HomeMy WebLinkAboutContract 47923-CO3 9
CFW Change Order Approval St-COAppIM SECRETARY419
6- Page 2 of 3
CONTRACT NO.�
103
tORT WORTH, "Yof Fort Worth
op Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: — � ^_
Change Order No.:jSt-COApp0_7 Date Started:'2017-08-08 _
City Sec. No.: 47923 �� Date Due:12017-09-27
Project Name: Mark IV and Cantrell Sansom
02261 Y4 -
Project Numbers: — —_—� DOE Numbers:
===-== `� ="—
:DOE No.
Project !Construction of 2 additional travel lanes for eastbound on
Description:'Cant rell Samson and a roundabout at the Intersection of Mark
IV Parkway at Cantrel Samson Rd.
Project Manager:jLissette Acevedo j City Inspector:(Kevin Chambers- �I
Contractor: !JLB Contracting, LLC
COUNCIL ACTION (If Required):
M&C Log Name:'
M&C Number:i — _ M&C Date:
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
TPW —_ _--_ -- 1$ 7,718.64 ;3401402004315740010i
Total Cost: $.7718.64Total Requested Days:�___
Approval Status:
� 91011
� 12
Go b' 4
N OFFICIAL RECORD
CITY SECRETARY
Goy 1*0&PR's .c� FT.WORTH,TX
`
CO
Of It mP6
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 8/22/2017
CFW Change Order Approval St-COApp07 Page 3 of 3
;Approved: Yes
Comments:
!User: Aaron Perez
;Date: 2017-08-09 4:59 PM
:Approved: Yes
!Comments:
User: Lissette Acevedo {
Date: 2017-08-10 9:04 AM
Approved: Yes
Comments:
User: Lissette Acevedo i
Date: 2017-08-10 9:04 AM
I
E
Approved: Yes 1
Comments: I
User: Kim Arnold
.Date:.2017-08-14 10:03 AM I
E
i
Approved: Yes
Comments:
User: Doug Wiersig
Date: 2017-08-15 10:02 PM 4
'Approved: Yes
Comments:
!User: Doug Black
;Date: 2017-08-16 5:52 PM
Approved: Yes
Comments:
User: ]ay Chapa
iDate: 2017-08-17 8:44 AM
i
Action Required: FORT �A
J. a r ity Se..Cretaiy 5
TE XP OFFICIAL RECORD
CITY SECRETARY
FNOM&C REQUIRED FT' WCRTH9 TX
M
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?Siteld=51500&Processl... 8/22/2017
FORT WORTH® City of Fort Worth
4111� Change Order Request Breakdown
Project Namel Mark IV Parkway and Cantrell Sansom Road City Sec# 1 47923
Client Project#(s)l 02261
Change Order Submittal# 0 Date 7/31/2017
Dept. T1PW Wafer Sewer Contract Time
Totals CD
Original Contract Amount $2,835,119.98 $2,835,119.98 250
Extras to Date $74,947.53 $74,947.53
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date :.$2;910 0675;1= - >' $2,910,067.51 250
Amount of Proposed Change Order 7i"ME7541MA. -",, $0A0 $0 00 $7,718.64 21
Revised Contract Amount $L,9(778615 e ``` _ $2,917,786.15 271
Original Funds Available for Change Orders $141,756.00 $141,756.00
Remaining Funds Available for this CO $6t 808,47 k j^ � - „ $66,808.47
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT _s;2.92%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $3,543;899;98
(First Addition)After observing current field conditions at 2605 and 2609 Cantrell Sansom Road properties,it was decided that installing 6"
Sidewalk Curb(2609 Cantrell Sansom Rd)and a 6"Concrete Driveway(2605 Cantrell Sansom Rd)would be more complimenting by keeping
the newly constructed sidewalk more uniform.These additions would require new line items as they were not depicted in the original contract.
(Second Addition)The City of Fort Worth has decided to utilize the portable message signs for the duration of the entire project life. Change
Order Submittal#1 added 104 weeks to the total weeks originally contracted. This increase in total weeks was incorrect. The original
contracted time specified in the contract documents was 48 total weeks.The portable message signs are rented at a unit price per week per
portable message sign. This project is utilizing 4 portable message signs for 36 weeks(project specified contract time of 250 calendar days).
Therefore,the total weeks for rentals during the entire project life is 36 weeks x 4 portable message signs which is 144 total weeks. This
results in an additional 96 weeks that was not originally contracted. 8 total weeks from Change Order Submittal#1 has been credited back on
the deletions tab.
(Third Addition) The City of Fort Worth has tasked JLB Contracting with procuring the irrigation water meter for the 1"water service for
landscaping within the roundabout. JLB Contracting will be responsible for setting up the water service account and paying for the water
service utility for 1 year from the date of project acceptance. At the end of the 1 year period,JLB Contracing will be responsible for closing the
water service account and transferring water service responsibilities to the City of Fort Worth. These additions would require new line items as
they were not depicted in the original contract.
FORTWORTH City of Fort Worth
�,I--- Change Order Additions
Project Name I Mark IV Parkway and Cantrell Sansom Road City Sec# 47923
Client Project# 1 02261
Change Order Submittal# 0 Date 7/31/2017
ADDITIONS
ITEM DE6UKIV I ION DEPT Qty Unit nit Cost Total
ew 3213.0401- Concrete Driveway
New 9999.0000- Concrete Sidewalk Curb 7P7 . 5. 0
ew 9999.0027lmgation Meter 5,
New Water service account setup and payment for I year from project acceptance T L 0 .0
ew Water Service account closing/transfer bac to the city
T/PW $12,438.64
Water $0.00
Sewer $0.00
Sub ota ibons
Change Order Additions Page 2 of 4
FORTWORTH City of Fort Worth
v--- Change Order Deletions
Project Name Mark IV Parkway and Cantrell Sansom Road City Sec# 47923
Client Project# 02261
Change Order Submittal# Date 7/3112017
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit nit Cost Total
31 3471.0002 Portable Message Sign ee s
TIPW $4,720.00
Water $0.00
Sewer $0.00
Sub Total Deletions 4,
Change Order Deletions Page 3 of 4
M/SBE Breakdown for this Change Order
M/SBE Sub Type of Service Amount for this CO_
Total $0.00
Previous Change Orders
Co# DATE AMOUNT.
Total $0.00
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensu all perform e d reporting requirements.
v
issette Acevedo,P.E.
Senior Professional Engineer
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX