HomeMy WebLinkAboutContract 33058 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 33o5ir
WHEREAS, Crowley Independent School District,hereinafter called
"Developer", desires to make certain improvements to New Crowley Hargrave
Elementary School located at Crowley-Cleburne Rd. and Poynter Drive, an addition to
the City of Crowley, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas,hereinafter called"City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL THESE PRESENTS:
That said Developer, acting herein by and through Greg Gilman, its duly
authorized President of the Board of Trustees for Crowley I.S.D., Daniel Allie, its
Associate Superintendent of School Operations for Crowley I.S.D., and the City, acting
herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in
consideration of the covenants and conditions contained herein, do hereby agree as
follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy herein
verbatim. Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor of
this Agreement.
C. Developer shall provide the City with a statement signed by a duly
authorized officer that Developer has appropriated sufficient moneys to pay
for its obligations contained herein.
D. The City shall award all contracts for the construction of community
facilities in accordance with Section 111,paragraph 7(E)of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered conformance with paragraph 8, Section II, of the Policy.
F. To the extent allowed by law, and specifically to the extent that liability
would exist under Chapter 101, Texas Civil Practice and Remedies Code
("Code"), including without limitation Section 101.051, Developer further
covenants and agrees to, and by these presents does hereby indemnify, hold
harmless and defend the City, its officers, agents and employees from all
claims, suits, or causes of actions which could be maintained against
Developer under Chapter 101 of the Code, in any way connected with the
construction of the improvements or facilities described herein and due to the
negligence or misconduct of Developer, its contractors, subcontractors,
agents, or employees.
G. Developer shall install or adjust all of the required utilities to serve
the development or to construct the improvements required herein.
H. Developer agrees that no street construction or storm drainage will begin
prior to City Council approval of this Community Facilities
Agreement. (Article 104.100, Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed.
(Article 104.100, Ordinance 7234).
J. Developer hereby releases the City for any inadequacies in the preliminary
plans, specifications and cost estimate supplied by the Developer for this
contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community facility
improvements shown as "current improvements"on the attached Exhibits 1, 2,
3, 4, 5, & 6.
As shown below in the "Summary of cost for Street and Storm Drain Facilities", the
Developer shall fund its share of"current Improvements" and shall either (i) award its
own contract for construction and pay the City the cost of construction inspection,
construction engineering and management as shown below, or (ii) pay to the City its
share of the cost of street, storm drainage, street lighting, street name signs as shown
below. The estimated total cost of current improvements and related support services
specified in this agreement, including design, construction and inspection is estimated to
$523,109.
Item CISD Cost City Cost Total Cost
a. Construction
1. Crowley Cleburne Rd. $217,188 $76,542 $293,730
2. Po rater Dr. $137,918 $0 $137,918
3. Water Improvements $36,780 $0
B. 10% Contingency $39,189 $7,654 $46,843
C. Construction Engineering $7,838 (*) $7,838
and Management by DOE 2%
TOTALS 1 $438,912 1 $84,197 1 $523,109
i
Notes:
1. All Preliminary Plats filed after Julyl 1, 2000 will require sidewalks on all streets.
2. Developer's column for Item B represents two percent(2%) costs for construction
inspection and materials testing.
(*)Represents City participation for construction fees.
3. Conditions Preclude the construction of improvements at this time. The City shall
design and award the improvements at a later date.
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said
DeveIN
r has executed this instrument in quadruplicate, at Fort Worth this the Z day
ofIyG,ty , 200 '.
Approval Recommended:
C,X11 Ys Transportation and Public Works Department
Contract authoriaatioa
- . -DeP_f4e-
Date Robert Goode, P. E.
Director
ATTEST:
City of Fort
By:
M c
City Secretary Assistant City Manager
Appr d as to
ssistCit Attorney
ATTEST: DEVELOPER
By:
Corporate Secretary �ssoGis� �E SVPF�/ic. TErVQ6vr
NOTARY:
UQF
pGLENDA BOLLARD�,e;;5`�i '��+' Notary PublicSTATE OF TEXASMy Comm.Exp.11/10/2005
CONCEPTUAL OPINION OF PROBABLE CONSTRUCTION COST
PROJECT. Offsite Improvements to Serve DATE: 7/1/2004
New Crowley Hargrave
TNP JOB#VLK 02332 PREPARED BY., JHB
ITEM DESCRIPTION QTY. I UNIT I UNIT I TOTAL I CITY I CITY CISD
COST % COST COST
I PAVING AND DRAINAGE IMPROVEMENTS ALONG CROWLEY-CLEBURNE RD.
1 Unclassified Street Exc 1500 CY $3.50 $5,250 50.0% $2,625 $2,625
2 6"Lime Stab Sub rade(27#'s/SY) 3764 SY $2.25 $8,470 50.0% $4,235 541235
3 Lime for Stab 27#'s/SY) 51 TN $105.00 $5,340 50.0% $2,6701 S2,67(i
4 6"Reinforced Conc Pavement 3457 SY $22.00 $76,060 48.8% $37,1171 $38,943
5 7"Concrete Curb 1332 LF $2.00 $2,670 50.0% $1,335 $1,335
6 4'Concrete Sidewalk 2250 SF 1 $4.00 $9,000 0.0% $0 $9,000
7 Concrete Sidewalk Ramps 2 EA $450.00 $900 0.0% $0 $900
10 4"HMAC Pavement Transition 2700 SY $20.00 $54,000 50.0% $27,000 $27,000
11 Si nae 12 EA $260.00 $3,120 50.0% $1,560 $1,560
12 Traffic Control 1 LS $4,500.00 $4,500 0.0% $0 $4,500
13 48" Reinforced Concrete Pie 210 LF $130.001 $27,300 0.0% $0 $27,300
14 42"Reinforced Concrete Pie 520 LF $100.00 $52,000 0.0% $0 $52,000
15 24" Reinforced Concrete Pie 350 LF $60.00 $21,000 0.0% $0 $21,000
16 10'Curb Inlet 2 EA $2,200.00 $4,400 0.0% $0 $4,400
17 48" Headwall 1 EA $3,500.00 $3,500 0.0% $0 $3,500
18 4';-4-;Drop Inlet 2 EA $3,000.00 $6,000 0.0% $0 $6,000
19 2"Schedule 40 PVC Conduit 720 L.F. $6.00 1 $4,320 0.0% $0 $4,320
20 Street Light Foundation 3 EA. $1,500.00 $4,500 0.0% $0 $4,500
21 Pull-Boxes 4 EA. $350.00 $1,400 0.0% $0 $1,400
UNIT I SUBTOTALl $293,730 $76,5421 $217,188
II PAVING&DRAINAGE IMPROVEMENTS FOR POYNTER DRIVE
1 Unclassified Street Excavation 1500 CY $3.501 $5,250 0.0% $0 $5,250
2 6"Lime Stab Sub rade(27#'s/SY) 3861 SY $2.25 $8,690 0.0% $0 $8,690
3 Lime for Stab(27#'s/SY) 52 TN $105.00 $5,480 0.0% $0 $5,480
4 6"Reinforced Conc Pavement 3810 SY $22.00 $83,820 0.0% $0 $83,820
5 7"Concrete Curb 1498 LF $2.50 $3,750 0.0% $0 $3,750
6 4'Concrete Sidewalk 2966 SF $4.00 $11,870 0.0% $0 $11.870
7 Concrete Sidewalk Ramps 6 EA $450.00 $2,700 0.0% $0 52,700
8 Concrete Header 41 LF $50.00 $2,050 0.0% $0 $2,050
9 Pavement Striping and Signage 1 LS $5,000.00 $5,000 0.0% $0 $5,000
10 lTraffir Control 1 LS $1,500.00 $1,500 0.0% $0 $1,500
11 2"Schedule 40 PVC Conduit 743 L.F. $6.00 $4,458 0.0% $0 $4,458
12 Street Light Foundation 2 EA. $1,500.00 1 $3,000 0.0% $0 $3,000
13 Pull-Boxes 1 EA. $350.00 $350 0.0% $0 $350
UNIT 11 SUBTOTAL $137,9181 $0 $137,918
III WATER IMPROVEMENTS
1 8"PVC Water Line 914 LF $25.00 $22,850 0.0% $0 $22,850
2 2"PVC Water Line 66 LF $8.00 $530 0.0% $0 $530
3 3"PVC Water Line 71 LF $10.00 $710 0.0% $0 $710
4 8"Gate Valve 3 EA $1,000.00 $3,000 0.0% $0 $3,000
5 2"Irrigation Meter 1 LS $2,000.00 $2,000 0.0% $0 $2,000
6 3"Domestic Meter 1 LS $4,000.00 $4,000 0.0% $0 $4,000
7 Ductile Iron Fittings 0.5 TON $2,500.00 $1,250 0.0% $0 $1,250
8 Fire Hydrant Assembl 1 EA $1,800.00 $1,800 0.0% $0 $1,800
9 Testing 640 LF $1.00 $640 0.0%1 $0 $640
UNIT III SUBTOTALI $36,780 $0 $36,780
mr ...................................................... .................STREET "SIM "
-- ._ ....................
TEAGUE NALL AND PERKINS _
ENGINEERS•SURVEYORS•CONSULTANTS PROP. l i' SAN.: SEWER (BY ®THERS) 1 i ; (--
Responsive Service. Reliable Results.
www.tnp-online com
P RAl OW DGE VELD MENT f
r - -- -
Ir
r
1
/ I I _
� -
J �I ❑ 1 I
r /
-
' 1 i
� I I
_ I 111
\ �I jj a
Ip
NEW HARGRAVE I - -
I� I
I ELEMENTARY SCHOOL it ,
I
_ is _
I I
I
I I I
I
I
_.._..._._....._..............._..
I I
I
I
I 1
I
I
I i I
I I
I PROP. 15" SAN. SEWER (BY OTHERS)
PER RAINBOW RIDGE DEVELOPMENT
I
I
I
-------
----------------------- --- -------- ---- -------------------- --- - ----
---- -
W.N. CROWLEY-CLEBURNE RD. (COUNTY RD. No. 1075
OFFSITE SEWER IMPROVEMENTS TO SERVE
o I I ;�� NEW HARGRAVE ELEMENTARY SCHOOL
EXHIBIT 11
21)
U -
CONCRETE PAVEMENT CROWLEY ISD
' /NC. ! CONCRETE PAVEMENT (CITY OF F.W.)
TEAGUE NALL AND PERKINS HMAC PAVEMENT TRANSITION
ENGINEERS•SU3VEYORS•CONSU.TANTS ® (50X BY CITY OF F.W.)
Respornahro Service, Reliable Reaulta l
wwum)-onlin�aco►n L.. LEGEND
w.
,I
�Y
JP 4 SISAL
Q PROP. 6"
GONG. PVYT.
NEW —
�I HARGRA VE
ELEMENTAR �--
SCHOOL
Am 41' —
RQP. C I •
PROP.
,al/MT 7RUS17TO PROP. 4 SIDEWALK
FOR
H A
- Pi/MT TRANSJTI N
(50/7o BY CITY F (BY CROW-EY /.SD.)
FOR r W RC�Tf)_� 41 B—B (50 B Y Cl T Y
FOR T WORT ann"ML ft lam
-
- a -
- OP. u " CO P�T.
B RO EY l. .D.
OP. " CONC. WMT ( C )
j Y CITY OF FORT (WORTH) I 1 I
1"=200'
u OFFSITE PAVING IMPROVEMENTS TO SERVE
NEW HARGRAVE ELEMENTARY SCHOOL
n EXHIBIT "3"
STREET "S"
INC. I 1
TEAGUE NALL AND PERKINS -
ENGINEERS•SURVEYORS•CONSULTANTS
Responsive Service. Reliable ResuRa
www.fnp-online.com
f /
wvc ,
" 100'
l �
- - � - -NEW HARGRAVE �
ELEMENTARY SCHOOL
0
— a
� I
�..__.............
_._......
PROP. 48" HDK.
I (OUTFALL TO CHANNEL) '
' PROP. 24" STORY
I i DRAIN LINE (� _
I
-- PROP. 42" & 48" STORM k
DRAIN LINE
I
I '
PROP. 2-10' CURB
k I INLETS (TYP.)
— - -- W.N. CROWL Y CLEBURNE RD. (COUNTY RD--No.,--1075)
o ` " OFFSITE STORM DRAIN IMPROVEMENTS TO SERVE
v) ' NEW HARGRAVE ELEMENTARY SCHOOL
of
EXHIBIT 114"
STREET "S"
TEAGUE NALL AND PERKINSL—
ENGINEERS•SURVEYORS•CONSULTANTS i
Responsive Service. Reliable Results
I
www.tnp-onllnacom
I PROP. PULL BOX -
-�/ �/ Q 0
� - -
C % PROP.. STREET LIGHT
FOOTING I '
tel' p
QO'
PROP 2" CONDUIT
NEW HARGRAVE I , - —
r ELEMENTARY SCHOOL I }
r I o
a
I �
i
_-_ - - PROP. STREET LIGHT
FOOTING
PROP PULL BOX
I
I
' PROP. 2'" CONDUIT PROP. STREET LIGHT
FOOTING
IE= I
+ PROP. STREET LIGHT
FOOTING
__ — --- W.N. CROWLEY—CLEBURNE RD. (COUNTY RD._No. .1-075)
of
�� :'� °� >� � � OFFSITE STREET LIGHT IMPROVEMENTS TO SERVE
En PROP. PULL �BO U� J�,).-: 1� hLa:C
o , � � ��`-15� NEW HARGRAVE ELEMENTARY SCHOOL
� p2 �,,u
EXHIBIT "5"
o I r -� ❑ � �m .
lir
L sg0 Z
( r r n
—7 7 m
- I m2
I , )
0
NEW HARGRAVE ---
-i' 1 ELEMENTARY SCHOOL II
I � �cruel I 1 I
PROP. SIGN L- --I--
rn o I I I 1 L--
fel G� c5 ' ' PROP. SIGN -�-
I
x n n - --T
cu
PROP. SIGN PROP. SIGN
r*i o ROP. SIGN- - ---- - PROP Sl
m m OR CITY ON
D � �DRT WDR -j
Z7 W.N. CROWLEY-CLEBURNE RD. (COUNTY RD. No. 1075 __-
o -- -- - - -- --- - — - --
nm PROP. SIGN PROP. SIGN PROP; SIGN
1
o (BY CITY OF (BY CITY QF I (BY CITY OF
C) a FORT WORTH) FORT WORTH) i FORT(WORTH)
Page 1 of 2
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 12/6/2005
DATE: Tuesday, December 06, 2005
LOG NAME: 20CROWLEYISD REFERENCE NO.: C-21185
SUBJECT:
Authorize Execution of Community Facilities Agreement with Crowley Independent School District
for the Installation of Community Facilities for Crowley Cleburne Road to Serve Hargrave
Elementary
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a community facilities
agreement with Crowley Independent School District for the installation of community facilities for Crowley
Cleburne Road to serve Hargrave Elementary.
DISCUSSION:
On April 22, 2003, (M&C G-13956) the City Council approved funds in the amount of $3.28 million to be
moved from the Special Assessments Fund to supplement the 1998 Capital Improvement Program New
Development Funds.
This project was included in the list of the 83 projects submitted to the City prior to July 29, 2003, when the
City Council placed a moratorium on City participation in community facilities agreements for street, storm
drain, street lights and street name sign facilities. Of the 83 projects, one more project remains that will
need City Council approval for funding.
Crowley Independent School District, the developer, has executed a proposed contract for community
facilities to construct street improvements to serve Hargrave Elementary, Hargrave Elementary is located
in south Fort Worth on Crowley Cleburne Road and Poynter Drive (see attached vicinity map). There will
be City participation for Crowley Cleburne Road street improvements only.
PLAN COMMISSION APPROVAL — The final plat (FS-003-051) has been filed of record on August 15,
2005.
This community facilities agreement is in compliance with the City's Policy for the Installation of community
facilities.
The estimated cost of the community facilities is as follows and subject to the actual bid price.
ESTIMATED COST CROWLEY ISD CFW STREET IMPROVEMENTS TOTAL
Street and Storm Improvements $355,106.00 $76,542.00 $431,648.00
Contingency $35,510.00 $7,654.00 $43,164.00
Construction Inspection Fees $7,102.00 $7,102.00
TOTAL $397,718.00 $84,196.00 $481,914.00
(*) The City's portion of construction inspection fees are calculated based on actual street and storm drain
construction costs over the 2% cap paid by developer, as per the community facilities agreement policy, in
http://www.cfwnet.org/council_packet/Reports/mc_print.asp 1/10/2006
Page 2 of 2
place at the time of the project.
This project is located in COUNCIL DISTRICT 6.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds will be available in the current capital budget, as appropriated of
the Street Improvements Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
C115 541200 020115136442 $76.542.00
Submitted for City Manager's Office b Marc Ott (8476)
Originating Department Head: Robert Goode (7804)
Additional Information Contact: Christa Sharpe (8009)