HomeMy WebLinkAboutResolution 2624A Resolution Adopted Resolution No.~a~ RESOLUTION AUTHORIZING PAYMENT TO CITGO PRODUCTS PIPELINE COMPANY TO RELOCATE APPROXIMATELY 1,400 FEET OF 8-INCH AND 1,000 FEET OF 3-INCH PETROLEUM/GAS PIPELINES FOR CONSTRUCTION OF TRINITY BOULEVARD FROM WEST OF ARLINGTON-BEDFORD ROAD TO FM157 WHEREAS on October 25 1994 (M&C G-10853) the City Council approved Texas Department of Transportation (TxDOT) Minute order No 104369 dated September 29 1994 for the construction of Trinity Boulevard from west of Arlington-Bedford Road to FM157 and the minute order establishing the cost sharing for utility adjustments to be 50% City and 50% TxDOT and WHEREAS TxDOT and CITGO Products Pipeline Company have determined that approximately 1 400 feet of 8-inch and 1 000 feet of 3-inch petroleum/gas pipelines belonging to CITGO Products Pipeline Company must be relocated for construction of Trinity Boulevard from west of Arlington-Bedford Road to FM157 at an estimated cost of $539 348 39 and WHEREAS CITGO Products Pipeline Company has estimated the cost of relocating the petroleum/gas pipelines and the actual cost may be more or less than estimated and WHEREAS CITGO Products Pipeline Company's work shall be performed by its own forces and personnel and/or contractors paid under a contract let by CITGO Products Pipeline Company in accordance with all applicable laws regulations and ordinances and WHEREAS costs as used and defined herein will mean the total actual cost, direct and indirect, incurred by CITGO Products Pipeline Company for labor including normal and regularly scheduled overtime required by CITGO Products Pipeline Company to complete the pipeline relocation and WHEREAS materials used in connection with the project, the cost of small tools and/or equipment actually consumed in the relocation of the pipelines and the rental or cost of major equipment used the costs of permits and inspections engineering services survey and field work, and to the extent that CITGO Products Pipeline Company shall subcontract any portion of the project, the amount of such subcontracts and CITY OF FORT WORTH WHEREAS cost shall not include the unamortized investment in removed or abandoned pipelines or appurtenances unless related to a new reduction in the pipelines system and equipment of CITGO Products Pipeline Company and City of Fort Worth does not pay for the cost of replacing the line capacity provided by such abandoned or removed pipelines and the cost of any work that enhances or provides an improvement in or an increase in capacity or service for CITGO Products Pipeline Company NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH that the City will pay CITGO Products Pipeline Company 24% of the final actual costs whether said costs are more or less than the estimated costs of 129 443 61 (with the Texas Department of Transportation reimbursing the City for 50% of the final actual costs) to relocate approximately 1 400 feet of 8-inch and 1 000 feet of 3-inch petroleum/gas pipelines for the construction of Trinity Boulevard from west of Arlington-Bedford Road to FM157 ADOPTED this ~ day of , 2000 c Mayor APPROV~~ CITY C4UNC1~. T ^ ~R 4 2000 City Secretary ~~~i Citq Secretarq of tRe Citp of Fort Woath, Tows APPROVED AS TO FORM AND LEGALITY Assistant Ci y Attorney CITY OF FORT WORTH