Z LL: Z LL LL J 0 J J W W W W W Z Q O Z F- z Q LU LLr J J W Q Q tY LU ` 06 071 F 5 LU W N ur LU LU Z X m Z W W O LW LU J Ln J D_ V ] Lu Z Z 0 � LU Z w � Z w _ LL p Q Ln J a a Z Z N LU Q w LU H H LU < Q V J V } j� iD 00 Y Cf w V a LU > la7 X X ` OC D - - r WLi- w G 0 00 00 L- -i 00 -i .-I V W ry O O Z cc Z a m t Ln tD r, 00 m ULU IM a C�XW Q%eir,LM F4 021e22011101 .\ j 0P,r1Cr AMUS rwa,.r EAMW ` raa., sae mfT-w-Mr a orr. p- so cc#amomamaffmr r s, 0 / eO 7 a 0 10 11 12 13 14 1s 16 17 1e 10 20 21 I \ 6 � LME KONA I A DRI OE \ 2s \ e � WY © 13 1 J 4 4 S SANITARY " 2 3 litSEWERLINE �, +x 1e 3 � 2 2e 27 26 25 24 23 22 2+ 20 ,a fe 17 ---�'-"-'"- ANOR ROAD 76 © 2 ` I 1 1 2e 3 � 1x 2 3 ��.�/rryyrJJ/ 4 e 6 +!7 f0 +4 20 e e 11 12 16 1a 6 © 3D a 7 zt x~¢ 30 31 2e 27 26 25 24 23 22 21 20 1a IS 17 I I I. 8 >s I I 0 HIL. VE I I Aram Amr. +e o �wr3 4 e a 7 0 10 11 12 13 j4 ow o ,gym ros'x rao' IT,=30 OF ,�. as & a ASEMW HAVW REALTY,LID m 1d..14102 PG aM cwmmmaI ( I M ga+tr LI \ \• \ \ LEGEND • SANITARY SEWER MANHOLE 8" SANITARY SEWER SANITARY SEWER SERVICE 200 0 100 200 4.00 �J EX. SANITARY SEWER MANHOLE —SS— EX. SANITARY SEWER LINE 1 inch = 200 ft. DATE: 05/16/2017 m m a MARINE CREEK PROJECT �: 2652-07-01 RANCH SECTION 1 ,2 mycoskie+mcinnis+associates Y DRAWN BA. TAYLOR dull engineering surveying landscape architecture penning tbpa registration numbr. f-2759 WASTEWATER egoeast abram CHECKED BY A. CASCO „ „ arIingtan, texas 76010 EXHIBIT A-1 8 1 7-4 6 9-1 6 7 1 SHEET N0: 3 OF 7 fax: 817-274-8757 www.mmataxa9.com H C) o O o O O O o o O o O o 0 0 0 -' V) o o O o O o O o o O o O o 0 0 0 0 N O0 o v o o N O O O O N O m o Lr; 0 0 0 0 0 0 0 00 V I� LD O r- 00 O Ln N C'4 J 01 00 01 O 1� to .--t O a0 O M r-1 1� O M V1 < Lr) 1-1 M -1 Lr) 000 00 Ln r-1 O M L!1 C4 en LU LU ~ v)- art yr yr yr v> +n yr yr yr in yr yr yr to yr yr yr yr in v� yr to LU o 0 0 0 0 o O o 0 o O O o 0 0 U Ln O O O O O O O O O O O O O O of r-1 0 .--1 o O M M L/1 I-: o O O o O O a -4 O N m -It m -It O r-( O 00 O Ln r-1 lD Ln r-1 -1 r-( N m tz Z N Ln Z) VII V? ll-? L? i/? L? V? to L? L? ar} L? L? L? lA Q O ^ � Ln LD 0) O m O lD O O ~ 0) r-i 0) ry 0 Ln 0) v v m v r-i cr ni 4 rr LU O 00 0 z n r- 00 O O O00 00 N LU W N N N 2 Ln O lz n Ln O m �. r, n 00 C:, N lD W 00 00 N Ln N m W .-1 N O Z 3 LU o LU N LU 2 Y N Dr Z Z LL Q LL 1' Q LL LL LL LL Q LL Q LL LL rl Q Z) J WJ U W J J J J W W N Q N � O z ~ z LU a a c H G J LU ZLL LU LU J m Ur J J Z J LL LL Y J J cLU Wc Q mZ Z co Z �-- G W N N Q Q J 0: Z X U Z N w N U J O °C a Z) U > U w LL = = g Ln U w w" a a H O H Q z_ Q w Z w a a a a w a w a = O LL w N a a O O U Lu N z o W W J aLU u u 3 3 3 w w z z Lu U w w Q Q U Z z H Z Z w w w N N X X X Z Q Q Ln Q w Z Ln _ - w w O Yd FOU v 00 00 O-4 O� v v in in w OU W u W O Z LLI Z 0 � `1 N m v Ln lD n 00 0) CD .`�-� � .m-i -ItLn a w U EX 4 SIDEWALK f w:CIDEMMOPUM. LIM PROP. 6' SIDEWALK IX EXISTING Ix Ix PA VEMEN T PROP. 5' SIDEWALK O12 13 14 Is is 11 to 19 20 22 23 .. . .. . . .. . . . . . . . . . . . . . . . . .. . .. . .. . . . . .............. 5 24 13 3 4 5 6 7 a 9 10 If 12 4 1 2 25 14 TYPE R-1 r6 RAMP TYPE R-1 26 RAMP 15 2 23 26 25 24 23 22 z20 10 to 17 27 27 . . . . .. . . . . .. . . . . . . . . . . . . ... . . .. . ... . . . -TYPE P-1 RAMP tx = 3 @ 5 6 7 a 9 to it 12 13 1* is 16 29 TYPE M-2 3014A PROP. 6' — TYPE /I/ C 7 31 SIDEWALK RAMP BARRICADE TYPE M 2 31 RAMP 20 25 24 23 22 Zf Zo 19 to 17 t 41 .7 3 ow Aw� 4 5 6 7 10 11 12 �3 14 is OAT= TYPE AVINM mom wlft I" ,TYPE R-1 RAMP RAMP 2 awgrmmm m All wr x 11w ++ �ft v��Cr EX. 4' &&� om *0�mw lt� + A0VA ft� SIDEWALK HAYCO W-4LTY I-ID + + agar WCL 1419Z PQ 644 CQXW� + + DOCT N ++++++ EXISTING L + TYPE R-1 RAMP LEGEND 29" B—B PA VEMEN T, 6" .. . . . . . CONC., 50" ROW 37' B—B PAVEMENT, 8" 200 0 100 200 400 CONC., 60' ROW 2" TYPE D ASPHALT OVER I inch = 200 ft. 4" TYPE B ASPHALT DAM 0511612017 MARINE CREEK m1mla PROJECT jf: 2652-07-01 RANCH mycoskie+mdnnis+assodates DRAWN BY A. TAYLOR SECTION .L civil engineering surveying landscape architecture planning tbpe registration limber. I—2759 PAVING 200 cost abrom CHECKED BY: A. CASCO a r I I n 0 7 6 0 1 0 EXHIBIT "B" "";" _"t 6 ,"7 1 SHEET NO. 4 OF 7 1 a x: 8 17—2 7 4—8 7 5 7 www.mmataxaa.com n F O O o O O O O LO O O O o 0 0 0 o0 o m o n o n o 0 0 0 o a 0 o o 0 M o. -i 1� vi oo o 0 0 �r1 O n o �n oo m O o .� m v o �n O o n O In N N N o0 kf CV) n N l0 oo O1 Q N M �--� tll V Q1 Ql Ql O Ol M m V �"� 00 LO O V m m e-i .--1 N N b cH G W W O O Ln vl O O O O O _V O O o0 w 00 O N C N n l0 m C O t= Z N N N � to V/ VT V} VT V/ Vf to V} Vf VT VT N V1 O n - W V M - - - O N N - Q .�-� N O W oo Lr VI Vl O N .ti O a v v v H v .. N N N N N N C v n n N N n lip Ln M M oI n O O ry p m vO1i n M M Ln N o N .moi O m N Z H � w Z 2Ol iD n Q .°i-i con CL n r a f- z J co cn n M n F .-I n co O V1 `ti Q V a r z ~ LL ZY > Y Y Y Y LL Q Q Q Q Q Z VI In VI VI V1 VI W W W W w � J Z c c) C L Z 2 D m O (7 cc ry •-� Z (� m w w w n N X 06 o a Z m 0 ¢ w wc wwc He He a =_ G Q V W L L L C C Q C K C W 'n Z ¢ > ¢ 2 w w w dJ J � LL LL LL Z W Z Z > H W Z W Z = S Z W_ W W O�/ o: O O Vl N O K '= C: Z m W v W 0 J V J V Q Q V Q Q Q j Q W G G< S lD t0 oo 00 N C V o1 01 M LL m U C5 W Q K Z l0 n M M O N r-1 r-1 N H U ~ LEGEND EXISTING STORM SEWER LINE PROPOSED STORM SEWER LINE a ; w STORM MANHOLE � ? = CURB INLET CRYVAL x a O N N 200 0 100 200 400 y Y o 4 • 1 inch = 200 ft. I N = X4. Lj a a _ _II ♦ a _ I HAVW gun LID o ML 14fa2 M e44 F rA aRTCT + ; a y N 'A J st a I o _ _ _ -all a e I a 5'cERe a (. 1 II Q e _ CLM M 33 s C" 5' y� I 21'RC J ME a ` ' II�LGrJ ,R(p I AHIfaAINw'IalAla�l d � �� � � I I awi � q/ M _ 39'ROP T 24'RCP — sd ewaYer�r `7J �11E CT1Y oF faPf NCIIPIN w.rasa K sm 15' 7 6 4714• a•/02CM9170 TCT o i 4' J� _ HEADWO / / rvsww,r asw.er 1thSi01tER air 1 a220M4 OMTCTe4 / pRTcr DATE: 05/16/2017 m I m a MARINE CREEK PROJECT � 2652-07-01 RANCH mycoskie+mcinnis+associates DRAWN BY- A. TAYLOR SECTION 12 cMienginserin9 surveying landsoapearchitecture planning ttpe registration number. f—2759 CHECKED BY: A. cAsco STORM DRAINAGE 2 0 0 east a b r a m orlington, telae 71010 EXHIBIT "B-1" 017-489-1671 SHEET N0: 5 OF 7 fa:: 817-274-8757 rrr.mmatesaa.eom C, 0 o O o 0 (D 0 0 o O O o O O N Ln V) o O O o O o O o o OO . o O O ON O tD N - O O 00 H 1n V 00 O N O O O 1 O an U H n O O tD N 1n 00 H O n O O O LI) Lf) J ko O tD N Ql N O ` lD H CD O O t0 W N if '" rq °° V M (N O 0N0 CY O lD M H n O N H � ui w V? V} V). V} t/} L} t/? V} Vf V? Vl V? L? V} V} V} V} V} V} O O O O O O O O O O O O O O O V) O O O O O O O O O O O O O O O 00 O O N H n 1-1 N O O O O O H w V O 001 tD n n0 N 00 O0 M0 CD 00 U T V V lD D_ F Z Q H O m v v H Ln v o m o I— O tD N H H In H 00 W N H In N N N V Q1 N N H k6 N LUH H W ry tD In 'n O1 tD N H Om 00 cn H N 00 lf1 ry V N tD M N Z m m V N H O cn Ol 00 tD H H co T cc O N N M H tD CD Z ui G ~ cc w ON Dal O H O H OLn N tD tD N J F F Z � LL Y Q Q LL LL LL LL LL LL Y Q Q Q LL ~ Z J to w w J J J J J J U w w w viLi Z L p m r oc p N d W W N Q > N Z X OC J J 0 C D D J ~ — — — — — U Q (~j Q > w = _ _ _ _ X �i LL W ~ Z L, V)i N N V1 > O W w p Q _ LL J J g g g g g m z z W a V I- N to O O U U U U U U J - - 2 Q Q 2 Z Z a a a a a XO 3 > > Y p U U W Cr � w 1-+ 'v it in ai X w in o w w 1 I m V F V tD N N N M M In 2 H N oC 3W ty O O Z ix Z a c H N CO lf1 tD n 00 QlLLJ H H H H H H u H l jM C! 02,7 ssssss� E lua \ —• 1% — — — — 1% i Athos rluK rw,oe�r � ^is�c Raaw•v 0 < \ \ act OR=w O7 ° 9 10 11 12 i! 14 13 16 17 15 19 20 21 22 1 e LAKONAWA DME j 23 KE 24 © 1! \ 4 < 1 2 ! 4 3 6 7 ° ° 10 11 12 \, 23 14 2 OF ! 26 2 6 2 ! 27 26 23 1; 23 22 r so 19 16 17 B p 21 16 i 4 © &MAWR RQAD 26 5 19 2 ! 4 5 624 /F © 7 6 9 10 11 12 13 14 13 6 3D W � 7 y1x 30 20 31 p0 21 26 23 24 23 22 21 20 19 18 f7 I 1$ FAL CM70 L DME 3V2 D I masa e'n 3 43oww 6 7 6 9 10 11 12 13 j4 i3 ©1 16 PA esIMM p V%l s MPMV.aeraV.Aa.. to� Mr1owessru taaa/a aAa s asmn«nai HAVCO W-4L7Y.LID EASMENFr Am= VM 14192,P0.614 SAM U anal OR/tT I L f \ LEGEND 200 0 100 200 400 X STREET LIGHTS 0 EX. STREET LIGHTS 1 inch = 200 ft. DATE: 05/16/2017 MARINE Cm 1 m a REEK PROJECT • 2652-07-01 RANCH mycoskie+mcinnis+associates DRAWN BY A. TAYLOR SECTION 12 civil engineering surveying landscape architecture planning tope registratlon numbs: f—2759 STREET LIGHTS 200 east abrom CHECKED BY A. CASCO EXHIBIT "'C"' arIInglon, taxa; 7601° 817-489-1671 SHEET NO. 6 OF 7 fax: 817-274-8757 •11 r.m m a t 0 x a e.c o m )4 EI E can T 1% 1% uws MUM uamrr 1C a w10.4 u, 1% \\ ra. PFEUK Ro�autt7x��v000��uW0����� Coo OIrnT I \ \ O7 ° e 10 11 12 0 14 15 to 1 17 18 1e 20 21 22 e STREET NAME SIGN q25 LAIR KQNAWA DRIVEWl—lASIGNS s \ , s I 4 I 5 I 8 7 ° 1011 12 \. 'LSTREET NAME & j4 2 E s STOP SIGNS �% (R1-1) W1-1A SIGNS 15 26 s 2 26 27 ze 25 24 23 22 2, m 1e 1° 17 p 21 18 B a 4 © I A l"WR Raw 20 5 ,% 2 s 4 5 ° 7 8 e 10 11 1 11 1 1314 15 20 Is C STREET NAME & ,e � 3D EXISTING STREET STOP SIGNS 7 JNAME SIGN (R1-1) xg, 211 28 27 26 25 24 23 22 TI 20 18 18 17 31 se© I I I K25 CMM?HILL DRIVE I I D III ■ s 4 5 �vic m e 1 8 e 10 11 12 1s 14 ,5 aslxaxt ft Nor� STOP SIGN STOP SIGND ..-=- (R1-1) (R1-1)' 2 "lr"&Vgr NA sinxewrr I W ar UM"o aw a cvmraAWA CASMEWr am HAVW REALTY, LTD n 1Q.141°;Pa 644 aglraAa110Q I I �'�ry OR1CT (\ \ LEGEND 200 0 100 200 400 STREET NAME SIGNS EXISTING STREET NAME SIGNS 1 inch = 200 ft. DATE: 05/16/2017 m m a MARINE CREEK PROJECT #• 2652-07-01 RANCH mycoskie+mcinnis+associates DRAWN BY A. TAYLOR SECTION 12 civil engineering surveying landscape architecture penning lan tbpe rcgM% number. f—27S STREET SIGNS egg as at obram CHECKED BY: A. CASCO „ „ arIingtan, taxaa 76010 EXHIBIT C-1 817-469-1671 SHEET NO. 7 OF 7 fax: 817-274-8757 •wV.mmalaxaa.eom 00 0 0 00 O �D `-' N I-q o O 00 O Ln 0 C0 Lr) N 4 n O 01 �n J M O � O C't l0 Ln N c0 G W N1, W O O O U O O O V1 d' M r4 V1 Lf O V). v> v> v> v). J O N 000 000 N 000 W H d Z l000 l0 W M N 0r0 N W W r-I a I 2 N ~ LL LL Q ZJ W W J ui H J W W d' N J O Z ~ Z W Lf1 N m "d O C U f6 7 C N Iv 00 U } C ZX 000 o ~ cu O W -a CH W G N E X = 3 V) U 0 ti Q LL Q w X CC C C d Z Z � Q Q Z = tw H — Y cr O 3 0 W W N c J l6 W v W O OZ d 2 �q N co V1 LLJ U ~