Loading...
HomeMy WebLinkAboutContract 33072 AMENDMENT NO. 1 STATE OF TEXAS 8 CITY SECRETARY CONTRACT NOdl�10_ (M&C Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Kimley-Horn and Associates, Inc. , (Engineer) made and entered into City Secretary Contract No. 31878, (the Contract) which was authorized by the City Council by M&C C-20699 on the 3rd day of May 2005; and WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Extensions for Stonegate and Arborlawn. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, of the Contract is amended to include the addition- al engineering services specified in M&C C-21209, adopted by the City Council on the 20th day of December 2005, and further amplified in a proposal letter dated November 2, 2005, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $94,440. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $492,020. li 1 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the --�-I--- day of,_T'"tfa , 2006, i n Fort Worth, Tarrant County, Texas. ATTEST: r 1 Contract Authorization Marty Hendrix City Secretary Date APPROVAL RECOMMENDED: A:PPR71 "�) ' A. Douglas Rademaker, P.E. Mar A. tt Director, Department of Assistan City Manager Engineering KIMLEY-HORN AND ASSOCIATES, INC. Engineer By: Name:Glenn A. Gary, P.E. Vice President 801 Cherry Street, Suite 1025 Fort Worth, TX 76102 APPROVED AS TO FORM AND LEGALITY: i Assists t Ci Att me -2- 7;7" err;.. .. Kimley-Horn and Associates,Inc. ■ November 2,2005 Suite 1025 801 Cherry Street.Unit 11 Mr.Liam Conlon Fort Worth,Texas Project Engineer 76102 City of Fort Worth Department of Engineering 900 Monroe Street, Suite 201 Fort Worth,TX 76102 Re: Water and Sanitary Sewer Extensions for Stonegate and Arborlawn Additional Services—Amendment No. 1 KHA No.061018030 City Project No.00107 Dear Liam: Due to additional services requested by the City as part of the Water and Sanitary Sewer Extensions for Stonegate and Arborlawn,Kimley-Horn has performed or will perform the work outlined in the following items: Item 1 (Coordination Meetings) In the current scope of services,Kimley-Horn would attend a total of sixteen coordination meetings with the design engineers for Stonegate,Arborlawn,SH- 121 T, and the development for this project. Due to the change in the project schedule,the City has requested that Kimley-Horn attend additional weekly to biweekly coordination meetings for this project. This amendment will add an additional twenty three coordination meetings for this project. Item 2(Water and Sanitary Sewer System Analysis) Due to the developer's request to increase the population densities for the Stonegate and Arborlawn Areas,the City requested Kimley-Horn to prepare a hydraulic analysis for the water and sanitary sewer improvements required for the change in densities. This analysis included both onsite and offsite utilities requirements for this development. Kimley-Horn presented this analysis to the City and the developer. Upon the developer's engineer review of the Kimley- Horn analysis,the developer lowered the densities from their original request. Kimley-Horn reanalyzed the system with the revised densities and presented this to the City and developer. Kimley-Horn prepared opinions of probable construction cost for each analysis and provided a comparison of these costs with the costs in the agreement between the City and the Developer. The recommend infrastructure from the final analysis totaled$8,500,000. The City also requested that Kimley-Horn investigate the potential alignments for a future sanitary sewer line across the proposed development to serve west Fort Worth. ■ J'J'�(�1y alis` try l�YJ'^I*\ u S`/1 •1'.u TEL 817 335 6511 L� ✓,11 �' , FAX 817 335 5070 Mr.Liam Conlon,November 2.2005,Page 2 C�� Kimley-Horn and Associates, Inc. Item 3(Survey and Easements) In the original scope for this project,the survey for the water and sanitary sewer lines would be provided by Carter&Burgess and Huitt-Zollars,the City's consultant for Stonegate Blvd. and Arborlawn Drive,respectively. The Developer and City are in the processes of finalizing the alignment of Stonegate Blvd.and Arborlawn Drive. Due to the changes in the alignment for Stonegate Blvd. from the original schematics, the Developer is requesting that the large diameter water and sanitary sewer line along Stonegate Blvd.be changed to follow the Trinity River from Bryant Irvin Road to the east side of the proposed SH-121T right-of-way. The waterline alignment for Arborlawn Drive has also changed on the west side of SH-121T to follow the SH-121T right-of-way.Due to these areas being outside the proposed roadway alignments,Kimley-Horn will perform an additional 4,000 LF of survey and prepare three additional easements for this project. Scope of Services The scope of services for this amendment is divided into the following tasks: Item l (Coordination Meetings): $21,100 (Water $9,355 Sewer $11,745) • Task 1 —Kimley-Horn has attended weekly coordination meetings from May 24,2005 through August 25,2005. Kimley-Horn was responsible for preparing the meeting agenda and meeting notes. $12,000 • Task 2—Upon request of the City,Kimley-Horn will attend biweekly to monthly coordination meetings from September 8,2005 through December 15,2005. Kimley-Horn will be responsible for preparing the meeting agenda and meeting notes. Kimley-Horn will also prepare and review the proposed construction phasing for the Stonegate and Arborlawn Project. Projected Fee$5,100 • Task 3—Upon request.of the City,Kimley-Horn will review the proposed right-of-way dedications and Community Facilities Agreement for the Stonegate and Arborlawn Areas. Projected Fee$4,000 Item 2 (Water and Sewer System Analysis): $44,170 Kimley-Horn 5,300 Reproduction $49,470 Total (Water $21,940 Sewer $27,530) • Task l —Data collection for the Stonegate and Arborlawn Areas includes the following: $2,800 o Review the proposed developer's engineer hydraulic analysis for the Stonegate and Arborlawn Areas. Mr.Liam Conlon,November 2,2005,Page 3 PPPP" Kimley-Horn h and Associates, Inc. o Review the City's water main break and sanitary sewer overflow history in the surrounding area. o Review the City's Holly and Southside II water models. • Task 2—Hydraulic analysis with 80 persons per area $25,600 o Revise the developer's total acreage to exclude the proposed SH- 121T, Stonegate,Arborlawn,and TXU right-of-ways. o Perform a hydraulic analysis in accordance with the City's standards. The water system analysis was performed by inputting the proposed demands into the City's WaterCAD models for the Holly and Southside II pressure planes. The sanitary sewer analysis was performed using existing topographic information and the proposed demands from the development. The water and sanitary sewer analysis was performed for each of the following scenarios(Tiers): ■ Tier 1 —water and sanitary sewer capacity required to serve a development density of 18 persons per acre(City standard)for all land uses. ■ Tier 2—water and sanitary sewer capacity required to serve the developer's requested densities. The requested densities vary depending on the location for the multi- use,multi-family,office,and office-retail land uses. The developer has requested a density of 18 persons per acre for all the single family land uses. ■ Tier 3—Includes the Tier 2 densities for the development and additional capacity to serve the greater Fort Worth water and sanitary sewer needs. o Prepare exhibits and opinions of probable construction cost for each hydraulic analysis. o Compare the opinions of probable construction cost with the City's agreement with the developer. . o Present the hydraulic analysis,opinions of probable construction costs,and comparisons with the Agreement to the City and developer. o Deliverables: ■ 15 sets of the hydraulic analysis,exhibits, and backup information(see attachment dated July 1,2005) • Task 3—Hydraulic analysis with revised densities $13,970 o Revise the hydraulic analysis for the following: ■ Tier 2—per the developer's increased densities; ■ Tier 3—per the City's overall system requirements. o Prepare exhibits and opinions of probable construction cost for the revised hydraulic analysis. ',�Uo .. ✓?' iCl G.o Mr.Liam Conlon,November 2,2005,Page 4 PPP�® Kimley-Horn hh,.— and Associates, Inc. o Compare the opinions of probable construction cost with the City's agreement with the developer. o Present the revised hydraulic analysis,opinions of probable construction costs,and comparisons with the Agreement to the City and developer. o Deliverables: ■ 10 sets of the hydraulic analysis,exhibits,and backup information(see attachment dated July 15,2005) • Task 4—Upon the request of the City,Kimley-Horn will prepare a Future Sanitary Sewer Alignment Study for the Stonegate area. It is anticipated that three alignments will be prepared with opinions of probably construction costs for each alignment. This study will be presented to the City and after the City's approval;the study will be presented to the Developer. Projected Fee $7,100 Item 3(Survey and Easements): $ 2,170 Kimley-Horn $21,7 Survey $23,870 Total (Water 14,045 Sewer 9,825) • Task 1—Perform survey for 3,000 LF along the Trinity River from Bryant Irvin to SH-121T. Perform survey for 1,000 LF along SH-121T right-of-way from Arborlawn south to the existing 24-inch water line. All survey will be provided in accordance with the current scope of services for this contract.Projected Fee$20,900 • Task 2—Prepare easement documentation for three locations within the Edwards Geren property. All easement documentation will be provided in accordance with the current scope of services for this contract. Projected Fee$2,970 We recommend that the City increase the budget by$94,440 for these additional services. From the additional services listed above,the recommended breakdown for water and sewer services is as follows: Description Water Sewer Total Item 1 -CoordinationMeetings $9,355 $11,745 $21,100 Item 2—Water and Sewer $21,940 $27,530 $49,470 Analysis Item 3-Survey and Easements $14,045 $9,825 $23,870 Total $45,340 $49,100 $94,440 Mr.Liam Conlon,November 2.2005,Page 5 C M11 Kimley-Horn _____ and Associates, Inc. The following table summarizes our recommended budget revisions by Item (please see attached Fee Breakdown for an hourly breakdown of each item): Description Item 1 Item 2 Item 3 Total Pre-Engineering $21,100 $49,470 $- $70,570 Conceptual Engineering $ - $- $23,870_ $23,870 Preliminary Construction - Plans Final Construction Plans - Pre-Construction Services - Construction Phase Services $ $ $ $ Total $21,100 $49,470 $23,870 $94,440 The following table summarizes our recommended budget revisions and shows the revised contract amount: Description Original Fee Amend Revised No. I Contract Pre-Engineering $22,600 $70,570 $93,170 Conceptual Engineering $84,900 $23,870 $108,770 Preliminary Construction $93,850 $- $93,850 Plans Final Construction Plans $167,300 $- $167,300 Pre-Construction Services $10,270 $- $10,270 Construction Phase $18,660 $- $18,660 Services Total Project $397,580 $94,440 $492,020 Kimley-Horn will subcontract a portion of these services to Alpha Graphics 1/83 and Gorrondona and Associates, Inc., M/WBE subconsultant. The amount we will be subcontracting is $23,400. This represents an M/WBE participation percentage of 24.8% for these additional services. With these Additional Services,our revised contract amount will be $492,020. This will revise our total contract M/WBE participation from$46,955 (12%) to $70,355 (14.3%). The water and sewer design fees for this amendment are $45,340 and $49,100 respectively. Our revised project water and sewer design fees will be $221,640 and $270,380 respectively. • Y Mr.Liam Conlon,November 2,2005,Page 6 C�� Kimley-Horn and Associates, Inc. We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES,INC. Glenn A.Gary,P.E. Vice President GAG/CTD:ctd Attachments: P:I061016.030\PPPVCHA COr4rwl\AnwndR&M\ArymOl-Ijr v6.doc r City of Fort Worth Water and Santiary Sewer Extensions for Stonegate and Arborlawn Amendment No.1 Fee Breakdown November 2,2005 City Project No.00107 PERSONNEL HOURS Labor Hours/ Total TASKS P8 P6-P7 P4-P5 P1-P3 A2 Labor Fee Expanse. 10%Sub Fee Fee Item 1(Coordination Meetings) Services Completed to Date Weekly Coordination Meetings from May 24,2005 through August 25,2005 40 40 5 0 40 40 0 5 85 Subtotal $0 $6,600 $5,100 $0 $300 $12.000 $0 $0 $12,000 Anticipated Services Byweekly Coordination Meetings from September 6,2005 through December 15.2005 16 16 7 Review dedications and Community Facilities Agreement for Stonegate and Arborlawn 9 18 2 0 25 34 0 9 68 Subtotal $0 $4,100 $4,400 $0 $600 $9,100 $0 $0 $9,100 0 65 74 0 14 153 ITEM 1 TOTAL $0 $10,700 $9,500 $0 $1,000 $21,200 $o $0 $21,200 ,Item 2(Water and Sanitary Sewer Analysis) Data collection and review,of data 2 10 10 1 Hydraulic Analysis for 80 persons per acre 2 25 75 70 5 $2,250 Hydraulic Analysis with revised densities 1 15 35 35 4 $1,350 Comparision of OPCC to Agreement for Developer Participation 5 5 Future Sanitary Sewer Alignment Study 10 15 30 4 Alpha Graphics Printing $1,700 $170 _ 3.... 57 140 145 14 359 ITEM 2 TOTAL $500 $9.400 $17,900 $15,200 $1,000 $44,000 $5,300 $170 $49,470 Item 3(Survey and Easements) Survey 4,000 LF $19,000 $1,900 Prepare three easements documents $2,700 $270 0 0 0 0 0 0 ITEM 2 TOTAL $0 $0 $0 $0 $0 $0 $21,700 $2,170 $23.870 3 122 214 145 28 $12 TOTAL $500 $20.100 $27.400 $15,200 $1,900 $65,100 $27,000 $2,340 $94,440 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 12/20/2005 DATE: Tuesday, December 20, 2005 LOG NAME: 30STONEGATE REFERENCE NO.: **C-21209 SUBJECT: Authorize Execution of Amendment No. 1 to Engineering Agreement with Kimley-Horn and Associates, Inc., for Water and Sanitary Sewer Extensions for Stonegate and Arborlawn (City Project 00107) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 31878 with Kimley-Hom and Associates, Inc., in the amount of$94,440.00, thereby increasing the contract amount to $492,020.00. Subsequent amendments, if necessary, will be processed administratively, up to a $25,000 total. DISCUSSION: On May 3, 2005, (M&C C-20699) the City Council authorized an engineering agreement with Kimley-Hom and Associates, Inc., in the amount of $397,580.00 for the design of water and sanitary sewer extensions for Stonegate and Arborlawn. This amendment will allow Kimley-Hom and Associates, Inc., to conduct a hydraulic analysis, as requested by the Water Department, of the water and sanitary sewer improvements required to accommodate increases in population density for the Stonegate and Arbodawn areas. In addition, the amendment will provide for an alignment study for a future sanitary sewer main interceptor through Stonegate and Arborlawn area to serve the western sector of the City. Kimley-Hom and Associates, Inc., proposes to provide the necessary additional engineering services for a lump sum fee of$94,440.00. City staff considers this amount to be fair and reasonable. Kimley-Hom and Associates, Inc., is in compliance with the City's M/ BE Ordinance by committing to 25% M/WBE participation on this amendment No. 1. The City's goal on this amendment is 20%. This project is located in COUNCIL DISTRICTS 3 and 9, Mapsco 74, 75, 88 and 89. http://www.cfwnet.org/council_packettReports/mc_print.asp I(, ' �� �'' 12/20/2005 rage z or z FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds will be available in the current capital budget, as appropriated, of the Water and Sewer Capital Project Funds. TO Fund/Account/Centers FROM Fund/Account/Centers P264 531200 603170010731 $9,388.00 P264 531200 603170010732 $18,777.00 P264 531200 603170010733 $3,130.00 P264 531200 603170010751 $14,045.00 P274 531200 703170010731 $11,782.00 P274 531200 703170010732 $23,565.00 P274 531200 703170010733 $3,928.00 P274 531200 703170010751 $9,825.00 Submitted for City Managers Office by_ Marc Ott (8476) Originating Department Head: A. Douglas Rademaker(6157) Additional Information Contact: A. Douglas Rademaker(6157) http://www.cfwnet.org/council_packet/Reports/mc_print.asp 12/20/2005