Loading...
HomeMy WebLinkAboutContract 49552 Developer and Project Information Cover Sheet: Developer Company Name: I DR Horton-Texas,LTD Address,State,Zip Code: 7 67511 North Freeway,Fort Worth,TX 76131 Phone&Email: 817-230-0800,mpallen@drhorton.com Authorized Signatory,Title: Mark Allen, A ss%s,a.JT ��uu�Qzr Project Name: Hawthorne Meadoo9hase 2 Brief Description: Water, Sewer,Paving, Storm Drain Project Location: between Blue Mound Road Hwy 287 and East Bonds Ranch Plat Case Number: f FP-16-077 EPIatName: Hawthorne Meadows Mapsco: 20U —[Council District: 7 "-ity Project Number: 100853 CFA Number: 2017-034 DOE Number: None To be completed by staff: Received by: Date: 5g7 89rp, �1► � jc� RECEIVED v� Q AUG 2 4 2017 -o g CITYOFFORTWORTH o' CITY SECRETARY 69 b gC OFFICIAL RECORD CITY SECRETARY City of Fort Worth,Texas FT.WORTH,TX Standard Community Facilities Agreement-Hawthorne Meados Phase 2 CFA Official Release Date:01.03.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. —I WHEREAS, DR Horton - Texas, LTD, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto("Improvements")related to a project generally described as Hawthorne Meadows Phase 2 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Tolicy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Hawthorne Meados Phase 2 CFA Official Release Date:01.03.2017 CITY SECRETARY Page 2of11 FT.WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®, Sewer(A-1) ®, Paving (B) ®, Storm Drain(B-1) ®, Street Lights & Signs (C) 0. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured,licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meados Phase 2 CFA Official Release Date:01.03.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meados Phase 2 CFA Official Release Date:01.03.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify,hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meados Phase 2 CFA Official Release Date: 01.03.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its fmancial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meados Phase 2 CFA Official Release Date:01.03.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meados Phase 2 CFA Official Release Date: 01.03.2017 Page 7of11 Cost Summary Sheet Project Name: Hawthorne Meadows Phase 2 CFA No.: 2017-034 City Project No.: 100853 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 265,089.00 2.Sewer Construction $ 167,832.80 Water and Sewer Construction Total $ 432,921.80 B. TPW Construction 1.Street $ 552,780.30 2.Storm Drain $ 233,715.00 3.Street Lights Installed by Developer $ - 4. Signals $ TPW Construction Cost Total $ 786,495.30 Total Construction Cost(excluding the fees): $ 1,219,417.10 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 8,658.44 D. Water/Sewer Material Testing Fee(2%) $ 8,658.44 Sub-Total for Water Construction Fees $ 17,316.88 E. TPW Inspection Fee(4%) $ 31,459.81 F. TPW Material Testing(2%) $ 15,729.91 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 47,189.72 Total Construction Fees: $ 64,506.60 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,219,417.10 x Completion Agreement=100%/Holds Plat $ 1,219,417.10 Cash Escrow Water/Sanitary Sewer=125% $ 541 152.25 Cash Escrow Paving/Storm Drain=125% $ 983,119.13 Letter of Credit=125%w/2yr expiration period $ 1,524,271.38 City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meados Phase 2 CFA Official Release Date:01.03.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER DR Horton-Texas,LTD., a Texas Limited Partnership by:D.R.Horton,Inc. Jesus J. Chapa a Delaware Corporation Assistant City Manager its Authorized Agent Date: Recommended by: Name: Mark Allen Title: Assistant Secretary Wendy Ch' Babulal, BA, P.E. Development Engineering Manager Date: Water Department ATTEST: (Only if required by Developer) Z& C.i; Dougl W. Wiersig, P.E. Director Transportation &Public Works Department Signature Name: Approved as to Form &Legality: Contract Compliance Manager: By signing, I acknowledge that I am the Ric and A. McCracken person responsible for the monitoring and Assistant City Attorney administration of this contract, including ensuring all performance and reporting M&C No. at�Q, requirements. Date: Form 1295: A7 � — ATTEST: ORT Name: OX %0 Title: ary J. r City Secr y City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Hawthorne Meados Phase 2 CITY SECRETARY CFA Official Release Date:01.03.2017 FT.WORTH,TX Page 9of11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment 1� Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map 1� Exhibit A: Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit 13-1: Storm Drain Improvements ® Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meados Phase 2 CFA Official Release Date:01.03.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100853 None City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meados Phase 2 CFA Official Release Date:01.03.2017 Page 11 of 11 ------------------------------------------------------------------------------------ --------- ----......---------------- BLUE MOUND ROAD W 6LV� MO�HO ROAD E TIMBERLAND BOULEVARD z 00 z = O GOLDEN TRIANGLE 2 BOULEVARD 81 287 m W BONDS E BONDS 35W RANCH ROAD RANCH ROAD PROJECT LOCATION HERITAGE TRACE z OcBOULEVARD 2 z 156 z O �O w¢ w no mo M o �0 LL 0 Lu NORTH Tq�, ¢ /vT � PARKWAY HARMON ROAD LE OSWELL ROAD o c f u n LL L ................................,.....-.. ....... ............................................................................. n HAWTHORNE OWNER/ DEVELOPER: Ii!1I PELOTON 0 NORTH II I LAMB HOLY TIOM� 300' D.R. HORTON 9800 HILLWOOD PARKWAY a MEADOWS SUITE 250 v 6751 NORTH FREEWAY FORT WORTH,TX 76177 PHASE 2 GRAPHIC SCALE FORT WORTH,TX 76131 PHONE:817-562-3350 (SHEET 1 OF 6) c DATE:JANUARY,2017 c -----------------------------------------: ----- 29 9 I 9 9 9 29 } --- wia: ze VN 1 f w I 18 z9 —fOWLUS DRNE 2 7 i zo z7 �� LOT 7x ©� m =1 ze� n z9 z5 "1 se \� Z1 PRIVATE £ 12 OPEN SPACE 25 I 2• 19 u 23 I4 \ \y i 41 22 z3 1' "\��� 23 a \15 22 3 k R 22 \N CHS 12 l 1 GS 021 ZON\NG a 31 i ; \N\ST pG 0 1 \G 31 9 gin Z1` L 19 I 13 � 9 a 1e 1 21x12 / !G 11 13 / N s 21 10 e N © N I —— —— T 20 8 '12 LOT 41X 48 I PRIVATE OPEN WT 1" 19 9 41 SPACE ws9 I OPEN N SPACE 40 18 U '� 07 51 p 12 ~ 17 38 ' 16 14 15 37 \ � 36 °0 11 12 13 J 4 Ctiln Ch160jO%p 37 y r Fa111\\YOP 12 Os9i2 33 3a 7 \n C.Pt GS• 10 31 32 7 ss a 10 13 30 LOT 8X 9 1 6 OPE S kc 9 �14 12 PRIVATE OPEN ^1 "— �- 3PACE rn 10 5 tldtY 16 ©11 a 11 r 502 3\\1 � t 10 12 I 3 \"S. 6 17 �V FIDDLENEC 29 28 27 26 13 1 2 STREET 12 E 8 /30 =�j 1 2 3 4 5 �....e. 25 14 9 rIq � �o 29 I-I -RE 22 2316 15 A DRIVE CUSH 28 p — , 2 3 4 5�6 7 I ,7 II , 27 Z E tl— w 1 W 0 26 )w I --- 23 22 21 20 pH 21 18 ) 2----�N N w r 3 h y� g 14 13 12 71 10 9 8 7 am g V 25 24 .....,.....—I— 20 19 4'�-{W it it - T.-T— — 5 Q a in U 7 I_ 0 N m I LOT 7X 1 2 3 14 57 8 9 10 111 12 I Q I PRIVATESPACEPEN Lo W 6 ¢ rn l T T TI�T 7�O a1 1\ ff P1gs —L ___ © 5 = I g� C 2 5302 R .1 _ q I 24 23 22 121 120 19 118 117 118 115 114 13 I 9 1n t H FLOWER; — \\ 3 ud —1 ,!_ JAL L-.- \0—� DRIVE - 211 \\ 2 w -� 21�-� F�T 11 Ban, It G lheting,LP: bg1# Og234 — 1 I 20'P peiin Easement � D2 24 23 22 21 20 19 18 17 18 15 14 13 12 S LOT 1X PRI 'OPEW9PACE �\{n0�, ————— LEGEND T g'48 sto zro5 CdcR G PROPOSED WATER LINES —••�� EXIST WATER LINES a — ; FUTURE WATER LINES Y 2 u' a NOTE:ALL PROPOSED WATER LINES ARE 8" " UNLESS OTHERWISE NOTED LL C EXHIBIT A — WATER ------------------- ---- --------------- .....................................................-.---------------- ............. a 11"D i HAWTHORNE OWNER/DEVELOPER: PELOTON I "A.- 9o�urioN4 9 0 NORTH 300' MEADOWS D.R. HORTON 9800 HILLWOOD PARKWAYSUITE 250 a PHASE 2 6751 NORTH FREEWAY FORT WORTH,TX 76177 = GRAPHIC SCALE FORT WORTH,TX 76131 PHONE:817-562-3350 (SHEET 2 OF 6) DATE:JANUARY,2017 c' ------------ --------------------------- ° - 20 co 28 lo 27 SOWLUS DRIVE 8 2e ++ ,� LOT 7X d27 g I 2e n m 25 ' 12 31 PRIVATE OPENSPACE 24 ie \ H 23 ( za +� \N� 22 ' G�9 2 \NS, CH#p212ONNG 2,I f' ,s Sl I S,pGZ 4+ /�� G / 2+ FX 14 �\ \2�� m ' I 13 N � 1211 45 47 / 44 21 1020 ° y © ,e I s LOT 41X ep wT+ox 19 9 ,�> n PRIVATE OPEN R PNNAIE SPACE so OPEN ePACE 18 / 39 'o \INN Qi s, © 16 77 r 38 15 37 13 14 S 36 p I 11 72 � v 35 C1•v parte 912 �ss, 33 34 O 6 _ FnsAS 10 _ A ` 31 32 7 30 9 74 LOT 8X 13 PRIVATE OPEN 6 OPENS G —— 12 SPACE ,W„ twi+ 10 r 5 15 Wy t �8 --11 es+d\ 16 ©11 ( n a 11 I 4:j 3 6 17 10 12 I 3 \t`5 F ID C , 29 28 27 1 26/ 13 2�p STREET 16 30 d 1 2 3 4 519 -/ 25 14 A 29 rI C S NG RI E ` 24 It 15 -DATURIKE 28 Lou DRIVE 1 2 3 4 156 7 23 I 16 I 1 w I 27 T 2217 � W z RE 2 C 23 22 21 20 >s p r 9QQN 26 2118 I 3�y t=A 9 9 I 14 1312 11 10 9 6 Q F I I 20 19 24 4 I i6$U 25 8 _I_L I —'� 1w m car 5 J mGm LOT7X ©5 +ww TI 5% 1 I—TI10TI 1-1�1-2 I _6 �O PRIVATE OPEN aw ase P w--T— \e\ 5 302 S 4 ! I 24o. 23 122 121 120 119 118 117 118 1 15 114 I 13 I( 9� FLOWER; \\\ 3 _1 I I I J— 7� DRiV ststevp' \ 2 11 I Bam tt G thenng,LP: Fie>d�234211 _ 8 I 20'P elin Easement \� 1 24 23 22 21 20 19 18 1771.115114 13 12 Z 1UcpZj.G1, \ 111111. � LOTIXPRI y��---- ��----- ---OPEtTS`-PACE Il A�e\slo 8tpn,N2�r n ��AS 2 LEGEND 0 PROPOSED SEWER LINES f --—� EXIST SEWER LINES �— FUTURE SEWER LINES u NOTE:ALL PROPOSED SANITARY SEWER LINES ARE 8"UNLESS OTHERWISE NOTED u EXHIBIT Al - WASTEWATER *oD HAWTHORNE OWNER DEVELOPER: IMI PELOTON 0 NOR1}i300' T11-1-1 LAMC to�unows MEADOWS D.R. HORTON 9800 HILLWOOD PARKWAY SUITE 250 PHASE 2 6751 NORTH FREEWAY FORT WORTH,TX 76177 FORT WORTH,TX 76131 PHONE:817-562-3350 GRAPHIC SCALE (SHEET 3 OF 6) c DATE:JANUARY,2017 ------.... .....------. A2S> 29 e 18 2° ° to T 0 � LOT TX 28 n 2s ss se „ , 21 PRIVATE ®2s I 25 12 OPEN SPACE 23 I2, 13 24 M 23 </ C,^ G I 22 23 14 23 3 \NS Ci ZON NG P 22 s ` ° EX\51 P q G�2, 21 14 2 \ 20 17 I 13#na J I e ♦s 21 12 / f N 71 13 s / 's 47 21 �.i e / wO b � 10 2 .0 20 8 42 LOT 41X 49 _—wT1ox 19 r 9 n SPAPRIVATE OPEN PRNATE OPEN SPACE w 18•• O et 12 16 17 \• 38 37 / 2 ' 14 15 sz 12 13 - '$\<J 38 A qSq sJ a' Gh1�def Q b-xP 11 35 Fa_%2196g1� _ 32 33 O 7 1 � \tTa`TC 34 C;1. 10 30-•31 I S5 10 139 _ LOT 6X 6 osc 9 14 12 PRIVATE OPEN 15 SPACE w W 10 5 w t 8 e 7 .I I 4 AAA �a ins 02 3G 17 10 12 3 FIDDLENEC 6 29 28 1 27 1 26/ t3 2�a STREET 1 18 / 30J I --- 1 2 3 4 5 25 14 �g 19 --4 , 29ZkYpp. N9 RI E 24 15 UAILIRA 28 p 1 2 3 4 156 7 2316 I 1 DRIV ~ z. ........... w 27 Z• 2217 I--2 Lu 23 22 21 2U 3 r 26 �. 21 18 3— a 41 2 g I. 14 13 12 11U 9 8 1 I 2019 i4— j m$U 25 24 m 8 . T-ITT - 6-1X N '— LOT 7X 1 2 3 4 5 6 7 8 9 10 11 12 I PRIVATE Ow PEN Q N w o e p I� SPACE 8 K: a y T T TI�T 7�~ P1e5 a 1\ Q 5 . x 82 4 Q: I: 24a 23 I ZZ 121 i 20 19 I 18 1 17 116 115 114 I 13 9 p RS H K I I I FLOWER' _I 3 wa n....l—L---L J—Wl 1� DRIVE �ywteUP \\ 2 m. r \ Bam 1tG thenng,LP; 19ha1 Rp2082�211 _— \\ 1 r 1 72 20'P pelin Easement 24 23 22 21 20 19 18 17 18 15 14 13 LOT 1X PR OPEITS-PACE \nv���—— a\st0�aN14' Rev 0011, .265 Gogy22,I?. j ORS C. LEGEND 29'B-B/50'ROW(TYP) SIDEWALK BY DEVELOPER SIDEWALK BY HOMEBUILDER r d OQO H.C.RAMPS BY DEVELOPER o 4 C EXHIBIT B - PAVINGr _-- -------------------------------------------------- OWNER DEVELOPER: PELOTON aHAWTHORNE III ` o NORTH 300' MEADOWS D.R. HORTON 9800 HILLWOOD PARKWAY Ic PHASE 2 6751 NORTH FREEWAY SUITE 250 FORT WORTH,TX 76131 FORT WORTH,TX 76177 a GRAPHIC SCALE PHONE:817-562-3350 (SHEET 4 OF 6) c DATE:JANUARY,2017 ! •.................................................. ....._ ....... .. ..-.............. 1e --.----.--.--. ........ w za e > a e �Luu a e zs a BOWLUSDRIVE p 2e 27 ,p zo aT W ze n zs zs I ze 11 1 21 PRIVATE ©x t~AI 1 zs ,z OPEN SPACE zs = I I \\\ 24 13 \ x m 23 G I 1422 \ xa C�c za 9 A s :z 1B t�S1--� :z I I ], 14 q�va '7 z1 i 13'N��i 14 \ e 21X r 12 € I G 11 13 e \ / 4s o / M 21 10 T e © 's IJ 20 8 \ 'z LOT 41X 40 ——LOT lax 19 9 27 RCP 41\\ PRIVATE4150 PW VATS OPEN SPACE 4,X4'DROP INLET 18 39 1 \© 17 38 24"RCP 1s 16\ GP 37 \\Q e: z 1 72 13 14 ,L11r, VS 35 oixn \ 36 a -ish, 11 1— 34 O 8 Fam\�21 X591 33 e M�GRTC• ' _ 32 7 �I 10 C 3 31 ss ,a 13 a 30"RCP LOT 8X 4� 6 OPEN SSC 9 �51 4 PRIVATE OPEN 12 n SPACE w y 10 NLET fl 5'INLET — ~ we+ L—J 6 11 p a 1, 4�w g51d+ e,3 1 0_ 16 O 2 331 $ \ns G I� 17 10 12 3 t♦RD FIDDLED s 29 28 27 1 26 �13 2 >_ STREET 'ITN +a BOX CULVERTS INSTALLED �M 30 dl 1 2 3 4 s 19 ( PER PHASE 1 CFA 2016-101 1 0 I \ 1 24+I 15DA I URAL t C S NG RIE 33"HDWL I T IDRIV 28 p1 2 3 4 5 6 7 23 16 1 1 I 1 z7 z 5'INLET 24"RCP W w 2217 I- -2 Lu u 2s 1 23 22 21 20 27°RCP I I I 21 18 I 3�o x oN 15'INLET 114 13 12 ++ 10 sl 1 2o�1a 1 zs 24 24"RCP a 1 'i LET _J �8F _33"RCP 39"RCP F ARE 4�w m dN _ 24"H_DWL HAS 5 z a 39"HDWL- 7 24 R PT �8 9)LOT 7X 5 6 7 8 9 10 11 12I a,— PRIVATE OPEN 6 7 e SPACE �U 15'IN$E l�� I I��� �o P11 as \5302 21"HDWL ©5 w� 24'R P� t— 6� 21 T 4 QM 1 24 231 22 21 201 191 18 17 16115 141 13 1 s n Rj GHOST —�� K 1 FLOWER; 1 \\ 3 WI I—1 I J_L.�L�� 1� DRIVE ; 21"HDWL _ �y2,etelP \\ 1 m r"�T t1 20' tt i t E.S. LP; +Rea\ ate I I I I 20'P elfin Easement 20nst COR2T.GT_ 24 23 22 21 20 19 18 17 16 15 14 13 ,2 LOT IX PRI _ LEGEND —0 ----- — - SPACE e Reve\sto atpn•N2S5 CA+��,P.I �- PROPOSED STORM DRAIN INLET 0 ———�—- EXIST STORM DRAIN INLET —� PROPOSED STORM DRAIN MANHOLE PROPOSED STORM DRAIN DROP INLET f —� PROPOSED STORM DRAIN HEADWALL ; s d ALL INLETS ARE 10'AND ALL LATERALS ARE 21"UNLESS OTHERWISE NOTED. 4 C EXHIBIT--- STORM DRAINAGE 0 IT OWNER DEVELOPER: I� PELOTONHAWTHORNE LAND tOLYT10Mt 0 NORTH 300' I MEADOWS D.R. NORTON 9800 HILLWOOD PARKWAY Cca SUITE 25011 PHASE 2 6751 NORTH FREEWAY FORT WORTH,TX 76177 = GRAPHIC SCALE FORT WORTH,TX 76131 PHONE:817-562-3350 (SHEET 5 OF 6) c DATE:JANUARY,2017c ----------------- ------------------ --- -- ----- - o e • e ° ]]1 zi=sw . iL -- 2e B 1e 27 10 27 x� n ze 1 xe x' PRIVATE ®ze xe �� LOT 7X I xs ,x OPEN SPACE xi 13 \ b I 23 23 14 pt\G I 22 3 AFF \N C 308912 p u 5 ��C z2 I \I\j PG ZON\NG q, G�x, B 7 14 •off� x \ zo \_ 13� 21X 12 13 PG 71 ° / M 21 10 ° © .e 7 20 8 az LOT41X PRIVATE OPEN 1.07,0% 19 9 n SPACE so PRNA7E OPEN SPACE 40 \ 1 17 38 18 /) 2 37 \ u 13 14 15 ` 36 \t1 C\te1t9 M 11 12 35 F Chy game 1� I 33 O 8 to34 1 ° T \ts"'C�j.Cj• 10 1 31 32 7 I ,a 13 30 LOT 8X ry �9 4 6 ods ——— 9 1PRN OPEN 12 10 B 15 w w— ~ 5 std\ Y'7e t 16 6 11 11 4�i e31 \ 7 ) O 12 T \ns 02 3C 17 10 3 FIDDL N 6 29 29 27 26/ 13 2 A STREET 1e 30 �I 1 M234 5 19 25 1 '—�o 29 ' RI E 24 i5 28 p 1 2 3 4 �5 T B 7 2716 RI 1 W 27 Z 22 17 r-2 It N I 26 1 23 22 21 20 I t I I 21 18 N N 9 I 14 13 12 1 10 9 8 1 3�� 7 $U 25 24 8 �o� — _— — F IgE — 5 a 6�- N a LOT 7X 1 2 3 4 5 6 7 8 9 10 11 12 �_ o — I PRIVATE OPEN a wi 0 SPACE wwy w I I I ©5 3 _ 4 4 23 22 121 120 118 118 17 118 1151 14�I 13 1) '�S p'- �\\ 2 J—L_1� \0"I FLp WER; —1 I I ��gl 11 Be ttG thedng,LP: ZBM'j1 � n 19 18 111 1�4T13 12 0'P lin Easement X PR ll —'—O LOT 1I- v'PACE \11t 4 ------T----- es ReVGon�,NZ65 Vd•CRS CYf 0 LEGEND PROPOSED STREET NAME SIGNS L EXIST STREET NAME SIGNS ' LL C EXHIBIT C1 - STREET NAME SIGNS HAWTHORNE OWNER DEVELOPER: Hill PELOTON I�I�I eANo °oeurtoN° 0 NORTH MEADOWS D.R. HORTON 9800 HILLWOOD PARKWAY a SUITE 250 PHASE 2 6751 NORTH FREEWAY FORT WORTH,TX 76177 = FORT WORTH,TX 76131 PHONE:817-562-3350 a GRAPHIC SCALE (SHEET 6 OF 6) c DATE:JANUARY,2017 c SECTION 00 42 43 PROPOSAL FORM UNIT PRICE Hawthorne Meadows Phase 2 UNIT PRICE BID Bidders's Application Project Item Information Bidlisl Item Description Specification Unit of Bid Quantity Unit Price Bid Value No. Section No. Measure WATER IMPROVEMENTS 3311.0261 8"PVC Water Pipe 33 11 12 LF 4.655 521.70 5101,013.50 3312.2003 1"Water Service 33 1210 EA 76 5780.00 559,280.00 3312.2103 1 1.2"Water Service 33 1210 EA 7 $1,300.00 $9,100.00 3312.3003 8"Gate Valve 331220 EA 19 $1,200.00 $22,800.00 3312.0001 Fire Hydrant 33 1240 FA 5 $3,550.00 S17,750,00 3311.0001 Ductile Iron Water Fittings wr Restraint 33 11 11 TON 5.8 $3,600.00 520,880.00 3305.0003 8"Waterline Lowering 3305 12 EA 7 54,600.00 $32,200.00 3312.0117 Connection to Existing 4'-12"Water Main 33 12 25 EA 2 $800.00 S1,600.00 3305.0109 Trench Safety 3305 10 LF 4.655 50.10 5465.50 TOTAL WATER IMPROVEMENT'S 5265,089.00 SANITARY SEWER IMPROVEMENTS 3331.4115 8"Sewer Pipe 333120 LF 2,248 528.60 564,292.80 3339.1001 4'Manhole 33 39 20 EA 15 $2,670.00 $40,050.00 9999.0001 CSS Encasement for Utility Pipes 3305 10 LF 240 $22.00 $5,280.00 9999.0009 Concrete Encasement for Utility Pipes 3305)0 LF 204 560.00 512,240.00 3339.1003 4'Extra Depth Manhole 33 39 20 VF 40 S130.00 $5,200.00 3301.0101 Manhole Vacuum Testing 33 01 30 EA 15 S 110.00 S1,650.00 3331.3101 4"Sewer Service 33 31 50 EA 47 $650.00 $30,550.00 9999.0014 Connect to Ex 10'SS to 8"SS 33 31 20 EA 5 $590.00 52,950.00 3305.0109 Trench Safety 33 05 10 LF 2.248 51.00 S2,248.00 3301.0002 Post-CCTV Inspection 33 01 31 LF 2.248 51.50 53,372.00 TOTAL SANITARY SEWER IMPROVEmEmrs 5167,832.80 STORM DRAIN IMPROVEMENTS 3349.0002 5'Storm Junction Box 3349 10 EA I 54,900.00 $4,900.00 3349.0001 4'Storm Junction Box 334910 EA 1 $4,300.00 S4,300.00 3349.7001 4'Dmp Inlet 33 49 20 EA l $4,500.00 54,500.00 3341.0312 39"RCP.Class M 3341 10 LF 177 S131.00 523,187.00 3341.0305 33"RCP,Class 111 3341 l0 LF 22 $99.00 52,178.00 3341.0302 30'RCP,Class 111 3341 10 1 LF 5% S80.001 547,680.00 3341.0208 27'RCP,Class 111 3341 10 LF 37 571.00 $2,627.00 3341.0205 -24"RCP,Class 111 3341 10 LF 831 $64.00 S53,184.00 3341.0201 21"RCP,Class IH 3341 10 LF 385 $55.00 $21,175.00 3349.5002 15'Curb Inlet 33 49 20 EA 3 54,900.00 S14,700.00 3349.5001 10'Curb Inlet 33 49 20 EA 10 53,600.00 536,000.00 9999.0002 5'Curb Inlet 33 49 20 EA I 52,900.00 52,900.00 3137.0102 Large Stone Riprap,dry 313700 SY 56 560.00 53,360.00 9999.0016 24"1 erra Precast Headwall-Crype B)or equivalent 33 49 40 EA I 52,200.00 52,200.00 9999.0017 21"Fortnra Precast Headwall-(Type B)or equivalent 33 49 40 EA I 52,200.00 52,200.00 9999.0003 39"Sloping Headwall 33 49 40 EA I S3,000.00 53,000.00 9999.0004 33"Sloping Headwall 33 49 40 EA I 52,500.00 $2,500.00 9999.0005 2f"Sloping Headwall 33 49 40 EA I 52,100.00 $2,100.00 3305.0109 Trench Safety 330510 LF 2.0481 50.50 51,024.00 TOTAL STORM DRAIN IMPROVEMENTS1 $233,715.00 Bid Summary Base Bid Water Improvements 5265,089.00 Sanitary Sewer Improvements $167,832.80 Stonn Drain Improvements $233,715.00 Total Base Bid $666,63b,80 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE Hawthorne Meadows Phase 2 UNIT PRICE BID Bidders's Application Project Item Information Bidlist Item Specifc�ion Unit of Description Section Measure Bid Quantity Unit Price Bid Value No. IPAVING IMPROVEMENTS 3213.0101 6'Cone Pvtnt 32 13 13 SY 11,820 $33.35 $394,197.00 3213.0301 4"Cone Sidewalk 32 1320 SF 4,767 $4.50 $21,451.50 3211.0501 6"Lime Treatment 32 1129 SY 12,411 $2.80 $34,750.80 3211.0400 Hydrated Lime 32 11 29 TN 199 $155.00 $30,845.00 3213.0501 Barrier Free Ramp,Tvpe R-I 32 1320 EA 5 $1,925.00 $9,625.00 3213.0504 Barrier Free Ramp.Ty pe M-2 321320 EA 7 $1,850.00W$15,"225.00 00 3213.0506 Barrier Free Ramp,Type P-1 321320 EA 7 $1,575.000 3217.0503 24"SLD Pvmt Marking Paint(W) 32 1723 LF 84 $16.500 9999.0020 Large Stone Riprap,dry for Paving 31 37 00 SY 45 $75.000 9999.0011 End of Road Barricade 344130 EA 5 $1,500.000 9999.0012 Std Street Header 32 13 13 LF 145 $10.000 9999.0015 Pedestrian Handrail 000000 LF 203 $75.0000 9999.0013 Street Sign 34 41 30 EA I8 $500.00 $9,000.00 TOTAL PAVING IMPROVEMENTS1 $552,780.30 Bid Summary Base Bid Paving Impruvemems $552,780.30 Total Base Bid $552,78030