HomeMy WebLinkAboutContract 49825 CITY SECRETARY
CONTRACT NO. I ..�
CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL
SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home-rule
municipality (the "CITY"), and MULTATECH Engineering, Inc., authorized to do business
in Texas, (the "ENGINEER"), for a PROJECT generally described as "2018 Bond
Street Reconstruction Contract 2, CPN# 101120."
Article I
Scope of Services
The Scope of Services is set forth in Attachment A.
Article II
Compensation
The ENGINEER's compensation shall be in the amount of$300,000.00 as
set forth in Attachment B.
Article III
Terms of Payment
Payments to the ENGINEER will be made as follows:
A. Invoice and Payment
(1) The Engineer shall provide the City sufficient documentation, including but
not limited to meeting the requirements set forth in Attachment D to this
AGREEMENT, to reasonably substantiate the invoices.
(2) The ENGINEER will issue monthly invoices for all work performed under this
AGREEMENT. Invoices are due and payable within 30 days of receipt.
(3) Upon completion of services enumerated in Article I, the final payment of
1 2'j
City of Fort Worth,Texas g S
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 1 of 17 OFFICIAL RECORDDC .CIVEU CITY SECRUARY
OCT ,- 2017
CICID CITY OF FORT WORTH FT.WORTH, TX
r CITYSECREI'ARY
i
any balance will be due within 30 days of receipt of the final invoice.
(4) In the event of a disputed or contested billing, only that portion so contested
will be withheld from payment, and the undisputed portion will be paid. The
CITY will exercise reasonableness in contesting any bill or portion thereof.
No interest will accrue on any contested portion of the billing until mutually
resolved.
(5) If the CITY fails to make payment in full to ENGINEER for billings contested
in good faith within 60 days of the amount due, the ENGINEER may, after
giving 7 days' written notice to CITY, suspend services under this
AGREEMENT until paid in full. In the event of suspension of services, the
ENGINEER shall have no liability to CITY for delays or damages caused the
CITY because of such suspension of services.
Article IV
Obligations of the Engineer
Amendments to Article IV, if any, are included in Attachment C.
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental
thereto.
B. Standard of Care
The ENGINEER shall perform its services:
(1) with the professional skill and care ordinarily provided by competent
engineers practicing in the same or similar locality and under the same or
similar circumstances and professional license; and
(2) as expeditiously as is prudent considering the ordinary professional
skill and care of a competent engineer.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 2 of 17
the CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that
could affect the total PROJECT cost and/or execution. These
conditions and cost/execution effects are not the responsibility of the
ENGINEER.
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on-site representatives or otherwise, do not make the
ENGINEER or its personnel in any way responsible for those duties that
belong to the CITY and/or the CITY's construction contractors or other
entities, and do not relieve the construction contractors or any other entity of
their obligations, duties, and responsibilities, including, but not limited to, all
construction methods, means, techniques, sequences, and procedures
necessary for coordinating and completing all portions of the construction
work in accordance with the Contract Documents and any health or safety
precautions required by such construction work. The ENGINEER and its
personnel have no authority to exercise any control over any construction
contractor or other entity or their employees in connection with their work or
any health or safety precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the
progress or quality of the completed work on the PROJECT or to determine,
in general, if the work on the PROJECT is being performed in a manner
indicating that the PROJECT, when completed, will be in accordance with
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 3 of 17
the Contract Documents, nor shall anything in the Contract Documents or
the agreement between CITY and ENGINEER be construed as requiring
ENGINEER to make exhaustive or continuous on-site inspections to
discover latent defects in the work or otherwise check the quality or quantity
of the work on the PROJECT. If the ENGINEER makes on-site
observation(s) of a deviation from the Contract Documents, the ENGINEER
shall inform the CITY.
(3) When professional certification of performance or characteristics of
materials, systems or equipment is reasonably required to perform the
services set forth in the Scope of Services, the ENGINEER shall be entitled
to rely upon such certification to establish materials, systems or equipment
and performance criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate
PROJECT cost or schedule. Therefore, the ENGINEER makes no
warranty that the CITY's actual PROJECT costs, financial aspects,
economic feasibility, or schedules will not vary from the ENGINEER's
opinions, analyses, projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling
and observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the Contract
Documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 4 of 17
r
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are not other
matters at issue between the CITY and the construction contractor that
affect the amount that should be paid.
H. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for
any errors or omissions in the information from others that is incorporated
into the record drawings.
I. Minority Business and Small Business Enterprise (MBE)(SBE)
Participation
In accord with the City of Fort Worth Business Diversity Ordinance No.
20020-12-2011, as amended, the City has goals for the participation of
minority business enterprises and/or small business enterprises in City
contracts. Engineer acknowledges the MBE and SBE goals established for
this contract and its accepted written commitment to MBE and SBE
participation. Any misrepresentation of facts (other than a negligent
misrepresentation) and/or the commission of fraud by the Engineer may
result in the termination of this Agreement and debarment from participating
in City contracts for a period of time of not less than three (3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers
and records of the ENGINEER involving transactions relating to this
contract. ENGINEER agrees that the CITY shall have access during normal
working hours to all necessary ENGINEER facilities and shall be provided
adequate and appropriate work space in order to conduct audits in
compliance with the provisions of this section. The CITY shall give
ENGINEER reasonable advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the
CITY shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 5 of 17
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in
order to conduct audits in compliance with the provisions of this article
together with subsection (3) hereof. CITY shall give subconsultant
reasonable advance notice of intended audits.
(3) ENGINEER and subconsultant agree to photocopy such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for
the cost of copies at the rate published in the Texas Administrative Code in
effect as of the time copying is performed.
K. INSURANCE
(1) ENGINEER'S INSURANCE
a. Commercial General Liability — the ENGINEER shall maintain
commercial general liability (CGL) and, if necessary, commercial
umbrella insurance with a limit of not less than $1,000,000.00 per each
occurrence with a $2,000,000.00 aggregate. If such Commercial General
Liability insurance contains a general aggregate limit, it shall apply
separately to this PROJECT or location.
i. The CITY shall be included as an insured with all rights of defense
under the CGL, using ISO additional insured endorsement or a
substitute providing equivalent coverage, and under the
commercial umbrella, if any. This insurance shall apply as
primary insurance with respect to any other insurance or self-
insurance programs afforded to the CITY. The Commercial
General Liability insurance policy shall have no exclusions or
endorsements that would alter or nullify: premises/operations,
products/completed operations, contractual, personal injury, or
advertising injury, which are normally contained within the policy,
unless the CITY specifically approves such exclusions in writing.
ii. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the commercial general
liability or commercial umbrella liability insurance maintained in
accordance with this agreement.
b. Business Auto — the ENGINEER shall maintain business auto liability
and, if necessary, commercial umbrella liability insurance with a limit of
not less than $1,000,000 each accident. Such insurance shall cover
liability arising out of"any auto", including owned, hired, and non-owned
autos, when said vehicle is used in the course of the PROJECT. If the
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 6 of 17
engineer owns no vehicles, coverage for hired or non-owned is
acceptable.
i. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the business auto liability or
commercial umbrella liability insurance obtained by ENGINEER
pursuant to this agreement or under any applicable auto physical
damage coverage.
c. Workers' Compensation —ENGINEER shall maintain workers
compensation and employers liability insurance and, if necessary,
commercial umbrella liability insurance with a limit of not less than
$100,000.00 each accident for bodily injury by accident or $100,000.00
each employee for bodily injury by disease, with $500,000.00 policy limit.
i. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by workers compensation and
employer's liability or commercial umbrella insurance obtained by
ENGINEER pursuant to this agreement.
d. Professional Liability — the ENGINEER shall maintain professional
liability, a claims-made policy, with a minimum of $1,000,000.00 per
claim and aggregate. The policy shall contain a retroactive date prior to
the date of the contract or the first date of services to be performed,
whichever is earlier. Coverage shall be maintained for a period of 5 years
following the completion of the contract. An annual certificate of
insurance specifically referencing this project shall be submitted to the
CITY for each year following completion of the contract.
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that the ENGINEER has obtained all
required insurance shall be attached to this AGREEMENT prior to its
execution.
b. Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, subject to any defense provided by the policy, as its
interests may appear. The term CITY shall include its employees,
officers, officials, agents, and volunteers as respects the contracted
services.
c. Certificate(s) of insurance shall document that insurance coverage
specified in this agreement are provided under applicable policies
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 7 of 17
-a
documented thereon.
d. Any failure on part of the CITY to attach the required insurance
documentation hereto shall not constitute a waiver of the insurance
requirements.
e. A minimum of thirty (30) days notice of cancellation or material change in
coverage shall be provided to the CITY. A ten (10) days notice shall be
acceptable in the event of non-payment of premium. Notice shall be sent
to the respective Department Director (by name), City of Fort Worth,
1000 Throckmorton, Fort Worth, Texas 76102.
f. Insurers for all policies must be authorized to do business in the State of
Texas and have a minimum rating of A:V or greater, in the current A.M.
Best Key Rating Guide or have reasonably equivalent financial strength
and solvency to the satisfaction of Risk Management.
g. Any deductible or self insured retention in excess of $25,000.00 that
would change or alter the requirements herein is subject to approval by
the CITY in writing, if coverage is not provided on a first-dollar basis. The
CITY, at it sole discretion, may consent to alternative coverage
maintained through insurance pools or risk retention groups. Dedicated
financial resources or letters of credit may also be acceptable to the
CITY.
h. Applicable policies shall each be endorsed with a waiver of subrogation
in favor of the CITY as respects the PROJECT.
i. The CITY shall be entitled, upon its request and without incurring
expense, to review the ENGINEER's insurance policies including
endorsements thereto and, at the CITY's discretion; the ENGINEER may
be required to provide proof of insurance premium payments.
j. Lines of coverage, other than Professional Liability, underwritten on a
claims-made basis, shall contain a retroactive date coincident with or
prior to the date of the contractual agreement. The certificate of
insurance shall state both the retroactive date and that the coverage is
claims-made.
k. Coverages, whether written on an occurrence or claims-made basis,
shall be maintained without interruption nor restrictive modification or
changes from date of commencement of the PROJECT until final
payment and termination of any coverage required to be maintained after
final payments.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 8 of 17
I. The CITY shall not be responsible for the direct payment of any
insurance premiums required by this agreement.
m. Sub consultants and subcontractors to/of the ENGINEER shall be
required by the ENGINEER to maintain the same or reasonably
equivalent insurance coverage as required for the ENGINEER. When
sub consultants/subcontractors maintain insurance coverage,
ENGINEER shall provide CITY with documentation thereof on a
certificate of insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent
consultant and not as a subcontractor, agent, or employee of the CITY.
The doctrine of respondeat superior shall not apply.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure
in writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing
of any conflicts of interest that develop subsequent to the signing of this
contract and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with
published design criteria and/or current engineering practice standards
which the ENGINEER should have been aware of at the time this
Agreement was executed, the ENGINEER shall revise plans and
specifications, as required, at its own cost and expense. However, if design
changes are required due to the changes in the permitting authorities'
published design criteria and/or practice standards criteria which are
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 9 of 17
published after the date of this Agreement which the ENGINEER could not
have been reasonably aware of, the ENGINEER shall notify the CITY of
such changes and an adjustment in compensation will be made through an
amendment to this AGREEMENT.
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
Amendments to Article V, if any, are included in Attachment C.
A. City-Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of
the information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of
the CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses
required by local, state, or federal authorities; and land, easements, rights-
of-way, and access necessary for the ENGINEER's services or PROJECT
construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches,
drawings, specifications, proposals, and other documents; obtain advice of
an attorney, insurance counselor, accountant, auditor, bond and financial
advisors, and other consultants as the CITY deems appropriate; and render
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 10 of 17
A
in writing decisions required by the CITY in a timely manner in accordance
with the project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of
such materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos
is a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification and Claims
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and
provisions providing for contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third-Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering
services performed. Only the CITY will be the beneficiary
of any undertaking by the ENGINEER."
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 11 of 17
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third-party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity
or person regarding the PROJECT a provision that such entity or person
shall have no third-party beneficiary rights under this Agreement.
(4) Nothing contained in this Section H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
I. CITY's Insurance
(1) The CITY may maintain property insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY will ensure that Builders Risk/Installation insurance is maintained
at the replacement cost value of the PROJECT. The CITY may provide
ENGINEER a copy of the policy or documentation of such on a certificate of
insurance.
(3) The CITY will specify that the Builders Risk/installation insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
J. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
K. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
General Legal Provisions
Amendments to Article VI, if any, are included in Attachment C.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 12 of 17
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not responsible for damages or delay in performance
caused by acts of God, strikes, lockouts, accidents, or other events beyond
the control of the ENGINEER that prevent ENGINEER's performance of its
obligations hereunder.
D. Termination
(1) This AGREEMENT may be terminated
a.) for convenience only by the City on 30 days' written notice.
b.) by either the CITY or the ENGINEER for cause if either party fails
substantially to perform through no fault of the other and the
nonperforming party does not commence correction of such
nonperformance within 5 days of written notice or thereafter fails to
diligently complete the correction.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Cost of reproduction of partial or complete studies, plans,
specifications or other forms of ENGINEER'S work product;
b.) Out-of-pocket expenses for purchasing electronic data files and other
data storage supplies or services;
C.) The time requirements for the ENGINEER'S personnel to document
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 13 of 17
the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all termination expenses. The
CITY'S approval will be obtained in writing prior to proceeding with
termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER
for the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors,
and ENGINEER's compensation will be made.
F. Indemnification
In accordance with Texas Local Government Code Section 271.904, the
ENGINEER shall indemnify or hold harmless the CITY against liability
for any damage committed by the ENGINEER or ENGINEER's agent,
consultant under contract, or another entity over which the ENGINEER
exercises control, other than liability for damage to the extent caused
by or resulting from an act of negligence, intentional tort, intellectual
property infringement, or failure to pay a subcontractor or supplier.
CITY is entitled to recover its reasonable attorney's fees in proportion
to the ENGINEER's liability.
G. Assignment
Neither party shall assign all or any part of this AGREEMENT without the
prior written consent of the other party.
H. Interpretation
Limitations on liability and indemnities in this AGREEMENT are business
understandings between the parties and shall apply to all the different
theories of recovery, including breach of contract or warranty, tort including
negligence, strict or statutory liability, or any other cause of action, except for
willful misconduct or gross negligence for limitations of liability and sole
negligence for indemnification. Parties mean the CITY and the ENGINEER,
and their officers, employees, agents, and subcontractors.
I. Jurisdiction
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016
Page 14 of 17
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
J. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any
reason to be invalid, illegal, or unenforceable in any respect, such invalidity,
illegality, or unenforceability will not affect any other provision, and this
AGREEMENT shall be construed as if such invalid, illegal, or unenforceable
provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F.,
VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause.
K. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in
any way affect this AGREEMENT and the work hereunder, and shall
observe and comply with all orders, laws ordinances and regulations which
may exist or may be enacted later by governing bodies having jurisdiction or
authority for such enactment. No plea of misunderstanding or ignorance
thereof shall be considered. ENGINEER agrees to defend, indemnify and
hold harmless CITY and all of its officers, agents and employees from and
against all claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or its employees.
Article VII
Attachments, Schedules and Counterparts
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, which supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. This Agreement may be
executed in one or more counterparts and each counterpart shall, for all purposes, be
deemed an original, but all such counterparts shall together constitute but one and the
same instrument. The following attachments and schedules are hereby made a part of
this AGREEMENT:
Attachment A-Scope of Services
Attachment B - Compensation
Attachment C -Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E - Location Map
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12,22.2016
Page 15 of 17
a
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
BY: BY:
CITY OF FORT WORTH ENGINEER
MULTATECH Engineering, Inc.
Jesus Chapa aul J. Padilla, P.E.
Assistant City Manager Vice President
Date: L-2 0 2 Date: 10-16-2017
APPROVAL RECOMMENDED:
By:
Douglas6N.Wiersig, P.E.
Director, Transportation Aublic Works
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Y,oe�
Ma n E.
Sr. Professional Engineer, TPW
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:12.22.2016 OFFICIAL RECORD
Page 16 of 17 CITY SECRETARY
FL WORTH,TX
i
APPROVED AS TO FORM AND LEGALITY
By: i?�7
ouglas W. Black
Assistant City Attorney
Form 1295 No.
ATTEST:
a
M&CNo. C-28397
Mibry J. t r
City Secret ry M&C Date: 09-26-2017
OF FOR?,
0 _
�XAS
City of Fort Worth,Texas OFFICIAL RECORD
Standard Agreement for Engineering Related Design Services CITY SECRETARY
Revised Date:12.22.2016
Page 17 of 17 FT.WORTHS TX
i
PROHIBITION ON CONTRACTS WITH COMPANIES BOYCOTTING
ISRAEL
Contractor acknowledges that in accordance with Chapter 2270 of the Texas
Government Code, the City is prohibited from entering into a contract with a
company for goods or services unless the contract contains a written verification
from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel
during the term of the contract. The terms "boycott Israel" and "company" shall
have the meanings ascribed to those terms in Section 808.001 of the Texas
Government Code. By signing this contract, Contractor certifies that Contractor's
signature provides written verification to the City that Contractor: (1) does not
boycott Israel; and 0) will not boycott Israel during the term of the contract.
Signat e
Vice President
Title
10-16-2017
Date
N
RECORDRETARYTH, TX
J
ATTACHMENT "A"
Scope for Engineering Design and Construction Phase
2018 Bond Street Reconstruction Contract 2
CPN 101120
The scope set forth herein defines the contemplated work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to
be performed and address the needs of the Project.
OBJECTIVE
The objective of this Task Order Agreement is to complete the construction plans for Neighborhood
Streets as assigned. An individual scope of work will be defined as projects are identified and
assigned. Work under this agreement includes, but is not limited to, project management,
data collection, topographic survey, subsurface utility exploration (SUE), right-of-way
documentation, conceptual/schematic design, preliminary and final design, bidding, and
construction phase services for transportation improvements
WORK TO BE PERFORMED
ENGINEER hereby agrees to provide services on a Task Order basis as may be directed by the CITY.
All work under this agreement will be performed on a Task Order basis. The CITY will request
services for each Task Order individually and independently. The ENGINEER shall prepare scope,fee
and schedule to perform the services requested by each Task Order within 10 working days of the
CITY'S request.
Each Task Order shall include a detailed scope of services as Attachment"A". This scope of services
will outline tasks required to complete the Task Order. The scope shall include a detailed
description of each task, outline any assumptions and list the required deliverables.
Each Task Order shall include Attachment"B",detailing the compensation for the Task Order.
Compensation will be based upon hours and labor costs agreed upon by the CITY and the ENGINEER
for each Task Order. Compensation will be based on the Schedule of Rates in Attachment"B"of this
agreement. The fee will include an estimate of reimbursable and sub-consultant cost for each Task
Order. Compensation for each Task Order shall be based upon the agreed upon not-to-exceed fee
and paid via invoiced amount.
If the Task Order requires a schedule it shall be attached as Attachment"D".
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.2012
Page 1 of 1
r
ATTACHMENT B
COMPENSATION
Work Authorization Design Services for
2018 Bond Street Reconstruction Contract 2
CPN 101120
Time and Materials with Rate Schedule Project
I. Compensation
a. The ENGINEER shall be compensated for personnel time, non-labor expenses,and
subcontract expenses in performing services for Task Orders up to$300,000.00 unless
amended. CITY and ENGINEER will agree upon compensation for each Task Order prior
to starting work. Each Task Order shall be time and materials.
L Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Category Rate for the ENGINEER's team member performing the work and
includes all direct salaries, overhead, and profit.
Labor Category Rate as presented in the rate schedule table below is the rate
for each labor category performing the work and includes all direct salaries,
overhead, and profit.
LABOR CATEGORY RATE ($/HOUR)(2018)
Principal $235
Senior Engineer $170
Engineer $140
Senior Designer $135
CAD $90
II. Non-Labor Expenses. Non-labor expenses shall be reimbursed as Direct Expenses at invoice or
internal office cost.
Direct Expenses (Non-labor) include, but are not limited to, mileage, travel and lodging,
expenses, mail, supplies, printing and reproduction services, other direct expenses
associated with delivery of the work; plus applicable sales, use, value added, business
transfer,gross receipts,or other similar taxes.
III. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost
to ENGINEER plus a markup of ten percent (10%).
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 1 of 4
B-1
r
ATTACHMENT B
COMPENSATION
IV. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and
will keep the City informed of progress toward that end so that the budget or work effort
can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted,
nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services that the PROJECT
cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope
of the project, increased costs or other conditions, the ENGINEER shall immediately report
such fact to the City and, if so instructed by the City,shall suspend all work hereunder.
When any budget has been increased, ENGINEER'S excess costs expended prior to such
increase will be allowable to the same extent as is such costs had been incurred after the
approved increase.
The Engineer shall be paid monthly payments as described in Section II — Method of
Payment.
II. Method of Payment
a. The ENGINEER shall be paid by the City based upon an invoice created on the basis of
statements prepared from the books and records of account of the ENGINEER, based on
the actual hours and costs expended by the ENGINEER in performing the work.
b. Each invoice shall be verified as to its accuracy and compliance with the terms of this
Agreement by an officer of the ENGINEER.
c. ENGINEER shall prepare and submit invoices in the format and including content as
presented in Exhibit B-1.
d. Payment of invoices will be subject to certification by the City that such work has been
performed.
III. Progress Reports
a. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and schedules in
the format required by the City.
IV. A Summary of Task Order Fees shall accompany each Task Order.
City of Fort Worth,Texas
Attachment S
PMO Official Release Date:8.09.2012
Page 2 of 4
B-2
ATTACHMENT B
COMPENSATION
I. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount %
Prime Consultant
MULTATECH Design, Management $250,000.00 80.00
Engineering, Inc.
Proposed MBE/SBE Sub-Consultants
Criado &Associates Survey & Right-of-Way $25,000.00 10.00
Gorrondona & Geotechnical Engineering $25,000.00 10.00
Associates
Non-MBE/SBE Consultants
TOTAL $300,000.00 100%
Project Number& Name Total Fee MBE/SBE Fee MBE/SBE
Local Roads $300,000.00 $50,000.00 16.67%
City MBE/SBE Goal =16.00% Consultant Committed Goal = 16.67 %
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 3 of 4
B-3
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 4 of 4
B-4
Professional Services Payment Request Project Manager. Mary Hanna Summary
Project: 2018 Bond St Recon Contract 2
City Project#: 101120
City See Number: Consultant instructions:
Fill in green cells including Involce Number,From and To Dates and the Included worksheets.
Company Name: Mukatech Engineering,Inc. When your Invoice Is complete,save and close,start euzzsaw and Add your invoice to the
Consultant folder within Project's folder-
Consultant's PM: Paul Padilla email: ppadillaCmultatecn—
Vendor Invoice#: Office Address:2821 West Tth Street,Suite 400 Fort Worth,TX 76107
Payment Request M. Telephone: 817-289-2060
From Date: Fax: fax
To Date:
Invoice Date: Remit Address:2821 West 7th Street.Suite 400 Fort Worth,Tx 76107
Agreement
Agreement Amendment Amount to Amount Percent ($)Invoiced Current Remaining
Sheet FAC and Work Type Description Amount Amount Date Spent Spent Previously Invoice Balance
Work Type 1 1 1 $300,000,001 $300,0001M1 $30.000.00
ont Type 2
Work Type 3
Work Type 4
Work Type 5
Work Type$
Totals This Payment Request $300F0000 $300.000.00 $300000.00
Overall Percentage Spent:
Multatech Engineering,Inc. 817-288-2060
W Invoice
2821 West 7th Street,Suite 400 2821 West 7th Street,Suite 400 Fort
Fort Worth,TX 76107 Worth,TX 78107
Consultant Project No.
CFW Project Manager Mary Hanna Proj.Invoice No.
Invoice data:
Consultant's Project Manager. Pad P■dib
Consultant's email: ppadW&QmWstach.mm Period From Date
To Date
Name of Project: City secretary Contract 0:
201 B Bond St Recon Contract 2 P.O.Number:
Labor Category Name Hours Rate($Ihrl Amount
Project Manager $o.DD
Senior Engineer(exam h,) $0.00
En ineer exam le) $0.00
Junior Engineer(example) $0.00
CAO Technician e m le $0.00
Adminstrative Support(example) W.DD
em $o.00
$0.00
$a00
$0.00
$0.00
$0.00
so.0a
$0.00
Total Labor 0.0 $0.00
Subcontract Service
r Subcontract Service-<i exemple>
Subcontract Service-12 example>
etc
Subcontractor Subtotal $0.00
10 Percent Markup on Subcontract Services $0.00
Nonlabor Expenses
Nonlabor Expense Subtotal $0.00
Total Expenses(Subcontract Services+Markup+Nonlabor Expenses) $0.00
TOTAL DUE THIS INVOICE $0.00
Professional Services Payment Request Project Manager: Mary Hanna
Project: 2018 Bond St Recon Contract 2
City Project#: 101120
Work Type Desc: Consultant Instructions:
FIA/C:
City Sec Number: Fill in green taus including Percent Complete and Inwiced Previously Guanities
Purchase Order: When yaur lnwice is complete,save and close,shut Buzzsaw and Add your inwice to the
Consultant folder within Project's folder.
Company Name: Muhmech Fngheering,Inc.
Consultant's PM: Paul Paddle email: PPadila@muhatmh.com
Vendor Invoice#: Paul Padilla Office Address:2821 West 7th Street,Suite 400 Fort Worth,TX 76107
Payment Request#: Telephone: 617-289-2060
From Date: Fax: rax
To Date:
Invoice Date: Remit Address:2821 Wssi 7th Street,Suite 400 Fort Wonh,TX 76107
Pay Items Agreement
Agreement Amendment Amendment Amount to Amount Percent ($j Invoiced Current Remaining
Description Amount Number Amount Date Sent Spent Previously invoice Balance
51-Preliminary serve $25000.00 625,00080 $25 C00 OC
32-Geotech Report 525000.00 525,0oo.Q0 $25.000.OF
30-Desi n $250,000.00 $250,000.00 $250 I'm Ac
Totals This Unit: $300.00000 $300.00000 $300.000.00
Overall Percentage Spent:
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
2018 Bond Street Reconstruction Contract 2
City Project No.101120
Labor hours Ex ense
Task No. Task Description Project Project Project CA DD
CADD Administrative Total Labor Subconsultant Total Expense Task Sub Total
Director Mana er Engineer ineer Desi ner Cost Travel Reproduction Cost
Rate 226 140 $130 120 $80 $76 MWBE Non-MWBE
1.0 Project Mana ement 0 0 0 0 0 0 $25,000 s0 0 $0 0 0 $25,000
1.1 Managing the
ernTeam
1.1.1 Intal Team Meetings $0 $0 $0
1.1.2 QA/QC $0 $0 $0
1.2 Communications and Reporting
1.2.1 Pre-Design Coordination Meeting $0 $0 $0
[monthly,bi-monthly,monthlyJ Project
1.2.2 Update Meetings $0 $0 $0
_ 1 20 Design Submittal Review Meetings _ $0 $0 $0
t24 Prepare Baseline Schedule $0 $0 $0
Prepare Monthly Progress Reports win
1.2.5 Schedule $0 $0 $0
1.2.6 Prepare Monthly MBE/SBE Re ods $0 $D $0
1.2.7 Invoicing $0 $0 $0
2.0Conce tual Design(30-Percent) 0 -.,.
0 D 0 0 0 $50,000 $0 $0 $0 $0 $D $50,000
2.1 Data Collection $0 $0 $0
Drainage Computations and Drainage Area
2.2 Map $0 $0 $0
2.3 Subsurface Utility En ineerin $0 $0 $0
2.4 Design Drawin s $0 $0 $0
2.5 Project Decision L $0 $0 $0
2.6 Construction Estimate $0 $0 $0
City of Fort Worth,Texas
Attachment B-Level of Effort Supplement
PMO Official Release Date:8.09.2012
1 of 4
Level of Effort Spreadsheet
TASKIHOUR BREAKDOWN
2018 Bond Street Reconstruction Contract 2
City Project No.101120
Labor hours Expense
Task No. Task Description Project Project Project CADD CADD Administrative Total Labor Subconsuhant Total Expense Task Sub Total
Director Mana er En ineer Desi ner Cost Travel Reprotluctlon Cost
ate $225 $140 $930 $120 $81) $r6 MWBE Non-MWBE
3.0 Preliminary Design 60 Percent 0 0 0 0 D 0 $60,000 $25,000 $0 $0 $D $25,000 $85,000
3.1 Preliminary Design Drawings $0 $0 $0
G eofechn cal Investigation/Pavement
3.2 Design $0 $25,000 $25,000 $25,000
3.3 Constructability Review $0 $0 $0
3.4 Public Meeting 1 $0 $0 $0
3.s Utility Clearance $0 $0 $0
3.6 Traffic Control Plan $0 $D $0
3.7 Project Decision Log $0 $0 $0
3.8 Construction Estimate $0 $D $0
4.0 Final Design 0 0 0 D 0 0 $60,000 $0 $0 $0 $0 $0 $60,000
Final Draft(90%)Construction Plans and
4.1 Specifcations $0 $0 $0
4.2 Final(100%)Plans and Specifications $0 $0 $0
4.3 Project Decision Logs(90%and 100%) $0 $0 $0
4.4 Construction Estimates(90!and 100%) $0 $0 $0
5.o Bid Phase 0 0 0 0 0 0 $30,000 $0 $0 $0 $0 $0 $30,000
5.1 Bid Support
Sell Contract Documents and Maintain
5.1.1 Plan Holders List $0 $0 $0
5.1.2 Issue Addenda $0 $D $0
5.1.3 Attend Pre-bid Conference $0 $0 $0
5.1.4 Attend Bid Opening $0 $0 $0
5.1.5 Tabulate Bids and Recommend Award $0 $0 $0
Issue Conformed Contract Documents $0 1 $0 $0
City of Fort Worth,Texas
Attachment B-Level of Effort Supplement
PMO Oficial Release Date:8.09.2012
2 of
r
Level of Effort Spreadsheet
TASKIHOUR BREAKDOWN
2018 Bond Street Reconstruction Contract 2
City Project No.101120
Labor hours Ex ense
Task No. Task Description Project Projectr Project I CADD CADD Administrative Total Labor Subconsuhant _ _ Total Expense raw Sur.Total
mama ner cost t ravel Reproduction Cost -"--�T--'
uuecior en ineer uesi
a e $225 $140 $130 $120 $80 $75 MWBE Non-MWBE
6.0 Construction Phase Services 0 0 0 0 0 0 $10,000 $0 $0 $0 $0 $0 $10,000
6.1 Construction Suppod
6.1.1 Attend Preconslrucfimd Conference $0 $0 $0
601 02 Attend Public Meeting $0 $0 $0
6.1.3 Project Site Visits $0 $0 $0
6.1.4 Submittal Review $0 $0 $0
Request for Information/Change Order
6.1.5 Review $0 $0 $0
6.1.6 Final Walk Through and Punch List $0 $0 $0
6.2 Record Dravdn s $0 $0 $0
City of Fort Worth,Texas
Attachment B-Level of Effort Supplement
PMO Official Release Date:8.09.2012
3 of
Level of Effort Spreadsheet
TASKIHOUR BREAKDOWN
2018 Bond Street Reconstruction Contract 2
City Project No.101120
Labor hours Expense
Task No. Task Description Project Project Project CADD CADD Administrative Total Labor Subconsultant Total Expense Task Sub Total
Director Mana er
Engineer Desi ner Cost Travel Reproduction Cost
ate 225 $140 $130 $120 $80 $75 MWBE Non-MWBE
7.0 ROWIEasement Services 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0
7.1 Right-of-Way Research $0 $0 $0
Right-of-Way/Easement Preparation and
7.2 Submittal $0 $0 $0
7.3 Temporary Right of Entry Submittal $0 $0 $0
8.0 Su—Y 0 0 0 0 0 0 $0 $25,OD0 $0 $0 $0 $25,0002$25,"(r0"11"1
8.1 Design Survey $0 $25,000 $25,0008.2 Temporary Ri ht of Entry Submittal $0 $08.3 Construction Surve $0 $09.0 Permittin 0 0 0 0 0 0 $12,500 $0 $0 $0 $D $09.1 SWPPP $0 $D9.2 Environmental Services $0 $09.3 Floodplain Services $0 $09.4 TxDOT $0 $0 $
9.5 Railroad $0 $0 $0
9.6 TD
$0 $0 $0
9.7 JCty of Forto ars Conversion $0 $0 $0
Totalsl 01 01 01 01 ul 0 247,500 $50,0001 $0 0 0 50,000 297,500
Project Summary
Total Hours 0
Total Labor $247,500
Total Expense $50,000
MBE/SBE Subconsultant $50,00
Non-MBE/SBE Subconsultant $0
5% Sub Markup $2,500
MBE/SBE Participation 16.7%
Total Project Cost 300,000
City of Fort Worth,Texas
Attachment B-Level of Effort Supplement
PMO Official Release Date:8.09.2012
4 of
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREETMENT
2018 Bond Street Reconstruction Contract 2
City Project No. 101120
No Changes or Amendments
City of Fort Worth,Texas
Attachment C
PMO Release Date:05.19.2010
Page l of 1
ATTACHMENT "D"
PROJECT SCHEDULE
2018 Bond Street Reconstruction Contract 2
City Project No. 101120
Project Schedule to be determined upon execution of Task Order
City of Fort Worth,Texas
Attachment C
PMO Release Date:05.19.2010
Page 1 of 1
MAYOR AND COUNCIL COMMUNICATION MAP
2018 BOND ST RECON- CONTRACT 2
MY" •�.�-1f1� 7-
!` _ S��` "` �.•- •- '.s� .'sm nFis - THHd—
L `'q'� ` Il#�x �#.�j
'.:.+ - t ." t, } G`ll ml ' r ,�+ ►
MO,DLIN ODLIN+� s ,rf4..;w-, , -eP:+iWODLINI' ,MQDLIN.,�" i� ',-
'i. w t fepr } i ' 3 1.. �{ L Z.'''> t•._` >U - -c .CROCKTT,..•,e=` i
aZ m }
tllZ1?*il'
TISON :� ; f,� 4 .sJ _.: u' :n� til F.1z(( qqq ❑ _"
_ _ ...»,.- MATTISON # r- Y `+ .J, g *••` z t 'i� p t.fi ..
! MO RTO
o
BUNTING a9- BUNTI .- g •;
-> - WIC
�11 OIL
`{ Ej_ ._ CLARKE� .. ^ 3 K C, '9=� j s `�,--•i' i
N �c, '# •.
LACASTER) _ ° 0
� Z.• � •rt �GP�`� � �,� I��Q. ROGERSc..z � ;'N ��
rrt w O r J
of > m: #} �r • =o c7 ;' c7' s ��` ti i
P
TURNETT_ BURNETT
•_��:rW- CRESyT�NE ;CRES�FLINE I .:+ 1 ;+. ANDYi TANDY - `�; CRES7T4LINE
_ 6 •`` —�^ .•„ate".I� E � 3 � r+_ .. �, .
WA+SaHBURN�ij�r
Lu
a; y , t ¢' -,^.e HAR"iLEYa.s,x HARLEY
} n i
yy
LAFA, ETTrn
' Vr PGS#' 4+`'"'�q j .
UE.T�ER, ZO
•� �DEX�Tj,ER+=i - - _- in DEXTER 'f.�$ - .. f .t - -.I _ _,'2-S �`
�.. t
BRY2 CE. ' RYCEt`:
BRYCE - BRYCE :N jBRYCE ;!� ,'"'�' •b se.' t-'' ^• �ds(� � � a
O
x
rn BYERS BY:ERS;,_.
x, m
u� r; N .I
LINDEN 'i -y1 {{
,. "� a N d•L*INDEN , rLIN t
Igi
EL CAMPO y,_ .s J
EL CAMEO) L C-AMPO.
`W gERSHING ,,PERSHING
('j;;BIRCHMAN.,.• � '
CALMONT i
g -
'LOCKE ' LOGE •^y�,�_ f.�+ 'OI`� ..� �+• R ,pca l0_C EK La
i`
�>
^VQv�ELL—w
•- �L■OVELL'. Y,r-'LOVE.LL
o o 800 1,600 CITY PROJECT # 101120
CITY OF FORT WORTH
CONTRACT COMPLIANCE MEMORANDUM
THIS FORM MUST BE ATTACHED TO THE ROUTING "M & C" BEFORE
LAW DEPARTMENT AND CITY MANAGER APPROVAL
To: Mary Hanna
Project Manager
From: Melani Valle (817) 212-2675
M/WBE Office Staff Extension
Date: September 05, 2017
In the Amount of $300,000.00 101120
DOE/Project No.
Project/Bid: Engineering and Design Services of Street and
Transportation Improvements at Various Locations in
preperation for the 2018 Debt Program
1. Compliance with the City's Business Diversity Enterprise (BDE)
Ordinance has been achieved by the following method:
a) Multatech Engineering, Inc. is in compliance with the City's BDE
Ordinance by committing to 17% SBE participation. The City's SBE goal on this
project is 17%. Additionally, Multatech Engineering, Inc. is a certified M/WBE
firm.
DOE PROJECT_X BID NUMBER
FORT WORTH CPN 101120k one)
Minority/Women Business Enterprise Office
LETTER OF INTENT TO PERFORM AS A SBE SUBCONTRACTOR/SUBCONSULTANT
[NOTE: Pursuant to the City of Fort Worth Business Diversity Enterprise Ordinance, SBE firms participating under the Ordinance must be certified
prior to recommendation of award in order to be counted towards subcontracting participation. A Small Business Enterprise(SBE) is defined as a
business concern located in the marketplace that meets the Unites States Small Business Administration definition of a small business as
outlined in the code of Federal Regulation 13 CFR 121. Firms certified as a Disadvantaged Business Enterprise (DBE) also meet small
business enterprise requirements.]
1. Name of Project 2018B o n clSt reet Rec o n srtr ct io n Co rt ract 2
2. Name of Offeror/Prime contractor MULTATECH Engineering, Inc.
3. The undersigned is prepared to perform the following described work and/or supply the material listed in connection with the
above project(where applicable specify"supply"or"install'or both):
Geotechnical Services
at the price of$ 25,000.
Gorrondona&Associates. August 23,2017
(Name of SBE Firm) (Date)
W. Truett Wilson RPLS QIL LQLor of Survey
Circle one(Own erlAuthorize(Agent of SBE firm) pe or Print Name (Signature of Owner or Authorized Agent of SBE firm)
TWILS0KDGA-INC.NET 0: 817-496-1424 F: 817-496-1768
(Email Address to appear on Listings provided by the MWBE Office) (Office and Fax Numbers)
AFFIDAVIT OF Offeror]Prime CONTRACTOR
I HEREBY DECLARE AND AFFIRM that I, Paul J.Padilla P.E. am the d my authorized representative of
Circle one(9wee4Authorized Agent)
MULTATECH Eng-ineerindric. and that I have personally reviewed the material and
Name of Prime Contractor
facts set forth in this Letter of Intent to Perform. To the best of my knowledge, information and belief, the facts in this form are true, and no
material facts have been omitted.
Pursuant to the City of Fort Worth Business Diversity Enterprise Ordinance, any person [entity] who makes a false or fraudulent
statement in connection with participation of a SBE in any City of Fort Worth contract may be referred for debarment procedures
under the City of Fort Worth Business Diversity Enterprise Ordinance.
I do solemnly swear or affirm that the signatures contained herein and the information provided by the Prime Contractor are true
and correct, and that I am authorized on behalf of the Prime Contractor to make the affidavit.
Paul J. Padilla P.E. MULTATECH Engineering, Inc.
Circle One(Ovmerl Authorized Agent)Type or Print Name (Name of Prime Contractor-Print or Type)
8-23-2017
(SignatuAuthorized Agent) (Date)
817-289-2060 817-877-4245
(Office Number) (Fax Number)
61112012
DOE PROJECT_X BID NUMBER
(Please check one)
FORT WOE T H CPN 101120
MinorityMomen Business Enterprise Office
LETTER OF INTENT TO PERFORM AS A SBE SUBCONTRACTOR/SUBCONSULTANT
(NOTE: Pursuant to the City of Fort Worth Business Diversity Enterprise Ordinance, SBE firms participating under the Ordinance must be certified
prior to recommendation of award in order to be counted towards subcontracting participation. A Small Business Enterprise(SBE)is defined as a
business concern located in the marketplace that meets the Unites States Small Business Administration definition of a small business as
outlined in the code of Federal Regulation 13 CFR 121. Firms certified as a Disadvantaged Business Enterprise (DBE) also meet small
business enterprise requirements.]
1. Name of Project 2018 Bond Street Reconstruction Contract 2
2. Name of Offeror/Prime contractor MULTATECH Engineering, Inc.
3. The undersigned is prepared to perform the following described work and/or supply the material listed in connection with the
above project(where applicable specify"supply"or"install"or both):
Field Survey
at the price of$ 25,000.
Criado&Associates. 43 -Z3 - 20
(Name of SBE Firm) (Date)
C��`�
Circle o Owne uthorized Agent of SBE firm)Type or Print Name (Signature of Owner or Authorized Agent of SBE firm)
�cri'a�o ��rr assoc.{c���,- c,�•,-� 97Z 3(A2 917Z
(Email Address to appear on Listings provided by the MWBE Office) (Office and Fax Numbers)
AFFIDAVIT OF Offeror/Prime CONTRACTOR
I HEREBY DECLARE AND AFFIRM that I, Paul J.Padilla,P.E. am the duly authorized representative of
Circle one(8wr"Authorized Agent)
MULTATECH Engineering,Inc. and that I have personally reviewed the material and
Name of Prime Contractor
facts set forth in this Letter of Intent to Perform. To the best of my knowledge, information and belief, the facts in this form are true, and no
material facts have been omitted.
Pursuant to the City of Fort Worth Business Diversity Enterprise Ordinance, any person[entity]who makes a false or fraudulent
statement in connection with participation of a SBE in any City of Fort Worth contract may be referred for debarment procedures
under the City of Fort Worth Business Diversity Enterprise Ordinance.
I do solemnly swear or affirm that the signatures contained herein and the information provided by the Prime Contractor are true
and correct,and that I am authorized on behalf of the Prime Contractor to make the affidavit.
Paul J. Padilla, P.E. MULTATECH Engineering, Inc.
Circle One(Ower Authorized Agent)Type or Print Name (Name of Prime Contractor-Print or Type)
Z?42( 'r 8-23-2017
(Signattu(a WOwner or Authorized Agent) (Date)
817-289-2060 817-877-4245
(Office Number) (Fax Number)
6/1/2012
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
Sofi
Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos.1,2,3,5,and 6 if there are no Interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number:
of business. 2017-253196
Multatech Engineering,Inc.
Fort Worth,TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 08/23/2017
being filed.
City of Fort Worth Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or Identify the contract,and provide a
description of the services,goods,or other property to be provided under the contract.
101120
2018 Bond Street Reconstruction Contract 2
4 Nature of interest
Name of Interested Party City,State,Country(place of business) (check applicable)
Controlling Intermediary
Padilla,Paul Fort Worth,TX United States X
Hong,Chen Fort Worth,TX United States X
Saenz,Alfred Fort Worth,TX United States X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and conecL
ff�ml
exoses
nature of authorized agent of contracting business entity
AFFIX NOTARY STAMP/SEAL ABOVE (�
Sworn to and subscribed before me,by the said 1 D al." �� �a����a` ,this the A3 day of
20_1/1_.to certify which,witness my hand and seal of office.
Lj
(u: Woo l( Nig�f If-veai+l, I�ss.'c
Signature of officer administering oath Printed name of officer administering oath Tule of dfficer administering oath
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.3337
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 9/26/2017
DATE: Tuesday, September 26,2017 REFERENCE NO.: **C-28397
LOG NAME: 20JUMPSTART CONTRACTS
SUBJECT:
Authorize Execution of Engineering Services Agreements with Baird,Hampton,
&Brown,Inc.,and MULTATECH Engineering,Inc.,Both in the Amount Up to
$300,000.00 and with DAL-TECH Engineering,Inc.,in the Amount Up to
$260,000.00 for Design Services,Construction and Project Management
Support to Advance High Priority Projects Needed to Improve Safety and
Capacity as Identified by Staff for the Anticipated 2018 Bond Election
(COUNCIL DISTRICTS 2,4,7 and 8)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the execution of an Engineering Services Agreement with
Baird,Hampton,&Brown,Inc.,in an amount not to exceed$300,000.00,for
design of transportation improvements along Great Southwest Parkway from
Mark IV Parkway to North Freeway Service Road Southbound,Alta View Street
from Kimbo Road to Premier Street,Kimbo Road from Mesquite Road to NE
Cul,-De-Sac and McComas Road from Kimbo Road to N.Beach Street(CPN
101119);
2. Authorize the execution of an Engineering Services Agreement with
MULTATECH Engineering,Inc.,in an amount not to exceed$300,000.00,for
design of transportation improvements along Clover Lane from Camp Bowie
Boulevard to Birchman Avenue, and West Will Rogers Road from Camp Bowie
Boulevard to W.Lancaster Avenue(CPN 101120); and
3. Authorize the execution of an Engineering Services Agreement with
DAL-TECH Engineering,Inc.,in an amount not to exceed$260,000.00 for
resign of transportation improvements along Creekfall Drive from Basswood
Boulevard to Misty Ridge Drive,Mesa Verde Trail from Isle Royale Drive to
Basswood,Tulip Tree Drive from Fox Chase Drive to Buttonwood Drive and
Rosita Street from Glen Eden Drive to Jean.Hills Lane(CPN 101121).
DISCUSSION:
The 2018 Jump Start Program is enabling design efforts prior to the 2018
Bond,Program election to advance early starts for construction upon a
'awQralile outcome for the 2018 Bond Program election.
i
In preparation for the 2018 Bond Program,M&C G-19009 (May 17,2017)
authorized$10,000,000 for the 2018 Jump Start Program to advance early
design efforts for infrastructure improvements considered high priority
basal upon current conditions including addressing capacity and safety
improve"Wts. Of that$10,000,000.00 approximately$9,000,000.00 was
assigned to eleven engineering contracts (M&C C-28288)for the design and
analysis of arterial and traffic improvement infrastructure
requirements. The remaining$1,000,000.00 is being directed to improving
the subject neighborhood streets presented in this M&C. Additional streets
may be added if there is contract capacity.
This effort will enable staff to begin the design and delivery of the
following projects:
Jump Start Engineering Contract City Total
Projects Scope Firm NTE Project Appropriation
Management
Partial Baird, $300,000.00 $50,000.00 $350,000.00
• Great Design Hampton,
Southwest &Brown Inc.
Pkwy Project
(from Management (New Award)
Mark IV
Pkwy to
North
Frwy
Service
Road
Southboun
• Alta
View St
(from
Kimbo Rd
to
Premier
St)
• Kimbo Rd
(from
Mesquite
Rd to NE
Cul-De-Sac
• Mc Comas
Rd(from
Kimbo Rd
to N.
Beach
St)
(CPN IOIII9)
(Council
Districts 2
and 4
• Clover
Ln(from
Camp
Bowie
Blvd to
Birchman
Ave)
• West
Will Partial MULTATECH
Rogers Design Engineering,
Rd(from Project Inc. $300,000.00 $50,000.00 $350,000.00
Camp Management (New Award)
Bowie
Blvd to
W
Lancaster
Ave)
(CPN]01120)
(Council
District 7
Partial DAL-TECH $260,000.00 $40,000.00 $300,000.00
• Creekfall Design Engineering,
Dr(from Project Inc.
Basswood Management
Blvd to (New Award)
Misty
Ridge
Dr)
• Mesa
Verde
Tri
(from
Isle
Royale
Dr to
Basswood)
• Tulip
Tree Dr
(from
Fox
Chase Dr
to
Buttonwoo
Dr)
• Rosita
St(from
Glen
Eden Dr
to Jean
Hills
Ln)
CPN 101121)
(Council
istracts 4
land 8
The engineering funis recommended for contract awards were selected based
on Transportation and Public Works'Request for Qualifications advertised
in the Fort Worth Star-Telegram on January 5.2017 and January 12,
2017. The Statements of Qualifications representative of the work required
for the projects were received and reviewed by Transportation and Public
Works staff in January 2017.
M1WBE OFFICE–
•Baird,Hampton&Brown,Inc.,is in compliance with the City's BDE
Ordinance by committing to 19 percent SBE participation. The City's SBE
goal on this project is 17 percent.
•Multatech Engineering,Inc.,is in compliance with the City's BDE
Ordinance by committing to 17 percent SBE participation. The City's SBE
goal on this project is 17 percent. Additionally,Multatech Engineering,
Inc.,is a certified M/WBE firm,
•Dal-Tech Engineering,Inc.;is in compliance with the City's BDE
Ordinance by committing to 16 percent SBE participation. The City's SBE
goal on this project is 15 percent.
The projects are located in COUNCIL DISTRICTS 2,4,7 and 8.
FISCAL INFORMATION/CERTIFICATION:
Tli c Director of Finance certifies that funds are available in the 2017 Tax
N o i%s Fund and that prior to an expenditure being made;the department has
IIIti: TL-NI107:—,11)111!y to validate the availability of funds.
FUND IDENTIFIERS (FIDs):
ig
Department Project Program Activity Budget Reference# Amount
Fund ID Account ID Year (Chartfield 2)
FROM
Fund Department Account Project program Activity Budget Reference# Amount
ID ID Year (Chartfield 2)
CERTIFICATIONS:
Submitted for Cil, Manager's Office by: Jay Chapa (5804)
Originating Department Head: Douglas Wiersig (7801)
Additional Information Contact: Mary Hanna (5565)
ATTACHMENTS
1. Compliance Memo 3 companies.pdf (CFW Internal)
2. Contract 1 map.pdf (Publicl
3. Contract 2 map.pdf (Public)
4. Contract 3-1 map.pdf (Public)
5. Contract 3-2 map.pdf (Public)
6. Form 1295 all companies.pdf (pubtic)
7. Jumpstart Contracts MC FID.pdf (CFw intemat)
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 9/26/2017
DATE: Tuesday, September 26,2017 REFERENCE NO.: **C-28397
LOG NAME: 20JUMPSTART CONTRACTS
SUBJECT:
Authorize Execution of Engineering Services Agreements with Baird,Hampton,
&Brown,Inc.,and MULTATECH Engineering,Inc.,Both in the Amount Up to
$300,000.00 and with DAL-TECH Engineering,Inc.,in the Amount Up to
$260,000.00 for Design Services,Construction and Project Management
Support to Advance High Priority Projects Needed to Improve Safety and
Capacity as Identified by Staff for the Anticipated 2018 Bond Election
(COUNCIL DISTRICTS 2,4,7 and 8)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the execution of an Engineering Services Agreement with
Baird;Hampton,&Brown,Inc.,in an amount not to exceed$300,000.00,for
design of transportation improvements along Great Southwest Parkway from
Mark IV Parkway to North Freeway Service Road Southbound;Alta View Street
from Kimbo Road to Premier Street,Kimbo Road from Mesquite Road to NE
Cul-De-Sac and McComas Road from Kimbo Road to N.Beach Street(CPN
101119);
2. Authorize the execution of an Engineering Services Agreement with
MULTATECH Engineering,Inc.,in an amount not to exceed$300,000.00, for
design of transportation improvements along Clover Lane from Camp Bowie
Boulevard to Birchman Avenue,and West Will Rogers Road from Camp Bowie
Boulevard to W.Lancaster Avenue(CPN 101120);and
3. Authorize the execution of an Engineering Services Agreement with
DAL-TECH Engineering,Inc:, in an amount not to exceed$260,000.00 for
design of transportation improvements along Creekfall Drive from Basswood
Boulevard to Misty Ridge Drive,Mesa Verde Trail from Isle Royale Drive to
Basswood,Tulip Tree Drive from Fox Chase Drive to Buttonwood Drive and
Rosita Street from Glen Eden Drive to Jean Hills Lane(CPN 101121).
DISCUSSION:
e 2018 Jump Start Program is enabling design efforts prior to the 2018
Bond Program election to advance early starts for construction upon a
Pavazable outcome for the 2018 Bond Program election.
la preparation for the 2018 Bond Program,M&C G-19009(May 17,2017)
uthofiized$10,000,000 for the 2018 Jump Start Program to advance early
design efforts for infrastructure improvements considered high priority
based upon current conditions including addressing capacity and safety
unpruveme ts. Of that$10,000,000.00 approximately$9,000,000.00 was
assigned to eleven engineering contracts(M&C C-28288)for the design and
analysis of arterial and traffic improvement infrastructure
requirements. The remaining$1,000,000.00 is being directed to improving
the subject neighborhood streets presented in this M&C. Additional streets
may be added if there is contract capacity.
This effort will enable staff to begin the design and delivery of the
following projects:
Jump Start Engineering Contract City Total
Projects Scope Firm NTE Project Appropriation
Management
Partial Baird, $300,000.00 $50,000.00 $350,000.00
• Great Design Hampton,
Southwest &Brown Inc.
Pkwy Project
(from Management (New Award)
Mark IV
Pkwy to
North
Frwy
Service
Road
Southboun
• Alta
View St
(from
Kimbo Rd
to
Premier
St)
• Kimbo Rd
(from
Mesquite
Rd to NE
Cul-De-Sac
• Mc Comas
Rd(from
Kimbo Rd
to N.
Beach
St)
(CYN 101119)
(Council
Districts 2
and 4
• Clover
Ln(from
Camp
Bowie
Blvd to
Birchman
Ave)
• West MULTATECH
Will Partial
Rogers Desiggn Engineering,
Rd(from Proj t Inc. 300,000.00 $50,000.00 $350,000.00
Camp Management
(New Award)
Bowie
Blvd to
W
Lancaster
Ave)
(CPN 101120)
(Council
District 7
Partial DAL-TECH $260,000.00 $40,000.00 $300,000.00
• Creekfall Design Engineering,
Dr(from Project Inc.
Basswood Management
Blvd to (New Award)
Misty
Ridge
Dr)
• Mesa
Verde
Trl
(from
Isle
Royale
Dr to
Basswood)
• Tulip
Tree Dr
(from
Fox
Chase Dr
to
Buttonwoo
Dr)
• Rosita
St(from
Glen
Eden Dr
to Jean
Hills
Ln)
(CPN 101121)
Council
istricts 4
nd 8
The engineering firms recommended for contract awards were selected based
on Transportation and Public Works'Request for Qualifications advertised
in the Fort Worth Star-Telegram on January 5,2017 and January 12,
2017. The Statements of Qualifications representative of the work required
for the projects were received and reviewed by Transportation and Public
Works staff in January 2017.
M/WBE OFFICE&ndasb;
•Baird,Hampton&Brown,Inc.,is in compliance with the City's BDE
Ordinance by committing to 19 percent SBE participation. The City's SBE
goal on this project is 17 percent.
•Multatech Engineering,Inc.,is in compliance with the City's BDE
Ordinance by committing to 17 percent SBE participation. The City's SBE
goal on this project is 17 percent. Additionally,Multatech Engineering,
Inc.,is a certified M/WBE firm.
•Dal-Tech Engineering,Inc.,is in compliance with the City's BDE
Ordinance by committing to 16 percent SBE participation. The City's SBE
goal.on this project is 15 percent.
The projects are located in COUNCIL DISTRICTS 2,4,7 and 8.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the 2017 Tax
cites Fund and that prior to an expenditure being made;the department has
I I IC rt ;17,M, i[Iility t0 valida€c the availability of funds.
FUND IDENTIFIERS(FIDs):
ig
Department Account Project Program Activity Budget Reference# Amount
Fund ID ID year (Chartfield 2)
FROM
Department Account Project Program Activity Budget Reference# Amount
Fund ID ID year (Chartfield 2)
CERTIFICATIONS:
Submitted for City Manager's Office by: Jay Chapa (5804)
Originating Department Head: Douglas Wiersig (7801)
Additional Information Contact: Mary Hanna (5565)
ATTACHMENTS
1. Compliance Memo 3 companies.pdf (CFW Intemal)
2. Contract 1 man.pdf (Public)
3. Contract 2 map.pdf (Public)
4. Contract 3-1 mappdf (Public)
5. Contract 3-2 man.ndf (Public)
6. Form 1295 all companies,pdf (public)
7. Jumpstart Contracts MC FID.pdf (CFW Internal)