Loading...
HomeMy WebLinkAboutContract 49673 Developer and Project Information Cover Sheet: Developer Company Name: BNM Lake Vista Development,LP By: HMH Development,Inc. Its General Partner Address, State,Zip Code: 1038 Texas Trail, Grapevine,TX,76058 Phone&Email: 817-849-5285,Bruce.French@historymaker.com i Authorized Signatory,Title: a Bruce French,Vice President Project Name: Lake Vista Ranch Phase 3 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: Boaz Rd Between Boat Club Rd&Bowman Roberts Rd Plat Case Number: FP-17-009 Plat Name: Lake Vista Ranch Mapsco: ' 32Q Council District: 7 .................................._.._.....__._.........__,_......_...._.....--- - —......._................................ ..._.....__..._.................................................................................................._..............................._........._..............._._...----._..........._.._............._............__.........------_.... i CFA Number: 2017-095 City Project Number: 101041 i To be completed by af.- Received by: Date: �7 B910yrreq OL ro c,EP 22 2p11 City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CITY SECRETARY CFA Official Release Date:02.20.2017 FTS WORTH,TX Page 1 of 10 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS,BNM Lake Vista Development,LP By: HMH Development,Inc.Its General Partner, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Lake Vista Ranch Phase 3 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ('Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements, -oper City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CITY aECRETARY CFA Official Release Date: 02.20.2017 Page 2 of 10 FT.WORTN,TX further acknowledges that said acceptance process requires the Developer's contractor(s) to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) b, Sewer(A-1) 3f, Paving (B) it, Storm Drain(B-1) IAC', Street Lights & Signs (C) S. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CFA Official Release Date: 02.20.2017 Page 3 of 10 bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s)it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CFA Official Release Date: 02.20.2017 Page 4 of 10 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CFA Official Release Date: 02.20.2017 Page 5 of 10 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent(4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 1 YEAR i. Developer shall complete the Improvements within one (1) year, provided, however, if construction of the Improvements has started within the one year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of one (1)year from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CFA Official Release Date: 02.20.2017 Page 6 of 10 construction of same before the expiration of one(1)year if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel"and"company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract,Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel, and(2) will not boycott Israel during the term of the contract. (REMAINDER OF PAGE INTENTIONALLY LEFT BLAND City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CFA Official Release Date: 02.20.2017 Page 7 of 10 z Cost Summary Sheet Project Name: Lake Vista Ranch Phase 3 CFA No.: 2017-095 City Project No.: 101041 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 222,330.20 2.Sewer Construction $ 202,768.00 Water and Sewer Construction Total $ 425,098.20 B. TPW Construction 1.Street $ 486,392.10 2.Storm Drain $ 68,015.50 3.Street Lights Installed by Developer $ 74,247.61 4. Signals $ - TPW Construction Cost Total $ 628,655.21 Total Construction Cost(excluding the fees): $ 1,053,753.41 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 8,501.96 D. Water/Sewer Material Testing Fee(2%) $ 8,501.96 Sub-Total for Water Construction Fees $ 17,003.92 E. TPW Inspection Fee(4%) $ 22,176.30 F. TPW Material Testing(2%) $ 11,088.15 G. Street Light Inspsection Cost $ 2,969.90 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 36,234.36 Total Construction Fees: $ 53,238.28 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,053,753.41 Completion Agreement=100%/Holds Plat $ 1,053,753.41 Cash Escrow Water/Sanitary Sewer-125% $ 531,372.75 Cash Escrow Paving/Storm Drain=125% $ 785,819.01 Letter of Credit=125%w/1 yr expiration period $ 1,317,191.76 x City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER BNM Lake Vista Development,LP By: HMH Development,Inc.Its General Partner Jesus J. Chapa Assistant City Manager Date: Recommended by: Name: Bruce French Title: Vice President Date: a (wtk l7 Wendy Ch)Babulal, EMBA, P.E. Development Engineering Manager ATTEST: (Only if required by Developer) Water Department �. tJ Douglas . Wiersig, P.E. Signature Director Name: Transportation& Public Works Department Contract Compliance Manager: Approved as to Form &Legality: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including Richard A. McCracken ensuring all performance and reporting Assistant City Attortley requirements. M&C No. IJ - Date: Form 1295: Name: Janie Morales Title: Development Manager ATT O RT�O . O�F '� RC UIRi;D ary . Kayser * L!��C Q City Secretary //rnTEE)( City of Fort Worth,Texas r` OFFICIAL RECORD Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CITY SECRETARY CFA Official Release Date: 02.20.2017 Page 9 of 11 'WORYH�TX i Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101041 None City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch Phase 3 CFA Official Release Date: 02.20.2017 Page 11 of 11 R fF s e 4� Z lowv Rd .THE •L. RA8C3uR f �,,+ It pr , r Oats Dr sway Boswell Rd wearwr&WW Md EoQkm,,,,,,,+Ica„,ycftQJECT LOCATION v a � ' Fla. ska *`g z W)Som Rd MiJ EAGLE RANCH ” ar r 2 S r LAKE CREST ESTATES W Mclemy eNd �.9erlerd Dr . w MARANE CREEK HILLS g. 11 ° cnx" dl Marg Creek Rd Cv*St tP�� OF TF�9 .:............................. CHARLES F. STARK ................................. N °: 57357 CITY PROJECT N0. 101041 �°"''?FC OWNER/DEVELOPER s/0NAL HMH LAKE VISTA LAND, LP. 28 2017 A TEXAS LIMITED PARTNERSHIP 06 NOT TO SCALE 1038 MAN TRAIL FP-17-009 USE OF THIS ELECTRONCIONANRE AMORBY CHARLES F.STARK,P.E. GRAPEVINE, TX. 76058 PP-14-005 TDN 7 57 PROJECT itis. Zu—SMS 9i►N011�•!�•�Ifl� 3ATE: JUW 2017 622,Swtro—1 sou.c-,.Gu W loo SFFE'f Fan waren. T".;" 76132 LAKE VISTA RANCH PHASE III (0)$17.231.800 B+7.231.8144 Tgy R gisltcrmd s,�m,y F,�rmFF•t0159tlUD CITY OF FORT WORTH,TARRANT COUNTY,TEXAS L `I 3 J t ce ' n ------- ---_---- - — -- ---- ----- -- -- ------ -- - -�--� -- --�-- i 1 1--1 1- 1 1 -1-1 1--1--1--1 -1 1-7-1 - - --1---- � i 010 I I I I I I I I I I I 0 0 0 0 0,0,0,0,0,00.0;0,0,0, ------------------ LO I I I I 0 I 0 jEEEDDE01:000PRI � ------�" LO I I i I I i j j I I I I I I I I I H� r i I ,Ol�i�;�, Oi0i0i0i0i00i0 , n r �-bfWE---------------- 0� L- DID Ii i i _ 3111". .L ..... 0 Ilk t GRAPHIC SCALE 1'=200' 100 0 100 200 tP�� OF• Tf�' LEGEND PROPOSED 8" WATER W CHARLES F. STARK ................................. PROPOSED GATE VALVE CITY PROJECT NO. 101041 Bio ��57357 PROPOSED FIRE HYDRANT FSS�!S7ER.• ? OWNER/DEVELOPER �ONnL EXISTING 8" WATER HAH LAKE VISTA UWD, L.P. a' 2 0 EXISTING GATE VALVE --{X}-- A TEXAS LAUTED PARTNERSHIP 06/ 1038 TEXAN TRAIL FP-17-009 U5E OF THIS ELECTRONIC SEAL/SIGNATURE EXISTING FIRE HYDRANT AIJfHORIZEO EGI CHARLES F.STARK,P.E Jam,;,.__ GRAPEVINE, TX. 76058 PP-14-005 TEYAS R I TI N NO.57357 �-- EXHIBIT 'A' PF�,LCT N� 241-9789 WATER IMPROVEMENTS DR'L ?G17 622' 9 3`6132 LAKE VISTA RANCH PHASE III �` FdY WaM, T�aiY 76132 f01 817.231.81DO (F)817.23144" A i Rlg6leiad EngiMa�rq Flnn F-la re}a.Rey�waren st,ryev elsaero CITY OF FORT WORTH,TARRANT COUNTY,TEXAS ww.v.6erronalsrk.mm � I ' Lu n -- ---- ---- --- ------- ---- ------------------ DOE !Ei i i• i i i i i i i i i i ..0:0 D o o�;o, olo:o:o o o o;o: .L----- � --��-------r ars I I 1 1 1 1 I I I I I 1 I�O D DICT 0101�DE 01�u a :1 . --- oa L 3 i y —" 17 L= 00 0000D L -L ........... ..„.. ............. ........... ,.. ............. ........... ...... ....... f E ........ E `x °..... �_4� "y1 r i f LLL N kil . ...................... • ZE OF TFk GRAPHIC SCALE 1'=200' `':' s 100 0 100 200 CHARLES .. STARK CITY PROJECT NO. 101041 yo:. 57357 LEGEND F��sTE�� .$ PROPOSED 8" SEWER S OWNER/DEVELOPER �SYONAL PROPOSED 4' MANHOLE HMH LAKE VISTA LAND, LP. 02 EXISTING 8" SEWER A TEX4S LIMITED PARTNERSHIP p6/ ............_............._.CJ......_.._._......_._.. 1038 TEXAN TRAIL FP-17-009 USE OF THIS ELECTRONIC SEAL/SIGNATURE UTHORIZED 8Y CHARLES F.STARK,P.E EXISTING 4' MANHOLE A ��— GRAPEVINE, TX. 76058 PP-14-005 REGISTRATION NO.57357 M__ m EXHIBIT 'A-1' MW No. 241-M SEWER IMPROVEMENTS "A7E Tp,1 F.M W"°'�;o T.."�S7612 LAKE VISTA RANCH PHASE III ` Fart Worth• Texas 76131 T 231 l".8 17 231 d14a A—� T° 'ate CITY OF FORT WORTH,TARRANT COUNTY,TEXAS Texas Regrsmretl S.. e:-,.., oaf._. I l ' > a a r II I I I I I �a.o.olo�o�o�o,o, 0 DUDE!0! LD I I I I i ► i I I I I I I I I I l I I I � � --i oo; Lo - - � = :j AL _ k 0 --�- . _ _ { j ••_.._........ _. i { 1 { N GRAPHIC SCALE 1'=200' 100 0 100 200 tEOF TF �P ....... ay LEGEND *: PROPOSED 6° CONCRETE CHAR LES..F."STARK PAVING CITY PROJECT NO. 101041 po��F57357�0 PROPOSED 4" CONCRETEFSS oINnL� �� OWNER/DEVELOPER SIDEWALK PAVING HMH LAKE VISTA LAND, L.P. L/ A TEXAS LIMITED PARTNERSHIP 06/28 2011 1038 TEXAN TRAIL FP-17-009 USE Of THS EECTRONIC SF�L/SIGNATURE GRAPEVINE, TX. 76058 PP-14-005 AUiHORQEORI_GISTRA'A�ON N0.57357 P.E. EXHIBIT 'B' � PROJECT No. 241-9389 Barron-Stark-BwiR PAVEMENT IMPROVEMENTS DATE. J 2017 8221 southwest Boulevard,suite 100 SN¢Er Fort Worth, Texas 76132 LAKE VISTA RANCH PHASE III (0)817.231.81DO (F)817.231.8144 Tam eZe t a g,F--"155�D0898D CITY OF FORT WORTH,TARRANT COUNTY,TEXAS www.banonstark.com i i .,. 'aw __. _. ............_...._ s _..i........_. ...........% .. I i _ ry . ... ! I I.0io I- I 0 ----_ --------- -- L - _-_- Al 3. T_ L0 DODO, i i i O 1 . LO #` " ViiI ; £-IESTdff-QR+dE— �4 00000000,0,0 0 ' O ' fl U f {j t { I i .�.....,.. s r` N GRAPHIC SCALE 1"=200' OF TFC 100 0 100 200 tip• y Tfir •itt LEGEND :......................:.... CHARLES .. STARK ................. .............. PROPOSED STORM DRAIN STM CITY PROJECT NO. 10104157357�0 PROPOSED STD. CURB INLET D PssC!STER.• OWNER/DEVELOPER ONAL EXISTING STORM DRAIN C 2p�� HMH LAKE VISTA LAND, L.P. EXISTING STD. CURB INLETS A TEXAS LIMITED PARTNERSHIP 06/28 1038 TEXAN TRAIL FP-17-009 usE of TNIs ELECTRONic sEAL/SIGNATURE, AIJfHORIZEO BY CWLES F.STM",P.E GRAPEVINE, TX. 76058 PP-14-005 TEXAS REGISTRATION NO.57357 EXHIBIT 'B-1' PROJECT No. 241-9364 STORM IMPROVEMENTS DATE: 20.7 6221 B1"."h stBoulevar4Sui6132 LAKE VISTA RANCH PHASE III ` Fort Worth, Texas 76132 T 817,23—dE' (F)612231.8144 D—I Texas Rcgistared enginaoriEg Fim F1'B86 D G�aReg erod&uneyFhmF-F015BB00 CITY OF FORT WORTH,TARRANT COUNTY,TEXAS www.baronsUrk.com E ) E .............................. .1111 ..,... w.;._ ..... LU a n - ----------- T- L=� --- ----------------------- o �a�o:oa�o.a:o�o:o�o�o�o;o�o�o�o�o� . r , , Illlll �a�o L „ EEO :0: D n 0101� NXv GRAPHIC SCALE 1'=200' CHARLES F. STARK 100 0 100 200 CITY PROJECT NO. 101041 57357�o^;�k� LEGEND OWNER/DEVELOPER FDNaL '03 PROPOSED STREET LIGHT HMH LAKE VISTA LAND, L.P. 0 1,01 28/2011 (POLE 18 EA) * A TEXAS LIMITED PARTNERSHIP use ne lnis E Ec sEu sGN�7use LUMINAIRE 21 EA 1038 TEXAN TRAIL FP-17-009 UO"I REa- —M -a sruaK P.E. ( ) GRAPEVINE, TX. 76058 PP-14-005 rEx�REGismAnmr uo.s73s7 Bannon-stark-li�IIrIR EXIIIBIT 'C' PROJECT No- R41– lco >� STREET LIGHT IMPROVEMENTS DXK, JK W17 62221 Sous—.!Bwlawrq,Seita 100 SHEET Fort Worth Texas 78,32 LAKE VISTA RANCH PHASE III 0)817.231.6100 (P)817.231.8144 oFF_<_F4 CITY OF FORT WORTH,TARRANT COUNTY,TEXAS wWw.karfonE6Pak.eAtR w > 0 -- ------------- ------- --------- =-----=--------- -- T-17 --- 11 1: � I IOty '0:0 U0000000 E000000 — GTRER - ----------------- _ 1 �o_ ► 0 , �0 ; o�0�0;0�0�0�00;0►00�00;0�0000�00�0 __-__�� :0;0:00000:0000:000 0 D0 0 0f --�,E-----___- 0 �� — — — --- Oar 0 ! DEODDE�000 - o as �_-_ - tx tll�� ol Y y i } lP+� OF 7- .:.......................:.... CHARLES F. STARK ................................. GRAPHIC SCALE 1"=200' o i CITY PROJECT NO. 101041 F •�/BIER: �? 100 0 100 zoo OWNER/DEVELOPER SS'oNAL LEGEND HMH LAKE VISTA LAND, L.P. 02g /20f7 A TEXAS LIMITED PARTNERSHIP o6/ 1038 TEXAN TRAIL FP-17-009 use of 11115 ELECMNIC ss�t!SIGN4n3RE PROPOSED STREET SIGN (5 EA) • AIlftiORIZED BY CwwLes .+: .F.. GRAPEVINE, TX. 76058 PP-14-005 TE06 REGISTRAT10h rva. s73sT EXHIBIT 'C-1' PMECT No. 241-30 STREET SIGN IMPROVEMENTS DATE JM 2Dt7 3221 Southwest Boulevard,Suite 100 SFFET =ort Worth, Texas 78132 LAKE VISTA RANCH PHASE III P,817.231.8100 (F)817.291.8144 C-1 R,-'Tr-aa Srgmering Filmo-110W CITY OF FORT WORTH,TARRANT COUNTY,TEXAS a„.„ www.bartonstark.com 00 42 43 DAP-BIDPROPOSAL Pape 1 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal item No. BidlistDescription Spm,'Ecatinn Section No. Unity a QBidntiUnit Price Bid Value NIT 1:WATER IMPROVEMENT 1 3311.0261 8"PVC WaterPi- + 33 11 12 LF 33`2 522.50 75 420.00 2 3312.3003 8"Gate Valve 33 12 20 EA 1i' $1 :410.00 13 100.00 43312.0001 Fire Hydrant w!6"Gate Valve 33 12.4-0 EA 7 53"C0.00 $27 020.00 5.... 3312.4005 36"x8"Tapping Sleeve 8,Valve 33 12 25 EA 1 S9.70.00 $9700.00 6 3312.2003 1'Water Service ?3 12 10 EA 104 7320.00 5 280.00 7 3305.0109 Trench Safety 33(i5 1 LF 33f, 50,10 $335.20 8 3311.0001 Ductile Iron Water Fittin s� w/Restraint 33 11 11 TON 2.75 $3 300.00 $9 075.00 _ 400.00 9 3312.0117 Connect to Existing Water Main(4"-12"water mains) 33 1.^25 EA 3 $800.00 $2 TOTAL UNIT 1:WATER IMPROVEMENTS1 $222,330.20 CITY OF FORT WORTH 00 42 43_M Prtyaaal STANDARD CONSTRICTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Lake Vista Ranch Phm 3 Farm Venian April 2,2014 CPN 0 101041 00 42 43 DAP-BID PROPOSAL rise 2 or7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Infonnation Bidders Proposal Bidhst Description Specification Section No. Unit m, Bid Unit Price Bid Value Item No. I Measure (7i tity NIT If:SANITARY SEWER IMPROVEMENTS 3331.4115 8"Sewer Pipe W 33 11 10,33 31 1.2.33.3120—-.!E— 2644 $34.50 $91,218_00, P 3331.4116 8"Sewer Pipe,CSS 13ackfill 33 11 10,33 3i 12,33 31 20 LF 55 $40.00 $2,200.00 3 3331.3101 4"Sewer Service 33 31 50 EA _ 104 $620.00„_, $64,480.00 4 3339.1001 4'Manhole 33 39 10,33 39 20 EA 11 $2,600.00 528,600.00 34 5 71.0001 Tra(fc Cl 34 71 13 M 2 O $8 .00 00 $1 11,600.00 _. ontro .. ....... _ . . ... 6 0330.0001 Concrete Encase Sewer Pie 03 30 00 LF 50 $60.00 $3,000.00 8 3301.0002 Post-CCTV Inspe--tion 330131 LF 2644 $1.50 $3.966.00 9 3305.0109 Trench Safety 330510 LF 2644 $1.00 $2,644.00 10 3301.6101 Manhole Vacuum Testing 330130 EA 11 S110.00 S1,210.00 11 3339.1003 4'Extra Depth Manhole 33 39 10,33 39 20 VF 5 $130.00 $650,00 13 9929,0001 Connect to Ex.Manhole 03 80 00 EA 2 $1 300.00 2 600.00 14 9999.0001 Connect to Ex.Main 03 80 00 EA 1 $600.00 $600.00 TOTAL UNIT If:SANITARY S WER IMEMENTS1 $202,768.00 CRY OF FORT WORTH 00 42 43 Bid PMPDW STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Lake Vista Rmch Phase 3 17 m Vmim April 2,2014 CPN q 101041 00 42 43 DAP-BID PROPOSAL Paye 3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder`s Propos BldllSt Description Specificawbon Section No. Unna ctE Bid Unit Price Bid Value Item No. Measure Quantity NIT III:DRAINAGE IMPROVEMENTS 1 3341.0201 24'RCP,Class 111 3341 10 LF 96 570.00 $6,720.00 2 3341.0302 27"RCP',Class III 3341 10 LF 271 $72.00 $19,512.00 3 3349.5002 20'Curb Inlet 33 49 20 EA 4 6,7W00 $26,800.00 4 3305.0109 Trench Safety 33 05 10 LF 367 5b.50 $183.50 5 3137.0102 Large Stone Riprap.dry 31 3700 SY 15 $50.00 $750.00 OT 6 9999.0001 27"TxOType CH FWJ Headwall 00 00 00 EA 1 $2 300 00 $2,300.00 7 9999.0002 Connect to Existing RCP QO 00 00 LS 1 $250.00 $250.00 8 9999.0003 Bands Utilities 00 00 00 LS 1 $11,500.00 $11,500.00 TOTAL UNIT 111:DRAINAGE IMPROVMENTSI 558,015.50 CITY OF FORT WORTH 00 42 43_Bid Proposal STANDARD CONSTRUCTION SPECIRCATION DOCUMENTS-DEVELOPER AWARDED PROJECTS lake Vista Ranch Phase 3 Farm Version April 2.2014 CPN#101041 DAP-BID PROPOSAL No,, SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project[tem Infomlation Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of e Bid UniPrice Bid Value Quantity UNIT N:PA IN IMPROVEMENTS 1 3211.0400 Hydrated Lime 32 11 29 TN 227 $155.00 $35185.00 2 3211.0501 6"Lime Treatment 32 11 29 SY 11,963 $3.25 $38 879.75 3 3213.0101 6"Conc Pvmt 32 13 13 SY 11 233 32.95 $370,127.35 4 3213.0301 4"Conc Sidewalk 32 13 20 SF 300 $7.00 $2,100.00 5 3213.0501 Barner Free Ramp,Type R-1 32 13 20 EA 9 $1,950.00 $17 550.00 6 3213.0501 Barrier Free Ramp,Type M-2 32 13 20 EA 4 $1,900.00 $7.600.00 7 3305.0111 Valve Bax Aclustment 33 05 14 EA 17 $150.00 $2.550.00 8 3305.0107 Manhole Adjustment,Minor 330514 EA 10 $200.00 $2,000.00 9 9999.0000 Bonds 000000 LS 1 $7,900.00 $7 900.00 TOTAL UNIT IV:PAVING IMPROVMENTS $483,892.10 CITY OF FORT WORTH 00 42 47 Bid Pmpool STANDARD CONSTRUCTION SPECIRCATION DOCUMENTS-DEVELOPER AWARDED PROJECTS tyro Vise Ranch Plum 7 Farm Version April 2,2014 CPN#101 D41 X 4, , DAP-BID PROPOSAL SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Biddees Proposal BldLst Description Specification Section No. Unit of Bid Unit Price Bid Value Ytem No Measlae Quantity UNIT Vc STREET LIGHTING IMPROVEMENTS 1 2605.3015 2"CONDT PVC SCH 80 926 05 33 _ LF 1939 �-, Sc 77 $11 'it3.03 2 3441.3110 Install Lightinq Fixture _ 34 4120 _ _. EA 18 59&.04 4',620 D0 3 3441.3201 LED Liqhtinq Fixture 34 41 20 EA 1° -sz f 2`. 5 42F Ci 4 3441.3301 Rdwy Ilium Foundation TY 1,Z and.4 34 41 20 EA 1E SJU .Ox, 5 3441.3302 Rdwy Illum Foundation TY 3 5,6 and,8 3441 20 EA _ 18 6 3441.1408 NO 6 Insulated Elec Condr 34 41 10 LF SC 1' 5:;. v �✓1 i6 79999.0000 ATBO 20BLED370 MVOLT R2 3K P7 Luminaires 00 00 00 EA a1 "1001 0C S XC -1) Wood Pole Arms mountedto Exist Oncor Poles 8 9999.0000 Bonds 00 00 00 LS 1 S99 00 42 43 DAP-BID PROPOSAL Page 6 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal BYdlis[ Description Specification Section No. Unit of Bid Unit Price Bid Value Ytem No. Measure Quantity NIT VI:STREET I N IMPROVEMENT 1 Street Name Signs Fro 5 $500.00 $2,500.00 TOTAL UNIT VI:STREET§IGN IMPROVMENTS $2.500.00 CRY OF FORT WORTH 00 42 43 Bid Pmpoeal STANDARD CONSTRUCTION SPECHFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS lake Vista Ranch Phan 3 Pum Vemim April Z 2014 CPN#101041 00 42 43 DAP-BID PROPOSAL Pace 7 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bmdhst Description Specification Section No. Unit of Bid Unit Price Bid VaNe Item No. Measure Quantity Bid S-ry UNIT I:WATER IMPROVEMENTS $222,33020 UNIT II:SANITARY SEWER IMPROVEMENTS $202,768.00 UNIT III:DRAINAGE IMPROVEMENTS $68,015.50 UNfT IV:PAVING IMPROVEMENTS $483,892.10 UNIT V:STREET LIGHTING IMPROVEMENTS $74,247.61 UNIT VI:STREET SIGN IMPROVEMENTS $2,500.00 Total Construction Bid $1,053,753.41 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 200 calendar days after the date when the CONTRACT commences to run as provided is the General Conditions. END OF SECTION CRY OF FORT WORTH 00 42 43_M Pmponl STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS lake Visa Rauch Phase 3 Form Venim April 2.2014 CPN#101041