Loading...
HomeMy WebLinkAboutContract 49718 Developer and Project Information Cover Sheet: Developer Company Name: Austin-Pauri Land Enterprise LLC Address, State,Zip Code: 700 W. Harwood Dr. ,Hurst, TX 76054 Phone&Email: 817-528-4100,jpitstick@ourcountryhomes.com Authorized Signatory, Title: Dustin Austin,Member Project Name: Hideaway Acres Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: North of Ray White Rd and west of Bear Hollow Dr. Plat Case Number: FP-016-112 Plat Name: Hideaway Acres Mapsco: 22P Council District: 2 CFA Number: 2017-091 City Project Number: 100982 To be complete"y staff /'7 Received by: Date: U OFFICIAL.RECORD CITY SECRETARY FT.WORTH,Tx City of Fort Worth,Texas Standard Community Facilities Agreement-Hideaway Acres CFA Official Release Date: 02.20.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. ' WHEREAS, Austin-Pauri Land Enterprise LLC, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Hideaway Acres ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance procc Ss reptFeS UIC ijuve oper's contractor(s) City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Hideaway Acres CITY SECRETARY CFA Official Release Date:02.20.2017 {WORTNI TX Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®, Sewer(A-1) Paving (B) �, Storm Drain(B-1) ®, Street Lights & Signs (C) 0. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured,licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Hideaway Acres CFA Official Release Date: 02.20.2017 Page 3 of 11 iii. To require the contractor(s)it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Hideaway Acres CFA Official Release Date:02.20.2017 Page 4 of 11 J. Developer hereby rleases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its pricers,servants, or employees. M. Developer will further.xequire its contractors to indemnify, defend and hold harmless the City,its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Hideaway Acres CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third parry beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Hideaway Acres CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Hideaway Acres CFA Official Release Date: 02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Hideaway Acres CFA No.: 2017-091 City Project No.: 100982 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developers Cost A. Water and Sewer Construction 1. Water Construction $ 136.817.00 2.Sewer Construction $ 112,182,00 Water and Sewer Construction Total $ 248,999.00 B. TPW Construction 1.Street $ 237,107.50 2.Storm Drain $ 92,272.00 3.Street Lights Installed by Developer $ 43,421.00 4. Signals $ - TPW Construction Cost Total $ 372,800.50 Total Construction Cost(excluding the fees): $ 621,799.50 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 4,979.98 D. Water/Sewer Material Testing Fee(2%) $ 4,979.98 Sub-Total for Water Construction Fees $ 9,959.96 E. TPW Inspection Fee(4%) $ 13,175.18 F. TPW Material Testing(2%) $ 6,587.59 G. Street Light Inspsection Cost $ 1,736.84 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 21,499.61 Total Construction Fees: f 31,459.57 Choice Financial Guarantee Options,choose one Amount Mark one) Bond=100% $ 621,799.50 Completion Agreement=100°fie f Holds Plat $ 621.799.50 x Cash Escrow Water/Sanity Sewer-125% $ 311,248.75 Cash Escrow Paving/Storm Drain=125% $ 466,000.63 Letter of Credit=125%w/2yr expiration period $ 777,249.38 City of Fort Worth,Texas Standard Community Facilities Agreement-Hideaway Acres CFA Official Release Date: 02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Austin-Pauri Land Enterprise LLC Jesus J. Chapa Assistant City Manage Date: r Name: Dustin Austin Recommended by: Title: Member Date: _ g — 2,1; ' 17 Wendy C Babulal, EMBA, P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department )4 (a tjSignature Dougla W. Wiersig,P.E Name: Director Transportation& Public Works Department Contract Compliance Manager: Approved as to Form &Legality: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting Richard A. McCracken requirements. Assistant City Attorneyy M&C No. P4 tv Al u ' W Date: Name: Janie Morales Form 1295: N��/�-- Title: Development Manager T ATTEST: �0 .. ��•Q Mary J. Kays r '' City Secretary City of Fort Worth,Texas OFFICIAL kECORn Standard Community Facilities Agreement-Hideaway Acres CITY$ECRETARV CFA Official Release Date: 02.20.2017 FT.WO�H TX Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements Paving Cost Estimate ® Exhibit 13-1: Storm Drain Improvements ® Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Hideaway Acres CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"I" Community Facilities Agreement City Project No. 100982 Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1)does not boycott Israel;and(2)will not boycott Israel during the term of the contract. The terms"boycott Israel"and"company"shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract,Developer certifies that Developer's signature provides written verification to the City that Developer.(2)does not boycott Israel,and(2)will not boycott Israel during the term of the contract. Developer Austin-Pauri Land Enterprise LLC &4A--)av) . Mune:Dustin Austin Title: M tuber Date: City of Fort worth,Texas Standard Community Facilities Agreement-Hideaway Acres CFA Official Release Date:02.20 2017 Page I I of I I EXHIBIT A STATE OF TEXAS: COUNTY OF TARRANT: BEING a tract of land situated in the J.L.Hansborough Survey,Abstract No. 747,City of Fort Worth Tarrant County,Texas,being all of Lot 3,Block One of the final plat of Lots 1,2,and 3,Block One,All American Farms, an addition in Tarrant County,Texas as recorded in Volume 388-173, Page 31, Plat Records,Tarrant County,Texas(PRTCT),being described in deed to Massimo Pauri and Mey-Ling Pauri, recorded in D216095993, Deed Records, Tarrant County, Texas(DRTCT),and being more particularly described as follows: BEGINNING at a 1/2"rebar found in the north right-of-way line of Ray White Road(R.O.W.varies)at the southeast corner of said Lot 3, Block One of All American Farms addition and the west line of Block 4 of the final plat of Bear Creek Vista, an addition to the City of Fort Worth, Tarrant County,Texas as recorded in Cabinet A, Slide 9926,PRTCT; THENCE N 89005'06" W,along the north right-ofBway line of said Ray White Road, a distance of 474.87 feet(plat 474.91 feet)to a point for corner at the southwest corner of said Lot 3,Block One and the southeast corner of said Lot 2,Block One, from which a 5/8"rebar capped Hancock Sury found at the southwest corner of said Lot 2, Block One bears N 89°05'06" W,214.34 feet(plat 214.34 feet),a 5/8" rebar capped Hancock Sury found bears N 50'37'W, 0.31 feet,and a 1/2" rebar capped ALS Land Surveying found bears S 00001'W, 5.00 feet; THENCE N 00°21'33" W,departing the north right-of-way line of said Ray White Road, at a distance of 331.31 feet(plat 331.52 feet)passing a 5/8"rebar found at the northeast corner of said Lot 2,Block One and the southeast corner of a tract of land as described in deed to VP Vista Holdings,LLC, recorded in D209032027,DRTCT,at a distance of 531.36 feet passing a 1/2" rebar capped JS Cole 5411 found at the northeast corner of said VP Vista Holdings,LLC tract and the southeast corner of Tract 4 as described in deed to Alta Vista Business Park, LLC, recorded in D207090889, DRTCT,continuing a total distance of 631.20 feet(plat 631.52 feet)to a 1/2" rebar found at the northwest corner of said Lot 3,Block One and the northeast corner of said Alta Vista Business Park, LLC Tract 4, said corner lying in the south line of Block 4 of Bear Creek Vista, an addition to the City of Fort Worth,Tarrant County, Texas as recorded in Cabinet A, Slide 9058, PRTCT; THENCE N 89032'59" E,along the north line of said Lot 3,Block One and the south line of said Block 4 of Bear Creek Vista as recorded in Cabinet A, Slide 9058,PRTCT,a distance of 474.82 feet(plat 474.82 feet)to a 1/2"rebar found at the northeast corner of said Lot 3,Block One, said corner lying the west line of aforementioned Block 4 of Bear Creek Vista as recorded in Cabinet A, Slide 9926, PRTCT; THENCE S 00°21'11" E,along the east line of said Lot 3, Block One and the west line of said Block 4 of Bear Creek Vista as recorded in Cabinet A, Slide 9926, PRTCT,a distance of 642.40 feet(plat 642.86) feet to the POINT OF BEGINNING and containing 302,343 square feet or 6.941 acres of land. City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 12 of 14 NOTE: Bearings are referenced to Texas State Plane Coordinate System,North Central Zdne,NAD83 as derived from Western Data Systems RTK Cooperative Network. City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date:07.01.2015 Page 13 of 14 GOLDEN TRIANGLE < 3 (n H � O Q = Q F- J Q Q W m m RAY WHITE v T,� SITE ~ J _ Q 1'n CF W H c H O = _ 3 Cil r Q `D v as c._ V) c v D- VICINITY MAP N .T .S . 7-, a =EAWAY ACRELS .s LOCATED IN 0cr a� C= OF FORT WORTH, TBXM PMAM POB: PPMAM BY: omcouf?sr woon� GOOM I HUM,rX 760% lyIfAILSI�ALi. Y cai7)528-4iao 0 CONTACT`MR JOHN PIrS1TC[ CNL 9JOM�i3-PLANNERS-SURVEYORS eoe 76MI (D Metro(S17)3M4373 O w JUNE, 2®17 EUD EAWA Y ACR Z WATM IDMMrr'A' I I 1I I 6 7 19 17 EX. 36' W.L-�J (CITY OF SOUTHLAKE ) EX. 20' W.L. I i i ; 5 �+ 8 18 16 Y (CITY OF KELLER ) T BLOCK B g 15 I I 4 17 0- I N _ I I 3 a 10 16 �D 14 ., BLOCK B BLOCK A EX. 16' W.L. 13 (COFW) I, 2 i I I * 11 12 13 14 15 12 1� = 1 I I I 11 3 I I M 11_ ro+z I I I BLCCK A I JNG m I I I i i 1 2 3 4 5 6 7 8 9 10 18X SCALE: 1"=100' I I I I I I I I I LEGEND Ii I7 1 -- I I I YI PROPOSED WATER LINE — —W— — EXISTING WATER LINE PBEPARM BY: PROPOSED FIRE HYDRANT ASSEMBLY GOOD INI NOTE EXISTING FIRE HYDRANT ASSEMBLY MAllt$IM&It ALL WATER LINES SHOWN °NLMR&M-P`MNM--RYE`°06 ARE 8' IN DIAMETER UNLESS H PROPOSED GATE VALVE a1066YWA"°�0,.7)32%4M 061 OTHERWISE NOTED I>< EXISTING GATE VALVE E:\10670 - Ray White Road\Plans\Hideaway Acres Plans.pro Wed Jun 21 09 1 01:03 2017 EMEAWA Y ACRES SHWER >�M>�"A_1" 6 7 19 IL 17 5 m 8 16 16 BLOCK B "4". 4 ® g 15 ® X 17 o � 3 10 16 �' �D 14 BLOCK B W BLOCK A l 13 11 12 13 14 15 >4 � � � 12 co SCS: 1"=100' BL K A g 2 3 4 5 6 7 8 9 10 18X LEGEND PROPOSED SANITARY S- SEWER LINE _ -- EXISTING SANITARY S SEWER LINE PROPOSED SANITARY peEPARMBY: SEWER MANHOLE Oy EXISTING SANITARY �nOODVMI SEWER MANHOLE }M&RSE AU Y NOTE: CNLBi10NME-PLVMM-SURVEYM ALL PROPOSED SANITARY SEWER PROPOSED SDR-35 SANITARY 240 wsy DrWOmp.w..Ta 76WI SEWER SERVICE .+�a+n3W+sM LINES SHOWN ARE 8' IN DIAMETER E:\10670 — Roy White Road\Plans\Hideaway Acres Plons.pro Wed Jun 21 09:05:08 2017 HHD AWAY ACRES S'1CR=S EDIMM"B" �. 6 -- 7 -- 19 17 58 18 16 SLOCK B ® g 15 w 4 C) 17 l u --. 3 10 16 14 BLOCK B BLOCK A �— 13 2 11 12 13 14 15 12 m�z � and - 11 -- -- SCALE: 1"=100' BLOCK A LINIGH'R LEGEPID l� g 2 3 4 5 6 7 8 9 10 18X ' 6 PROPOSED 29'B—B ROADWAY _ -- 6/ CONCRETE PAVING PRWA3W HY: G00D nNl SIDEWALK PER THIS CONTRACT ELALL 9 DrvL Baas—PLMMM—sunvEMM Nano(ST)3M4M E;\10670 — Ray White Road\Plans\Hideaway Acres Plons.pro Wed Jun 21 16:24;06 2017 EM EAWA Y ACRES STORM DRAIN 6 7 19 17 5 E� 8 18 ru .6 BLOCK B ® g x 15 X 4 U 17 ® CCU 3 10 16 � 14 BLOCK B BLOCK A 15' INLE 13 11 12 13 14 15 12 1 � " 21" R.C.P. ro 11 q - ET X. 30,. m+z , BLOCK A IlNG � 36" R.0.P. g 2 3 4 5 6 7 8 9 10 18X m 30" R.C.P. SCt11.]E: 1"=100' LEGEND - -- PROPOSED STORM DRAIN Lm PILAR®BY: EXISTING STORM DRAIN LINE PROPOSED STORM DRAIN Mi ET �Y�IDO✓IN1 MARSHALL II aurBMMM—PLMNM—UNIVM s 24MVa VD*^Dnpr&o.roMWI liro 017)3M43M E,\10670 — Ray White Road\Plans\Hideaway Acres Plons.pro Wed Jun 21 09,20; 11 2017 HEDEAWAY ACRES STREET LIGHTS EIIT 6 7 19 16 17 ' 5 i 8 18 BLOCK B x 4 17 Q d_g N 3 10 16 14 BLOCK B BLOCK A _ �. 13 2 11 12 13 14 15 12 1 11 BLOCK A m g 2 3 4 5 6 7 8 9 10 18X 1 SCALE: 1"=100' LEGEND 2' PVC CONDUIT LIGHT POLE ►6 FWWABBD BY: LIGHT MOUNTED TO EXISTING POLE (GOODWINO MARSHALL Y TRANSFORMER ON PAD F CNL MOV4 M-PIANPMRS-SURVEYORS 24W wurn W.Ompwhr.To T WSI wen 017)saa+srs E;\10670 — Ray White Road\Plans\Hideaway Acres Plans.pro Wed Jun 21 09;40;57 2017 s ll 111DE il V V 6 il 1L 6")\CRES STREET SIGNS II U"G;-1" 6 7 19 1 17 5 8 18 16 BLOCK B 4 ® 9 15 ® x � 17 0 N 3 10 16 14 BLOCK B BLOCK A 13 2 11 12 13 14 15 1 � 12 11 BLOCK A LANE 1 2 3 4 5 6 7 8 9 10 18X ao�z SCALE: 1"=100' � - -- LEGEND rRW,wO aY: X PROPOSED STREET NAME SIGN (GOOD INI Kill PROPOSED REGULATORY SIGN M&ESH II,9 aNL v OMMEEM-PLMM ns-suRVErrns aim M."m 0".onc.ww T—7=1 Won(W)9044 E,\10670 — Ray White Road\Plans\Hideaway Acres Plans.pro Wed Jun 21 09;43;45 2017 UM-BID PROPoS.SL Py"I o t SECTION 00 42 47 Developer Awarded Projects-PROPOSAL FORM Hi4mra3 Acro UNIT PRICE BID Bidder's Application Project Itrm Irl-u- BiddQ's Pmpueal Bi N D-�m SpeciBFahw SecDon Na Unit of Bid Unit Price Bid Value Item No. Measure (juenul_v Sheet Numhn& nun UNITL WATER IMPROVEMENTS 4 1 3311.0261 8"PVC Water Pipe 3311 12 LF 1,260 $38.00 $47,880.00 1,283 2 3305.2002 8"Water Carrier Pipe 33 05 24 LF 23 $58.00 $1,334.00 23 3 3312.3003 8"Gate Valve 331220 EA 5 $1,250.00 $6,250.00 5 4 3312.0001 Fire Hydrant 33 12 40 EA 3 $3,800.00 $11,400.00 3 5 3312.2003 1"Water Service 331210 EA 38 $850.00 $32,300.00 38 6 3305.1103 20"Casing By Other Then Open Cut 33 05 22 LF 23 $440.00 $10,120.00 23 7 3312.3106 16"Cutin Gate Valve w/Vault 33 12 20 EA 2 $8,500.00 $17,000.00 2 8 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 0.5 $5,500.00 $2,750.00 1 9 3305.0109 Trench Safety 330510 LF 1,283 $1.00 $1,283.00 1,283 10 19999.0001 16"x 8"Tee&Gate Valve 1 33 1225 EA 1 $6,500.00 $6,500.00 1 TOTAL UNIT I:WATER IMPROVEMENT $136,817.00 Sheet Number&Quanun UNIT It:SANITARY SEWER IMPROVEMENTS 5 1 3331.4115 8"Sewer Pipe 33 11 10,33 31 12, LF 1,163 1,163 333120 $44.110 $51,172.00 2 3339.1001 4'Manhole 33 39 10,33 39 20 EA 6 $4,000.00 $24,000.00 6 3 3331.4116 8"Sewer Pipe w 33 11 10,33 31 12,l CSS Backfill 333120 LF BS $52.00 $4,420.00 85 4 9999.0002 Connect to Ex.8"Stub 00 00 00 EA 1 $1,000.00 $1,000.00 1 5 3331.3101 4"Sewer Services 3331 50 EA 36 36 $600.00 $21,600.00 6 3339.1003 4'Extra Depth Manhole 33 39 10,33 39 20 VF 10 $185.00 $1,850.00a�248 7 0241.2103 8"Sewer Abandonment Plug 02 41 14 EA 2 $500.00 $1,000.00 8 3305.0109 Trench Safety 33 05 10 LF 1,248 $2.00 $2,496.009 3301.0002 POst-CCTV Inspection 330131 LF 1,248 $3.00 $3,744.0010 3301.0101 Manhole Vacuum Testing 3301 30 EA 6 $150.00 $900.00 TOTAL UNIT 11:SANITARY SEWER IMPROVEME T $112,182.00 Sheer Number&Q-1- UNIT III:DRAINAGE IMPROVEMENTS 18 28 29 1 3349.5002 15 Curb Inlet 33 49 20 EA 3 $4,000.00 $12,000.00 0 3 0 2 3349.4105 24"SET,1 pipe 334940 EA 2 $3,000.00 $6,000.00 0 0 2 3 3349.4107 30"SET,1 pipe 33 49 40 EA 1 $4,200.00 $4,200.00 0 1 0 4 3349.4109 36"SET,1 pipe 33 49 40 EA 1 $4,800.00 $4,800.00 0 1 0 5 3341.0201 21"RCP,Class III 3341 10 LF 33 $55.00 $1,815.00 0 33 0 6 3341.0205 24"RCP,Class III 3341 10 LF 364 $65.00 $23,660.00 0 364 0 7 3341.0207 24"RCP,Class V 3341 10 LF 80 $77.00 $6,160.00 0 C 80 8 3341.0302 30"RCP,Class III 3341 10 LF 48 $75.00 $3,600.00 0 48 0 9 3341.0309 36"RCP,Class III 3341 10 LF 46 $95.00 $4,370.00 0 46 0 10 3137.0104 Medium Stone Riprap,dry 31 3700 SY 53 $75.00 $3,975.00 0 16 37 11 3305.0109 Trench Safety 33 05 10 LF 571 $2.00 $1,142.00 0 491 80 12 0241.3104 24"Storm Abandonment Plug 0241 14 EA 1 $500.00 $500.00 0 1 0 13 9999.0003 Connect to Existing SDMH 00 00 00 EA 1 $2,500.00 $2,500.00 0 1 0 14 19999.0004 Turf Reinforcement Mat 00 00 00 SY 1 195 $90.00 $17,550.00 195 0 0 TOTAL UNIT 111:DRAINAGE IMPROVEMENT_q $92,272.00 CT'or FORT WORTH STANO,WDCONSTRUCTIONSM3F[CAnI DOCUMENTS-pR\RLUPFJiAWARDEDIROR3frS Fme\'mim 59--1.3113 VamalY INmia Hide"Y." w.z.� DAv-em Faoros.u. z z SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Md-.y A.- UNIT PRICE BID Bidder's Application R jest Iu W.-Zion Bidda'.Pmpowl HiJlist DeecrSpuon Speciii-u-Section No Unit 11mt Pn.e I Bid Valu. Iron Na. M- Qwnon Shea Nwnt<�& nDn Sheet N-b,,&Qwnnn UNIT IV:PAVING IMPROVEMENTS 20 1 21 22 1 3213.01016"Cont Pvmt 321313 SY 4,626 $36.50 $168,849.00 2,147 1,370 1,109 2 3211.05016"Lime Treatment 32 1129 SY 5,058 $3.25 $16,438.50 2,348 1,498 1,212 3 32 11.0400 Hydrated Lime 3211 29 TON 76 $185.00 $14,060,00 35.3 22.5 18,2 4 9999.0005 Saw Cut Ex.Asphalt Pavement 00 00 00 LF 89 $30.00 $2,670.00 89 0 0 5 9999.0006 Connect to Existing Pavement 00 00 00 LF 89 $20.00 $1,780.00 89 0 0 6 3213.0504 Barrier Free Ramp,Type M-2 32 1320 EA 1 $1,500.00 $1,500.00 1 0 0 7 3213.0506 Barrier Free Ramp,Type P-1 32 1320 EA 2 $1,200.00 $2,400.00 2 0 0 8 3213.0302 6 Conc Sidewalk 32 13 20 LF 495 $18.00 $8,910.00 495 0 0 9 9999.0007 Concrete Retaining Wall 00 00 00 FF 28 $100.00 $2,800.00 0 28 0 10 3471.0001 Traffic Control 347113 MO 1 $3,500.00 $3,500.00 1 0 0 11 9999.0008 End-of-Road Barricades 00 00 00 LF 28 $25.00 $700.00 0 28 0 12 13441.4003 Fumishflnstall Alum sign Ground Mount City Sid 1 33 41 30 EA 18 $750.00 $13,500.00 18 0 D TOTAL UNIT IV:PAVING IMPROVEMENT $237,107.50 Shcci Number& tin UNIT V:STREET LIGHTING IMPROVEMENTS 31 1 3441.3201 LED Lighting Fixture 3441 20 EA 7 $600.00 $4,200.00 7 2 3441.1633 Type II Pale wl Type 33B Arte 3.441 20 EA 7 $2,200.00 $15,400.00 7 3 3441.3301 Rdwy Ilium Foundation TY 1,2,and 4 34 41 20 EA 7 $1,000.00 $7,000.00 7 4 2605.3011 2"Conduit PVC SCH 40 M 26 05 33 LF 623 $15.00 $9,345.00 623 5 3441.1408 NO 6Insulated Elec Condr 3441 10 LF 1,869 $4.00 $7,476.00 1,869 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $43,421.00 Bid Summary UNIT I:WATER IMPROVEMENTS $136,817.00 UNIT II:SANITARY SEWER IMPROVEMENTS UNIT III:DRAINAGE IMPROVEMENTS UNIT IV:PAVING IMPROVEMENTS $_237,107.50 UNIT V:STREET LIGHTING IMPROVEMENTS ^^� $43,421.00 ToW C-1-d-Bid- $621,799.50 Ctrl'OF FORT WORTH STANDARDCONSTR-0NSPFLaTCAT10NDDCVWVTS-OF,U0NERAWARDEDgr-rS Foe A'mia S.pwhv I,+.LIS (]umliry Slum Hide.ry.eY