RESOLUTION AUTHORIZING PAYMENT TO CITGO PRODUCTS PIPELINE
COMPANY TO RELOCATE APPROXIMATELY 1,400 FEET OF 8-INCH AND 1,000
FEET OF 3-INCH PETROLEUM/GAS PIPELINES FOR CONSTRUCTION OF TRINITY
BOULEVARD FROM WEST OF ARLINGTON-BEDFORD ROAD TO FM157
WHEREAS on October 25 1994 (M&C G-10853) the City Council approved Texas
Department of Transportation (TxDOT) Minute order No 104369 dated September 29
1994 for the construction of Trinity Boulevard from west of Arlington-Bedford Road to
FM157 and the minute order establishing the cost sharing for utility adjustments to be
50% City and 50% TxDOT and
WHEREAS TxDOT and CITGO Products Pipeline Company have determined that
approximately 1 400 feet of 8-inch and 1 000 feet of 3-inch petroleum/gas pipelines
belonging to CITGO Products Pipeline Company must be relocated for construction of
Trinity Boulevard from west of Arlington-Bedford Road to FM157 at an estimated cost of
$539 348 39 and
WHEREAS CITGO Products Pipeline Company has estimated the cost of relocating
the petroleum/gas pipelines and the actual cost may be more or less than estimated
and
WHEREAS CITGO Products Pipeline Company's work shall be performed by its own
forces and personnel and/or contractors paid under a contract let by CITGO Products
Pipeline Company in accordance with all applicable laws regulations and ordinances
and
WHEREAS costs as used and defined herein will mean the total actual cost, direct
and indirect, incurred by CITGO Products Pipeline Company for labor including normal
and regularly scheduled overtime required by CITGO Products Pipeline Company to
complete the pipeline relocation and
WHEREAS materials used in connection with the project, the cost of small tools and/or
equipment actually consumed in the relocation of the pipelines and the rental or cost of
major equipment used the costs of permits and inspections engineering services
survey and field work, and to the extent that CITGO Products Pipeline Company shall
subcontract any portion of the project, the amount of such subcontracts and
CITY OF FORT WORTH
WHEREAS cost shall not include the unamortized investment in removed or
abandoned pipelines or appurtenances unless related to a new reduction in the
pipelines system and equipment of CITGO Products Pipeline Company and City of Fort
Worth does not pay for the cost of replacing the line capacity provided by such
abandoned or removed pipelines and the cost of any work that enhances or provides
an improvement in or an increase in capacity or service for CITGO Products Pipeline
Company
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FORT WORTH that the City will pay CITGO Products Pipeline Company 24% of the
final actual costs whether said costs are more or less than the estimated costs of
129 443 61 (with the Texas Department of Transportation reimbursing the City for 50%
of the final actual costs) to relocate approximately 1 400 feet of 8-inch and 1 000 feet of
3-inch petroleum/gas pipelines for the construction of Trinity Boulevard from west of
Arlington-Bedford Road to FM157
ADOPTED this ~ day of , 2000
c
Mayor
APPROV~~
CITY C4UNC1~.
T
^ ~R 4 2000
City Secretary
~~~i
Citq Secretarq of tRe
Citp of Fort Woath, Tows
APPROVED AS TO FORM AND LEGALITY
Assistant Ci y Attorney
CITY OF FORT WORTH