HomeMy WebLinkAboutContract 48512-FP1 FORTWORTH.
CITY SECRETARY c I
CONTRACT NO.'+ � �.1.�-
TRANSPORTATION AND PUBLIC WORKS
NOTICE OF PROJECT COMPLETION
(Developer Projects)
City Project N2: 100547
L'sa-SI X5/2
Regarding contract for PRIMROSE CROSSING-PHASE 1D as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through
M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
Original Contract Price: $645,683.09
Amount of Approved Change Orders: Ns 1
Revised Contract Amount: $645,683.09
Total Cost Work Completed: $645,683.09
Recommended for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
6J ,
Accepted 7 0Date
4W Director,
TRANSSPPORRTTATION AND PUBLIC WORKS DEPARTMENT
7
Asst. City Manager Department of TPW Const. Services Date
CPN# l � Dat r�
Project Manager
Risk Management S. Gatewoo -17
Comments: D.O.E. Brotherto OFFICIAL RECORD
L+`MA."Arlf- !Tater V. Gutzier -1 CITYSECRVARY
CNA Janie-Morales/Scanned ❑
SEPA2 2017 FT,WOR YN,YX
The Proceeding people have been Contacted concerning the request
for lrml payment&have released this project for such payment.
Clearance Conducted By Etta Bacy
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name PRIMROSSE CROSSING-PHASE 1D
Contract Limits
Project Type PAVING
City Project Numbers 100547
DOE Number 0547
Estimate Number I Payment Number 1 For Period Ending 9/7/2017
CD
City Secretary Contract Number 2100547 Contract Time 16(ED
Contract Date 12/16/2016 Days Charged to Date 226
I
Project Manager NA Contract is 100.00 Complete
Contractor L.H.LACY COMPANY
P.O.BOX 541297
DALLAS, TX 75354
Inspectors RODGERS / FLUTE
i
I
6
Thursday,September 7,2017 Page 1 of 4
City Project Numbers 100547 DOE Number 0547
Contract Name PRIMROSSE CROSSING-PHASE 1D Estimate Number 1
Contract Limits Payment Number I
Project Type PAVING For Period Ending 9/7/2017
Project Funding
UNIT IV:PAVING
Estimated Unit Unit Cost Estimated Completed Completed
Item Description of Items
No. Quanity Total Quanity Total
1 HYDRATED LILME(30 LBS/SY) 164 TN $146.20 $23,976.80 164 $23,976.80
2 6"LIME TREATMENT 10925 SY $2.39 $26,110.75 10925 $26,110.75
3 6"CONC PVMT 10227 SY $33.21 $339,638.67 10227 $339,638.67
4 6"CONC PVMT(ALLEY SECTION) 4517 SY $37.52 $169,477.84 4517 $169,477.84
5 4"FLEXIBLE BASE TYPE A GR-1 4949 SY $10.75 $53,201.75 4949 $53,201.75
6 BARRIER FREE RAMP TYPE R-1 2 EA $1,505.80 $3,011.60 2 $3,011.60
7 BARRIER FREE RAMP TYPE M-2 2 EA $1,473.45 $2,946.90 2 $2,946.90
8 BARRIER FREE RAMP TYPE P-1 16 EA $1,385.98 $22,175.68 16 $22,175.68
9 REMOVE BARRICADE AND CONNECT TO 10 EA $263.61 $2,636.10 10 $2,636.10
EXISTING PAVEMENT
10 STOP SIGNS 2 EA $163.50 $327.00 2 $327.00
11 STREET NAME BLADE 16 EA $54.50 $872.00 16 $872.00
12 STREET SIGN POLE 4 EA $327.00 $1,308.00 4 $1,308.00
Sub-Total of Previous Unit $645,683.09 $645,683.09
Thursday,September 7,2017 Page 2 of 4
City Project Numbers 100547 DOE Number 0547
Contract Name PRIMROSSE CROSSING-PHASE ID Estimate Number I
Contract Limits Payment Number I
Project Type PAVING For Period Ending 9/7/2017
Project Funding
Contract Information Summary
Original Contract Amount $645,683.09
Chante Orders
Total Contract Price $645,683.09
Total Cost of Work Completed Date $645,683.09
Cont Less %Retained $0.00
' Zb�l Net Earned $645,683.09
Date Earned This Period $645,683.09
Inspection Supervisor
Retainage This Period $0.00
�'d Date r `1 Less Liquidated Damages
Proj t Manager
Days @ /Day $0.00
R44 Date'
LessPavement Deficiency $0.00
Asst Director/TPW-Infrastructu a Design and Construction Less Penalty $0.00
h]�_ /'J J Date Less Previous Payment $0.00
Direct /Contracting Depart ent Plus Material on Hand Less 15% $0.00
Balance Due This Payment $645,683.09
I
i
I
I
Thursday,September 7,2017 Page 3 of 4
I
City Project Numbers 100547 DOE Number 0547
Contract Name PRIMROSSE CROSSING-PHASE 1D Estimate Number I
Contract Limits Payment Number I
Project Type PAVING For Period Ending 9/7/2017
Project Funding
Project Manager NA City Secretary Contract Number 2100547
Inspectors RODGERS / FLUTE Contract Date 12/16/2016
Contractor L.H.LACY COMPANY Contract Time 160 CD
P.O.BOX 541297 Days Charged to Date 226 CD
DALLAS, TX 75354 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $645,683.09
Less %Retained $0.00
Net Earned $645,683.09
Earned This Period $645,683.09
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $645,683.09
Thursday,September 7,2017 Page 4 of 4
AFFIDAVIT
STATE OF Texas
COUNTY OF Dallas
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Ronald S Murawski,
President Of L.H. Lacy Company, Ltd, known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Primrose Crossing 1D
BY
Ronald S. Murawski
Subscribed and sworn before me on this date 5 of September, 2017.
Notary Public
Dallas County, Texas
DARLENE COI�IEY
NotaryID # 10317301
My Commission Expires /
SSjEOF 1EKPy
March 9, 2020 �
CONSENT OF SURETY OWNER XJ
TO FINAL PAYMENT ARCMTi;CT
CONT'RACT'OR �7
.AIA Document G707 SURETY f7
Bond No. 1535043 0THFR E3
TO OWNER: ARCHITECT'S PROJECT -NO.:
(Narne ittid adilmz)
City of Fort Worth&Wilbow-Llano Springs Development Corporation
4131 N. Central Expressway, Suite 990 CONTRACI'FUR: Paving Improvements
Dallas, TX 75204
PROJECT: CONTRACT DATED
(Mimeand addrwo
Primrose Crossing Phase 1 D, Fort Worth, TX
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated,above,the
answ nanmand add, of,Su>xt11
Great American Insurance Company of New York
301 E Fourth Street
Cincinnati, OH 45202
SURETY,
on bond of
{lnserr,rame and addmcs q�'Conlrrrctw)
L.H. Lacy Company, Ltd.
1880 Crown Road, Suite 1200
Dallas, TX 75234
CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of
any of its obligations to
(I)Wtl=1110 and a4(re.V Qf Orrrrer)
City of Fort Worth &Wilbow-Llano Springs Development Corporation
4131 N. Central Expressway, Suite 990
Dallas, TX 75204
OWNER,
as set fortb in said Surety's bland.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date, August 7, 2017
(AtsurY(n uv11(irj(fhe rnonrAfollou�t(ht+rfic rrrunerrc datearrda+ear,i
Great American Insurance Company of New York
(S1nxKY)
By:
(SYg,rattnr oJarNbor9xrd+Nprucrntati2r)
A�m+ t' L( _ Rita G. Gulizo Attorney-in-Fact
(Praised manta and ddr)
G707-1994
GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
New York
Administrative Office:301 E 4TH STREET • CINCINNATI,OHIO 45202 • 513-369-5000 • FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than THREE No. 0 19964
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS:That the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK,a corporation
organized and existing under and by virtue of the laws of the State of New York,does hereby nominate,constitute and appoint the
person or persons named below its true and lawful attorney-in-fact,for it and in its name, place and stead to execute on behalf of
the said Company,as surety,any and all bonds,undertakings and contracts of suretyship,or other written obligations in the nature
thereof;provided that the liability of the said Company on any such bond,undertaking or contract of suretyship executed under this
authority shall not exceed the limit stated below.
Name Address Limit of Power
DAVID T.MICLETTE ALL OF ALL
RITA G. GULIZO NEW ORLEANS, $100,000,000.00
SUSAN D.ZAPALOWSKI LOUISIANA
This Power of Attorney revokes all previous powers issued on behalf of the attorney(s)-in-fact named above.
IN WITNESS WHEREOF,the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK has caused these presents to be signed
and attested by its appropriate officers and its corporate seal hereunto affixed this 30TH day of JUNE , 2017
Attest GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
'i o0 oxnrE A /�
,SEAL;'=
Assistant Secretory, Dirisianal Senior Pice Prrcirleni
DAVID C.KITCHIN(877-377-2405)
STATE OF OHIO,COUNTY OF HAMILTON-ss:
On this 30TH day of JUNE 2017 before me personally appeared DAVID C.KITCHIN,to me known,
being duly sworn, deposes and says that he resides in Cincinnati, Ohio,that he is a Divisional Senior Vice President of the Bond
Division of Great American Insurance Company of New York,the Company described in and which executed the above instrument;
that he knows the seal; that it was so affixed by authority of his office under the By-Laws of said Company, and that he signed
his name thereto by like authority.
,,RIAI
&W N0WyPtea�cono��/tW
7 Iy *%=
This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great
American Insurance Company of New York by unanimous written consent dated May 14,2009.
RESOLVED: That the Divisional President,the several Divisional Senior Vice Presidents,Divisional Vice Presidents and Divisional
Assistant Vice Presidents, or any one of them, be and hereby is authorized, from time to time, to appoint one or more Attorneys-in-Fact
to execute on behalf of the Company,as surety,any and all bonds, undertakings and contracts of suretyship, or other written obligations
in the nature thereof,'to prescribe their respective duties and the respective limits of their authority;and to revoke any such appointment
at any time.
RESOLVED FURTHER:That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant
Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond,
undertaking, contract of suretyship, or other written obligation in the nature thereof,such signature and seal when so used being hereby
adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the
Company with the same force and effect as though manually affixed.
CERTIFICATION
I,STEPHEN C. BERAHA,Assistant Secretary of Great American Insurance Company of New York,do hereby certify that
the foregoing Power of Attorney and the Resolutions of the Board of Directors of May 14, 2009 have not been revoked and are
now in full force and effect.
Signed and sealed this 7th day of August 2017
�si coneonrF\;=
- ' SEAL
Assistant Secrelary
S1185L(06/15)
FORTWORTHREV:02/22/07
TI =NSPORTi A a'Ict N AND PUBLIC WORKSy
CON IRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 19/8/2017
Nrnne of Contractor Project Name
L.H.Lacy Utility Construction Compan c. Primrose Crossing Phase 1D
DOEInspector Project Manager
Michael Flute Kahl Jaafari
DOENumber }ProjectDiculty Type of Contract
CPN# 100547 !,O Simple QQ Routine Q Complex ❑water ❑waste water ❑Storm Drainage Pavement
Initial Contract Amount Final ContractAmount
$645,683.09 $645,683.09
II)PERFORMANCE EVALUATION
0-Inade uate 1 -Deficient 2- Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 3 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 2 Clarity& Sufficiency of Details 3
3 Accuracy of Measured Quantities 3 3 Applicability of Specifications
4 Dis la Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
i6 Performance- Setting up Valve Crews,Labs -7 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Mana er 3
1 Change Order Processing Time 77 3 Communication 3
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3
3 Bid Openin tg o Pre-Con Meeting Timeframe
III)COPvIMENTS & SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
, E The City of Fort Worth• 1000 Throckmorton Street• Fort Worth,TX 76012-6311
r (817) 392-7941 •Fax: (817) 392-7845
FORTWORTHREV:8/20/16
'YR 1\\JSJPDXTATICIl*-J AND PUBLIC WORKS !�
Th s11�/�anA�nrT.r�u SVT A Y YTA''�''YITS- 01 A9e��.,IN nfi AA"'T Vii
J, \, O_IJV 1 kd e_1 v i._a-,UrKA iaJl J Asn altrl J_n
1) CONTRACTOR cab PROJECT DATA
Name ofContraclor Project Name
L.H. Lacy Company,Ltd Primrose Crossing Phase 1D
Inspector Citi Project Number
Michael Flute 1100547
Construction Components Project Manager
❑Water ❑Waste Water ®Storm Drainage Q Pavement Kahl Jaffari
Initial ContractArnoent Project Difficulty
$654,683.09 0 Simple O Routine 0 Complex
Final ContactAmount Date
$654,683.09 9/8/2017
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT MTEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 7
2 Public Notifications 5 Y 3 20 15
3 Plans on Site 5 Y 4 20 20
4 Field Supcii ision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 Ell 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Homs Response 5 N
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 402
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE('I'S) 402
III)CONTRACTORS RATIrNG
Maximum Score(MS)=448 or sum of applicable element score maximums which= 428
Rating([TS/MS]*100%) 402 / 428 = 94%
Performance Category Excellent
'20%=Inadequate 20%to<40%=Deficient 40%to X60%=Standard 60%to<80%=Good X80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector Signature Contractor Signature
Inspector's Supervisor Signature
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC\\CORKS
The City of Fort Worth•8851 Camp Bowie West Bled. ° Fort Worth,TY 76t 16> (817)392-8306
FORTWORTH REV:8/20116
4!B7!3 'q T^TA'0 T "DIF qR 7� rn n.Y,"y
r AAAA u.,�A01VA1-11V�`✓L'e A=*V1�VI�:il TI.A�{'1V V.J'll �`✓,U�1��`J�211.61�ii�U�_A�A\.
I CONTRACTOR,-u PROJECT DATA
Name of Contractor Project Name
L.H. Lacy Company,Ltd Primrose Crossing Phase 1D
Inspector City Project Number
Michael Flute _ 100547
Construction Components Project Manager
❑Water ❑Waste Water [—]Storm Drainage [2]Pavement Kahl Jaafari
Initial ContractAnrount Project Difficulty
$654,683.09 0 Simple 0 Routine 0 Complex
Final ContractAnrount Date
$654,683.09 9/8/2017
II)PERFORMANCE EVALUATION
0-hiadequate I -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 7
2 Public Notifications 5 Y 3 20 15
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up I 5 _ Y 3 20 15
10 Citizen's Complaint Resolution 5_� Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 N
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 402
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 402
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 428
Rating([TS/MS] *100%) 402 / 428 = 94%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >:80%—Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector Signature 1 Contractor Signature
Inspector's Supervisor Signature
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•8851 Camp Bowie West Blvd.•Fort Worth,TZ 76116 a (817)392-8306
FORTWORTH rev 03/05/07
- _
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:
NAME OF PROJECT: Proimrose Crossing Phase I D
PROJECT NO.: 100547 CONTRACTOR: L.H. Lacy Company,Ltd.
DOE NO.: NA
PERIOD FROM:01/24/17 TO: 09/07/17 FINAL INSPECTION DATE: 7-Sep-17
WORK ORDER EFFECTIVE:1/24/2017 CONTRACT TIME: 160 0 WD CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGDURING CREDITED MONTH DURING CREDITED
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS * CHARGED DAYS
THIS
PERIOD
PREVIOUS
226 226
PERIOD
TOTALS
226 226
TO DATE
*REMARKS:
!V12
CONTRAC2�k DATE INSPECTOR DATE
ENGINEERING DEP_ARTNtENT
s' The City of Fort Forth• 1000 Throckmorton Street• Fort North,TY 76012-6311