Loading...
HomeMy WebLinkAboutContract 49608 CITY SECRETARY CONTRACT N0.. Developer and Project Information Cover Sheet: _......................__......_.............._.............-...._..__----._......................._......_........._...._................._......_.._.._...............---...........---_......_.......--........._._...--_._._......._._-...................................._.__.._...- .._......._._....._-....._....._.........._.........._........... Developer Company Name: Copper Creek Partners,LP Address, State,Zip Code: 5055 Keller Springs Rd.,Addison,TX 75001 Phone&Email: 214-545-0591,fspj87@gmail.com ............................................---]........ C....__.._..._.....__..._._._........_...............__..__._......--------.... .......................... _..._..__.._.__....._...._.............__.._.......�...__.... Authorized Signatory,Title: John D.Hutchinson,President Project Name: Copper Creek Phase 2 Brief Description: Water,Sewer,Paving, Storm Drain, Street Lights Project Location: ( NW Corner of Copper Creek Dr& Silver Dollar Drive ............................._.._._..__._......_..._._........._.r._._._......................--._........_.. . . . _. 2....._..._... -....- -----...-_-......._......__..__............._ -------._....,.___._........_._._.._..-------.__.... Plat Case Number: FP-16-094 Plat Name: Copp er Creek Phase 2 E Mapsco: 20X Council District: 7 CFA Number: 2017-083 City Project Number: 100911 E To be completed b staff Received by: l Date: [ 6678 8788� 0 Q l SEPy'Fr' K of 8?P1T CITySE��RY rH OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement-Copper Creek Phase 2 CFA Official Release Date:02.20.2017 FT.WORTH,TX Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Copper Creek Partners, LP, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Copper Creek Phase 2 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Copper Creek Phase 2 CFA Official Release Date: 02.20.2017 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) Sewer (A-1) 0, Paving (B) �, Storm Drain (B-1) �', Street Lights & Signs (C) , E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement-Copper Creek Phase 2 CFA Official Release Date:02.20.2017 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement-Copper Creek Phase 2 CFA Official Release Date:02.20.2017 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement-Copper Creek Phase 2 CFA Official Release Date: 02.20.2017 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement-Copper Creek Phase 2 CFA Official Release Date:02.20.2017 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Copper Creek Phase 2 CFA Official Release Date: 02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Copper Creek Phase 2 CFA No.: 2017-083 City Project No.: 100911 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developers Cost A. Water and Sewer Construction 1. Water Construction a. 277,570.00 2.Sewer Construction $ 549,763.32 Water and Sewer Construction Total $ 827,333.32 B. TPW Construction 1.Street S $50,344.45 2.Storm Drain $ 163,369-00 3.Street Lights Installed by Developer S 85101-93 4. Signals $ TPW Construction Cost Total $ 1,199,595.38 Total Construction Cost(excluding the fees): $ 2,026,928.70 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 16,546.67 D. Water/Sewer Material Testing Fee(2%) $ 16,546.67 Sub-Total for Water Construction Fees $ 33,093.34 E. TPW Inspection Fee(4%) $ 44,548.54 F. TPW Material Testing(2%) $ 22,274.27 G. Street Light Inspsection Cost $ 3,435.28 H. Signals Inspection Cost v H. Street Signs Installation Cost 5 - Sub-Total for TPW Construction Fees $ 70,258.09 Total Construction Fees: $ 103,351.43 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 2,026,928.70 x Completion Agreement=100%/Holds Plat $ 2,026,928.70 Cash Escrow Water/Sanitary Sewer=125% $ 1,034 166.65 Cash Escrow Paving/Storm Drain=125% $ 1,499,494.23 Letter of Credit=125%w/2yr expiration period $ 2,533,660.88 City of Fort Worth,Texas Standard Community Facilities Agreement-Copper Creek Phase 2 CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Copper Creek Partners,LP a Texas Limited Parthership Je us J. Chapa By:TA GP,LLC Assistant City Manager a Delaware limited liability company Date: — 7- 0 its General Partner Recommended by: Nam . ohn b. HuVhinson Wendy Chi-Babulal, EMBA, P.E. Title. President Development Engineering Manager Date: Water Department _ 4g•Z.?•» ATTEST: (Only if required by Developer) Dougl s W. Wiersig, P.E. Director Transportation & Public Works Department Signature Approved as to Form cls Legality: Name: Si=Z A. fll bcr Contract Compliance Manager: Richard A. McCracken By signing, I acknowledge that I am the Assistant City Attorney person responsible for the monitoring and M&C No. _ ��. administration of this contract, including ensuring all performance and reporting Date: requirements. Form 1295: V; C) AT me: Janie Morales '* tle: Development Manager J. Kayser City Secretary OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement-Cooper Creek Phase 2 FT.WORTH,TX CFA Official Release Date:02.20.2017 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 -Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvements Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate g Exhibit B: Paving Improvements C Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Copper Creek Phase 2 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Community Facilities Agreement City Project No. 100911 Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it:(1)does not boycott Israel;and(2)will not boycott Israel during the term of the contract. The terms"boycott Israel'and"company"shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer.(1)does not boycott Israel;and(2)will not boycott Israel during the term of the contract. Developer Copper Creek Partners, LP a Texas Limited Partnership By: TA GP, LLC a Delaware limited liability company its General Partner Oittle:Presid e, ohn D. Hutchinson nt Date: - C3 1-3,_�a_.._.+.__�-_..�...._..____.. City of Fort Worth,Texas Standard Community Facilities Agreement-Copper Creek Phase 2 CFA Official Release Date:02.20.2017 Page 1.1 of 11 BONDS RANCH ROA PROJECT LOCI z o cn Q Lu __jw oNL.L � .. :..- ERIPARKWAY y�/L 3 5 W w In �CP Lu c rn � N () a z HARMON N � COPPER c m CREEK PH. 1 N rn BAILEY - BOSWELL 0 a N N L VICINITYMAP n Ksa Y N N U a COPPER CREETLN., 0 Q) N PHASE HH c 0 j ]LOr-A=IN C= OF FORT WORTH, TEXAS a� U a� n. EDEVEI(.01POWWMM: PRFpA=HY: n. U Copper Creek 232 Holdings,LP (G OODWIIN I 1 5055 KELLER SPRINGS ROAD,SUITE 450 OSHA][,][, Y ADDISON,TEXAS 75001 0') (214)914-9809 CML ENGINEERS-PLANNERS-SURVEYORS Ln 246 MLmbM DrIm Gnp&Am Tees 78061 O Me&0(817)3Z"M JUNE9 2017 W rl- U) O U) N W M3: ? MO m O (n W N LLI W co J Z O 3� JQO M I N R �(0 WzLLI � rn c(R mm N Q N m N LTJ CO W N m N m m ^ I— JW = ?i JO �m NN N^ { OzQQO O d O 0 o CV U) m 0 W Q t N V M ^ 0- 0 O O CL j O y � N N F a a. W � O = U a� y N M NN 1° _ g LOO W O(o �O � O \CO Qo� J } ill �C N W rL 41� Cn W Z LLI Z W Z W Q J � J Z ? Q W r W > F- W W = F-- W 3 W W U W W W �J N Z N Z N Z O N O N O N ® w 01 w x w x cr x w a_ w a W Ix Z LLI � I � ti O W N W 3:LLJ O w N Q 0 N Ix Z N m Q O ooffN � (S� `D t / E _ <� \^V i /n / 0-1 m N m W z m m N gym.. N y 0 o 3:.,\ N m �^ m Ri = � �(n O m gQ m a � LLJ C-(n a W ! m m OJz _N L–'QJ N 0 m o r a- lam/ N U m 2 L N m m U N � m rn m n m $ 0 8 3APla a- p in N 11 j U m Z°, p o N I .112I an m z LO O mLLI 8 z Q H _ Z a N cr ryNJY��/�dy Q Q M �n ^�J Z H_ ZJ h_J �W N Z SOT Z= U)> 1 co 0z Nz pQ �Q 0w �-1 N_1 Z_1 N z N(n a.LLI w w 8 OS' SQ3 03 �3 OSS CL W W CL W W CL W CL to W(n CL(n W(n a(n P � w BB N/ z m I 3 z W �/ J O N N N ^ 0 I m m CD f ^ yJ Q oa x Id 00000 oa o0 00000 ^ CL m oa�ao w U W 2 v N O / 9AR10 m m m i 0 N N L U L m CL- CD- 0 a0 U I Ln r Q a a w o cD � z m � i a m .w N O W u ryl N` Z 000 � [74 w BV s o z a) Z r U w a a J 3 o a z 0 0 O C2 �J ❑❑ �W ❑❑ ,ipw a ❑❑ LLJ a�U Y ❑❑ (n- Z ❑❑ OQ ❑❑ OWU W ❑❑ a�,�` m d 3 CD SO fl- 0 `O N N N N F N OD O VVm �i m •• 1 m ^ � a N ^ ^ aLU d Y p J 8 �0111 �- Ig a) aN m^ '25 n rn d 10 N •l JJ m m m Tz V � a W o = U a am I � W W 2 W W O F � ® l� cWn p cWn cWn 2 cr. cQr ZfA v=4 cQr W 3 z w w ti O N GO mN -- N N\ N XiGD N N m O cc ^ m m m M N ^ mm N N v ti N pO m N y � Om N LL'1 .Ni e Q .mow .w O 2 m m ^ 1 .mw OI U ....�✓✓--/111 m � Y e m � _ p n �L N 0 N S N U U N / fn L U a� s a °�, N — lE LU Z LO 8 Z w a4 04Q4 LLIa ® Jd d Os H z m z �_ w O wLd 0 U 0 J 0 J z > CL z LL O O p In (90- � 0 z Z a N J w 2 r- 0 N LO M Cr N GD N`fib% O N M N m N N m m N N m m N m 1 N L V O O N N O m � L 1O `� m SSSyyyA 0- ZL t o a m o U m d CL m N n o $ N N p pp NN O JJ L- Q)U L- Ot LO p ' D �p t0 Q Q 0 � Q 0 U w GN 07777 �= NN W >- ao ZF W J LLIU ® N � IL �� 0 0 W W N N Z (n 0 0 3 0 ad Z W c� X® VENUS 1426 S. Main Mansfield,TX 76063 Office: 817-477-2050 Venusconstruction.com July 7, 2017 COPPER CREEK PARTNERS, LLC. 5055 Keller Springs Road, Suite 450 Addison,Texas 75001 Attention: Mr.Alan Adkins Gentlemen: We propose to furnish all labor, materials and equipment necessary to construct the following described work: Project: Copper Creek Ph.2 City: Ft. Worth Water Item Description Quantity U/M Unit Total 1 8"Water Line 4,532 LF 29.50 133,694.00 2 8"Gate Valve &Valve Box 13 EA 1,270.00 16,510.00 3 Std. Fire Hydrant Assembly w/6"Gate Valve& Box 3 EA 3,925.00 11,775.00 4 Ductile Iron Fittings w/Restraint 2 TN 4,295.00 8,590.00 5 Trench Safety 4,532 LF 0.50 2,266.00 6 1" Domestic Water Services 130 EA 709.00 92,170.00 7 1 '/2" Domestic Water Services 1 EA 1,215.00 1,215.00 8 Connect to Existing 8"W.L. Stub-Out 10 EA 1,135.00 11,350.00 Water Total $ 277,570.00 Sewer Item Description Quantity U/M Unit Total 9 8"SDR-26 PVC 4,771 LF 46.42 221,469.82 10 Connect to Existing 8" S.S. Stub-Out 3 EA 1,480.00 4,440.00 11 Core Into Existing S.S.M.H.w/8" S.S. 1 EA 2,550.00 2,550.00 12 SDR-26 Sewer Services 127 EA 1,175.00 149,225.00 13 Std. 4' Dia. S.S.M.H. 27 EA 4,265.00 115,155.00 14 Extra Depth 4'Dia. S.S.M.H. 64 VF 525.00 33,600.00 15 Cement Stabilized Backfill 308 LF 37.00 11,396.00 16 Trench Safety 4,771 LF 0.50 2,385.50 17 TV&Test Sanitary Sewer Line 4,771 LF 2.00 9,542.00 Sewer Total $ 549,763.32 Copper Creek Ph.2 Utilities Workbook-FW-Revised 5-18-17 7(7/2017-3:29 PM Page:1 of 2 Storm Item Description Quantity U/M Unit Total 18 10' Depressed Curb Inlet 12 EA 3,570.00 42,840.00 19 21"Class III R.C.P. 247 LF 57.00 14,079.00 20 24"Class III R.C.P. 832 LF 67.00 55,744.00 21 27"Class III R.C.P. 325 LF 76.00 24,700.00 22 33"Class III R.C.P. 105 LF 100.00 10,500.00 23 27" Sloped End Headwall 1 EA 2,035.00 2,035.00 24 33"Sloped End Headwall 1 EA 2,380.00 2,380.00 25 4'x 4' S.D.M.H. 1 EA 3,800.00 3,800.00 26 Connect to Existing 24" 1 EA 865.00 865.00 27 9"Thick Gabion Mattress 54 SF 119.00 6,426.00 Storm Total $ 163,369.00 Miscellaneous Item Description Quantity U/M Unit Total 1 Payment/Performance/Maintenance Bonds 1 LS 16,000.00 16,000.00 Miscellaneous Total $ 16,000.00 TOTAL WATER, SEWER&STORM $1,006,702.32 QUALIFICATIONS: We have quoted this project on a unit price basis, any work not specifically quoted or qualified is not included in this proposal. Units are based on Goodwin& Marshall Engineering plans dated 1/31/2017. No permits or fees. No sales tax on incorporated materials. No surveying or staking No compaction testing, concrete testing, or any geotechnical testing included No irrigation or electrical adjustments or repairs. No water or irrigation meters, backflow preventers, or fees. No landscaping,topsoil, sod, or seeding. No concrete or asphalt removal or replacement No traffic control, barricades, etc.. No offsite export of spoils. No installation, removal, or maintenance of erosion control devices. No grade to drain, channel excavation, or embankment We will require 70 working days for substantial completion and 10 working days for final completion. This proposal is subject to a mutually agreeable start date. Final quantities to be based on approved construction plans and all revisions. Repectfully Submitted R." &&4.0 Copper Creek Ph.2 Utilities Workbook-FW-Revised 5-18-17 7/7/2017-3:29 PM Page:2 of 2 -M A__SINACOLA & S ONS EXCAVATING,INC. July 10, 2017 Scarborough Lane Development 16380 Addison Road Addison, Texas 75001 ATTENTION: Mr. Alan Adkins GENTLEMEN: We propose to furnish all labor, materials and equipment necessary to construct the following described work: PROJECT: Copper Creek Phase 2 LOCATION: Fort Worth, Texas EARTHWORK Description Quantity Unit Unit Bid Total Bid 1 'fAering & Grubbing 14.00 AC 00 $ 42,000.00 2 ExcavaTrm25,455.00 CY 3.00 $ 76,365.00 3 Initial Lot Benchi 50. A 300.00 $ 15,000.00 4 Final Lot Benching .00 EA 125.00 $ 16,000.00 5 4' Moisture Condition Zone 3 4.00 EA 1,400.00 $ 19,600.00 Pads 6 6 Mil Poly Zone ads 14.00 EA 600.00 $ 8,400.00 EART RK TOTAL $ 177,365.00 Printed:7/10/2017 2017-066;170710;GP Prop;Copper Creek Ph 2-Prop Page:1 of 4 PAVING Item Description Quantity Unit Unit Bid Total Bid 1 8" Concrete Pavement 5,538.00 SY 40.00 $ 221,520.00 2 8" Lime Stabilized Subgrade 5,834.00 SY 3.25 $ 18,960.50 3 Hydrated Lime (36 lbs/sy) 105.00 TN 145.00 $ 15,225.00 4 6" Concrete Pavement 15,602.00 SY 33.50 $ 522,667.00 5 6" Lime Stabilized Subgrade 16,568.00 SY 2.90 $ 48,047.20 6 Hydrated Lime (30 lbs/sy) 249.00 TN 145.00 $ 36,105.00 7 Barrier Free Ramp Type P-1 22.00 EA 1,300.00 $ 28,600.00 8 Barrier Free Ramp Type M-1 3.00 EA 1,300.00 $ 3,900.00 9 5' x 4" Concrete Sidewalk 1,567.00 LF 25.00 $ 39,175.00 10 Connect to Existing Header 154.00 LF 10.00 $ 1,540.00 11 Concrete Header 87.00 LF 9.25 $ 804.75 12 Stop Sign 11.00 EA 500.00 $ 5,500.00 13 Street Name Blades 26.00 EA 70.00 $ 1,820.00 14 Speed Limit Sign 6.00 EA 500.00 $ 3,000.00 15 End of Road Barricades 87.00 LF 40.00 $ 3,480.00 16 Payment/Performance/Two Year 1.00 LS 10,927.00 $ 10,927.00 100% Maintenance Bond PAVING TOTAL $ 961,271.45 P Y E $ , PAVING TOTAL $ 961,271.45 ROCK EXCAVA1MWVPeHARGE— Item Description Quan ' Unit Price 1 Upcharge - Rock 1.00 CY $ Printed:7/10/2017 2017-066;170710;GP Prop;Copper Creek Ph 2-Prop Page:2 of 4 QUALIFICATIONS: Units are based on Goodwin & Marshall, Inc. plans Dated: 1/31/17 - Received: 2/13/17. This proposal is based on existing grades received on 4-24-17. Existing grades and final excavation quantities to be field surveyed and verified. Any adjustments to quantities and pricing to be finalized prior to mobilization All work on this proposal will be performed with one move-in at one time Final quantities will be determined using "Approved Plans" Payment & Performance bonds included for paving scope only. No bonds for Earthwork scope Final lot benching of existing graded lots only. No hauling or moving of material between lots One mobilization for site grading only One mobilization for final lot benching only No over-excavation, moisture conditioning or poly for Zone 1 or Zone 2 lots Zone 3 lots to be moisture conditioned 4 feet from design grade and capped with 6 mil poly No compaction, concrete or geotechnical testing No excavation or backfill for lot retaining walls No fence removal, replacement or repair No hand labor in tree area No clearing on perimeter fence lines No hazardous material removal No import, export or trucking of material. Excess material to be stockpiled adjacent to site No rock excavation included in base bid. See alternate for the net upcharge for any rock encountered during mass grading No landscape, irrigation, electrical adjustments or repairs — No maintenance, installation or removal of erosion control devices — No sediment basin, outfall structure, risers, piping, riprap, etc No handling of spoils generated by others Printed:7/10/2017 2017-066;170710;GP Prop;Copper Creek Ph 2-Prop Page:3 of 4 Before commencement of lime operations, pipe spoils to be removed by others and all subgrades to be established by others No median paving stones No stamped or stained pavement No permanent traffic markings No Brandon Industries signage No permits, impact fees or fees of any kind No respreading of topsoil, sod, curlex, or seeding No sales tax on incorporated materials No street lighting No surveying No trash haul-off No manhole blockouts for separate pour back; paving to be completed around manholes in monolithic pour during machine paving operations Reinforced steel to be#3's on 18" c-c both ways Street subgrade to be +/- 0.20 feet, and pad subgrade to be +/- 0.30 feet of proposed No building demolition or haul-off No well abandonment Trees to be chipped and disposed off-site Owner to provide a concrete plant site with city water, either on-site or adjacent to the project site location (minimum 2 acres) Proposal based upon approval of batch plant site by respective municipality. If a plant site is not available that will meet respective city regulations, unit prices for concrete paving will be adjusted due to ready mix concrete use — We have quoted this project on a unit price basis, any work not specifically quoted or qualified is excluded Should you have any questions, or need clarification regarding this proposal, please feel free to contact this office. Sincerely, MARIO SINACOLA& SONS EXCAVATING, INC. Harlan Jones Vice President Printed:7/10/2017 2017-066;170710;GP Prop;Copper Creek Ph 2-Prop Page:4 of 4