Loading...
HomeMy WebLinkAboutContract 33056 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 330516 WHEREAS, D.R. Horton — Texas, Ltd., hereinafter called "Developer", desires to make certain improvements to Alexandra Meadows, Phase 8, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section 11, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Alexandra Meadows Ph VIII-Newer CFA 4% and Utilities 10 3105 � � !; � ;' I f� V F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). 1. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. =:, c 4 ''.J Alexandra Meadows Ph VIII-Newer CFA 42o and Utilities 10 31 05 p L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain(B-1) Attached; Street Lights and Signs (C) Attached. M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $323,083.50. Lf J f � Alexandra Meadows Ph VIII-Newer CFA 43o and Utilities 10 31 05 r' SUMMARY OF COST Alexandra Meadows Phase Vlll Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $273,734.75 273,734.75 2. Storm Drainage $15,384.00 15,384.00 3. Street Lights $22,000.00 22,000.00 4. Street Name Signs $400.00 400.00 B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ 4% 11,564.75 11,564.75 TOTALS 323,083.50 $ - 323,083.50 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. N it •�; I i I 1'�� 1 Alexandra Meadows Ph VIII-Newer CFA 4% and Utilities 10 31 05 O IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth,Texas this the &41"day of Suc� ,2005((o Approval Recommended: Transportation and Public Works Department C5 Robert Goode, P. E. Director CiAofth NO M&C REQUIRED _ Marc Ott Assistant City Manager - ATTEST: Marty Hendrix City Secretary Approve as to Form: Assistant C y A torney ATTEST: DEVELOPER DR Horton—Texas,Ltd By:D. Inc.—Its Auth.A@at By: Corporate Secretary Don E. Allen—Asst. Sec. Alexandra Meadows Ph VIII-Newer CFA 4% and Utilities 10 3105 C&B No. 013510.060 ...... ...... .......... .... ....... TH ................. ......... ......... ---- .... ............ ....... .. ............................ ... . .. ............... .. ....................... ... .......... ......... CFA Estimate for: ALEXANDRA MEADOWS PH Vill October 7, 2005 STREET IMPROVEMENTS Item No. DESCRIPTION QTY UNIT PRICE AMOUNT 1 6" R.C. Street Pavement 10,117 L.F. 22.00 222,574.00 2 Lime Stabilized Sub rade 10,430 S.Y. 2.25 23,467.50 3 Hyd ated Lime 156 TON 105.00 16,427.25 4 16" Concrete Curb 5,633 1 L.F. 1 2.00 1 11,266.0011 ,JTOTAL - STREET IMPROVEMENTS $273,734.75 Sidewalks to be built by homebuilder concurrent with the construction of each home. r4,,0,�Do 6 GAJ0B\013510\ES-RPH7\CFA Estimate 20051007.xis Page 3 of 5 C&B No. 013510.060 . ............. ii fiiii:�:?iiiiiiiiiiiii:iyiiiiii iii: :::::::••:::i .......... .......... . .......... NG ..... .... ...... ........... FORT . ..... .. _0 TEXAS ................... M 0 . . ............... ........ .. ..... . ........ ............ .......................... ........ .. ......... 11.............. . . ......................... .. ... CFA Estimate for: ALEXANDRA MEADOWS PH Vill October 7, 2005 STORM DRAIN SYSTEM Item No. DESCRIPTION QTY UNIT PRICE AMOUNT 1 27" RCP 81 L.F. 48.00 3,888.00 2 21" RCP 15 L.F. 40.00 600.00 3 10' STD. CURB INLET 2 EA. 2,200.00 4,400.00 4 15' STD. CURB INLET 1 2 1 EA. 3,200.001 6,400.00 5 ITRENCH SAFETY 1 961 L.F. 1 1.001 96.001 TOTAL STORM DRAIN SYSTEM $15,3E-0:0:1 G:\JOB\013510\EST\PH7\CFA Estimate 20051007.xis Page 4 of 5 I. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 3 EA $ 2, 000 $6, 000.00 MID-BLOCK RESIDENTIAL 3 EA $ 2, 000 $6, 000.00 CHANGE OF DIRECTION RESIDENTIAL 4 EA $ 2, 000 $8, 000.00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000.00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000.00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000. 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000. 00 Subtotal $20,000.00 City' s Cost $00,000.00 Developer's Subtotal $20,000.00 10% Contingency $2,000.00 Project Total $22,000.00 Adjacent Developer' s Cost $00,000.00 Developer's Cost $22,000.00 2% Inspection Fee $00,000.00 CFA CODE #2005137 DEVELOPER' S COST: $22,000.00 ALEXANDRA MEADOWS, PHASE VIII October 31, 2005 Fort Worth, Texas October 31, 2005 PAGE I OF Exhibit C II. STREET LIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works. 3. The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the city the amount shown below prior to the City starting its design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors. 5. The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPERS COST: $22,000.00 ALEXANDRA MEADOWS, PHASE VIII October 31, 2005 FORT WORTH, TEXAS CFA CODE #2005137 Page II of Exhibit C III "STREETLIGHTS" INTERSECTIONS PRISCELLA DR & ANABELLE DR 1 PRISCELLA DR & NAVASOTA CIR 1 ANABELLE DR & ANABELLE CT 1 MID BLOCK PRISCELLA DR 2 ANABELLE CT 1 CHANGE OF DIRECTIONS PRISCELLA DR 2 ANABELLE CT 1 ANABELLE DR 1 ALEXANDRA MEADOWS, PHASE VIII Page III of Exhibit C IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of$100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following four (4) intersections at a cost to the Developer of$400.00: Priscella Dr & Anabelle Dr Priscella Dr & Novasota Cir Priscella Dr & Anabelle Dr Anabelle Dr & Anabelle Ct Alexandra Meadows, Phase VIII CFA code: 2005137 October 18, 2005 2� "�' n ,� CEDAR ANYON w � � U - ' CITY OF FORT MI a WESTERN CENTER BOULEVARD NOT TO SCALE -: GLOBE z BELL GLEN o CORRIN \ a � �o FAGAN 5� o GILL ti . `PROJECT 1 o TYSON o ( J LOCATION MERICANA 3 CONTINEN AL z o = OD Z z 7 Z 28 r w CO o J a ,n uZ w 7�t w z Z w a g o � 3 C /CHADWICK�49 w O J LDu �w Fes- '��\ McAD00 i o a z = - ANCY �L ✓ U 3 Z q J � � O o C NTREL �� o G EN H NEYCOMB o F CANTRELL SA SOM -= Tl! QSS/� RFF 1 ,Y. w � w -- f J a NORTHE,gs MAP Burgess LOCATION MAP GARTER 8 BURGESS,INC. »?�"T FORT Warm,n 76M ALEXANDRA MEADOWS IanJECT PROJECT N0. 013510.OTO.7.D630 PHASE VIII < < 1, MPI NIL�1 SCALE 11 = 200 ...... IR 19 1t � { IB 11 �F �' t • i 3 IJ �_ ...__. ._.. ...... 27 21 • I2 ' JO 9 31 ....-._ I 1 ] I l� 1S I6 f) IB l9 10 q1 re G• tr n 10 59 ]B 11 ]b 11 JI ]J JT JI Jo ?9 1e 17 16 TS N z] 11 11 ]s ' SI • •• •• •• • • •• • • Sy • •• •• • • •• •• •• p S JS B 7 6 5 ® ] 1 I • ST• SI 50 09 IB e) 16 IS ® B] II II •Io•• J9 •JB • J) Je\\!\\\ LEGEND PROP. 29'B/B � STREETS ROADWAY/50'ROW EXHIBIT 'B' PROP. 41'B/B ALEXANDRA MEADOWS ROADWAY/60'ROW PHASE VIII PROP. 4'SIDEWALK ...................• (BY HOMEBUILDER) PROP. 4'S I DEWALK Carter Burgess �:.e (BY DEVELOPER) ' CARTER 8 BURGESS,INC. 777 AWN STRET FOU WO ,TI(76%Y2 LIMITS OF PROJECT I8171]]3-E000 PROJECT NO. 013510.070.1.0630 3N PAGE 4 OF 6 =a-\Jab\510\clv\phage VIII\51081aia.tlpn y Y U(N) r......�_.___. — .... M•ak SCALEI 1" = 200' r ` Ex.....: .-_.._._... IST 4'MH ' •l7!{31L°LLF._1J.B1\T:._...>.._....'. _..-.(,.Ly,K, ♦♦ ..... ._-. i J iJ O lR �M .r z+ � 0 z t i ze zT aJ EXIST 4'MH + I ao .,...._.__ .......-_.___..._..—_ z9 .•' � , —EXIST 24" ---' - 3 E%IST 2)" EXIST 15'INLET j'�'Q' L EXIST 10'INLET 1 �» M�_•r�_ !—E%IST 15'IML ,•'" Jo .. ._. —— Ex IS 21" ,. I. .... EXIST IO'INLET E%IST i'1Ali II IS /B 17 /! l9 TD T. B hIl I Y Ji I N�IIi ® tl +/ +0 N fB J) J6 SS !0 JJ li J/ JO ?D 21 i) 16 TS N YJ iT JJ I E%IST 21 �1 E%IS 24" 15 5' _ — — J9 Exl --EXIST 27 N O •��,.��.r B ) 6 S + L I ST 51 SO 19 IB 1) IB ISL L • +D JB J J 0 STORM DRAIN LEGEND EXHIBIT 'B-1' PROP. STORM DRAIN LINE ALEXANDRA MEADOWS PROP. INLET r PHASE VIII PROP. MANHOLE - P'ROP. HEADWALL —[ :': _ Carftr BYWss _ P;1" EXIST. STORM DRAIN LINE CARTER& BURGESS,INC. )))MNN SI T LIMITS OF PROJECT —' RinTn�IX"1M PROJECT NO. 013510.070.1.0630 )GN=aI\lob\510\cIv\phase v111\51081cia.don PAGE 5 OF 6