Loading...
HomeMy WebLinkAboutContract 49538 s QN D N RETE 2a\� CITY SECRETARY Lt o! c5i sECR50 z' CONTRACT NO. —T Q53- Xl___ �d CITY OF FORT WORTH, TEXAS S AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home-rule municipality (the "CITY"), and CMJ Engineering, Inc., authorized to do business in Texas, (the "ENGINEER"), for a PROJECT generally described as: Construction Materials Testing Services for Far North Branch—Golden Triangle Boulevard, Fort Worth, Texas. Article I Scope of Services A. The Scope of Services is set forth in Attachment A. Article II Compensation A. The ENGINEER's compensation shall be in the Not-to-Exceed amount of $32,160.00 as set forth in Attachment A. Article III Terms of Payment Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment A to this AGREEMENT, to reasonably substantiate the invoices. (2) The ENGINEER will issue monthly invoices for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. (3) Upon completion of services enumerated in Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting anyyttlt- r" ion thereof. OFFICIAL RECORD CITY SECRETARY City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/241201 7.WORTH,TX Page 1 of 15 Far North Branch Library—CMJ Engineering,Inc. i I August2017 No interest will accrue on any contested portion of the billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving 7 days' written notice to CITY, suspend services under this AGREEMENT until paid in full. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment B. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The standard of care applicable to the ENGINEER's services will be the degree of skill and diligence normally employed in the State of Texas by professional engineers or consultants performing the same or similar services at the time such services are performed. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page 2 of 15 Far North Branch Library—CMJ Engineering,Inc. August 2017 changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel! at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on-site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the Contract Documents, nor shall anything in the Contract Documents or the agreement between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on-site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on-site observation(s) of a deviation from the Contract Documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page 3 of 15 Far North Branch Library—CMJ Engineering,Inc. August 2017 services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page 4 of 15 Far North Branch Library—CMJ Engineering,Inc. August 2017 any errors or omissions in the information from others that is incorporated into the record drawings. I. Minority Business and Small Business Enterprise (SBE) Participation This paragraph is not applicable for this project. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. INSURANCE (1) ENGINEER'S INSURANCE a. Commercial General Liability — the ENGINEER shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance with a limit of not less than $1,000,000.00 per each occurrence with a$2,000,000.00 aggregate. If such Commercial General Liability insurance contains a general aggregate limit, it shall apply separately to this PROJECT or location. City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page 5 of 15 Far North Branch Library—CMJ Engineering,Inc. August 2017 i. The CITY shall be included as an insured under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the CITY. The Commercial General Liability insurance policy shall have no exclusions by endorsements that would alter or nullify: premises/operations, products/completed operations, contractual, personal injury, or advertizing injury, which are normally contained within the policy, unless the CITY approves such exclusions in writing. ii. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with this agreement. b. Business Auto — the ENGINEER shall maintain business auto liability and, if necessary, commercial umbrella liability insurance with a limit of not less than $1,000,000 each accident. Such insurance shall cover liability arising out of "any auto", including owned, hired, and non-owned autos, when said vehicle is used in the course of the PROJECT. If the engineer owns no vehicles, coverage for hired or non-owned is acceptable. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by ENGINEER pursuant to this agreement or under any applicable auto physical damage coverage. c. Workers' Compensation —ENGINEER shall maintain workers compensation and employers liability insurance and, if necessary, commercial umbrella liability insurance with a limit of not less than $100,000.00 each accident for bodily injury by accident or $100,000.00 each employee for bodily injury by disease, with $500,000.00 policy limit. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by ENGINEER pursuant to this agreement. d. Professional Liability — the ENGINEER shall maintain professional City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page 6 of 15 Far North Branch Library—CMJ Engineering,Inc. August 2017 liability, a claims-made policy, with a minimum of $1,000,000.00 per claim and aggregate. The policy shall contain a retroactive date prior to the date of the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate. of insurance specifically referencing this project shall be submitted to the CITY for each year following completion of the contract. (2) GENERAL INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be delivered to the CITY prior to ENGINEER proceeding with the PROJECT. b. Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. c. Certificate(s) of insurance shall document that insurance coverage specified in this agreement are provided under applicable policies documented thereon. d. Any failure on part of the CITY to request required insurance documentation shall not constitute a waiver of the insurance requirements. e. A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 200 Texas Street, Fort Worth, Texas 76102. f. Insurers for all policies must be authorized to do business in the State of Texas and have a minimum rating of A:V or greater, in the current A.M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. g. Any deductible or self insured retention in excess of $25,000.00 that would change or alter the requirements herein is subject to approval by the CITY in writing, if coverage is not provided on a first-dollar basis. The CITY, at it sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to the CITY. City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page 7 of 15 Far North Branch Library—CMJ Engineering,Inc. August 2017 h. Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. i. The CITY shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion; the ENGINEER may be required to provide proof of insurance premium payments. j. Lines of coverage, other than Professional Liability, underwritten on a claims-made basis, shall contain a retroactive date coincident with or prior to the date of the contractual agreement. The certificate of insurance shall state both the retroactive date and that the coverage is claims-made. k. Coverages, whether written on an occurrence or claims-made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the PROJECT until final payment and termination of any coverage required to be maintained after final payments. I. The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement. m. Sub consultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When sub consultants/subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page 8 of 15 Far North Branch Library—CMJ Engineering,Inc. August 2017 N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities- Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City Amendments to Article V, if any, are included in Attachment C. A. City-Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page 9 of 15 Far North Branch Library—CMJ Engineering, Inc. August 2017 other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights- of-way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page 10 of 15 Far North Branch Library—CMJ Engineering,Inc. August 2017 Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and provisions providing contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third-Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third-party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third-parry beneficiary rights under this Agreement. (4) Nothing contained in this section V.H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. I. CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY will ensure that Builders Risk/installation insurance is maintained at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page 11 of 15 Far North Branch Library—CMJ Engineering,Inc. August 2017 amended or a separate agreement will be negotiated between the parties. K. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions Amendments to Article VI, if any, are included in Attachment B. A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure The ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of the ENGINEER that prevent ENGINEER's performance of its obligations hereunder. D. Termination (1) This AGREEMENT may be terminated only by the City for convenience on 30 days' written notice. This AGREEMENT may be terminated by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and does not commence correction of such nonperformance with in 5 days of written notice and diligently complete the correction thereafter. City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page 12 of 15 Far North Branch Library—CMJ Engineering,Inc. August 2017 (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) Out-of-pocket expenses for purchasing electronic data files and other data storage supplies or services; c.) The time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT'S schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification In accordance with Texas Local Government Code Section 271.904, the ENGINEER shall indemnify, hold harmless, and defend the CITY against liability for any damage caused by or resulting from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control. G. Assignment Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party. H. Interpretation Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties and shall apply to all the different theories of recovery, including breach of contract or warranty, tort including City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page 13 of 15 Far North Branch Library—CMJ Engineering,Inc. August 2017 negligence, strict or statutory liability, or any other cause of action, except for willful misconduct or gross negligence for limitations of liability and sole negligence for indemnification. Parties mean the CITY and the ENGINEER, and their officers, employees, agents, and subcontractors. I. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. J. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. K. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. Article VII Attachments,Schedules,and Signatures This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A- Scope of Services, Compensation, and Schedule Attachment B - Amendments to Standard Agreement for Engineering Services City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page 14 of 15 Far North Branch Library—CMJ Engineering,Inc. August 2017 Executed and effective this the a'�4ay of , 2017. BY: BY: CITY OF FORT WORTH ENGINE CMJ E ineeri g, In . Jesus J. Chapa R. Parl Lee, S. .T. Assistant City Manager Ex cutive Vice resi nt Date: '� "l Date: 0 APPROVAL RECOMMENDEn: B / 1 Y• ve Cooke Director, Property Management APPROVED AS TO FORM AND M&C No.: Not Required LEGALITY By: M&C Date: ohn B. Strong Assistant City Attorney Form 1295 Certification: ATTEST: FORT.,t�/o .Z May J ayse t3 City retary �j�P CONTRACT COMPLIANCE MANAGER: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contr ct, including ensuring all performance and reporting requirements. By: Brian R. Glass, AIA OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX City of Fort Worth,Texas—Std.Agreement for Eng.Related Design Services(9/24/2014) Page lb of 15 Far North Branch Library—CMJ Engineering,Inc. August 2017 14%7TAcAH IEWT "P 7636 Pebble Drive !<)cmj ENGINEERING, INC. Fort Worth,Texas 76118 www.cmjengr.com Estimate No.: 17-259 August 2, 2017 City of Fort Worth Attn: Mr. Alfonso Meza 401 W. 13th Street Fort Worth, Texas 76102 email: alfonso.meza@fortworthtexas.gov ESTIMATE CONSTRUCTION MATERIALS TESTING SERVICES FOR FAR NORTH BRANCH LIBRARY—GOLDEN TRIANGLE BOULEVARD FORT WORTH, TEXAS Dear Mr. Meza, We are pleased to submit this estimate for providing construction materials engineering services on the above referenced project. We understand we have been selected to provide these services based on our qualifications. Scope of Work Our scope of service is based on our review of the project plans and specifications. We propose to service this project on a call out, as-needed basis. Earthwork Laboratory testing of existing subgrade, backfill, select fill and stabilized pavement subgrade materials; in-place moisture/density testing of same. In-place sieve analysis of stabilized pavement subgrade. Post testing verification of all reports for a 79G letter if required. Drilled Piers On site verification of initial pier start by senior pier specialist or a geotechnical engineer if required. Full time excavation observation, reinforcing steel observation, and concrete testing and observation. Post installation verification of pier reports by project management staff. Cast-In-Place Concrete Pre-concrete placement reinforcing steel observation. On-site placement observation and testing to include slump, temperature, entrained air content, and the molding of test cylinders. Laboratory curing and testing of cylinders. Structural Steel Observation On-site visual observation and testing of field welded and bolted connections by AWS Certified Welding Inspector. a Phone(817)284-9400 Fax(817)589-9993 Metro(817)389..... CMJ ENGINEERING,INC. City of Fort Worth Estimate No. 17-259 Far North Branch Library—Golden Triangle Blvd. August 2, 2017 Fort Worth,Texas Page 2 Project Budget Based upon our understanding of the project specifications, our unit fees and estimated quantities for this project will be as stated on the budget attachment. All fees for services performed which do not appear on the budget attachment will be based on our standard fee schedule. The final charges will be a function of the total services performed. All charges for laboratory services are F.O.B. our laboratory. The prices provided in the attached fee schedule will remain valid for forty-five (45) days from the date on this estimate or for one year from that date if our services for this project are started within that forty-five (45) day period. Invoices will be submitted for these services on a monthly basis. These will be due and payable upon receipt. CMJ will not supervise or direct work that is performed by the contractor or subcontractors and is not responsible for their means and methods utilized or the resultant outcome of their efforts. Closing CMJ Engineering, Inc. appreciates the opportunity to submit this estimate. We have provided the attached unit fees that corresponds to our understanding of the work scope that will be required of CMJ Engineering. Feel free to call us if you have any questions regarding our services or estimate. Following your authorization, we are ready to begin work and look forward to providing you with our services. Respectfully, CMJ ENGINEERING,INC. 7Ecutive ee, S.E.T. ire ester, S.E.T. Vice President Senior Estimator AASH O 7636 Pebble Drive CMJ ENGINEERING, INC. Fort Worth,Texas 76118 Tel:(817)284-9400 Fax: (817)589-9993 City of Fort worth Estimate No. 17-259 August 2, 2017 ESTIMATE CONSTRUCTION MATERIALS TESTING SERVICES FOR FAR NORTH BRANCH LIBRARY-GOLDEN TRIANGLE BOULEVARD FORT WORTH,TEXAS DESCRIPTION NO FEE UNIT AMOUNT Earthwork Moisture/Density Relations(ASTM D698) 8 $ 158.00 each $ 1,264.00 Oversize Rock Correction(ASTM D4718) 1 $ 117.00 each $ 117.00 Liquid&Plastic Limit(ASTM D4318-13) 8 $ 54.50 each $ 436.00 Laboratory Sieve Analysis(ASTM C117, D1140) 6 $ 60.50 each $ 363.00 Laboratory Sieve Analysis(ASTM C136) 1 $ 75.00 each $ 75.00 Earthwork Observation/Testing Including all In-Place Moisture/Density 112 $ 65.00 hour $ 7,280.00 Testing by ASTM D6938(Min.4 hours/trip) Vehicle Trip Charge 28 $ 36.00 trip $ 1,008.00 Estimated Total for Earthwork Services: $ 10.543.00 Pier Observation Concrete Test Cylinders(ASTM C31/39) 52 $ 18.00 each $ 936.00 Engineering Technician(Min.4 hours/trip) 130 $ 56.00 hour $ 7,280.00 Project Management 7 $ 85.50 hour $ 598.50 Senior Engineering Technician 4 $ 75.00 hour $ 300.00 Cylinder Pick Up 3 $ 132.00 each $ 396.00 Vehicle Trip Charge 16 $ 36.00 trip $ 576.00 Estimated Total for Pier Observation Services: $ 10.086.50 Concrete Observation/Testing Concrete Test Cylinders(ASTM C31/39) 112 $ 18.00 each $ 2,016.00 Engineering Technician(Min. 3 hours/trip) 85 $ 44.50 hour $ 3,782.50 Reinforcing Steel Observation without Testing(Min. 3 hours/trip) 18 $ 56.00 hour $ 1,008.00 Cylinder Pick Up 14 $ 132.00 each $ 1,848.00 Vehicle Trip Charge 43 $ 36.00 trip $ 1,548.00 Estimated Total for Concrete Observation/Testing Services: $ 10.202.50 Structural Steel Observation Structural Steel Observation by CWI (Min.4 hours/trip) 16 $ 74.00 hour $ 1,184.00 Vehicle Trip Charge 4 $ 36.00 trip $ 144.00 Estimated Total for Structural Steel Services: $ 1.328.00 Estimated Total for Above Testing and Observation Services: $ 32.160.00 Notes: 1. Project Management fees will be charged as follows: 2 hours for initial project setup for projects utilizing piered/footing foundations, 1 hour for projects without piered/footing foundations or a very small project, foundation reconciliation at 3 minutes per pier, compliance review and statement of same at 3 minutes per report with a 1 hour minimum and 79G review and letter at 5 minutes per lot, if CMJ is informed at the start of this project of this need. All other services that would be requested of a project manager will be charged at the above listed hourly rates. Should the client choose not to sign CMJ's agreement and instead request CMJ to sign the client's contract, any time spent reviewing/revising client's contract will be billed at the above listed project management hourly rate. All other requested project management services will be billed on the actual time spent. 2. Overtime rates of 1.5 times the regular rate will be charged for hours worked or services performed over ten (10) hours per day or before 7:00 a.m. and/or after 5:00 p.m.Monday thru Friday. All lab and field services performed on Saturday,will be billed at 1.5 times the regular rate and will be billed at 2.0 times the regular rate for Sundays and recognized holidays. 3. All laboratory test fees are F.O.B. our laboratory. Engineering technician minimums and vehicle trip charges will apply to all trips to the job-site including sample pickups and specimen pickups. 4. A minimum amount of technician time and a vehicle trip charge will be billed for each call out, sample pickup or specimen pickup unless noted otherwise. Technician time is charged portal-to-portal from our Fort Worth office. 5. 4"X8"concrete compression test specimens will be used unless instructed otherwise. 6. Structural steel observation at fabrication shop fees based on facilities located in the Dallas-Fort Worth metroplex area. 7. Additional tests not specified in this fee schedule will be quoted upon request, or based on our current fee schedule. 8. Vehicle trip charge in excess of 25 miles from CMJ's office will be based on$0.655/mile, portal-to-portal our office. 9. Specimen collection fees as stated are either project specific or for Tarrant County only. 10. CMJ will not supervise or direct work that is performed by the contractor or subcontractors and is not responsible for their means and methods utilized or the resultant outcome of their efforts. CERTIFICATE OF INTERESTED PARTIES FORM 1295 lofl Complete Nos.l-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-248409 CMJ Engineering and Testing, Inc. Fort Worth,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 08/11/2017 being filed. City of Fort Worth Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 02500 Geotechnical Engineering and Construction Materials testing Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary 5 Check only if there is NO Interested Party. X i 6 AFFIDAVIT I swear,or affir ,unde nalty of per r ,th the abo e disclosure is true and correct. ANGELIAM.M000LLOUGH *: *= MY COMMISSION EXPIRES September 14,2018 Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE I Sworn to and subscribed before me,by the said _ car` � this the�_day of kaj),- 20__�_,to certify which,witness my hand and seal of office. 4na2mofl Sign ure of officer administering oath Printecer administering oath Title of officer administeririg oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883