HomeMy WebLinkAboutContract 49673 Developer and Project Information Cover Sheet:
Developer Company Name: BNM Lake Vista Development,LP By: HMH Development,Inc. Its
General Partner
Address, State,Zip Code: 1038 Texas Trail, Grapevine,TX,76058
Phone&Email: 817-849-5285,Bruce.French@historymaker.com
i
Authorized Signatory,Title: a Bruce French,Vice President
Project Name: Lake Vista Ranch Phase 3
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: Boaz Rd Between Boat Club Rd&Bowman Roberts Rd
Plat Case Number: FP-17-009 Plat Name: Lake Vista Ranch
Mapsco: ' 32Q Council District: 7
.................................._.._.....__._.........__,_......_...._.....--- - —......._................................ ..._.....__..._.................................................................................................._..............................._........._..............._._...----._..........._.._............._............__.........------_....
i
CFA Number: 2017-095 City Project Number: 101041
i
To be completed by af.-
Received by: Date: �7
B910yrreq
OL ro
c,EP 22 2p11
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CITY SECRETARY
CFA Official Release Date:02.20.2017 FTS WORTH,TX
Page 1 of 10
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS,BNM Lake Vista Development,LP By: HMH Development,Inc.Its General
Partner, ("Developer"), desires to make certain specific improvements as described below and on
the exhibits attached hereto ("Improvements") related to a project generally described as Lake
Vista Ranch Phase 3 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth,
Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ('Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements, -oper
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CITY aECRETARY
CFA Official Release Date: 02.20.2017
Page 2 of 10 FT.WORTN,TX
further acknowledges that said acceptance process requires the Developer's contractor(s)
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) b, Sewer(A-1) 3f, Paving (B) it, Storm Drain(B-1) IAC', Street Lights & Signs
(C) S.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure,and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
City of Fort Worth,Texas
Standard Community Facilities Agreement-Lake Vista Ranch Phase 3
CFA Official Release Date: 02.20.2017
Page 3 of 10
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s)it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Lake Vista Ranch Phase 3
CFA Official Release Date: 02.20.2017
Page 4 of 10
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits,actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such iniuries, death or damages are
caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with,the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify,and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Lake Vista Ranch Phase 3
CFA Official Release Date: 02.20.2017
Page 5 of 10
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent(4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 1 YEAR
i. Developer shall complete the Improvements within one (1) year, provided,
however, if construction of the Improvements has started within the one year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of one (1)year from the date of this Agreement (and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Lake Vista Ranch Phase 3
CFA Official Release Date: 02.20.2017
Page 6 of 10
construction of same before the expiration of one(1)year if the Developer breaches
this Agreement, becomes insolvent or fails to pay costs of construction and the
financial guarantee is not a Completion Agreement. If the financial guarantee is a
Completion Agreement and the Developer's contractors and/or suppliers are not
paid for the costs of supplies and/or construction, the contractors and/or suppliers
may put a lien upon the property which is the subject of the Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the company that it: (1) does
not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel"and"company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract,Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel, and(2) will not boycott Israel during the term of the contract.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLAND
City of Fort Worth,Texas
Standard Community Facilities Agreement-Lake Vista Ranch Phase 3
CFA Official Release Date: 02.20.2017
Page 7 of 10
z
Cost Summary Sheet
Project Name: Lake Vista Ranch Phase 3
CFA No.: 2017-095 City Project No.: 101041
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 222,330.20
2.Sewer Construction $ 202,768.00
Water and Sewer Construction Total $ 425,098.20
B. TPW Construction
1.Street $ 486,392.10
2.Storm Drain $ 68,015.50
3.Street Lights Installed by Developer $ 74,247.61
4. Signals $ -
TPW Construction Cost Total $ 628,655.21
Total Construction Cost(excluding the fees): $ 1,053,753.41
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 8,501.96
D. Water/Sewer Material Testing Fee(2%) $ 8,501.96
Sub-Total for Water Construction Fees $ 17,003.92
E. TPW Inspection Fee(4%) $ 22,176.30
F. TPW Material Testing(2%) $ 11,088.15
G. Street Light Inspsection Cost $ 2,969.90
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 36,234.36
Total Construction Fees: $ 53,238.28
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 1,053,753.41
Completion Agreement=100%/Holds Plat $ 1,053,753.41
Cash Escrow Water/Sanitary Sewer-125% $ 531,372.75
Cash Escrow Paving/Storm Drain=125% $ 785,819.01
Letter of Credit=125%w/1 yr expiration period $ 1,317,191.76 x
City of Fort Worth,Texas
Standard Community Facilities Agreement-Lake Vista Ranch Phase 3
CFA Official Release Date:02.20.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
BNM Lake Vista Development,LP By: HMH
Development,Inc.Its General Partner
Jesus J. Chapa
Assistant City Manager
Date:
Recommended by: Name: Bruce French
Title: Vice President
Date: a (wtk l7
Wendy Ch)Babulal, EMBA, P.E.
Development Engineering Manager ATTEST: (Only if required by Developer)
Water Department
�. tJ
Douglas . Wiersig, P.E. Signature
Director Name:
Transportation& Public Works Department
Contract Compliance Manager:
Approved as to Form &Legality:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
Richard A. McCracken ensuring all performance and reporting
Assistant City Attortley requirements.
M&C No. IJ -
Date:
Form 1295: Name: Janie Morales
Title: Development Manager
ATT O RT�O .
O�F
'� RC UIRi;D
ary . Kayser * L!��C Q
City Secretary
//rnTEE)(
City of Fort Worth,Texas r` OFFICIAL RECORD
Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CITY SECRETARY
CFA Official Release Date: 02.20.2017
Page 9 of 11 'WORYH�TX
i
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A: Water Improvements
® Water Cost Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Cost Estimate
® Exhibit B: Paving Improvements
® Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Lake Vista Ranch Phase 3
CFA Official Release Date:02.20.2017
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 101041
None
City of Fort Worth,Texas
Standard Community Facilities Agreement-Lake Vista Ranch Phase 3
CFA Official Release Date: 02.20.2017
Page 11 of 11
R
fF
s e
4�
Z
lowv Rd
.THE
•L. RA8C3uR f �,,+
It pr ,
r
Oats Dr
sway Boswell Rd wearwr&WW Md
EoQkm,,,,,,,+Ica„,ycftQJECT LOCATION
v a �
'
Fla.
ska *`g z
W)Som Rd MiJ
EAGLE RANCH ” ar
r
2
S
r
LAKE CREST
ESTATES
W Mclemy eNd
�.9erlerd Dr .
w
MARANE CREEK HILLS g.
11 °
cnx" dl Marg Creek Rd Cv*St
tP�� OF TF�9
.:.............................
CHARLES F. STARK
.................................
N °: 57357
CITY PROJECT N0. 101041 �°"''?FC
OWNER/DEVELOPER s/0NAL
HMH LAKE VISTA LAND, LP. 28 2017 A TEXAS LIMITED PARTNERSHIP 06
NOT TO SCALE 1038 MAN TRAIL FP-17-009 USE OF THIS ELECTRONCIONANRE
AMORBY CHARLES F.STARK,P.E.
GRAPEVINE, TX. 76058 PP-14-005 TDN 7 57
PROJECT itis. Zu—SMS
9i►N011�•!�•�Ifl�
3ATE: JUW 2017
622,Swtro—1 sou.c-,.Gu W loo SFFE'f
Fan waren. T".;" 76132 LAKE VISTA RANCH PHASE III
(0)$17.231.800 B+7.231.8144
Tgy R gisltcrmd s,�m,y F,�rmFF•t0159tlUD CITY OF FORT WORTH,TARRANT COUNTY,TEXAS
L `I
3
J
t
ce '
n
------- ---_---- - — -- ---- ----- -- -- ------
-- - -�--� -- --�-- i 1 1--1 1- 1 1 -1-1 1--1--1--1 -1 1-7-1 - - --1----
� i
010
I I I I I I I I I I I 0 0 0 0 0,0,0,0,0,00.0;0,0,0,
------------------
LO I I I I 0 I 0 jEEEDDE01:000PRI
� ------�"
LO I I i I I i j j I I I I I I I I I H�
r i I ,Ol�i�;�, Oi0i0i0i0i00i0 ,
n
r
�-bfWE---------------- 0�
L- DID Ii i i _
3111". .L
.....
0 Ilk
t
GRAPHIC SCALE 1'=200'
100 0 100 200 tP�� OF• Tf�'
LEGEND
PROPOSED 8" WATER
W CHARLES F. STARK
.................................
PROPOSED GATE VALVE CITY PROJECT NO. 101041 Bio ��57357
PROPOSED FIRE HYDRANT FSS�!S7ER.• ?
OWNER/DEVELOPER �ONnL
EXISTING 8" WATER HAH LAKE VISTA UWD, L.P.
a' 2 0
EXISTING GATE VALVE --{X}-- A TEXAS LAUTED PARTNERSHIP 06/
1038 TEXAN TRAIL FP-17-009 U5E OF THIS ELECTRONIC SEAL/SIGNATURE
EXISTING FIRE HYDRANT AIJfHORIZEO EGI CHARLES F.STARK,P.E
Jam,;,.__ GRAPEVINE, TX. 76058 PP-14-005 TEYAS R I TI N NO.57357
�-- EXHIBIT 'A' PF�,LCT N� 241-9789
WATER IMPROVEMENTS DR'L ?G17
622' 9 3`6132 LAKE VISTA RANCH PHASE III �`
FdY WaM, T�aiY 76132
f01 817.231.81DO (F)817.23144" A
i Rlg6leiad EngiMa�rq Flnn F-la
re}a.Rey�waren st,ryev elsaero CITY OF FORT WORTH,TARRANT COUNTY,TEXAS
ww.v.6erronalsrk.mm
� I '
Lu
n
-- ---- ---- --- ------- ---- ------------------
DOE !Ei i i• i i i i i i i i i i ..0:0 D o o�;o, olo:o:o o o o;o:
.L----- � --��-------r ars
I I 1 1 1 1 I I I I I 1
I�O D DICT 0101�DE 01�u a :1
.
---
oa
L 3
i
y
—"
17
L=
00
0000D
L -L
...........
..„.. .............
...........
,..
............. ........... ...... .......
f E
........
E `x °..... �_4�
"y1
r
i f
LLL
N
kil
. ......................
• ZE OF TFk
GRAPHIC SCALE 1'=200' `':' s
100 0 100 200 CHARLES .. STARK
CITY PROJECT NO. 101041 yo:. 57357
LEGEND F��sTE�� .$
PROPOSED 8" SEWER S OWNER/DEVELOPER �SYONAL
PROPOSED 4' MANHOLE HMH LAKE VISTA LAND, LP. 02
EXISTING 8" SEWER
A TEX4S LIMITED PARTNERSHIP p6/
............_............._.CJ......_.._._......_._.. 1038 TEXAN TRAIL FP-17-009 USE OF THIS ELECTRONIC SEAL/SIGNATURE
UTHORIZED 8Y CHARLES F.STARK,P.E
EXISTING 4' MANHOLE A
��— GRAPEVINE, TX. 76058 PP-14-005 REGISTRATION NO.57357
M__ m EXHIBIT 'A-1' MW No. 241-M
SEWER IMPROVEMENTS "A7E Tp,1
F.M W"°'�;o T.."�S7612 LAKE VISTA RANCH PHASE III `
Fart Worth• Texas 76131
T 231 l".8
17
231 d14a A—�
T° 'ate CITY OF FORT WORTH,TARRANT COUNTY,TEXAS
Texas Regrsmretl S.. e:-,.., oaf._.
I l '
>
a
a
r
II I I I I I
�a.o.olo�o�o�o,o,
0
DUDE!0!
LD I I I I i ► i I I I I I I I I I l I I I � � --i
oo;
Lo
- - � = :j
AL
_ k
0 --�-
.
_ _
{
j
••_.._........
_.
i
{ 1 {
N
GRAPHIC SCALE 1'=200'
100 0 100 200 tEOF TF
�P ....... ay
LEGEND
*:
PROPOSED 6° CONCRETE CHAR LES..F."STARK
PAVING CITY PROJECT NO. 101041 po��F57357�0
PROPOSED 4" CONCRETEFSS oINnL� ��
OWNER/DEVELOPER
SIDEWALK PAVING HMH LAKE VISTA LAND, L.P. L/
A TEXAS LIMITED PARTNERSHIP 06/28 2011
1038 TEXAN TRAIL FP-17-009 USE Of THS EECTRONIC SF�L/SIGNATURE
GRAPEVINE, TX. 76058 PP-14-005 AUiHORQEORI_GISTRA'A�ON N0.57357 P.E.
EXHIBIT 'B'
� PROJECT No. 241-9389
Barron-Stark-BwiR
PAVEMENT IMPROVEMENTS DATE. J 2017
8221 southwest Boulevard,suite 100 SN¢Er
Fort Worth, Texas 76132 LAKE VISTA RANCH PHASE III
(0)817.231.81DO (F)817.231.8144
Tam eZe t a g,F--"155�D0898D CITY OF FORT WORTH,TARRANT COUNTY,TEXAS
www.banonstark.com
i
i .,.
'aw __. _. ............_...._
s
_..i........_. ...........% .. I
i
_ ry . ...
! I
I.0io
I- I 0 ----_
--------- --
L -
_-_-
Al
3.
T_
L0 DODO, i i i O 1 .
LO #`
"
ViiI
;
£-IESTdff-QR+dE— �4
00000000,0,0 0
' O '
fl
U f
{j
t
{ I
i .�.....,.. s
r`
N
GRAPHIC SCALE 1"=200'
OF TFC
100 0 100 200 tip• y
Tfir •itt
LEGEND :......................:....
CHARLES .. STARK
................. ..............
PROPOSED STORM DRAIN STM CITY PROJECT NO. 10104157357�0
PROPOSED STD. CURB INLET D PssC!STER.•
OWNER/DEVELOPER ONAL
EXISTING STORM DRAIN C 2p��
HMH LAKE VISTA LAND, L.P.
EXISTING STD. CURB INLETS A TEXAS LIMITED PARTNERSHIP 06/28
1038 TEXAN TRAIL FP-17-009 usE of TNIs ELECTRONic sEAL/SIGNATURE,
AIJfHORIZEO BY CWLES F.STM",P.E
GRAPEVINE, TX. 76058 PP-14-005 TEXAS REGISTRATION NO.57357
EXHIBIT 'B-1' PROJECT No. 241-9364
STORM IMPROVEMENTS DATE: 20.7
6221 B1"."h stBoulevar4Sui6132 LAKE VISTA RANCH PHASE III `
Fort Worth, Texas 76132
T 817,23—dE' (F)612231.8144 D—I
Texas Rcgistared enginaoriEg Fim F1'B86 D
G�aReg erod&uneyFhmF-F015BB00 CITY OF FORT WORTH,TARRANT COUNTY,TEXAS
www.baronsUrk.com
E ) E
..............................
.1111 ..,... w.;._ .....
LU
a
n
- ----------- T- L=� --- -----------------------
o �a�o:oa�o.a:o�o:o�o�o�o;o�o�o�o�o� .
r ,
, Illlll �a�o
L
„
EEO :0: D n 0101�
NXv
GRAPHIC SCALE 1'=200'
CHARLES F. STARK
100 0 100 200 CITY PROJECT NO. 101041 57357�o^;�k�
LEGEND OWNER/DEVELOPER FDNaL '03
PROPOSED STREET LIGHT HMH LAKE VISTA LAND, L.P. 0 1,01 28/2011
(POLE 18 EA) * A TEXAS LIMITED PARTNERSHIP use ne lnis E Ec sEu sGN�7use
LUMINAIRE 21 EA 1038 TEXAN TRAIL FP-17-009 UO"I REa- —M -a sruaK P.E.
( ) GRAPEVINE, TX. 76058 PP-14-005 rEx�REGismAnmr uo.s73s7
Bannon-stark-li�IIrIR EXIIIBIT 'C' PROJECT No- R41–
lco >� STREET LIGHT IMPROVEMENTS DXK, JK W17
62221 Sous—.!Bwlawrq,Seita 100 SHEET
Fort Worth Texas 78,32 LAKE VISTA RANCH PHASE III
0)817.231.6100 (P)817.231.8144
oFF_<_F4 CITY OF FORT WORTH,TARRANT COUNTY,TEXAS
wWw.karfonE6Pak.eAtR
w
>
0
-- ------------- ------- --------- =-----=--------- --
T-17
---
11
1:
� I IOty '0:0
U0000000 E000000
— GTRER - ----------------- _
1
�o_ ► 0 ,
�0 ; o�0�0;0�0�0�00;0►00�00;0�0000�00�0 __-__��
:0;0:00000:0000:000 0
D0 0 0f --�,E-----___- 0
�� — — — --- Oar
0 !
DEODDE�000 - o
as
�_-_
- tx
tll��
ol
Y y
i }
lP+� OF 7-
.:.......................:....
CHARLES F. STARK
.................................
GRAPHIC SCALE 1"=200' o i
CITY PROJECT NO. 101041
F •�/BIER: �?
100 0 100 zoo OWNER/DEVELOPER SS'oNAL
LEGEND HMH LAKE VISTA LAND, L.P. 02g
/20f7
A TEXAS LIMITED PARTNERSHIP o6/
1038 TEXAN TRAIL FP-17-009 use of 11115 ELECMNIC ss�t!SIGN4n3RE
PROPOSED STREET SIGN (5 EA) • AIlftiORIZED
BY CwwLes .+: .F..
GRAPEVINE, TX. 76058 PP-14-005 TE06 REGISTRAT10h rva. s73sT
EXHIBIT 'C-1' PMECT No. 241-30
STREET SIGN IMPROVEMENTS DATE JM 2Dt7
3221 Southwest Boulevard,Suite 100 SFFET
=ort Worth, Texas 78132 LAKE VISTA RANCH PHASE III
P,817.231.8100 (F)817.291.8144 C-1
R,-'Tr-aa Srgmering Filmo-110W CITY OF FORT WORTH,TARRANT COUNTY,TEXAS
a„.„
www.bartonstark.com
00 42 43
DAP-BIDPROPOSAL
Pape 1 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
item No.
BidlistDescription Spm,'Ecatinn Section No. Unity a QBidntiUnit Price Bid Value
NIT 1:WATER IMPROVEMENT
1 3311.0261 8"PVC WaterPi- + 33 11 12 LF
33`2 522.50 75 420.00
2 3312.3003 8"Gate Valve 33 12 20 EA 1i' $1 :410.00 13 100.00
43312.0001 Fire Hydrant w!6"Gate Valve 33 12.4-0 EA 7 53"C0.00 $27 020.00
5.... 3312.4005 36"x8"Tapping Sleeve 8,Valve 33 12 25 EA 1 S9.70.00 $9700.00
6 3312.2003 1'Water Service ?3 12 10 EA 104 7320.00 5 280.00
7 3305.0109 Trench Safety 33(i5 1 LF 33f, 50,10 $335.20
8 3311.0001 Ductile Iron Water Fittin s� w/Restraint 33 11 11 TON 2.75 $3 300.00 $9 075.00
_ 400.00
9 3312.0117 Connect to Existing Water Main(4"-12"water mains) 33 1.^25 EA 3 $800.00 $2
TOTAL UNIT 1:WATER IMPROVEMENTS1 $222,330.20
CITY OF FORT WORTH
00 42 43_M Prtyaaal
STANDARD CONSTRICTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Lake Vista Ranch Phm 3
Farm Venian April 2,2014
CPN 0 101041
00 42 43
DAP-BID PROPOSAL
rise 2 or7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Infonnation Bidders Proposal
Bidhst Description Specification Section No. Unit m, Bid Unit Price Bid Value
Item No. I Measure (7i tity
NIT If:SANITARY SEWER IMPROVEMENTS
3331.4115 8"Sewer Pipe W 33 11 10,33 31 1.2.33.3120—-.!E— 2644 $34.50 $91,218_00,
P 3331.4116 8"Sewer Pipe,CSS 13ackfill 33 11 10,33 3i 12,33 31 20 LF 55 $40.00 $2,200.00
3 3331.3101 4"Sewer Service 33 31 50 EA _ 104 $620.00„_, $64,480.00
4 3339.1001 4'Manhole 33 39 10,33 39 20 EA 11 $2,600.00 528,600.00
34
5 71.0001 Tra(fc Cl 34 71 13 M 2 O $8 .00 00 $1 11,600.00
_. ontro .. ....... _ . . ...
6 0330.0001 Concrete Encase Sewer Pie 03 30 00 LF 50 $60.00 $3,000.00
8 3301.0002 Post-CCTV Inspe--tion 330131 LF 2644 $1.50 $3.966.00
9 3305.0109 Trench Safety 330510 LF 2644 $1.00 $2,644.00
10 3301.6101 Manhole Vacuum Testing 330130 EA 11 S110.00 S1,210.00
11 3339.1003 4'Extra Depth Manhole 33 39 10,33 39 20 VF 5 $130.00 $650,00
13 9929,0001 Connect to Ex.Manhole 03 80 00 EA 2 $1 300.00 2 600.00
14 9999.0001 Connect to Ex.Main 03 80 00 EA 1 $600.00 $600.00
TOTAL UNIT If:SANITARY S WER IMEMENTS1 $202,768.00
CRY OF FORT WORTH 00 42 43 Bid PMPDW
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Lake Vista Rmch Phase 3
17 m Vmim April 2,2014
CPN q 101041
00 42 43
DAP-BID PROPOSAL
Paye 3 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder`s Propos
BldllSt Description Specificawbon Section No. Unna ctE Bid Unit Price Bid Value
Item No. Measure Quantity
NIT III:DRAINAGE IMPROVEMENTS
1 3341.0201 24'RCP,Class 111 3341 10 LF 96 570.00 $6,720.00
2 3341.0302 27"RCP',Class III 3341 10 LF 271 $72.00 $19,512.00
3 3349.5002 20'Curb Inlet 33 49 20 EA 4 6,7W00 $26,800.00
4 3305.0109 Trench Safety 33 05 10 LF 367 5b.50 $183.50
5 3137.0102 Large Stone Riprap.dry 31 3700 SY 15 $50.00 $750.00
OT
6 9999.0001 27"TxOType CH FWJ Headwall 00 00 00 EA 1 $2 300 00 $2,300.00
7 9999.0002 Connect to Existing RCP QO 00 00 LS 1 $250.00 $250.00
8 9999.0003 Bands Utilities 00 00 00 LS 1 $11,500.00 $11,500.00
TOTAL UNIT 111:DRAINAGE IMPROVMENTSI 558,015.50
CITY OF FORT WORTH 00 42 43_Bid Proposal
STANDARD CONSTRUCTION SPECIRCATION DOCUMENTS-DEVELOPER AWARDED PROJECTS lake Vista Ranch Phase 3
Farm Version April 2.2014 CPN#101041
DAP-BID PROPOSAL
No,,
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project[tem Infomlation Bidder's Proposal
Bidlist Item No. Description Specification Section No. Unit of e Bid UniPrice Bid Value
Quantity
UNIT N:PA IN IMPROVEMENTS
1 3211.0400 Hydrated Lime 32 11 29 TN 227 $155.00 $35185.00
2 3211.0501 6"Lime Treatment 32 11 29 SY 11,963 $3.25 $38 879.75
3 3213.0101 6"Conc Pvmt 32 13 13 SY 11 233 32.95 $370,127.35
4 3213.0301 4"Conc Sidewalk 32 13 20 SF 300 $7.00 $2,100.00
5 3213.0501 Barner Free Ramp,Type R-1 32 13 20 EA 9 $1,950.00 $17 550.00
6 3213.0501 Barrier Free Ramp,Type M-2 32 13 20 EA 4 $1,900.00 $7.600.00
7 3305.0111 Valve Bax Aclustment 33 05 14 EA 17 $150.00 $2.550.00
8 3305.0107 Manhole Adjustment,Minor 330514 EA 10 $200.00 $2,000.00
9 9999.0000 Bonds 000000 LS 1 $7,900.00 $7 900.00
TOTAL UNIT IV:PAVING IMPROVMENTS $483,892.10
CITY OF FORT WORTH
00 42 47 Bid Pmpool
STANDARD CONSTRUCTION SPECIRCATION DOCUMENTS-DEVELOPER AWARDED PROJECTS tyro Vise Ranch Plum 7
Farm Version April 2,2014 CPN#101 D41
X 4, ,
DAP-BID PROPOSAL
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Biddees Proposal
BldLst Description Specification Section No. Unit of Bid Unit Price Bid Value
Ytem No Measlae Quantity
UNIT Vc STREET LIGHTING IMPROVEMENTS
1 2605.3015 2"CONDT PVC SCH 80 926 05 33 _ LF 1939 �-, Sc 77 $11 'it3.03
2 3441.3110 Install Lightinq Fixture _ 34 4120 _ _. EA 18 59&.04 4',620 D0
3 3441.3201 LED Liqhtinq Fixture 34 41 20 EA 1° -sz f 2`. 5 42F Ci
4 3441.3301 Rdwy Ilium Foundation TY 1,Z and.4 34 41 20 EA 1E SJU .Ox,
5 3441.3302 Rdwy Illum Foundation TY 3 5,6 and,8 3441 20 EA _ 18
6 3441.1408 NO 6 Insulated Elec Condr 34 41 10 LF SC 1' 5:;. v �✓1 i6
79999.0000 ATBO 20BLED370 MVOLT R2 3K P7 Luminaires 00 00 00 EA a1 "1001 0C S XC -1)
Wood Pole Arms mountedto Exist Oncor Poles
8 9999.0000 Bonds 00 00 00 LS 1 S99
00 42 43
DAP-BID PROPOSAL
Page 6 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
BYdlis[ Description Specification Section No. Unit of Bid Unit Price Bid Value
Ytem No. Measure Quantity
NIT VI:STREET I N IMPROVEMENT
1 Street Name Signs Fro 5 $500.00 $2,500.00
TOTAL UNIT VI:STREET§IGN IMPROVMENTS $2.500.00
CRY OF FORT WORTH 00 42 43 Bid Pmpoeal
STANDARD CONSTRUCTION SPECHFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS lake Vista Ranch Phan 3
Pum Vemim April Z 2014 CPN#101041
00 42 43
DAP-BID PROPOSAL
Pace 7 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bmdhst Description Specification Section No. Unit of Bid Unit Price Bid VaNe
Item No. Measure Quantity
Bid S-ry
UNIT I:WATER IMPROVEMENTS $222,33020
UNIT II:SANITARY SEWER IMPROVEMENTS $202,768.00
UNIT III:DRAINAGE IMPROVEMENTS $68,015.50
UNfT IV:PAVING IMPROVEMENTS $483,892.10
UNIT V:STREET LIGHTING IMPROVEMENTS $74,247.61
UNIT VI:STREET SIGN IMPROVEMENTS $2,500.00
Total Construction Bid $1,053,753.41
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 200 calendar days after the date when the
CONTRACT commences to run as provided is the General Conditions.
END OF SECTION
CRY OF FORT WORTH 00 42 43_M Pmponl
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS lake Visa Rauch Phase 3
Form Venim April 2.2014 CPN#101041