Developer and Project Information Cover Sheet:
_......................__......_.............._.............-...._..__----._......................._......_........._...._................._......_.._.._...............---...........---_......_.......--........._._...--_._._......._._-...................................._.__.._...- .._......._._....._-....._....._.........._.........._...........
Developer Company Name: Copper Creek Partners,LP
Address, State,Zip Code: 5055 Keller Springs Rd.,Addison,TX 75001
Phone&Email: 214-545-0591,fspj87@gmail.com
............................................---]........ C....__.._..._.....__..._._._........_...............__..__._......--------.... .......................... _..._..__.._.__....._...._.............__.._.......�...__....
Authorized Signatory,Title: John D.Hutchinson,President
Project Name: Copper Creek Phase 2
Brief Description: Water,Sewer,Paving, Storm Drain, Street Lights
Project Location: ( NW Corner of Copper Creek Dr& Silver Dollar Drive
............................._.._._..__._......_..._._........._.r._._._......................--._........_.. . . . _.
2....._..._... -....- -----...-_-......._......__..__............._ -------._....,.___._........_._._.._..-------.__....
Plat Case Number: FP-16-094 Plat Name: Copp er Creek Phase 2
E
Mapsco: 20X Council District: 7
CFA Number: 2017-083 City Project Number: 100911
E
To be completed b staff
Received by: l Date: [
6678
8788�
0
Q
l SEPy'Fr' K
of 8?P1T
CITySE��RY rH
OFFICIAL RECORD
City of Fort Worth,Texas CITY SECRETARY
Standard Community Facilities Agreement-Copper Creek Phase 2
CFA Official Release Date:02.20.2017 FT.WORTH,TX
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Copper Creek Partners, LP, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements") related
to a project generally described as Copper Creek Phase 2 ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Copper Creek Phase 2
CFA Official Release Date: 02.20.2017
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) Sewer (A-1) 0, Paving (B) �, Storm Drain (B-1) �', Street Lights &
Signs (C) ,
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section II, of the Policy. Developer shall
ensure its contractor(s) pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth,Texas
Standard Community Facilities Agreement-Copper Creek Phase 2
CFA Official Release Date:02.20.2017
Page 3 of 11
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Copper Creek Phase 2
CFA Official Release Date:02.20.2017
Page 4 of 11
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers,servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth,Texas
Standard Community Facilities Agreement-Copper Creek Phase 2
CFA Official Release Date: 02.20.2017
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth,Texas
Standard Community Facilities Agreement-Copper Creek Phase 2
CFA Official Release Date:02.20.2017
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period)the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Copper Creek Phase 2
CFA Official Release Date: 02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name: Copper Creek Phase 2
CFA No.: 2017-083 City Project No.: 100911
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developers Cost
A. Water and Sewer Construction
1. Water Construction a. 277,570.00
2.Sewer Construction $ 549,763.32
Water and Sewer Construction Total $ 827,333.32
B. TPW Construction
1.Street S $50,344.45
2.Storm Drain $ 163,369-00
3.Street Lights Installed by Developer S 85101-93
4. Signals $
TPW Construction Cost Total $ 1,199,595.38
Total Construction Cost(excluding the fees): $ 2,026,928.70
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 16,546.67
D. Water/Sewer Material Testing Fee(2%) $ 16,546.67
Sub-Total for Water Construction Fees $ 33,093.34
E. TPW Inspection Fee(4%) $ 44,548.54
F. TPW Material Testing(2%) $ 22,274.27
G. Street Light Inspsection Cost $ 3,435.28
H. Signals Inspection Cost v H. Street Signs Installation Cost 5 -
Sub-Total for TPW Construction Fees $ 70,258.09
Total Construction Fees: $ 103,351.43
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 2,026,928.70 x
Completion Agreement=100%/Holds Plat $ 2,026,928.70
Cash Escrow Water/Sanitary Sewer=125% $ 1,034 166.65
Cash Escrow Paving/Storm Drain=125% $ 1,499,494.23
Letter of Credit=125%w/2yr expiration period $ 2,533,660.88
City of Fort Worth,Texas
Standard Community Facilities Agreement-Copper Creek Phase 2
CFA Official Release Date:02.20.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Copper Creek Partners,LP
a Texas Limited Parthership
Je us J. Chapa By:TA GP,LLC
Assistant City Manager a Delaware limited liability company
Date: — 7- 0 its General Partner
Recommended by:
Nam . ohn b. HuVhinson
Wendy Chi-Babulal, EMBA, P.E. Title. President
Development Engineering Manager
Date:
Water Department _ 4g•Z.?•»
ATTEST: (Only if required by Developer)
Dougl s W. Wiersig, P.E.
Director
Transportation & Public Works Department
Signature
Approved as to Form cls Legality: Name: Si=Z A. fll bcr
Contract Compliance Manager:
Richard A. McCracken
By signing, I acknowledge that I am the
Assistant City Attorney person responsible for the monitoring and
M&C No. _ ��. administration of this contract, including
ensuring all performance and reporting
Date: requirements.
Form 1295:
V; C)
AT
me: Janie Morales
'* tle: Development Manager
J. Kayser
City Secretary
OFFICIAL RECORD
City of Fort Worth,Texas CITY SECRETARY
Standard Community Facilities Agreement-Cooper Creek Phase 2 FT.WORTH,TX
CFA Official Release Date:02.20.2017
Page 9 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Attachment 1 -Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvements
Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
g Exhibit B: Paving Improvements
C Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Copper Creek Phase 2
CFA Official Release Date:02.20.2017
Page 10 of 11
ATTACHMENT"1"
Community Facilities Agreement
City Project No. 100911
Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City
is prohibited from entering into a contract with a company for goods or services unless the contract
contains a written verification from the company that it:(1)does not boycott Israel;and(2)will not
boycott Israel during the term of the contract. The terms"boycott Israel'and"company"shall have the
meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this
contract, Developer certifies that Developer's signature provides written verification to the City that
Developer.(1)does not boycott Israel;and(2)will not boycott Israel during the term of the contract.
Developer
Copper Creek Partners, LP
a Texas Limited Partnership
By: TA GP, LLC
a Delaware limited liability company
its General Partner
Oittle:Presid
e, ohn D. Hutchinson
nt
Date:
- C3 1-3,_�a_.._.+.__�-_..�...._..____..
City of Fort Worth,Texas
Standard Community Facilities Agreement-Copper Creek Phase 2
CFA Official Release Date:02.20.2017
Page 1.1 of 11
BONDS RANCH ROA
PROJECT
LOCI
z
o
cn Q
Lu __jw
oNL.L � .. :..- ERIPARKWAY y�/L
3 5 W
w In �CP
Lu c
rn �
N ()
a z HARMON
N � COPPER
c m CREEK
PH. 1
N
rn
BAILEY - BOSWELL
0
a
N
N
L
VICINITYMAP
n Ksa
Y
N
N
U
a
COPPER CREETLN.,
0
Q)
N PHASE HH
c
0
j ]LOr-A=IN
C= OF FORT WORTH, TEXAS
a�
U
a�
n. EDEVEI(.01POWWMM: PRFpA=HY:
n.
U Copper Creek 232 Holdings,LP (G OODWIIN I
1 5055 KELLER SPRINGS ROAD,SUITE 450 OSHA][,][, Y
ADDISON,TEXAS 75001
0') (214)914-9809 CML ENGINEERS-PLANNERS-SURVEYORS
Ln 246 MLmbM DrIm Gnp&Am Tees 78061
O Me&0(817)3Z"M
JUNE9 2017
W
rl-
U) O
U) N
W
M3: ? MO
m
O
(n W N
LLI W co
J Z O
3� JQO M
I N
R �(0 WzLLI
� rn
c(R
mm N Q
N m N LTJ CO W
N m N m m ^ I— JW = ?i
JO �m NN N^ { OzQQO O
d
O 0 o CV
U)
m 0
W Q t
N
V
M ^ 0-
0 O
O
CL
j O
y � N
N F a
a. W � O
= U
a�
y
N
M
NN
1° _ g LOO
W
O(o �O
� O
\CO Qo� J }
ill �C N W rL
41� Cn W
Z
LLI
Z W
Z W Q J �
J Z
? Q
W r W >
F- W W = F-- W
3 W W U
W W W �J
N Z N Z N Z
O N O N O N
® w 01 w x w x cr x
w a_ w a W
Ix
Z
LLI
� I �
ti
O
W N
W
3:LLJ O
w
N Q
0 N
Ix Z N
m Q O
ooffN � (S�
`D t
/ E _ <� \^V
i /n
/ 0-1
m N m W z
m m N
gym.. N y 0 o
3:.,\ N m �^ m Ri =
�
�(n O
m gQ m
a � LLJ C-(n a
W
! m m OJz _N
L–'QJ N
0
m
o r a-
lam/ N U
m
2 L
N
m m U
N �
m rn m
n m $ 0
8 3APla a-
p in
N
11 j U
m
Z°, p o
N
I .112I
an
m
z LO
O
mLLI
8 z
Q
H
_ Z
a
N
cr
ryNJY��/�dy Q Q M
�n
^�J Z H_ ZJ h_J �W
N Z SOT Z= U)>
1 co 0z Nz pQ �Q 0w
�-1 N_1 Z_1 N z N(n
a.LLI
w w
8 OS' SQ3 03 �3 OSS
CL W W CL W W CL W
CL to W(n CL(n W(n a(n
P � w BB
N/ z m I
3 z
W
�/ J
O
N
N N
^ 0
I m m
CD
f ^ yJ
Q
oa x
Id
00000 oa o0 00000
^ CL
m oa�ao
w U
W 2
v N O
/ 9AR10
m m m i 0
N
N
L
U
L
m
CL-
CD-
0 a0
U
I
Ln
r Q
a
a w
o cD
� z
m �
i a
m .w
N O W
u
ryl N` Z
000
� [74 w BV
s o
z a) Z r U
w a a
J
3 o
a z
0 0 O
C2
�J ❑❑ �W
❑❑ ,ipw a
❑❑ LLJ a�U Y
❑❑ (n- Z
❑❑ OQ
❑❑ OWU W
❑❑ a�,�` m
d 3 CD SO
fl-
0
`O
N
N
N
N
F N
OD
O
VVm
�i m •• 1
m ^ �
a N
^ ^ aLU
d
Y
p J 8 �0111 �-
Ig a)
aN m^ '25 n rn d
10 N •l
JJ m m m
Tz
V
� a
W o
= U
a am I
� W
W
2
W W O
F �
® l� cWn p cWn cWn
2
cr. cQr
ZfA
v=4 cQr W
3 z
w
w
ti
O
N
GO
mN --
N N\
N
XiGD
N N
m O
cc ^ m
m m M
N ^
mm N N v ti N
pO m
N y � Om N LL'1 .Ni e Q
.mow .w O
2
m
m ^
1 .mw OI U
....�✓✓--/111 m �
Y
e m �
_ p n �L
N 0 N S N U
U
N /
fn
L
U
a�
s a
°�,
N —
lE
LU
Z LO
8 Z w
a4 04Q4 LLIa
® Jd
d Os H
z m z �_ w
O wLd
0 U 0 J 0 J
z > CL z LL
O O
p In
(90- � 0 z Z
a
N J w 2
r-
0
N
LO
M
Cr
N
GD
N`fib% O
N M
N
m N N
m m N N
m
m N m 1
N
L
V O O N
N
O
m � L
1O `� m SSSyyyA 0-
ZL
t o a m o U
m d
CL
m
N
n o
$ N
N
p pp NN O JJ
L-
Q)U
L-
Ot
LO
p ' D
�p t0
Q Q
0 � Q
0
U
w
GN
07777
�= NN
W >-
ao
ZF
W J
LLIU
® N �
IL �� 0 0
W W
N N
Z (n 0 0
3 0 ad
Z
W
c� X®
VENUS
1426 S. Main
Mansfield,TX 76063
Office: 817-477-2050
Venusconstruction.com
July 7, 2017
COPPER CREEK PARTNERS, LLC.
5055 Keller Springs Road, Suite 450
Addison,Texas 75001
Attention: Mr.Alan Adkins
Gentlemen: We propose to furnish all labor, materials and equipment
necessary to construct the following described work:
Project: Copper Creek Ph.2
City: Ft. Worth
Water
Item Description Quantity U/M Unit Total
1 8"Water Line 4,532 LF 29.50 133,694.00
2 8"Gate Valve &Valve Box 13 EA 1,270.00 16,510.00
3 Std. Fire Hydrant Assembly w/6"Gate Valve& Box 3 EA 3,925.00 11,775.00
4 Ductile Iron Fittings w/Restraint 2 TN 4,295.00 8,590.00
5 Trench Safety 4,532 LF 0.50 2,266.00
6 1" Domestic Water Services 130 EA 709.00 92,170.00
7 1 '/2" Domestic Water Services 1 EA 1,215.00 1,215.00
8 Connect to Existing 8"W.L. Stub-Out 10 EA 1,135.00 11,350.00
Water Total $ 277,570.00
Sewer
Item Description Quantity U/M Unit Total
9 8"SDR-26 PVC 4,771 LF 46.42 221,469.82
10 Connect to Existing 8" S.S. Stub-Out 3 EA 1,480.00 4,440.00
11 Core Into Existing S.S.M.H.w/8" S.S. 1 EA 2,550.00 2,550.00
12 SDR-26 Sewer Services 127 EA 1,175.00 149,225.00
13 Std. 4' Dia. S.S.M.H. 27 EA 4,265.00 115,155.00
14 Extra Depth 4'Dia. S.S.M.H. 64 VF 525.00 33,600.00
15 Cement Stabilized Backfill 308 LF 37.00 11,396.00
16 Trench Safety 4,771 LF 0.50 2,385.50
17 TV&Test Sanitary Sewer Line 4,771 LF 2.00 9,542.00
Sewer Total $ 549,763.32
Copper Creek Ph.2 Utilities Workbook-FW-Revised 5-18-17 7(7/2017-3:29 PM Page:1 of 2
Storm
Item Description Quantity U/M Unit Total
18 10' Depressed Curb Inlet 12 EA 3,570.00 42,840.00
19 21"Class III R.C.P. 247 LF 57.00 14,079.00
20 24"Class III R.C.P. 832 LF 67.00 55,744.00
21 27"Class III R.C.P. 325 LF 76.00 24,700.00
22 33"Class III R.C.P. 105 LF 100.00 10,500.00
23 27" Sloped End Headwall 1 EA 2,035.00 2,035.00
24 33"Sloped End Headwall 1 EA 2,380.00 2,380.00
25 4'x 4' S.D.M.H. 1 EA 3,800.00 3,800.00
26 Connect to Existing 24" 1 EA 865.00 865.00
27 9"Thick Gabion Mattress 54 SF 119.00 6,426.00
Storm Total $ 163,369.00
Miscellaneous
Item Description Quantity U/M Unit Total
1 Payment/Performance/Maintenance Bonds 1 LS 16,000.00 16,000.00
Miscellaneous Total $ 16,000.00
TOTAL WATER, SEWER&STORM $1,006,702.32
QUALIFICATIONS:
We have quoted this project on a unit price basis, any work not specifically quoted or qualified
is not included in this proposal.
Units are based on Goodwin& Marshall Engineering plans dated 1/31/2017.
No permits or fees.
No sales tax on incorporated materials.
No surveying or staking
No compaction testing, concrete testing, or any geotechnical testing included
No irrigation or electrical adjustments or repairs.
No water or irrigation meters, backflow preventers, or fees.
No landscaping,topsoil, sod, or seeding.
No concrete or asphalt removal or replacement
No traffic control, barricades, etc..
No offsite export of spoils.
No installation, removal, or maintenance of erosion control devices.
No grade to drain, channel excavation, or embankment
We will require 70 working days for substantial completion and 10 working days for final completion.
This proposal is subject to a mutually agreeable start date.
Final quantities to be based on approved construction plans and all revisions.
Repectfully Submitted
R." &&4.0
Copper Creek Ph.2 Utilities Workbook-FW-Revised 5-18-17 7/7/2017-3:29 PM Page:2 of 2
-M A__SINACOLA & S ONS
EXCAVATING,INC.
July 10, 2017
Scarborough Lane Development
16380 Addison Road
Addison, Texas 75001
ATTENTION: Mr. Alan Adkins
GENTLEMEN: We propose to furnish all labor, materials and equipment
necessary to construct the following described work:
PROJECT: Copper Creek Phase 2
LOCATION: Fort Worth, Texas
EARTHWORK
Description Quantity Unit Unit Bid Total Bid
1 'fAering & Grubbing 14.00 AC 00 $ 42,000.00
2 ExcavaTrm25,455.00 CY 3.00 $ 76,365.00
3 Initial Lot Benchi 50. A 300.00 $ 15,000.00
4 Final Lot Benching .00 EA 125.00 $ 16,000.00
5 4' Moisture Condition Zone 3 4.00 EA 1,400.00 $ 19,600.00
Pads
6 6 Mil Poly Zone ads 14.00 EA 600.00 $ 8,400.00
EART RK TOTAL $ 177,365.00
Printed:7/10/2017 2017-066;170710;GP Prop;Copper Creek Ph 2-Prop Page:1 of 4
PAVING
Item Description Quantity Unit Unit Bid Total Bid
1 8" Concrete Pavement 5,538.00 SY 40.00 $ 221,520.00
2 8" Lime Stabilized Subgrade 5,834.00 SY 3.25 $ 18,960.50
3 Hydrated Lime (36 lbs/sy) 105.00 TN 145.00 $ 15,225.00
4 6" Concrete Pavement 15,602.00 SY 33.50 $ 522,667.00
5 6" Lime Stabilized Subgrade 16,568.00 SY 2.90 $ 48,047.20
6 Hydrated Lime (30 lbs/sy) 249.00 TN 145.00 $ 36,105.00
7 Barrier Free Ramp Type P-1 22.00 EA 1,300.00 $ 28,600.00
8 Barrier Free Ramp Type M-1 3.00 EA 1,300.00 $ 3,900.00
9 5' x 4" Concrete Sidewalk 1,567.00 LF 25.00 $ 39,175.00
10 Connect to Existing Header 154.00 LF 10.00 $ 1,540.00
11 Concrete Header 87.00 LF 9.25 $ 804.75
12 Stop Sign 11.00 EA 500.00 $ 5,500.00
13 Street Name Blades 26.00 EA 70.00 $ 1,820.00
14 Speed Limit Sign 6.00 EA 500.00 $ 3,000.00
15 End of Road Barricades 87.00 LF 40.00 $ 3,480.00
16 Payment/Performance/Two Year 1.00 LS 10,927.00 $ 10,927.00
100% Maintenance Bond
PAVING TOTAL $ 961,271.45
P Y
E $ ,
PAVING TOTAL $ 961,271.45
ROCK EXCAVA1MWVPeHARGE—
Item Description Quan ' Unit Price
1 Upcharge - Rock 1.00 CY $
Printed:7/10/2017 2017-066;170710;GP Prop;Copper Creek Ph 2-Prop Page:2 of 4
QUALIFICATIONS:
Units are based on Goodwin & Marshall, Inc. plans Dated: 1/31/17 - Received: 2/13/17.
This proposal is based on existing grades received on 4-24-17. Existing grades and final
excavation quantities to be field surveyed and verified. Any adjustments to quantities and
pricing to be finalized prior to mobilization
All work on this proposal will be performed with one move-in at one time
Final quantities will be determined using "Approved Plans"
Payment & Performance bonds included for paving scope only. No bonds for Earthwork
scope
Final lot benching of existing graded lots only. No hauling or moving of material between
lots
One mobilization for site grading only
One mobilization for final lot benching only
No over-excavation, moisture conditioning or poly for Zone 1 or Zone 2 lots
Zone 3 lots to be moisture conditioned 4 feet from design grade and capped with 6 mil
poly
No compaction, concrete or geotechnical testing
No excavation or backfill for lot retaining walls
No fence removal, replacement or repair
No hand labor in tree area
No clearing on perimeter fence lines
No hazardous material removal
No import, export or trucking of material. Excess material to be stockpiled adjacent to site
No rock excavation included in base bid. See alternate for the net upcharge for any rock
encountered during mass grading
No landscape, irrigation, electrical adjustments or repairs
— No maintenance, installation or removal of erosion control devices
— No sediment basin, outfall structure, risers, piping, riprap, etc
No handling of spoils generated by others
Printed:7/10/2017 2017-066;170710;GP Prop;Copper Creek Ph 2-Prop Page:3 of 4
Before commencement of lime operations, pipe spoils to be removed by others and all
subgrades to be established by others
No median paving stones
No stamped or stained pavement
No permanent traffic markings
No Brandon Industries signage
No permits, impact fees or fees of any kind
No respreading of topsoil, sod, curlex, or seeding
No sales tax on incorporated materials
No street lighting
No surveying
No trash haul-off
No manhole blockouts for separate pour back; paving to be completed around manholes
in monolithic pour during machine paving operations
Reinforced steel to be#3's on 18" c-c both ways
Street subgrade to be +/- 0.20 feet, and pad subgrade to be +/- 0.30 feet of proposed
No building demolition or haul-off
No well abandonment
Trees to be chipped and disposed off-site
Owner to provide a concrete plant site with city water, either on-site or adjacent to the
project site location (minimum 2 acres)
Proposal based upon approval of batch plant site by respective municipality. If a plant site
is not available that will meet respective city regulations, unit prices for concrete paving
will be adjusted due to ready mix concrete use
— We have quoted this project on a unit price basis, any work not specifically quoted or
qualified is excluded
Should you have any questions, or need clarification regarding this proposal, please feel free to contact
this office.
Sincerely,
MARIO SINACOLA& SONS EXCAVATING, INC.
Harlan Jones
Vice President
Printed:7/10/2017 2017-066;170710;GP Prop;Copper Creek Ph 2-Prop Page:4 of 4