HomeMy WebLinkAboutContract 49324-A1 AMENDMENT NO. 1 TO AGREEMENT
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
PARD Consolidated Service Center
STATE OF TEXAS
CITY SECRETARY CONTRACT NO. 3
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and Quorum Architects (Consultant) made and
entered into City Secretary Contract No. 49324 (The Contract) which was authorized by
the City Council by M&C C-28283, the 20th day of June, 2017, for Amendment 01 for
Architectural Services, Contract 49324 PARD Consolidated Service Center, Quorum
Project No. 17056; and
WHEREAS, further amendment is necessary to reimburse the Consultant as part of the
design services agreement for additional design services for sub-contracting for
geotechnical investigative services, option 1.
NOW THEREFORE, City and Consultant, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1
Article I — Scope of Services, Paragraph (3) shall be added to read as follows:
(3) Provide additional design services for the sub-contracting for geotechnical
investigative services, option 1. The cost of this additional service is $15,400.00
plus $0.00 in reimbursable expenses. The scope of services is described more
fully in Quorum Architects Letter dated September 13, 2017, subject:
"Amendment 01 for Architectural Services, Contract 49324 PARD Consolidated
Service Center, Quorum Project No. 17056".
2.
Compensation, first paragraph, is amended as follows:
sultant shall be compensated in accordance with the Fee Schedule shown
.� RECEIVED i achment "A". Payment shall be considered full compensation for all labor,
SEP 2 201 m rials, supplies, and equipment necessary to complete the services
Q CITYOFFORTwom d ribed in Attachment "A". However the total fee paid by the City shall not
C"SECRETARY ed a total of$991,000.00 unless the City and the Consultant mutually agree
zA, on a fee amount for additional services and amend this Agreement
�L of s e ccordingly."
of Fort Worth,Texas OFFICIAL RECORD
Standard AgreementAM
for Professional Services ENDMENT
Revision Date:8118!2018
Page 1 of 2 CITY SECRETARY
Pape
FT.WORTH,TX
3.
All other provisions of this Contract which are not expressly amended herein shall
remain in full force and effect.
EXECUTED this the day of 2017, in Fort Worth, Tarrant County,
Texas.
Consultants Name APPROVED:
By: By:
me pAv4,, 0,t-f ld Jesus J. Chapa
Title FPriKer fb&uI Assistant City Manager
APPROVAL R COMMENDED: RECORDED:
By: By: F OR;P,
STevet6oke, Director Mary J. s
Property Management Department City Secretary
v. :_
APPROVED AS TO FORM AND LEGALITY: M&C Not Required AS
(`�J Contract Authorization
By:
J trong
Assistant City A mey
CONTRACT COMPLIANCE MANAGER:
By signing I acknowledge that I am the person responsible for the monitoring and administration of this
contract, including ensuring all performance and reporting requirements.
By: `�-
Brian R. Glass, AIA
Architectural Services Manager
Nt
City of Fart Worth,nt for
Standard Agreement for Processional Services AMENDMENT
Psan«Date:�lerzola
Quorum
Dosign. Spaces. People.
September 13,2017
Brian Glass,AIA
Property Management Department
City of Fort Worth
401W131hSt
Ft Worth,Texas 76102
RE: Amendment 01 for Architectural Services
Contract 48324 PARD Consolidated Service Center
Quorum Project No.17058
Dear Brian:
We respectfully submit this request for Amendment of for Architectural services for the PARD Consolidated
Service Center(Contract 49324). This request Is specifically for geotechnical Investigation since this was not
Included in our original fee proposal or Agreement We have presented below two options for the geotechnical
servk*s;Option 1—covers geoteohnical for the master plan development,Including possible Phase 2 areas In
the southwest comer of the existlng site, and Option 2,which Is the rninknal investigation needed for the
Phase 1 development for four new structures along with paving and road base material for fire lanes. The qty
may choose either optlon.
Compensation for Amendment of as described herein Is proposed to be a lump sun fee as described below:
Option Y. $15,400
Option Z. $13,200
We have attached a copy of CMJ%a proposal to us so you can see specifically what their scope includes in
more detall.Please let us know If this is acceptable so that we may begin the process of obtaining a signed
amendment and can notN CMJ to schedule the borings in order to maintain this compressed design
schedule.
SirKWely,
y f Digilally signed by Davld Duman
1 Date:2017.09.1412:50:50-0510(Y
David G.Duman,AIA
Quorum Architects,Inc.
TX Registration#14305
ArchiteCtUT4 IntOrlor Deden 4 707 W Vickery Blvd suite loi Fort worth Texas 7OW USA ph 871730 0095 Ix 0i7 738 9524 y WwKgmh oom