HomeMy WebLinkAboutContract 45032-A3 AMENDMENT NO. 3 TO AGREEMENT
FOR PROFESSIONAL SERVICES
NORTH SERVICE CENTER GEOTECHNICAL INVESTIGATION
STATE OF TEXAS ''``��--
CITY SECRETARY CONTRACT NO.T�D3a 3
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and Mas-Tek Engineering & Associates, Inc. (Engineer) made and entered
into City Secretary Contract No. 45032 (The Contract) which was administratively executed in the amount of
$23,500.00.
WHEREAS, further amendment is necessary to reimburse the Engineer for professional services for the project as
part of the design services agreement; and
NOW THEREFORE, City and Architect, acting herein by and through their duly authorized representatives, enter
into the following agreement which amends the Contract:
1.
Article 1.1, SECTION I —SERVICES OF THE ENGINEER, the following paragraph is added to read as follows:
"Provide additional Material Testing Services for the construction of Phase Two of the North Service Center. The
fee for these services is a Not to Exceed amount of$30,271.00 and the scope of services is described in the Mas-
Tek Engineering and Services, Inc. letter dated August 28, 2017, Re: CMT Testing, North Service Center phase 2,
Additional Construction Cost, Fort Worth, Texas 76102, Mas-Tek Proposal No. 08-04-C attached hereto a
Attachment"D"and made a part of this Agreement"
"Provide Materials Testing Services for the construction of the North Service Center. The fee for these services is
a Not to Exceed amount of$150,000.00 and the scope of services is described in the Mas-Tek Engineering and
Associates, Inc. letter dated February 18, 2015, Re: CMT Testing, North Service Center, Fort Worth, Texas
76102, Mas-Tek Proposal No. 02-06-C attached hereto as Attachment"C"and made a part of this Agreement"
"Provide additional equipment (atv boring rig) for the implementation of on-site boring to produce a complete
Geotechnical Investigation Report. The fee for these services is $1,000.00 and the scope of services is described
in the Mas-Tek Engineering & Associates, Inc. letter dated November 1, 2013, Subject: Supplemental Proposal,
Proposed North Service Center Fort Worth, Texas, AGG Proposal No. P13-1102E, attached hereto as Attachment
"A" and made a part of this Agreement"
"Provide supplement Geotechnical investigation to the existing Geotechnical Investigation Report. The fee for
these services is $5,000.00 and the scope of services is described in the Mas-Tek Engineering &Associates, Inc.
letter dated February 5, 2014, Subject: Proposal for Supplemental Investigation, Proposed North Service Center,
Fort Worth, Texas, MTE Proposal No. P14-0203E attached hereto as Attachment "B" and made a part of this
Agreement"
2.
Paragraph 1 of SECTION V-COMPENSATION TO ENGINEER, is amended as follows:
"The total compensation for all of the assignments to be performed by Engineer as described in CHARACTER
AND EXTENT of ENGINEER'S SERVICES hereof shall be a fixed fee of$209,771.00. "
QMH 23gS
s
OFFICIAL RECORD Q� Q CP
CITY SECRETARY RECEIVED o
FT.WORTN,TX o SEP 19 2017
C I OF FORT
(The remainder of this page intentionally left blameCin SFCRFr-,,"y ^�
3.
All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect.
EXECUTED this the Q9J day of ,2017, in Fort Worth, Tarrant County, Texas.
Mas-Tek Engine r Associates, Inc. APPRO
By: By:
Steve ason Jesus J. Chapa
President Assistant City Manager FoRr
VAL ECOM D D: REC FiiD h, 10�
By: By: n c 2
Steve ooke, Director - a J. Kayser
G� Property Management Department City Secretary
APPROVED AS TO FORM AND LEGALITY: M&C Not Required for this AmendmenAS
Contract Authorization
By: /r
JAB. Stron
Assistant City Attorney
Contract Compliance Manager:
By signing I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
re uirements
Brian R. glass, AIA
Architectural Services Manager
OFRECORD
CITY SECRETARY
FT.WOM,TX
�'ST*+l�tM�t�tT *pt t
M�T[E'
04
ENGINEERING
August 28,2017
City of Fort Worth
401 W. 131"Street
Fort Worth,TX 76102
Attention: Mr.Ronald Clements
Registered Architect
Property Management Department
817.392.8014 Office
817.392.8488 Fax
ronald.clements(@fortworthtexas.gov
Re: CMT Testing
North Service Center phase 2
Additional Construction Cost
Fort Worth,Texas 76102
Mas-Telt Proposal No. 08-04-C
Mas-Tek Engineering&Associates is delighted to submit this estimate of fees for Construction
Material Testing Services on the above referenced project.This estimate is based on the review of
project plans and specifications.
We anticipate:
• Observation and testing of site earthwork,utility backfill and paving subgrade
• Concrete Sampling&Testing
• Project Management&Administration
We appreciate the opportunity to serve you. if you have any questions do not hesitate to
contact our office.
Sincerely yours,
Mas-Tek Engineering&Associates,Inc.
Syed A. Ahmed,P.E
Senior Project Manager
Attachment: Cost Estimate
Geoleehrkel Erglneerirg Services—Carslrucfion biakmk%Engineeeng Inspwbon&Testing SaMeas
10626 Newkirk St,Suite#800 Dallas,TX 76220 Ph. 972-709-7384 FX.972-709-7386
i
ESTIMATE OF FEES
FOR MIE
CONSTRUCTION MATERIALS TESTING SERVICES INUMINS
NORTH SERVICE CENTER PHASE 2 ENGINEERING
ADDITIONAL AMENDED COST
Proposal No:08-04
SERVICE Unit Rate Units Unit Cost
SOILS
Soil Testing(hourly) $48.00 85 $4,080.00
Soil Testing(hourly)OT $72.00 50 $3,600.00
Moisture Density Relations ASTM D-698(each) $150.00 3 $450.00
Alterbeg Limits(each) $52.00 3 $156.00
In Place Density ASTM D-6938(each,nein 3 tests) $14.00 150 42,10D.00
Lime/PH Series(4 Points) $215.00 2 $430.00
Lime Field Gradations $16.00 8 $128.00
Lime Field Depth Test $16.00 8 $128.00
Sieve Analysis(Coarse/Fine Aggregates) $85.00 3 $255.00
PIERS
Pier Inspection(hourly) $48.00 0 $0.00
Pier Inspection(hourly)(OT) $72.00 0 $0.00
Concrete Cylinders(each) $16.00 0 $0.00
CONCRETE TESTING&PREPOUR INSPECTIONS
Concrete Inspection(hourly) $48.00 110 $5,280.00
Concrete Inspection(hourly)(OT) $72.00 30 $2,160.00
Concrete Cylinders(each)(5 Per Set) $15.00 150 $2,250.00
STRUCTURAL STEEL
Structural Steel Inspection(hourly)(4 hour min) $65.00 12 $780.00
MORTAR/GROUT SAMPLING&TESTING
Mortar Cubes(6 per set) $16.00 12 $192.00
Groat Cylinders(4 per set) $16.00 12 $192.00
TRAVEL
Trip Charge(each) $50.00 100 $5,000.00
PROJECT MANAGEMENT
Project Management(hourly) $80.00 15 $1,200.00
Clerical(hourly) $34.00 25 $850.00
Project Engineer $130.00 8 $1,040.00
Note:Project Management time is billed as lime for reviewing reports,coordination,end consultation.
ESTIMATED BUDGET: $30,271.00
NOTES:
1)This proposal and estimated cost is based on on anticipated conslruclion schedule. Invoices will be based on actual time spent on the project,
charged at the quoted unit prices.
2)Overtime rates or I S limes the regular hourly rale will be charged for hours worked over eight(5)hours per day,&on Soturduys.Services performed
on Sulxlays and recognized holidays will be billed at 2.0 times We resider hourly rate.
3)All services billed at a hourly rare and charged at the applicable Fate,portal-10-portal.
a)Additional test nal specified in this proposal will be quoted upoo request.
5)The estimated units above do not include stand-by-time for contractor not-readiness or retests of previously failing tests.