Loading...
HomeMy WebLinkAboutContract 28006-A6 CITY SECRETARY Q _ 1 AMENDMENT No. 6 CONTRACT NO. U �lG J TO CITY SECRETARY CONTRACT WHEREAIS, the City of Fort Worth (CITY) and Dannenbaum Engineering Corporation, (ENGINEER) made and entered into City Secretary Contract No. 28006, (the CONTRACT) which was authorized by M&C C-19172 on the 30th day of July, 2002 in theamount of $721,899.76; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $111,800 .52 which was authorized by M&C C-19936 on January 20 , 2004 and Amendment No.2 in the amount of $329,406.00 which was authorized by M&C C-22535 on November 27, 2007 and Amendment No. 3 in the amount of $96,825 .00 which was authorized by M&C C-23578 on June 9, 2009 and Amendment No. 4 in the amount of $60,835.00 which was authorized by M&C C-24794 on March 22, 2011 and Amendment No. 5 in the amount of $149,012.00 which was authorized by M&C C -28110 on February 14, 2017; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Main 257 and 325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design; and WHEREAS, it has become necessary to execute Amendment No. 6 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated August 8, 2017, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $63,751 .00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall bean �} amount of $1 ,533 ,519.28 . �C) 3. All other provisions of the Contrab" ;-WNIZK—are not expressly a ;�. MIAL RECORD CITY SECRETARY 5 EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Dannenbaum Engineerin C rporation, Jesus J. Chapa Wayne Q71 Ahrens, P.E. Assistant City Manager Executive Vice-President DATE: A2 " �/�7 DATE: D _ APPROVAL RECOMMENDED: /_1P �.rC,G Christopher Harder, P.E. Assistant Director, Water Department APPROVED AS TO FORM AND LEGALITY: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee Ti e: Project Manager ' M&C: NIA Date N/A Douglas W. Black Senior Assistant City Attorney N ATTES O� FOR xZr J. Kayser r city Secretary wAS OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX ENGINEERING EXCELLENCE DANNENBAUM ENGINEERING CORPORATION SINCE 6100 WESTERN PLACE,SUITE 402, FORT WORTH,TEXAS 76107 194$ August 8, 2017 Mr.John Kasavich, P.E. City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth,TX 76102 Re: Sanitary Sewer M-257&325 Middle& Upper Village Creek Parallel Relief Alignment Study& Design City Secretary Contract No. 28006-Amendment No.6(Rev01) City Project No.01333 DEC Project No. 3642-32 Dear Mr. Kasavich: Dannenbaum Engineering Corporation, (Dannenbaum or ENGINEER) is pleased to provide the City of Fort Worth (CITY) with Amendment No.6 for the Sanitary Sewer Main 257 & 325 Middle and Upper Village Creek Parallel Relief Alignment Study contract (the PROJECT). The CITY has asked Dannenbaum to perform additional services under this contract for: 1) Re-design associated with increased sanitary sewer pipe size from 42-inch to 48-inch diameter. 2) Hydrovac Excavation services for utility locates at 9 proposed crossing locations for Parts 1 and 2 of the PROJECT. 3) Survey associated with tying in the location and elevation of the 9 utility locates 4) Survey and easement preparation associated with access roadway easements east and west of PROJECT crossing IH-35W. These services are necessary because: 1) The City determined that it was more cost effective to rehabilitate the existing 18-inch to 24-inch Main 325 through Parts 1 and 2, than to replace it with a new 30-inch pipeline as recommended in the DeOtte/Freese and Nichols Revaluation of the Village Creek Basin CIP Needs for Burleson's Peak Flow Design Memorandum.This required that Main 325 Relief Sewer provide the additional capacity required to offset the capacity reduction between the 30-in replacement and the 18-inch to 24-inch rehabilitation. 2) Subsurface locates of existing utilities at crossings of the proposed Main 325 alignment were not included in prior scopes of work and the CITY's on-call utility locate contract has expired. 3) Hydrovac Excavation services only include GPS locations and measure-downs from the existing surface to the utility. More accurate elevations and locations tied to PROJECT control are required for sewer pipeline design. 4) In conversations with TxDOT regarding access permits,TxDOT indicated new access driveways located at the proposed PROJECT crossing would be too close to nearby existing access driveways and violate their minimum spacing requirements. To address this, we propose separate access roadway easements be acquired that utilize existing gas well sites' access driveways and roadways. The additional services required for this realignment are as follows: 1) Re-Design for Increased Pipe Size- The re-evaluation and re-design of the sewer pipeline profile for increased pipe size for Parts 1 and 2 of the PROJECT is to be performed by Dannenbaum Engineering Corporation (DEC). This work is classified as Basic Engineering Services under former Part 2-Main 325 Design Phase and current Work Phase 33 of the contract.The detailed scope of services is as described in Sanitary Sewer Main 257&325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design-Amendment No.6(Rev02) DEC No.3642-32 Page 2 of 3 Exhibit "A"—General Scope of Services of the original contract and includes subconsultant management. Fee=$35,691 (Lump Sum), 2) Hydrovac Excavation Services — Badger Daylighting, Ltd. (Badger) will perform Hydrovac Excavation Services for utility locates at nine (9) proposed crossing locations in Parts 1 and 2 as identified on Exhibit A.1. This work is classified as Special Services under former Part 2-Main 325 Design Phase and current Work Phase 33 of the contract. The scope of work is described in Attachment A—Subconsultant's Scope of Work. Fee=$20,210(Not-to-Exceed, Billed on Hourly Basis). 3) Survey— a. ANA Consultants, LLC will survey,stake and tie-in the Hydrovac Excavation locations.This work is classified as Special Services under former Part 2-Main 325 Design Phase and current Work Phase 51 of the contract. The scope of work is described in Attachment A. Fee=$4,250 (Lump Sum). b. The survey work for preparing and providing easement documents for two (2) access easement parcels, one east and one west of IH-35W. These documents will include Exhibit A, easement parcel description, and Exhibit B, easement parcel map in the format required by the City of Fort Worth Real Property Management Department.The scope of work is described in Attachment A. Fee=$3,600(Lump Sum). ENGINEER will perform/manage the work described in the items above for this Amendment in accordance with the original Contract. We recommend that the City increase the budget by $63,751 for these additional services. From the additional services listed above,the recommended breakdown for Item 1) Design Services for DEC is as follows: Description Total Part 2—Main 325 Design $35,691 - Work Phase 33 - $35,691 Total $35,691 These Services are presented in further detail in attached Exhibit B—Summary of Manhours and Project Fees. The ENGINEER will subcontract a portion of these services as described in Items 2) and 3)to the following consultants: Subconsultant Service Fee %Amend No. 6 Badger Daylighting, Ltd. Hydrovac Excavation Services $20,210 31.7% ANA Consultants, LLC Survey(Part 2) $7,850 12.3% Total $28,060 44.0% Overall M/WBE Fees and%of Contract are presented in attached Exhibit B,Tab Exhibit B-3A Fee Summary. The following table summarizes the Fee per Work Phase breakdown: Work Phase Total 33 (Design, Design Support) $55,901 51(Survey) $7,850 Total $63,751 Sanitary Sewer Main 257&325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design-Amendment No.6(Rev02) DEC No.3642-32 Page 3 of 3 These Services are presented in further detail in attached Exhibit B,Tab Exhibit B-3. The following table summarizes our recommended budget revisions and shows the revised contract amount: Current Contract Through Amend No.5 Revised Contract Description Amend No.6 Original Work New Work Original Work New Work Phase Phase Phase Phase Part 1-Alignment Study $145,727.46 $145,727.46 - - $145,727.46 $145,727.46 Part 2-Main 325 Design $1,009,128.99 $860,116.99 $63,751 - $1,072,879.99 $860,116.99 Work Phase 51(Survey) $36,150 - $7,850 $44,000 Work Phase 33(Design,Design Support) $112,862 - $55,901 $168,763 Part 3—Village Creek Basin Rehab Part 4 $231,929.54 $0 $231,929.54 Part 4—Main 238 Basin Rehab $82,992.29 $0 $82,992.29 Total Project $1,469,778.28 $63,751 $1,533,529.28 It is proposed that funding for this amendment be drawn from the previously approved contract Amendment No. 5 (dated 3/5/2017) budget for the acquisition of Easement Parcels 15PE(r01) and 15CE(r01) (Reference Exhibit C—Amendment 5—Exhibits 4 and 5 )which are located on property (Deer Creek Park) owned by the City of Fort Worth.A cost of$123,954 was inadvertently assigned to cover acquisition costs for these two easement Parcels and is included in the Amendment No. 5 budget (Reference Exhibit D—City Council Action Ref No.C- 28110,dated 2/14/2017). Since the two Parcels are owned by the City,there is no acquisition cost associated with them, and the associated funds are available to cover the contract budget increase for this Amendment (No. 6). We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, Dannenbaum Engineering Corporation 9�� Digitally signed by Douglas E Guinn �` � _ Date:2017.08.08 12:05:48-05'00' Douglas E. Guinn, P.E. Sr. Project Manager DEG/JCP Attachments: Attachment A—Subconsultants' Scope of Work. (w/ Exhibit A.1—Hydrovac Excavation Locations) Exhibit B—Summary of Manhours and Project Fees Exhibit C—Amendment 5—Exhibits 4 and 5 Exhibit D—City Council Action Ref No.C-28110,dated 2/14/2017 ATTACHMENT A Hydrovac Excavation and Restoration Scope of Services A. Scope of Services 1. Provide equipment,water and labor to perform hydro-vacuum excavation at nine(9) Potholes at Sites as identified on the attached Exhibit A.1 to include: a. Hydro-vacuum excavated potholes at no more than ten (10)feet in depth each b. Locate and identify the top of the pipe or utility, record the distance from natural ground to the top of the pipe or utility and record the diameter of the pipe or utility. c. Traffic Control for entering and exiting on South Oak Grove Road and 135W d. GPS pot hole tracker and 2" PVC for line marking e. Backfill with cushion sand approximately two (2) cubic yards for each ten (10)foot deep pothole f. Dump off at a disposal site provided by the contractor for non-contaminated excavated soil B. General Notes&Conditions: 1. In no event shall Badger Daylighting be liable for any special, indirect, incidental, consequential (including loss of profit), or punitive damages. 2. Work shall comply with Specification Section 33 05 30, "Design Phase Vacuum Excavation Location of Existing Utilities" in attached Exhibit A.2. 3. In the event that the pipe or utility is not located at the location staked in the field, embedment and backfill to fill the excavation will comply with Specification Section 33 05 10, "Utility Trench Excavation, Embedment and Backfill" in attached Exhibit A.3. 4. Reference Attachment"B"for Pricing. C. Additional Cost: 1. Should contaminated soils be encountered there will be an additional charge per day that the materials have to be maintained on the contractors truck while processing the required paperwork to properly dispose of the contaminated soils. 2. Should the pipeline that is being located be deeper than ten (10)feet deep, additional charges for excavation and backfill will be applied. City will be notified if such conditions exist. 3. Any additional training required by the site owner will be done at an additional charge for time out of the field. 4. Any additional embedment and backfill dirt required due to inaccurate preliminary staking and inability to locate the utility upon excavation will be an additional cost and will be as described in Section B.3,General Notes & Conditions above. 5. Breaking, removal, and restoration of asphalt and or concrete unless agreed to in writing prior,will be an additional cost. 6. Site restoration to include grass,trees, shrubs, etc... unless agreed to in writing prior will be an additional cost. 7. Materials to secure and cover the excavation unless agreed to in writing prior,will be an additional cost. 8. It is understood that the City will provide all specialty PPE which will include, but is not limited to, Self-Contained Breathing Apparatus,trailer unit, masks, attachments, and other 6/26/2017 Page 1 of 2 Hydrovac Excavation and Restoration Scope of Services related equipment. If specialty wet suits or other PPE are required to be supplied by Badger,they will be an additional cost. D. Dannenbaum Engineering responsibility Includes: 1. Communicate to owner of pipeline findings. 2. Specific direction and locations for Hydrovacuum excavation based on coordination and staking by a surveyor. 3. Notify Badger of all billing requirements and any appropriate purchase orders,job numbers, AFE, etc.that would be necessary to release payment to Badger. This must be done prior to the first day of work. 4. Notify Badger of any of the following:Certified payrolls,OCIP requirements, prevailing wage requirements,additional insurance requirements over what Badger already has in place. DI. City of Fort Worth responsibility Includes: 1. Access to the Hydrovacuum site. Permits and permission from property owners, utilities, and government agents. 2. All required shoring, maintenance and barricading. 3. Ownership of the soil and debris removed by the Hydrovacuum including any soils or debris contaminated or suspect which cannot be readily disposed of. DII. Contractor Deliverables Include: 1. Excavation Report provided to Dannenbaum Engineering indicating actual coordinates of the located pipe at the location of the Pothole,top of located pipe depth from the surface, top of surface elevation,and any unusual conditions or findings encountered during the hydrovacuum excavation. DIII. Schedule of Excavation:(Based on a Notice to Proceed no later than August 7, 2017. 1. Site 1 is PRIORITY. Site 1 excavation and utility location shall be coordinated, performed and completed no later than August 14,2017. 2. Sites 2—9 are not as urgent as Site 1 and shall be completed, in no particular sequence, no later than September 18,2017. 3. Site 9 is within Union Pacific Railroad ROW and involves locating AT&T facilities. This location will require additional coordination efforts on the contractor. The contractor is advised to begin coordination efforts with the appropriate parties upon Notice to Proceed. With prior authorization from Dannenbaum and the City of Fort Worth,an extension of time for completion will be considered in the event that coordination,access or completion is delayed by either UPRR or AT&T. 6/26/2017 Page 2 of 2 MANHOURS Page 4 of 4 DANNENBAUM ENGINEERING CORPORATION SUMMARY OF MANHOURS BY CLASSIFICATION SUMMARY OF TOTAL PROJECT FEES-SUPPLEMENTAL AGREEMENT NO.6 M-325 ENGINEERING DESIGN&SUPPORT SVCS.-1)42 TO 48-INCH PIPE SIZE CHANGE;2)HYDROVAC EXCAVATION AT 9 SITES;3)SURVEY/EASEMENTS AMENDMENT#& ESTIMATED MANHOURS PER TASK BY CLASSIFICATION DEC PLAN TOTAL TOTAL TASK DESCRIPTION OF WORK TASK SHEET PRINCIPAL PROD SENIOR STRUCTI PROJECT SR DGN TECH. QNQC MH'S COST CODE REQUIREMENTS MGR ENGR HYDR ENG ENGR TECH. CADD REVIEW SECTY PER PER QNTY UNIT $270.00 $230.00 $185.00 $15D.00 $120.00 $110.00 $60,00 $185.00 65.00 TASK TASK DESIGN PHASE ENGINEERING 0120 PROJECT MANAGEMENT 1 LS 24.0 24.0 5,520.00 2400 FINAL DESIGN COVER SHEET 0 SHEET QO D.DD GENERAL CONSTRUCTION NOTES 0 SHEET 0.0 O.DO GENERAL SEWER NOTES 0 SHEET 0.0 0.00 FRCP GENERAL NOTES 0 SHEET 0.0 0.00 LOCATION MAP 0 SHEET 0.0 0.00 SHEET LAYOUT&CONTROL 0 SHEET 0.0 0.00 SAN.SEWER PLAN&P ROFILF 28 SHEET 42,0 84.0 84: 14.0 224.0 25,480.00 SAN.SEWER DETAILS 1 SHEET 2.0 4.0 F0 1.0 11.0 1,275.00 SW3P DETAIL SHEETS 0 SHEET 0.0 0.00 TRAFFIC CONTROL PLANS 0 SHEET 0.0 0.00 OPINION OF PROBABLE CONSTRUCTION COST LS 1.0 2.0 TO 4.0 610.00 BID PROPOSAL/SPEC[RCATfONS 0 LS 0.0 0.00 0,0 0.00 0.0 0.00 GRAND TOTAL D0.0 24.0 45.0 0.0 90,0 0. 88.0 16.D 0.0 263.0 32,885.00 0.00% 9.13% 17.11% 0.00% 34.22% 0.00°% 33.46% 6.08% 0.00% 100.00% DIRECT LABOR COSTS: $ 32,885.00 SUBCONTRACTORS FIELD SURVEY(ANA)(M/WBE $ 7,850:0 HYDROVAC EXCAVATION(BADGER) $ 20,210.00 MANBE Participation: 12.3% TOTAL SUBCONTRACTOR COSTS $ 28,060.00 10%SUBCONTRACTOR MARKUP $ 2,806.00 TOTAL DEC COSTS(LABOR�MARKUP) $ 35,691 00 TOTAL COSTS(DEC+SUBS) $63,751.00 Exhibit B-Summary of Manhours and Project Fees(Amendment 6)(r01) 7/31/2017 fnRrlYottrn -'�t-'- City of Fort Worth ACCEPTANCE OF PREVIOUS M/WBE COMMITMENT FORM (for use with CHANGE ORDERS or AMENDMENTS greater than$50,000) To be Completed by City Project Manager Amendment-(for Professional Sentices Agreement):_ . - ProJect Name City Project Number, - - Sanitary Sewer Main 257 and 325 Middle and Upper Village _-..-- 01333 Creek Parallel Relief Alignment Study and Design City"Pi Ject,Manager Consultant: ; ._ . _: John R.Kasavich — Dannenbaum Engineering Corporation - ..City's M/WBE Ph jdef-Goal: 24 Original Amount of Agreement: $721,889.76 - Accepted M/WBE Commitmeraf: 28 Total of Previous Amendments: $747,878.52 Date of Last-MNVBEReporE 9/13/2017 Amount for this Amendment: _ $63,751.00 Amendment#. 6 = Revised Amount of Agreement.-: $1,533,519.28 " Date ds Language to be inserted in the M&C for this Agreement Dannenbaum Engineering Corporation agrees to maintain its initial M/WBE commitment of 28% that it made on the original agreement and extend and maintain that same M/WBE commitment of 28%to all prior amendments up to and inclusive of this Amendment No. 6. Therefore Dannenbaum Engineering Corporation remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. To be Completed by the Representative of the Cgns tant Wayne G.Ahrens,P.E. Pricipal Printed Signature Title C' Auth zed Signature/Date Dannenbaum Engineering Corporation Douglas E.'Guinn, P.E. Company Name Contact Name(if different) 6100 Western Place,Suite 402 doug.guinn@dannenbaum.com Address E-mail address Fort Worth,Texas 76107 (817)763-8883 (817)570-1323 City/State/Zip Phone number Fax Number 31% as of 7/18/2017 M/WBE%Paid to Date Date City Project Manager has reviewed the work=associate with t is Amen Tent, conSiders It the same or similar to work in.the orig!nal:Agreement, and recommends that the` Consultant have the option to.retain and confirm its existing.M/WBE commitment. John R. Kasavich o?S City Project Manager Ity Project Manager Signature: Date Attach • • 4 1 Documentation I I 1 to To be;,tompl6tedl ! the 0 0 r� M/VVBE Com Tlidnee Staff 1134 M/WBE Current°o Level via Last Report Recd M/VVBE Signature Date ,EP 25'17 PH 3:56