--_' Construction Allowance Request CONTRACT N0. 10
Project Namel Northside II 48-Inch Water Transmission Main Phase II,Part 2 City Sec No. 47982
Project No.(s)l 56005/0600430/C01783 M&C C-27822 City Proj.No. 2304
Project Description: Installation of 48-inch Water main from Wagley Robertson Rd.to Park Hlls Ln.down Old Decatur Rd.
Contractor: S.J.Louis Construction of Texas,Ltd. Allowance No: 0 Date: 1 8/31/2017
City Project IVIgr.1 Robert Sauceda City Inspector: I Raymond Brice
Phone Number: 817-392-2387 Phone Number: 817-392-8452
Paving and Contract Time
Dept. Water Drainage Totals (Calender days)
Original Contract Amount $11,391;347.00 $2,829,076.00 $14,220,423.00 540
Extras to Date 10
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $11,391,347.00 $2,829,076.00 $14,220,423.00 550
Amount of Proposed Allowance Allocation $7,560.00 $0.00 $7,560.00
Revised Contract Amount $11,391,347.00 $2,829,076.00 $14,220,423.00 550
Original Allowance Available for Allocation $300,000.00 $100,000.00 $400,000.00
Allowance Funds Previously Allocated $92,469.25 $0.00 $92,469.25
Remaining Allowance Funds $207,530.75 $100,000.00 $307,530.75
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.05%
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $17,775,528.75
Despite the presence of traffic message boards informing motorists of one way traffic on a segent of Old
Decatur Road,several instances of near head on collisions by drivers going the wrong way have occured on
the road. One way traffic was necessary to facilitate the installation of a 48-inch water main on Old
Decatur Road. In an attempt to enforce one way traffic and prevent traffic fatality,staff recommends that
Fort Worth Police be hired to patrol and enforce one way traffic the roadway at the rate of$60/hr for 7
days (in two shifts Monday through Sunday;9/25-10/1)as follows: QM 3 4
2shifts(7amto4pm)and (4pmto11pm)= 18 �. S
$60/hr x 18 hrs/day x Mays=$7,560.00. CP
A by. o /!.%� o
J. Kayser, Cita}
.S
It is understood and agreed that the acceptance of this Constructs equest by the contrac an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.
rJntrac#o€s ;ditft Contractor Name Contractor f Date
__ _
ouis of Construction,Ltd. Justin Whitman �y �� ' 7
_se L7
r
0Av-40 �_V K O, r`a� IL 1MAO A416iL G�..17-17 /100,4 4 <l >1io L
-Assistant0 r * Date
=17—/7
_AOSW City A _ l� Assistant City Manager ate
t7:3
- � �
t •k:
OItTH TX
P,-F WORTH City of Fort Worth
W Construction Allowance Request
Project Name Northside If 48-Inch Water Transmission Main Phase II,Part 2 City Sec No. 47982
Project No.(s) 56005/0600430/C01783 DOE No.= City Proj.No. 2304
Project Installation of 48-inch Water main from Wagley Robertson Rd.to Park His Ln.down Old Decatur Rd.
Description
Contractor S.J. Louis Construction of Texas,Ltd. Allowance No: 1—J Date: 8/3112017
City Project Mgr. Robert Sauceda City Inspector Raymond Brice
CONSTRUCTION ALLOWANCE ITEMS TO BE ADDETED
OMRIPTIUR —7—DEPT Unit Unit Cost Total
44 Allowance No. 2 Water 1.00 LS $7,560.00 $7,560.00
Water $7,560.00
Paving and Drainage
Page 1 of 1 lAdditions Sub Total $7,560.00
FORT WORTH City of Fort Worth
Construction Allowance Request
Project Name Northside II 48-Inch Water Transmission Main Phase II,Part 2 City Sec No. 47982
Project No.(s) 56005/0600430/C01783 DOE No. C-27822 City Proj.No. 2304
Project Description Installation of 48-inch Water main from Wagley Robertson Rd.to Park Hlls Ln.down Old Decatur Rd.
Contractor S.J. Louis Construction of Texas,Ltd. Allowance No: 0 Date 8131/2017
City Project Mgr. Robert Sauceda City Inspector Raymond Brice
CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Paving and Drainage
Page 3 of 4 IDeletions Sub Total
MMBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 4 of 4
Sholola, Tony
From: Mark Ailara <MarkA@SJLouis.Com>
Sent: Thursday, September 21, 2017 6:28 PM
To: Sholola, Tony
Cc: Sauceda, Robert;Johnson, David R.;Justin Whitman;Salazar, Ralph
Subject: RE: Police Presence on Old Decatur
Tony,
As discussed,the cost for Patrol Officer coverage for Public Safety and Enforcement for the North Old Decatur Road
$60/hour
2 shifts—1'shift(7 am—4 pm), 2n,shift(4 pm—11 pm)= 18 hours
7 days—Monday through Sunday
$60 x 18 x 7=$7,560.00
Subcontract will be made for Officer Rafael Salazar#3369
Please let me know if you have any questions
Thank you,
Mark
Mark Ailara
Asst. Construction Manager
S.J. Louis Construction of Texas, LTD.
520 South 6th Ave.
Mansfield,TX 76063
marka@silouis.com
C 817-247-7025
"Blame No One,Expect Nothing,Do Something"
From:Sholola,Tony [mailto:Tony.Sholola@fortworthtexas.gov]
Sent:Thursday,September 21,2017 2:19 PM
To: Mark Ailara<MarkA@SJLouis.Com>
Cc:Sauceda, Robert<Robe rt.Sa uced a @fortwo rthtexas.gov>;Johnson, David R.<David.Johnson2@fortworthtexas.gov>;
Justin Whitman<JustinW@SJLou is.Com>
Subject: Police Presence on Old Decatur
Mark:
As we discussed this morning, please contact Officer Salazar with regards to hiring off-duty FW police officers to enforce
the one way traffic message boards and signs on Old Decatur Road for a seven day period within the hours of 7:00 AM
1
to 4:00 PM and also from 4:00 PM to 11:00 PM.The City will reimburse SA for this expense. My understanding is that
the going rate is$50.00 per hour. Hopefully after the week of police presence,folks will pay heed to the one way signs.
We appreciate your cooperation with this matter.
z
FORTWORTH
Contract Compliance Manager
By signing I acknowledge that I am the person responsible for the monitoring and administration of this
contract, including ensuring all performance and reporting requirements.
Signature
Roberto C. Sauceda,RE
Name of Employee
Water Department-En ing eering
Department
Senior Professional En ig neer
Title
817-392-2387
Phone
7 Z--� /-�'
Date
OFFICIAL RECORD
CITY SECRETARY