HomeMy WebLinkAboutContract 49630 Developer and Project Information Cover Sheet:
Developer Company Name: 351 Development,LLC
Address, State,Zip Code: ? P.O.Box 1122 Argyle,TX 76226
Phone&Email: 214-455-8759
Authorized Signatory,Title: Steve Gee,Manager
Project Name: ; Live Oak Phase 3B
' Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: North of White Settlement west of Chapel Creek Blvd
Plat Case Number: FP-17-048 Plat Name: ! Live Oak Creek
Mapsco: ' 57P ; Council District: [CD 4]
CFA Number: ' 2017-089 City Project Number: 101033
To be completed by staff.
XReceived by: Date: ,
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
�2g4567
CIA
City of Fort Worth,Texas
Standard Community Facilities Agreement-Live Oak Phase 313 6'
CFA Official Release Date:02.20.2017 8! g
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.-4�(P,�
WHEREAS, 351 Development, LLC, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements") related
to a project generally described as Live Oak Phase 3B ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth,Texas("City"); and
WHEREAS,the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement;and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Live Oak Phase 3B OFFICIAL RECOR®
CFA Official Release Date:02.20.2017 CITY�l~GRET
Page 2 of 11 ARY
FI'. Ih�;�,�'�HI TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer (A-1) ®, Paving (B) 0, Storm Drain (B-1) 0, Street Lights &
Signs (C) N.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section H, of the Policy. Developer shall
ensure its contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s),Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent(1001/6) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth,Texas
Standard Community Facilities Agreement-Live Oak Phase 3B
CFA Official Release Date:02.20.2017
Page 3 of 11
s
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253,Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort worth,Texas
Standard Community Facilities Agreement-Live Oak Phase 3B
CFA Official Release Date:02.20.2017
Page 4 of 11
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers,servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and an claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the Citrof Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth,Texas
Standard Community Facilities Agreement-Live Oak Phase 3B
CFA Official Release Date:02.20.2017
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent(4%) and material testing fees equal to two percent (20/6) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
H. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth,Texas
Standard Community Facilities Agreement-Live Oak Phase 3B
CFA Official Release Date:02.20.2017
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period)the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Live Oak Phase 3B
CFA Official Release Date:02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name:Live Oak Phase 3B
CFA No.: 2017-089 CityProject No.: 101033
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 128,890.15
2_Sewer Construction $ 157,143.23
Water and Sewer Construction Total $ 286,033.38
B. TPW Construction
1.Street $ 313,571.80
2.Storm Drain $ 105,000.46
3.Street Lights Installed by Developer $ -
4. Signals $ _
TPW Construction Cost Total $ 418,572.26
Total Construction Cost(excluding the fees): $ 704,605.64
Construction Fees:
C. Water/Sevuer Inspection Fee(2%) $ 5,720.66
D_ Water/Sewer Material Testing Fee(2%) $ 5,720.66
Sub-Total for Water Construction Fees $ 11,441.32
E. TPW Inspection Fee(4%) $ 16,742.89
F. TPW Material Testing(2%) $ 8,371.45
G_ Street Light Inspsection Cost $ -
H. Signals Inspection Cost $
H. Street Signs Installation Cost $
Sub-Total for TPW Construction Fees $ 25,114.34
Total Construction Fees: $ 36,555.66
Choice
Financial Guarantee Options, choose one Amount Mark one
Bond= 100% $ 704 605.64
Completion Agreement=100%/Holds Plat $ 704 605.64 x
Cash Escrow Water/Sanitary Sewer= 125% $ 357 541.73
Cash Escrow Paving/Storm Drain=125% $ 523 215.33
Letter of Credit= 125%w/2 r expiration period $ 880 757.05
City of Fort Worth,Texas
Standard Community Facilities Agreement-Live Oak Phase 3B
CFA Official Release Date:02.20.2017
Page 8of11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
351 De--�-)
Developm t, LLC
�
Jesus J. Chapa
Assistant M ager
Date:_ ,/ —1
Name: Steve Gee
Recommended by: Title: Manager
Date: � �-1
Wendy Chi abulal,EMBA, P.E. ATTEST: (Only if required by Developer)
Development Engineering Manager
Water Department
-L �L CJ. LJn Signature
Douglas . Wiersig, P.E. Y Name:
Director
Transportation& Public Works Department Contract Compliance Manager:
Approved as to Form&Legality: By signing,I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
Richard A.McCracken requirements.
Assistant City Attorna
M&C No. NN
D G
Date:
• 11 Name: Janie Morales
Form 1295: _ N Title: Development Manager
ATTEST:
City Secretary
r
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Live Oak Phase 313 CITY SECRETARY
CFA Official Release Date:02.20.2017
Page 9 of 11 FT.WORTH, TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 - Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A: Water Improvements
® Water Cost Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Cost Estimate
® Exhibit B: Paving Improvements
® Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Live Oak Phase 3B
CFA Official Release Date:02.20.2017
Page 10 of 11
AWACILME"+iT tet"
Cormnimity is hfics Agmenumt
'C.}tv Yrcicct No. 10 103.a
Dewt sper acknowledges that in accordance with Chapter 2270 of the Texas Government Cade.the City
is prohibited from entering into a contract with a company for$mss or services unlus the cantrati
contains a written verification from the company that it:(1)does not boymn Israel;and(2)will not
boycott"I during the term of the contract, The toms`boycott Israel"and'company'shall have the
meanings ascribed to those terms in Section W8.001 of the Testas Government Code. 8y soirag this
controM Oevelow terrifies that DeWoper's sJfVmftrr provides written,vrrificotion to the City that
Dewlgwrr(1;does not boys vtt Israel;and(2)well not Ott WW during the cern of the contract.
ikveft►�er
S} })cVeiu}a css I C
Name:Steve Gec
Dutr: /
17
City of Fat Wodk T"cm
Sea Aud Community Facilities Agrmmc t-Live Oak Phasc 18
CFA O(7icial Relexte r)ao:02.20.2W
Faye 11 ori 1
i
SITE
WFII��LE�E�R41D
90 s
cam
c�"r c3
01B�Vpr�OWt c m
WEST POINT
BLVD
0
m 1-30
Y
W
K
U
yW
U
CAMP BOWIE W BLVD
w
1.30
OWNER!DEVELOPER: 6+! PE LOTON
LIVE OAK 351 DEVELOPMENT, LLC -1i lI `AND SOLUTIONS
N0RTH PHASE 3B P•O. BOX 1122 9800 HILL
ITE D250ARKWAI
NOT TO SCALE ARGYLE, TEXAS 76226 FORT WORTH, TX 76177
DATE: JUNE, 2017 PHONE: 214-455-8759 PHONE: 817-562-3350
�
C T.C.i
n t I
W125' I
7
p3 e ° m 11 B
0
W 0 M 13 10 1 1. 1 16
m S Z w FRONTIER DRIVE I I
j
xl w
1n I
CQo
Q R' ' . 6 SHASEO�fA
1 �D
Q � Q
UNE OAC ~
4e O CHASE 33.
]] t1 20 1t 18 17 16 16 14 /7 17
o3/
M ;
c
�FCQZ�7U
•.
iT
URE
WENDYWAY WE DY
WAY
41 .w
1 x t 4 s e o 10 11
�
11 42u so
46
1t 16 17 16 16 14 13 12 i b
I
1
DIXON COURT 37 '.
W
�o
se ��
0 Iii II i � 11 j ww I 7`:I PilelY II E?OHNA(S
.EI A3xAI17 t n 1 ?b !I b Si On I 9
1 {.
—�B2x6
x
38
u3, 33 2e07u >o LrvE 6
°OLL 1 y3wru
17 7 1619
21 1 3212
17 14 s
�
TUSCARORA DRIVE u
I s1xi 3y
�Dhve
A
Live Ock cr..w
I I z
h"f"L•'041E01 {i ; x 16 19 20 z1 zz 11 24 16 M 2 ze D°
CR.T.C.T. 1 j I j ; 10 ( m
�
4
F � I
u � I
LEGEND
PROPOSED GATE VALVE
EXIST GATE VALVE
PROPOSED FIRE HYDRANT
EXIST FIRE HYDRANT
i
NOTE:ALL PROPOSED WATER LINES ARE 8"
UNLESS OTHERWISE NOTED
EXHIBIT A - WATER
OIC' OWNER f DEVELOPER: Ij!1I PELOTON
TIONS
0 e 9800 HI NOPTH 200' LIVE OAK 351 DEVELOPMENT LLC ���� WOO' LANDtOlYKW
PHASE 3B P.O. BOX 1122 SUITEODP5UARKWAY
ARGYLE, TEXAS 76226 FORT WORTH, TX 76177
GRAPHIC SCALE DATE: JUNE, 2017 PHONE: 214-455-8759 PHONE: 817-562-3350
wI{ r m.
i WL• T.C.T 827 I
C R.T.C.6
1
i 1 5' 1
Q I%� 3 J 4
< B 9 10 II I{
11
w ' 13 13 14 15 + 16 17
61 v FRONTIER DRIVE
Lu � w
N �
�,1 3 J •
0�1 1 L9
a 0 � s 6 7 e .h a 10 11 p
_ G
I JJ <
I N
IVE aJ 1
3.
u 31 30 t9 1e t7 1e 1s 14 19 13
FUTURE
WENDY WAY WE DY WAY
7
�1 <
. InZQ�
1 3 9 4 s e 7 e 6 19 11 ^KN
N
u
1
39
C
u
M L21Ja 19 1e 17 1B 13 1I 19 13 3e
{ I
DIXON COURT J7
------------
NIS
.o �
3 LM OAK
97 PH 30.
35 >. 99 u J+ >o 29 20 n za ss
zr
dM
NM I.Iv� >AK
PHASE 7A.
30{ 11 12 1J 1l 15 1 % fl 16 19 31 33� � 111111 I ; � N,
j ! TUSCARORA DRIVE 9+K LL ss'
A�
O30
.Z
O
Ll-oak Cr66kPhu
0Sectim
2*01834t ! is +9 39 i 3+ 1 u 33 1 74 l 35 3e v ! 36 29
CAT.C.T. p'
O m'
w i j j i i
+
O
o
LEGEND
—� PROPOSED SEWER LINES
—� EXIST SEWER LINES
i PROPOSED FLOW ARROWS
D EXIST FLOW ARROWS
I
NOTE:ALL PROPOSED SANITARY SEWER
LINES ARE 8"UNLESS OTHERWISE NOTED
E` XHIBIT A1 - WASTEWATER
OWNER/DEVELOPER: PELOTON
o "`` LIVE OAK 351 DEVELOPMENT, LLC 1 - TIONS
Till t LAND 6O L
PHASE 3 B P.O. BOX 1122 9800 HISUITE 5PARKWORKWAY
ARGYLE, TEXAS 76226 FORT WORTH, TX 76177
GRAPHIC SCALE DATE: JUNE, 2017 PHONE: 214-455-8759 PHONE: 817-562-3350
j fur R£P4 £
I)j W/J L.P.
M 203
{ .• 20e4 23
kj C .T.C.ri i
� I
Xj
I II 1 5' I
x 3 a 5 V l
p 10 ++ e
w O' I 12 13 14 15 is j 17 !
v FRONTIeR DRIVE
N J I 1 1 1 w
! w
j j 1 x 3 1 IIJYE O ; i w
Q 11 4 5 4ASE A.
1 dD
1 p O e 7 e 9 I 10 11 O
Q
O I N
OOAC F
µ A.S£
Z2 21 20 19 19 +7 1s 1s 14 13 12
FUTURE
WENDY WAY WE DY WAY
41
1 2 3 s e 7 e B 10 ++
�+ � 0 O
42
]9
u
1 I
M 4
xI x+ M 19 10 17 to 1S 14 13 12 I
I �----�
? DIXON COURT 33 7
s
I
40
99 38 '4' ::.OAK
37 Ph; E SE. •. 35
>s 75 34 333x 31 30 x9 xe 27 xe 26 24 23 xI I
I
34
I
I
I I 7 33
AX
PN�SE3ti I ! w�gci
11 12 13 14 1s 1e 17 10 19 20 xt
TUSCARORADRIVE
store i I I i i I :
ME
Dyye � i I
Li4. �
�, + j
W1.•D21006=4 j I y +e 1e 20 21 22 z3 u xs ze 27 7 xe 29
C.R.T.C.T. ' v l O i � I I m
Tj
u
I
LEGEND)
29' B-B 150' ROW(TYP)
SIDEWALK BY DEVELOPER
SIDEWALK BY HOMEBUILDER
O H.C. RAMPS BY DEVELOPER
EXHIBIT B - PAVING
OWNER!DEVELOPER: Ii!II PE LOTO N
Q NORTH ZQQ'
LIVE OAK 351 DEVELOPMENT, LLC I WOO ..PARKI--
0
Me
PHASE 3B P.O. BOX 1122 9800 HISUWOODITE 5POARKWAY
ARGYLE, TEXAS 76226 FORT WORTH, TX 76177
GRAPHIC SCALE DATE: JUNE, 2017 PHONE: 214-455-8759 PHONE: 817-562-3350
—NT _
W/J 14 yw'r9 f L.P.
Mt• 206 Z3
C R.T.C.T
125
X3 3 . 5
8 7
Q ° 9 10 II
LL.
w 77 3
13 t. I 15 16 17
m
S L) FRONTIER DRIVE
x
I
y w
>
a4>(I 3 3 A POND
apt s ° 7 e e 19 I 11 LIMITS
j
O U
vl
H
WE
24"RC
/ 23 31 30 to to 17 16 15
'41
1] t3
10'INLET FUTURE
WENDY WAY I I WE DY WAY
24"RC
24"RC
10'INLET 41 2
1 3 3 . a a 7 a 9 10 11 I40
' .
.1 o
u
3e
43
24"HDWL
10'INLET 19 10 17 1a 1e 14 13 73 3°
'X4'MANHOLE
10'INLET 18 INLET
24"RCP DIXON COURT21"RC i 37
40 4'X4'MANHOLES 24"RC �
39 3e 21"RC .RC 21 RCP
o/x ,
37 3a. 1 33
76 36 73T.T.426 n 3e >s 15'INLET
I
I
N
NM
PrlrsE a� 0 �eE:
I 11 13 j 13 1 14 15 16 171e 19 30 j 31
7y TUSCARORA DRIVE 31X I s
j
4i 300 D O
T
j
�0f•�• �t 1e 19 30 31 , 33 z] 3a 3e i M T za j M m>
M t.•
021608634 y i i D'
O 3 I I I j mi
a
LEGEND
-� PROPOSED STORM DRAIN INLET
�- EXIST STORM DRAIN INLET
�- PROPOSED STORM DRAIN MANHOLE
-� EXIST STORM DRAIN HEADWALL
EXHIBIT B1 - STORM DRAINAGE
ll�"D ..OWNER/ DEVELOPER: lil1l PELOTON
0 NORTH 200' 9800 HI
LIVE OAK 351 DEVELOPMENT, LLC I.
6 PARK*MWaAY
PHASE 3B P.O. BOX 1122 SUITE 250RK
ARGYLE, TEXAS 76226 FORT WORTH, TX 76177
GRAPHIC SCALE DATE: JUNE, 2017 PHONE: 214-455-8759 PHONE: 817-562-3350
r W/JH y—I L.P.
W.�D205250823
C R.T.C.T
II
1X 2 3 ♦ 5
Q 6 1
Q ° e 10 1 II
W Oa, 1 1+ u
17 16 1)
= FRONTIER DRIVE
U
m =�
I W W
CO >
d
j 2 3 VE 0
Q a' ♦ 5
Q .AS£ A 05
ao ° ) e s o „ U
L ry
O U
N
F-
O Y£0 (
F-
21
21 x0 1S 16 1] 16 16 1A 13 12
FUTURE
WENDY WAY
WEPIDYWAY
a
C7
a+ �Z
1 2 3 e 5 6 ] a a 10 11
40
N
u
39
C
N
~ ti` 22 N A 10 16 17 to 15 14 13 12
DIXON COURT 3)
w �
3e 3e LIVLE OAK PF
3736. 35
3e
36 >. 33 32 31 30 3S 2e Y] 26 25 m 23 22
N
dH
O 1 -
MN LIVE DAK NN
GHASEj 3A
11 12 iJ 14 15 1e 11 1e 19 ZO 21
4 a a aru Ora
�Ove
OJ m m yr
i
32
SCAROR, 0O
z1
bV 260634LnOak Crert
Gross 2.Section 1 19 19 20 21 y 27 x! 29 2S
.T.C.T. v
LEGEND
PROPOSED STREET LIGHTS
EXIST STREET LIGHTS
I
YU
EXHIBIT C - STREET LIGHTS
OWNER 1 DEVELOPER: 1;111 PE LOTO N
LIVE OAK 1 LAND SOLUTIONS
2UU
351 DEVELOPMENT, LLC 9800 HILLWOOD PARKWAY
PHASE 3 B P.O. BOX 1122 SUITE 250
ARGYLE, TEXAS 76226 FORT WORTH, TX 76177
DATE: JUNE, 2017 PHONE: 214-455-8759 PHONE: 817-562-3350
GRAPHIC SCALE
ti
W/J H xtf I L.P,
Nat• 20625 23
C R.T.C.T
1X a a / 5
^ 8 ]
10 it
W K 11 12 13 14 is m 17
FRONTIER DRIVE
u Q�a2
W W
_h >
QL❑] a
R a a a LIVE 0 w
a ir 6 HAS£ A
O6 7 9 9 10 11 O
JJ �
G U
h
7
O VE 0
ASE ~
2a at 10 19 19 17 t0 16 14 /3 12
FUTURE
WENDY WAY WE DY WAY
C7
N z
In z
1 a a a s a 7 a 9 10 11 1 ��
b �
41
42
as
c
u
~ �s 22 21 10 t9 19 t] 19 15 u u 12 I x
DIXON COURT a7
b 39 �
30LN OAK
36
37 PH 38. >6
35 u as 32 31 ao 29 ae n ae zs u n 2a I
u I
jN
D O LIVE ,x O
PHASE 3Ai3
11 12 13 1/ 1s 19 17 19 t9 20 32 n
e!—,
!{ i SCARORADRIVE 91X 3j
A
C] 30O
Uva Oak Craik Z
Phar 2.Sxtion 1 3 10 19 20 21 1 22 21 U as 10 1] 29 29
1-t.D21608%34 l v
C_4.T.C.L O 1 1 1 m
u J J I
m o I
LEGEND
PROPOSED STREET NAME SIGNS
0 EXIST STREET NAME SIGNS
i
EXHIBIT Cl - STREET NAME SIGNS
OWNER/ DEVELOPER: �',� PELOTON
0 NORTH LIVE OAK 351 DEVELOPMENT, LLC 9800 H�� �•�� {O L
PHASE 3B P.O. BOX 1122 ISU�TE D250SUITE
ARGYLE, TEXAS 76226 FORT WORTH, TX 76177
11 GRAPHIC SCALE DATE: JUNE, 2017 PHONE: 214-455-8759 PHONE: 817-562-3350
SECTION 00 42 43
PROPOSAL FORM UNIT PRICE
Live Oak Phase 3B
UNIT PRICE BID Bidders's Application
Project Item Information Bidders Proposal
Nditst item Description Specification Unit of Bid Quantity Unit Price Bid Value
Section No. Measure
WATER IMPROVEMENTS
1 8"PVC Water I'y, 33 11 12 i.l 2,027 $28.82 $58,418.14
P82 l"Water Ser 33 12 10 F 4 57 $769.07 $43,836.99
3 8" +t 6 51,296.84 $7,781.04
4 Fire Ii dDlit 1 53,981.42 $3,981.42
5 Ducalr Iron Water I utiugs w,Restraint 3 'l C I Via; I $6,767.75 56,767.75
7 8"',^. 535.3
ire line Lowering 1 $2,525.34 52. 4
G,iuw,tion toExisiing4"-12"Water Main 4 5984.40 � .`r?`.(t)
9 -1 n•n h Satcic 31 L'- 2,tt27 $0.81 S 1,o41.57
TOT41 IVATTR IMPRO%'F.MI:',TS $128,X90.15
SANITARY SEWER IMPROVEMENTS
10 8"Sewer Pipe 333120 LF 1,483 $36.59 554._'h7}J
I I 4'Manhole 33 39 20 EA 7 53,511.61 S24,581.2-
12
_'4,581'-12 CSS Encasement for Utility Pipes 3305 10 LF 40 Sr -r, $2,510.40
13 4'Extra Depth Manhole 33 39 20 VF 1132 w;15.41 —;,721.24
14 Manhole Vacuum Testing 33 01 30 EA 7 1
15 Epoxy Manhole Liner(Warren Environmental) 333960 VF 10.15 53, `6.15
16 4"Sewer Service 33 3150 EA 57 51,074.66 $61,255.62
17 Connect to Existing 8"Sanitary Sewer 3331 20 EA 2 $658.32 $1,316.64
18 Tr,uthSafety 330510 1.4t1 50.32 5474.56
19 Pvcr-t( IV Inspection 33 01 31 LF 51.61 $2,387.63
TOTAL SAN[IARI SLk%'ERINIPRf13'IIIENIS $157143.23
STORM DRAIN INIPROVENIENUS
20 36"RCP,Class 111 3341 10 LF 5132.98 $6,383.04
21 24"RCP,Class 111 3341 10 LF o:4 $79.99 $49,113.86
22 21"RCP.Class 111 334110 LF $70.74 $15,138.36
23 4'Storm Junction Box 3349 10 EA 53,414.64 $6,829.28
24 10'Curb Inlet 33 49 20 EA 4 $4,152.94 $16,61 1.76
25 15'Curb Inlet 33 49 20 EA 2 55,321.92 $10,643.84
26 ITrench Safety 3305 10 1 LF 8761 50.32 528032
TOTAL SANITARY SEWER IMPROVEMENTS $105,000.
PAVING iMPRON'EMENTS
1 6"ConcPvmt 321313 ���
2 4"Cone Sidewalk 321320
3 6"Lime Treatment 321129
4 Hydrated Lime 32 1129 A8 $160.Ot
5 Barrer Free Ramp,Type R-1 32 1320 EA 2 $2,000.0(1 54,000.00
6 Barrer Free Ramp,Type M-2 -J EA 2 S2,1-i�u 1 54,000.00
7 Barrer Free Ramp,Type P-1 1320 EA 2 $2,uOH,0(l $4,000.00
8 24"SLD Pvmt Marking Paint 1 W 1 1723 LF 42 1(,5'i 5693.00
9 Connect to Ex Street Header ) , LF 87 ti If t.1 v $870.00
10 Remove End of Road Barricade 4113 1 F? I is too,no $1,500.00
TOTAL PAVING IMPRON FIR NTS $303,571.80
STREET SIGNS
14 Street Sign 34 41 30 1 A 50Q ', 510,000.00
Bid Summary
Base Bid
Water Improvements S128,890.15
Sanitary Sewer Improvements $157,143.23
Stone Drain Improvements 5105,000.46
Paving Improvements 5303,571.80
Street Signs S10,000.00
TOTAL BID $704,605.64