HomeMy WebLinkAboutContract 49050-CO1 DISTRIBUTION:
WIM-FILE CITY OF FORT WORTH CITY SECRETARY
CANARY-CONSTRUCTION FILE CONTRACT N0. �qO':VU�
PINK-PROJECT MANAGER CHANGE ORDER REQUEST
GOLDENROD-CONTRACTOR
CBANGE ORDER NO. 1 DATE: 8f1712017 -TI)OX_NO. PROJECT NO.Waar DcpxU=W Plojcd 00(80
PROJECT DESCRIPTION: Riverside Wastewater Treatmrnt Plot Demolition and Sludge Lagoons Excavation and Disposal Project CITY SECRETARY CONTRACT NO.49050
ORIGINAL CONTRACT AMOUPiI... » .» »».«...... « «.»...». ..�S„ S7.698-018.50
EXTRAS TO DATE...............................................................S so.00 OF FRTG
CREDITS TO DATE............................
CONTRACTCOST TO DATE...................................................................................................................................«. .......]......... .. ... .......qO. S S7 698t0.B.50
* i
AMOUNT OF PROPOSED CHANGE ORDER....................... ................................................ ..... . .. .... ..........,; .S 550.450.00
REVISED CONTRACT AMOUNT..............................«....._.................. ...................................... ......•''s.,........... .. *. ....S 57.74 -468.50
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS..................._ ................ . .............................-......-...... ......�...... .............S 50.00
ADDITIONAL FUNDING(IF NECESSARY)....................................... »....S SSOA50.00
oaa..ld P. �ranWes, st..Ci�.c�..� ....................S So.0o
REMAINING FUNDS AVAIIAHLE FOR CHANGE ORDER................_.............................................................«...
IN ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL:
The Riverside Wastewater Treatment Plant Demolition and Sludge Lagoons Excavation and Disposal Project is in progress at the Former Riverside
Wastewater Treatmmt Plant.At the request of third parties with vested interest in the project and its location within Gateway Pad;additional haul road
access has been constructed to the former plant area,mechanical protection will be provided by the Contractor where the haul road intersects the Texas
Midstream Gas Service pipeline easement,and two metal swing gates will be provided by the Contractor along haul road within Gateway Park to reduce
recreational users from using the haul mad to access off-mad portions of the pads. (Attachment A).
To date,the City's overall objectives for the Riverside Wastewater Treatment Plant Demolition and Sludge Lagoons Excavation and Disposal Project are
being met by the Contractor.
The Contractor shall complete all portions of the contract work as approved in the original contract documents.
Contract quantities and unit costs are revised per this change order as shown in Table I(attached). OFFICIAL RECORD
M/WBE participation goal for the project remains unchanged at 6%. CITY SECRETARY
FT.WORTH,TX
T,N -r Yd R,Wt� Ve+eSI to W,051el b� (hnif� �1G� _�A,.....
13 fU C�ZRl 1 i* • %*ill
Uc� %AX1'10-Avwi �vwG �. ..
t me1
mels s TONY
l3OSECK@i
� .
TOTAL COST FOR CHANGE ORDER NUMBER 11,rS/ 16 $50.450.00
i
It is understood cad aatasd that the aeeeptanee of this Chance Order by the connector coostitotes an accord sed satisfaction �8• ��,f
and represents payment in ran(both in time and money)for as costs arkia4 out of,or incidental to,the Chance Order. v
ORIGINAL CONTRACT TDO: ADDRIONALAPPROVED T'D MDATE APPROVED CON7AACfTOM TODATE ADDMOKALTZIEFM110CKANGEORM
270 days 0 days 270 days 0 days
CONTRACTOR FUMD ENWEER DATE
Lindamood Demolition,Inc. 6 RtOlW19- Tony Bosecker,P.E.,Freese and Nichols,Inc. 0131/7- 17
MANAGER/CONST.SER DTE D OR(MANAGING DEPT. DATE
Stacy Walters,Project Manager $-;t__3`- (7
DEPT. DATE tA RNEY DATE
Chris Harder,P E.,Assistant Director,Engineering& ��Z}' (�- Reynolds,Sehi cis C' ey
rj�72
C fiance
IL We DATE COUNCILACTIN OF REQUJR�p DATE
apa,Assistant Manager p� a APPROVED Q DISAPPROVED a arm-_
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Name o Employee/Signatur
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature