Loading...
HomeMy WebLinkAboutContract 47719-FP1 FORTWORTHe CITY SECRETARY CONTRACT N0. 11 LEP TRANSPORTATION AND PUBLIC WORKS NOTICE OF PROJECT COMPLETION (Developer Projects) (r�l r' !Gn S "n�j 1 1011 q City Project Ns: 02731 l C5ht-477/q Regarding contract 02731 for KROGER SW 530 as required by the TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Price: $73,497.65 Amount of Approved Change Orders: Ns Revised Contract Amount: Total Cost Work Completed: $73,497.65 ti --&� 6 - to I Recommended for Acceptance Date Ass Director, TPW - Infrastructure Design and Construction Accepted 0 Date Director, TRANSPORTATIOTI & PUBLIC WORKS Asst. City Manager- Department f TP&W Const.Services ?ate CPN# —Rh D16 Project Manager Risk Management Canady Comments: D.O.E. Brotherton (0 OFFICIAL RECORD CFA Morales/Scanned 0` j, m.Ali , Gutzler/Scanned CITY SECRETARY The Proceeding people have been Contacted WORTH TX OCT Q �0,� concerning the request for final payment& have + released this project for such payment. YIIitin Rev.9/22/16 Clearance Conducted By PA' zdm FORT WORTH r f CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name KROGER SW530 Contract Limits Project Type STORM DRAIN&PAVING City Project Numbers 02731 DOE Number 2731 Estimate Number 1 Payment Number I For Period Ending 3/13/2017 CD City Secretary Contract Number Contract Time 259D Contract Date Days Charged to Date 324 Project Manager NA Contract is 100.00 Complete Contractor COLLINS&ARNOLD CONSTRUCTION CO.,LLC 6111 PEACHTREE DUNWOODY RD BLDG B,SUI ATLANTA, GA 30328 Inspectors LAYER / SALAZAR Monday,March 13,2017 Page I of 4 City Project Numbers 02731 DOE Number 2731 Contract Name KROGER SW530 Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 3/13/2017 Project Funding STORM DRAIN Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 CONCRETE RIPRAP 47 SY $83.00 $3,901.00 47 $3,901.00 2 5X2 BOX CULVERT 106 LF $175.00 $18,550.00 106 $18,550.00 3 HEADWALL,BOX CULVERT 1.5 CY $4,360.00 $6,540.00 1.5 $6,540.00 4 TRENCH SAFETY 53 LF $0.25 $13.25 53 $13.25 Sub-Total of Previous Unit $29,004.25 $29,004.25 PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 REMOVE CONCRETE DRIVE 902 SF $5.00 $4,510.00 902 $4,510.00 2 REMOVE CONC CURB&GUTTER 444 LF $5.00 $2,220.00 444 $2,220.00 3 HYDRATED LIME 13.32 TN $160.00 $2,131.20 13.32 $2,131.20 4 6"LIME TREATMENT 498 SY $9.00 $4,482.00 498 $4,482.00 5 8"LIME TREATMENT 168 SY $10.00 $1,680.00 168 $1,680.00 6 8"CONC PVMT 498 SY $41.00 $20,418.00 498 $20,418.00 7 4"CONC SIDEWALK 136 SF $3.00 $408.00 136 $408.00 8 8"CONCRETE DRIVEWAY 1510 SF $4.67 $7,051.70 1510 $7,051.70 9 BARRIER FREE RAMP 4 EA $150.00 $600.00 4 $600.00 10 7"CONC CURB&GUTTER 397 LF $2.50 $992.50 397 $992.50 Sub-Total of Previous Unit $44,493.40 $44,493.40 Monday,March 13,2017 Page 2 of 4 City Project Numbers 02731 DOE Number 2731 Contract Name KROGER SW530 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 3/13/2017 Project Funding Contract Information Summary Original Contract Amount $73,497.65 ChanIze Orders Total Contract Price $73,497.65 titi 1 Date 3 5 Total Cost of Work Completed $73,497.65 Con rac or Less %Retained $0.00 Net Earned $73,497.65 / Date Inspecti Supervisor Earned This Period $73,497.65 Retainage This Period $0.00 ate /(�� Less Liquidated Damages &Pr 'ectManager Days @ /Day $0.00 Date ln4don LessPavement Deficiency $0.00 Asst. irector/TPW-Infrastructure Design c, traction Less Penalty $0.00 Date l rJ r /7 Less Previous Payment $0.00 Director/contracting Depart ent Plus Material on Hand Less 15% $0.00 Balance Due This Payment $73,497.65 i I �i Monday,March 13,2017 Page 3 of 4 City Project Numbers 02731 DOE Number 2731 Contract Name KROGER SW530 Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 3/13/2017 Project Funding Project Manager NA City Secretary Contract Number Inspectors LAYER / SALAZAR Contract Date Contractor COLLINS&ARNOLD CONSTRUCTION CO.,LLC Contract Time 253 CD 6111 PEACHTREE DUNWOODY RD BLDG B,SUI Days Charged to Date 324 CD ATLANTA, GA 30328 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $73,497.65 Less %Retained $0.00 Net Earned $73,497.65 Earned This Period $73,497.65 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $73,497.65 Monday,March 13,2017 Page 4 of 4 FORTWORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:I NAME OF PROJECT: Kroger SW 530 PROJECT NO.: 02731 CONTRACTOR: Collins&Arnold Const,Inc. DOE NO.: N/A PERIOD FROM;04/25/16 TO: 03/14/17 FINAL INSPECTION DATE: 14-Mar-17 WORK ORDER EFFECTIVE:N/A CONTRACT TIME: 324 O WB* CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. S. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS * DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS 324 PERIOD PREVIOUS PERIOD TOTALS 324 TO DATE *REMARKS: r 1 y,s /o CONT } TOR IDAE INW TOV DATE i ENGINEERING DEP ARnIENT E� The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TZ 76012-6311 (817) 392-7941 • Fax: (817)392-7845 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: KrogerSW530 CHANGE CONTRACT: Water Sewer,Paving and Drainage Improvements ORDER No: CFA# 2015-104 CITY PARTICIPATION.F No CITY PROJECT# 2731 DOE# WA WATER PROJECT# P265-602150273163 SEWER PROJECT# P275-702130273163 FILE# X-23365 W-2369 INSPECTOR: Edwin R.Rodriguez Phone No: 817392-8306 PROJECT MANAGER: Gopal Sahu Phone No: 817392-7949 CONTRACT UNIT WATER SEWER PAVING DRAINAGE STREETLIGHTS TRAFFIC SIGNAL CONTRACT Developer Developer Developer Developer Developer Developer DAYS Cost Clty Cost Cost City Cost Cost City Cost Cost City Cost Cost Clty Cost Cost City Cost ORIGINAL CONTRACT $29,287.50 $16,172.00 $449492.40 $29,004.25 EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE $29,287.50 S0.00 $16,172.00 $0.00 $44,492.40 $0.00 $29,004.25 $0.00 $0Ao $0.00 $0.00 $0.00 0 AMOUNT OF PROP.CHANGE ORDER ($14,547.00) REVISED CONTRACT AMOUNT $29,287.50 $0.00 1 $1,625.00 1 $0.00 $44,492.40 $0.00 $29,004.25 $0.00 $0.00 $0.00 $0.00 $0.00 0 TOTAL REVISED CONTRACTAMOUNT PER UNIT $29,287.50 $1,625.00 $44,492.40 $29,00425 $0.00 $0.00 REVISED COST SHARE D.V.Cost: $104,409.15 City Cost: $0.00 TOTAL REVISED CONTRACT $104,409.15 00 0 Revised:10-12-2011 Y( Page 1 f You are directed to make the following chan es in the contract documents: CITY BID ITEM PAY ITEM# # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL Unit I-Sewer Improvements 3305.1002 -48 LF 16"Casin Other Than O en Cut $200.00 59,600.00 33052002 -48 LF 8'Sewer Camer Pie $25.00 57,200.00 3331.4115 -69 LF 8'Sewer Pie $25.00 57,725.00 3339.1001 -1 FA 5'Manhole $1,500.00 -$1,500.00 3305.0116 -2.5 CY Concrete Encasement for Utility Pi es $105.00 5262.50 3305.0109 -70 LF Trench Safety $0.25 -$1.50 3301.0002 -117 LF Post-CCTV Inspection $1.00 -$117.00 3301.0101 -1 FA Manhole Vacuum Testing $125.00 5125.00 TOTAL 514,547.00 TOTAL 11514,547.00 REASONS FOR CHANGE ORDER Unable to vid"e/Jsr� o ongina/ly approved when CFA was executed.Sanitary Sewerprovided is all private thm private Eft station. ECOMMENDED: ' APPROVED: II `� APPROVED: By: Winkelmann and Associates,Inc. By: Kroner Texas L.P. By: Collins and Amold Name: Michael Dcugett Name: Richard Bmkley Name: Jon L.Arnold Title:Vice President Title: Sr.Project Manager Title: Vice President Revised:10-12-2011 Page 2 CONSENT OF SURETY OWNFR o TO FINAL PAYMENT ARCHITECT CONTRACTOR ❑ AIA Docu)n"G707 SURLY �J Bond No. 4351583 OTHER TO OWNER: ARCHITECT'S PROJECT NO.: (Name and addrez) City of Forth Worth, TX Developer Kroger Texas LP CON'J'RAC'i'EOR: Construction Fort Worth,TX FROJECTCONTRACT DATED:January 28, 2016 (Name and adWo q CFA#02731 -Water, Sewer, Paving and Drainage to Serve Kroger SW530 Ft Worth, TX In accordance with the provisions of the Contract between the Owner and the Contractor as indiested above,the (hart name and addirm ofSarew Westfield Insurance Company P.O. Box 5001 Westfield Center, OH 44251-5001 SURETY, on bond of ()na;rr nanra and address of Connutror) Collins and Arnold Construction Company, LLC 6111 Peachtree Dunwoody Road, Bldg B, Suite 102 Atlanta, GA 30328 CONTRACTOR, hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (hwn nawaandadrWg o`Oawury City of Forth Worth, TX Developer Kroger Texas LP Fort Worth,TX OVNEI, as set forth in said Surety's bond. W WITNESS WHEREOF,the Surety has hereunto set its hand on this date: March 10, 2017 (RtsurX(n uvi ft,(be womb jolloard by t)x inorrer k date andyCar.) s,.v,jh..... , Westfield Insurance Company SEAL By: ,,, (5�nattaroJauiborizrrl,rp,sxrtttatitr) Attest. Se�JKevin M. Neidert Attorney-in-Fact Marie M. Hartley (Aitued uante and iitlr) Surety Phone No. 330-887-0101 G'707-1994 Westfield Insurance Co. General Power of Attorney Westfield National Insurance Co. Ohio Farmers Insurance Co. CERTIFIED COPY Westfield Center, Ohio Know All Men by These Presents,That WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY,and OHIO FARMERS INSURANCE COMPANY,corporations,hereinafter referred to individually as a"Company"and collectively as"Companies,"duly organized and existing under the laws of the State of Ohio,and having their principal offices in Westfield Center,Medina County,Ohio,do by these presents make, constitute and appoint Kevin M.Neidert of Atlanta and State of GA their true and lawful Attomey(s)-in-Fact,with full power and authority hereby conferred in their names,place and stead,to execute,acknowledge and deliver the following surety bond: Surety Bond Number: 4351583 Principal: Collins and Arnold Construction Company,LLC Obligee: City of Forth Worth,TX Developer Kroger Texas LP and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President,sealed with the corporate seal of the applicable Company and duly attested by its Secretary,hereby ratifying and confirming all that the said Attorneys)-in-Fact may do in the premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY,and OHIO FARMERS INSURANCE COMPANY: "BE IT RESOLVED,that the President,any Senior Executive,any Secretary or any Fidelity&Surety Operations Executive or other Executive shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: The Attorney-in-Fact may be given full power and authority for and in the name of and on behalf of the Company,to execute,acknowledge and deliver,any and all bonds,recognizances,contracts,agreements of indemnity and other conditional or obligatory undertakings and any and all notices and documents cancelling or terminating the Company's liability thereunder,and any such instruments so executed by any such Attomey-in-Fact shall be as binding upon The Company as if signed by the President and sealed and attested by the Corporate Secretary." "BE IT FURTHER RESOLVED,that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signatures or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached." (Each adopted at a meeting held on February 8,2000.) In Witness Whereof,WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY,and OHIO FARMERS INSURANCE COMPANY have caused these presents to be signed by their National Surety Leader and Senior Executive and their corporate seals o be hereto affixed this 1"day of April,A.D.,2014, WESTFIELD INSURANCE COMPANY ;�y0°irisu WESTFIELD NATIONAL INSURANCE COMPANY . "ito.... S 1NStlgt4 Corporate ,��.. o .��P.,,......,,•sG,., ��••,. *.,,••.c Seals :;oS OHIO FARMERS INSURANCE COMPANY Affixed SEAL ':?: ::o yo• ttr ti? By: Dennis P.Baus, National Surety Leader and Senior Executive State of Ohio County of Medina ss.: On thislst day of April,A.D.,2014,before me personally came Dennis P.Baus,to me known,who,being by me duly sworn,did depose and say, that he resides in Wooster,Ohio;that he is National Surety Leader and Senior Executive of WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY,and OHIO FARMERS INSURANCE COMPANY,the companies described in and which executed the above instrument;that he knows the seals of said Companies;that the seals affixed to said instrument are such corporate seals;that they were so affixed by order of the Board of Directors of said Companies;and that he signed his mine thereto by like order. NotarialY A' Seal pPR11/%el; By s Affixed *`: l*; David A.Komik,Attorney at Law,Notary Public N; . My Commission Does Not Expire(Sec.147.03 Ohio Revised Code) F OF State of Ohio County of Medina ss.: CERTIFICATE I,Frank Carrino,Secretary of the WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY,and OHIO FARMERS INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney,executed by said Companies,which is still in full force and effect;and furthermore,the resolutions of the Board of Directors,set out in the Power of Attorney are in full force and effect. In Witness Whereof,I have hereunto set my hand and affixed the seal of said Company at Westfield Center,Ohio,this 1 Oth day of March ,AD.,2017. un.,,.. ,. pINSU '�ioNAti' 1NSUIt A. Rq�c, ,,,.......,YyG., By ,Q. SEAL ;-:' SEAL �: !� Frank Carrino,Secretary "ys :foo, �. 1844 aO BPOAC (03-01) AFFIDAVIT STATE OF Georgia COUNTY OF Dekalb Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Jonathan L Arnold, Vice President Of Collins and Arnold Construction Co., LLC., known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Right of Way Work for Kroger SW 530 - CFA 02731 BY 0 Z ZO I�- risdate than L Arnold, Vice Presi ent Subscribed and sworn before me o► 1 Second of October, 2017. � �oR �OSSIO/y��A Notary,Public m ��-- Count�y, State PUBoc) 'Z 04, OoUN~ FORTWORTHREV.8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR 1) CONTRACTOR&PROJECT DATA Name of Contractor Project Name Collins and Arnold Construction Company,LLC Kroger SW 530 Inspector City Project Number Edwin R.Rodriguez, Sr. 02731 Consii•uction Components Project Manager Q Water Q✓ waste Water❑ Storm Drainage[] Pavement Gopal Sahu,P.E. Initial Contract Amount Project Dctdty $73,497.65 O Simple Routine O Complex Final Contract Amount Date $73,497.65 3/14/2017 I1)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 3 20 15 TOTAL ELEMENT SCORE(A) 408 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 408 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS] * 100%) 408 / 448 = 91% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature Con actor Signature Inspector's Supervisor Signature CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•8851 Camp Bowie West Blvd. •Fort Worth,TX 76116 •(817)392-8306 FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY n PROJECT INFORMATION Date: 3/14/2017 Name of Contractor Project Name Collins and Arnold Construction Company,LLC Kroger SW 530 DOE Inspector Project Manager Edwin Rodriguez Gopal Sahu,P.E. DOENzanber ProjectDiffivulty T}pe of Contract 02731 Q Simple Q Routine O Complex ❑ Water❑ waste water0 Storm DrainageR] Pavement Initial Contract Amount Final Contract Amount $73,497.65 $73,497.65 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity& Sufficiency of Details 5 3 Accuracy of Measured Quantities t-} 3 Applicability of Specifications o5 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs ( I Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervi r INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 w,il (817)392-7941 •Fax: (817)392-7845