Loading...
HomeMy WebLinkAboutContract 45872-A2 QUA 34 $ 6 'o CITY SECRETARYtq r AMENDMENT No . 2 CONTRACT NO. T � 0 �a TO CITY SECRETARY CONTRACT �8 'd S READ, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 45872, (the CONTRACT) which was authorized by M&C C-26873 on the 22nd day of July, 2014 in the amount of $208,150 .00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $120, 649 .00 which was authorized by M&C C -27909 on September 13, 2016; and WHEREAS, the CONTRACT involves engineering services for the following project: Bellaire Drive South and Arborlawn Drive Sanitary Sewer Main Replacements; and WHEREAS, it has become necessary to execute Amendment No.2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated July 12, 2017, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $56,800.00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $385,599.00 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in ful:Lr--,r- alzda effect. OFFICIAL RECORD CITY SECRETARY Page -1- FT.WORT H9 TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Kimley-Horn and Associates, Inc. , Jesus J. Chapa Glenn Gary, P.E. Assistant Cit/y� Manager Senior Vice-President DATE: �� (� J/ DATE: 9- ")C- APPROVAL RECOMMEND APPROVALRECOMMENDED: Christopher Harder, P.E. Assistant Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Nameof Employee /nhpo Title: Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date N/A Douglas W. Black Senior Assistant City Attor 4RT.W ary J. Kayser V City Secretary ' OFIFICWL RECORD CITY 5,ECRETARY RTH5 'fX Page -2- F . O Kimley>>>Horn July 12,2017 Mr. John Kasavich, P.E. Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Sanitary Sewer Interceptor Improvements for Bellaire Dr. S. and Arborlawn Dr. Additional Services—Amendment No.2 KHA No.061018129 City Project No. 02321 Sewer Project No. P258-631200-703170232133 Water Project No. P253-531200-603170232133 Dear John: This letter is in reference to the contract between Kimley-Horn and Associates, Inc. (Kimley-Horn)and the City of Fort Worth(the City)dated 08-21-2014 referred to herein as the"Contract This amendment will provide for additional 2,200 linear feet of 12-inch sanitary sewer fine design along Bellaire Drive South from Overton Woods Drive to Mist Hollow Court, 300 linear feet of 8-inch water line design for Green Arbor Court and Mist Hollow Court,and pavement design services for the outside southbound lane of Bellaire Drive South from Overton Woods Drive to Mist Hollow Court which were not included in the original contract, these services will be performed as Amendment No. 2. The additional sanitary sewer and pavement design is required to avoid conflicts between multiple existing sanitary sewer laterals(L-8400, L-8401, L-8402, L-8411, L-8413, and L-8414)and a proposed 8'x8' reinforced concrete box storm drain which is being designed by another consultant, but associated with the same construction contract. ITEM 1 SANITARY SEWER DESIGN: $19,850Klmley-Horn (Water$0, Sewer$19,850) Kimley-Hom will design additional sanitary sewer line segments within the Bellaire Drive South corridor including: • Conceptual Design layout for approximately 2,200 linear feet of parallel 12-inch sanitary sewer from Overton Woods Drive to Mist Hollow Court • Preliminary(60%) and Final(90%and Construction Drawings)for approximately 2,200 linear feet of parallel 12-inch sanitary sewer from Overton Woods Drive to Mist Hollow Court, and applicable City Standard Details • Traffic Control Details associated with the parallel sanitary sewer construction ITEM 2 — WATER LINE DESIGN: $3,500 Kimley-Horn (Water$3,500, Sewer$0) Kimley-Hom will design water line segments within the Bellaire Drive South corridor including: Kim ey>>>Horn Page 2 • Preliminary(60%)and Final(90%and Construction Drawings)for approximately 300 linear feet of parallel 8-Inch water line(plan view only) in Mist Hollow Court and Green Arbor Court, and applicable city standard details ITEM 3 - BELLAIRE PAVING DESIGN: $27,030 Kimley-Nom (Water$0, Sewer$27,030) Kimley-Hom will design paving improvements for the reconstruction of the outside southbound lane of Bellaire Drive South between Overton Woods Drive and Briarhaven Drive: • Preliminary(60%) and Final(90%and Construction Drawings)for the following: ■ Up to five(5)storm drain inlet location and sizing ■ Up to four(4)side street profiles and grading(Overton Woods Drive, Lantem Hollow Street, Clear Fork Trail,and Ranch View Road) ■ Up to eleven(11)driveway profiles and grading ■ Revisions to signing plans in current roadway design ■ Revisions to striping plans in current roadway design ■ Revisions to removal plans in current roadway design ■ Revisions to paving plans in current roadway design ■ Roadway cross-sections ■ Revisions to traffic control phasing in current roadway design ITEM 4 - CUL-DE-SAC PAVING DESIGN: $6,420 Kimley-Horn (Water$3,210, Sewer$3,210) Kmley-Horn will design paving improvements for Green Arbor Court and Mist Hollow Court including: • Performing two(2)soil borings to a depth often(10)feet below existing grades to determine existing pavement section and soil conditions. • Perform pavement section design for proposed pavement replacement. Indicate proposed pavement section detail In the drawings. The remainder of this page intentionally left blank 801 ..� r Krim ey*Horn Page 3 To accommodate these additional services,we request that the City increase the budget by$56,800. The following table summarizes the fee for this amendment by project phase: Description Original Amend Amend Revised Fee No.1 No.2 Contract Pre-Engineering $18,455 $10,950 $29,405 Conceptual Engineering $46,540 $23,265 $3,130 $72,935 Preliminary Construction Plans $45,815 $39,924 $43,170 $128,909 Final Construction Plans $47,765 $20,560 $10,500 $78,825 Bid Phase Services $9,575 $9,575 Construction Phase Services $40,000 $25,950 $65,950 Total Project $208,150 $120,649 $56,800 $385,599 Water Sewer Total Original Contract $0 $208,150 $208,150 Amendment No. 1 $0 $120,649 $120,649 Amendment No.2 $6,710 $50,090 $56,800 Total $2,600 1 $375,679 $385,599 The following table summarizes the fee for this amendment by Work Phase: Total Work Phase Water Fee Sewer Fee Fee 31 $0 $0 $0 32 $0 $0 $0 33 $6,710 $50,090 $56,800 51 $0 $0 $0 Total $6,710 $50,090 $56,800 �- .I 801i Kim ey)>>Horn Page 4 The following tables summarize our revisions to the SBE percentages: This Amendment Sub-Consultant Fee CMJ Engineering and Testing, Inc. (Geotechnical Engineering Services) $3,700 Total $3,700 SBE Percentage 6.5% Total Contract Description Original Revised Contract Amount $208,150 $385,599 Total Contract SBE $33,500 $53,240 Total Contract SBE 16.0% 13.8% Percentage City's SBE Goal 8.0% 8.0% We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC Glenn A. Gary, P.E. Sr.Vice President GAGfjck Attachments NFTWFP0110eta1ProjecNFTW UMf0as10B1018129-�SMPP"OST_WMAmwWmw*-NdZ1BN.lr*SSAw2_Ltr.doc I801 - Street, 1 Ft.Worth, 76102i i!I Kidep Horn July 11,2017 Mr.Jay Sappington CMJ Engineering,Inc. 7636 Pebble Drive Fort Worth,TX 76118 RE: City of Fort Worth Sanitary Sewer Interceptor Improvements for Bellaire Dr. S. and Arborlawn Dr.—Amendment No. 2 SBE Requirements Notice of Intent Dear Mr.Sappington: Kimley-Horn&Associates, Inc.is committed to complying with the City of Fort Worth's Small Business Enterprise(SBE)Program. For this project,It is our intent,upon approval of this contract,to use CMJ Engineering, Inc.for the following services: Geotechnical Engineering $3,700 If you have any questions,please do not hesitate to call. Very Truly Yours, KIMLEY-HORN AND ASSOCIATES, INC. Texas Registration No.F-928 /Joshcho, P.E. JCK:Jrt ACKNOWLEDGED: CMJ Engineering, Inc. By. '�'4 �, (/V� Date: 7- 1 17 \\ P01\Dat.\Prolett\FM_UtilU.sl061018129-Bellafre_SSTPPIPOST NTPUmerdnent44o-2Wmerdmot-lo- ktoiA_CMJ.d= • 801 • 1 Ft.Worth, 76102 M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FaH COUNCIL ACTION: Approved on 9/19/2017 - Ordinance Nos. 22899-09-2017 & 22900-09-2017 DATE: 9/19/2017 REFERENCE ,C-28383 LOG NAME: 60BELLAAIRESSKHAFUNDING NO.. CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Adopt Appropriation Ordinances in the Collective Amount of$71,800.00 for Increased Project Management Costs on Bellaire Drive South and Arborlawn Drive Sanitary Sewer Main Replacements (COUNCIL DISTRICT 3) RECOMMENDATION: It is recommended that the City Council adopt the attached appropriation ordinances increasing estimated receipts and appropriations in the Water Projects Fund in the amount of$11,710.00 from available fund and Sewer Capital Project Fund-Legacy in the amount of$60,090.00 from available funds for the purpose of funding Bellaire Drive South and Arborlawn Drive Sanitary Sewer Main Replacements. (City Project No. CO2321) DISCUSSION: On July 22, 2014 Mayor and Council Communication (M&C C-26873) the City Council authorized an engineering Agreement with Kimley-Horn and Associates, in the amount of$218,150.00 for Arborlawn Drive Sanitary Sewer Main Replacements. The Agreement was subsequently revised by Amendment No. 1 in the amount of$120,649.00 on September 13, 2016 (M&C C-27909). The Project requires additional funding for project management and to cover costs associated with Amendment No. 2, in the amount of$56,800.00, that provides for additional engineering services on the project. This project will have no impact on the Water Department's operating budget when completed. Design is expected to be completed by March 2018. Construction is expected to start in August 2018 and be completed by December 2019. The total cost for Bellaire Drive South and Arborlawn Drive Sanitary Sewer Main Replacements is estimated to be $4,574,229.00. The project is located in COUNCIL DISTRICT 3. This M&C does not request approval of a contract with a business entity. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendation and adoption of the attached appropriation ordinances, funds will be available in the current capital budget, as appropriated, of the Water Capital Fund and the Sewer Capital Fund - Legacy. The Fiscal Year 2017 Water Operating Budget includes appropriations of$21,060,000.00 for the purpose of providing Pay- As-You-Go Funding for Water Capital Projects. After this transfer for Fiscal Year 2017, the balance will be $68,898.00. The Fiscal Year 2017 Water Operating Budget includes appropriations of $31,636,073.00 for the purpose of providing Pay-As-You-Go Funding for Sewer Capital Projects. After this transfer for Fiscal Year 2017, the balance will be $265,442.00. http://apps.cfwnet.org/council_packet/mc review.asp?ID=25127&councildate=9/19/2017 9/21/2017 M&C Review Page 2 of 2 Funding for Bellaire Drive South and Arborlawn Drive Sanitary Sewer Main Replacements Project as depicted below: FUND Existing Additional Project EAppropriations Appropriations Total* Water Capital Fund 59601 $0.00 $11,710.00 $11,710.00 Sewer Capital Fund - Legacy $359,007.00 $60,090.00 $419,097.00 59607 Project $359,007.00 $71,800.00 $430,807.00 Total * Numbers rounded for presentation purposes. TO Fund Department Account Project Program Activity I Budget Reference# Amount ID ID L Year (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Kara Shuror(8819) Additional Information Contact: John Kasavich (8480) ATTACHMENTS 60BELLAAIRESSKHAFUNDING 60 AO 17.docx 60BELLAAIRESSKHAFUNDING 70 AO 17.docx 60BELLAIRESSKHAA2FUNDING Map01.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=25127&councildate=9/19/2017 9/21/2017 60BELLAAI RESSKHAFU N DING FID Table: L FIDs (KK Journal Entries) -----------Dept Amount rr 59601 0600430 4959607 002321 2017 $11,710.00 59601 0600430 5110101 CO2321 C01730 2017 $5,000.00 59601 0600430 5330500 CO2321 C01733 2017 $6,710.00 59607 0700430 4959607 CO2321 2017 $60,090.00 59607 0700430 5110101 002321 C01730 2017 $10,000.00 59607 0700430 5330500 CO2321 C01733 2017 $50,090.00 r Rec # Fundr� r Activity Bu get Year CF Program Amount Purpose Amortize 59601 0600430 4959607 CO2321 C017ZZ 9999 $11,710,00 59601 0600430 5110101 CO2321 001730 9999 $5,000.00 59601 0600430 5330500 CO2321 C01733 9999 $6,710.00 59607 0700430 4959607 CO2321 C017ZZ 9999 $60,090.00 59607 0700430 5110101 CO2321 C01730 9999 $10,000.00 59607 0700430 5330500 002321 001733 9999 $50,090,00 L F I D s Expense Only-No KK or GL Entries Needed) Dept#-T CF Program Amount Purpose