HomeMy WebLinkAboutContract 49809 STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.A (�
WHEREAS, Crystal Lake Development, LLC , ("Developer"), desires to make certain
specific improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as Marine Creek Ranch Section 4 ("Project") within the
City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contr
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Marine Creek Ranch Section 4 CITY SECRETARY
CFA Official Release Date: 02.20.2017
Page 2 of 2 FT.WORTH,TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) 0, Sewer (A-1) ; Paving (B) ®!, Storm Drain (B-1) 0, Street Lights &
Signs (C) 0.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section 11, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section 11, of the Policy. Developer shall
ensure its contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth,Texas
Standard Community Facilities Agreement-Marine Creek Ranch Section 4
CFA Official Release Date: 02.20.2017
Page 3 of 3
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Marine Creek Ranch Section 4
CFA Official Release Date: 02.20.2017
Page 4 of 4
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers,servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims,suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth,Texas
Standard Community Facilities Agreement-Marine Creek Ranch Section 4
CFA Official Release Date: 02.20.2017
Page 5 of 5
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth,Texas
Standard Community Facilities Agreement-Marine Creek Ranch Section 4
CFA Official Release Date: 02.20.2017
Page 6 of 6
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code, the City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the company that it: (1) does
not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Marine Creek Ranch Section 4
CFA Official Release Date: 02.20.2017
Page 7 of 7
Cost Summary Sheet
Project Name: Marine Creek Ranch Section 4
CFA No.: 2017-129 City Project No.: 1.01052
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 92,695.50
2.Sewer Construction $ 117,829.00
Water and Sewer Construction Total $ 210,524.50
B. TPW Construction
1.Street $ 311,185.50
2.Storm Drain $ 58,432.00
3.Street Lights Installed by Developer $ 24,699.06
4. Signals $ -
TPW Construction Cost Total $ 394,316.56
Total Construction Cost(excluding the fees): $ 604,841.06
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 4,210.49
D. Water/Sewer Material Testing Fee(2%) $ 4,210.49
Sub-Total for Water Construction Fees $ 8,420.98
E. TPW Inspection Fee(4%) $ 14,784.70
F. TPW Material Testing(2%) $ 7,392.35
G. Street Light Inspsection Cost $ 987.96
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 23,165.01
Total Construction Fees: $ 31,585.99
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 604,841.06
Completion Agreement=100%/Holds Plat $ 604,841.06 x
Cash Escrow Water/Sanitary Sewer-125% $ 263,155.63
Cash Escrow Paving/Storm Drain=125% $ 492,895.70
Letter of Credit=125%w/2yr expiration period 1 $ 756,051.33
City of Fort Worth,Texas
Standard Community Facilities Agreement-Marine Creek Ranch Section 4
CFA Official Release Date: 02.20.2017
Page 8 of 8
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Crystal Lake Development,LLC
Jesus J. Chapa
Assistant City Mana er
Date:
e: John Cockerham
Recommended by: Title: Manager
Date: 9/act /a017
Wendy Ch' Babulal,EMBA, P.E. ATTEST: (Only if required by Developer)
Development Engineering Manager
Water Department
a� �J. Z1j
Signature
DouglaY W. Wiersig, P.E. Y Name:
Director
Transportation& Public Works Department Contract Compliance Manager:
Approved as to Form & Legality: By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
Richard A. McCracken requirements.
Assistant City Attorn
M&C No. ltd f+` N 1�I' Y�� ,�c ✓ G� (,/d-�'�
Date:
N/j�"' Name: Janie Morales
Form 1295: _ Title: Development Manager
ATTEST:
RT
Majk J. kayser U
City Secretary
City of Fort Worth,Texas TEXT OFFICIAL RECORD
Standard Community Facilities Agreement-Marine Creek 12aii6h Section 4 CITY SECRETARY
CFA Official Release Date: 02.20.2017 FT.WORTH,Tx
Page 9 of 9
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
ISI Location Map
Exhibit A: Water Improvements
Water Cost Estimate
® Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Marine Creek Ranch Section 4
CFA Official Release Date:02.20.2017
Page 10 of 10
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 1.01 052
None
City of Fort Worth,Texas
Standard Community Facilities Agreement-Marine Creek Ranch Section 4
CFA Official Release Date: 02.20.2017
Page 11 of 11
c w HaR[NE CREEK t M
c� V
& �w
Ksrinel Ernk as
reek
g 9A 10
7 9•rkr Creep
NorFe Ci k 12
516 H
H6L Ffl
S TE
f
�� tHVCst cDL E
HILL r '4/( MARIroE iJarior CW 7
dPCREEK bbrthaast C pus
RIDGf LAKE
SQPW RIDGE
82
O
LOCATION MAP
MAPSCO NO. 46H
COUNCIL DISTRICT 2
BLOCK 1, LOTS 1X, 2-8, 9X, 10-22 AND 23X
BLOCK 2 LOTS 1X AND 2-19
BEING 10.130 ACRES OF LAND LOCATED IN THE
JOSEPH BOMAN SURVEY, ABSTRACT NO. 79,
CITY OF FORT WORTH, TARRANT COUNTY, TEXAS
38 BUILDABLE LOTS,
4 PRIVATE OPEN SPACE LOTS
OWNER/DEVELOPER:
CRYSTAL LAKE
DEVELOPMENT, LLC.
3825 CAMP BOWIE BLVD.
FORT WORTH, TX 76107 PRELIMINARY PLAT CASE NUMBER: PP-16-073
TEL: (817) 665-2321 CASE NAME. MARINE CREEK RANCH
CONTACT: RANDY LOCKHART PHASE: SECTION 4
DATE: 0s/0112017 m l m �
PROJECT �: 2552-0e-01 1I/IARl_NE` GRE'E'K
RANCH myc�os�ae+mannss+assoCi3teS
DRAWN BY.• M. BIGGERSTAFF S.EC'TION 4 .4 A "'w'y'"D km*w"sid1ia""V
It"raglsbaWm aua4a° t-1759
PLAT INFORMATION 1 0 0 .a a I 0 b,a m
CHECKED BY: A. TAYLOR & VICINITY MAF a'tI"9I I•"as 76010
611—a 09-1671
SHEET NO: 1 OF 7 1 a 1 517-176-6757
a 0...m a t a x 0 a.c 0 r0
!L 1
VA HOA
EX. 8" MWLWfR
WATER LINE . /
x fir/�, ( / FLM OODFLAEASEMENT J
CAR A SLOE 12WO
PRrcr
A \ APPRQ9IAM LOCAFKW GE
11AYtlCC CREEK RANCH P ` raj.EAR noao^LAN PER
GC/ 2 1 \ Y r]RM YAP 46439C016a f
1 DAM0 SEPIEM6ER 24 2000
EX. FIRE ! / �\ /
HYDRANT ) ,o
•.ti•"'^may / \ APPROJPMAtE LOCAROR ar
� t
IW YEAR K RANCH
PER
/j a \ MA100 CREEK RA+MX RECOPY
EX. 16" q ,TLOGD ASS PREPARED D
j / OpUtGY ASSOpA YES OAtED,
WATER LINE N a \ MARC a 2017
�..
13'SANrARY 5[IIER[SY7. -
�(SECLwO
Lor+S.0 Aoor 2
EX, S" _ I WATTS BAR t" N MARINE CREEKRANO+
WATER LINE 1 !Z COURT \ uR A.anE 12M
PRMT
N �
V q
Mm
OPEN.9-Aa FIRE f
HYDRANT O a ` e9l
rBY
R'PARAIE
k tilt
rs•ssE
yWCJ'5 tilt {{ AYLORSVILL£DRIVE
1 ( O1 oP�L•N�snnCC
AtE MDA/ fSY 13'DF.Br SEPARATE \
DEVELa�ER ++sr1RAKENr � -�"""
2W ACae53 M(T..00.'S /a m'"s eLECDSER
IM VICE Ca M CREEK
RANCH
!I Wt.17M,is 57 D7/io27ee7
I PR rcr
• IOL OomFr. to
S \
2b'SAJRrANY SENR El
�`— WL 14565.IC Sol \\
VOL "2""m MS
NOTE MM,
ALL WATER LINES ARE 8"
UNLESS OTHERWISE NOTED
LEGEND
200 0 100 200 +00 y
WATER LINE
T FIRE HYDRANT
►� GA TE VALVE
SERVICES
1 inch = 200 ft.
DATE: 09/01/2017
MAR-TATE CR.EE7K
PROJECT g 2652-08-01 R."l-11 AI CH
DRAWN BY. M. BIGGERSTAFF ,SEC'170N ' -
r,7Wrdlo^twnbr:r-27se
CHECKED BY A. TAYLOR R 2 a" ®111n 011 cost e e 7.m
l+x+^ 78010
EXHIBIT "A
(� e17-+et-lerl
SHEET NO. 2 OF 7 1..: e17-2r+-e7er
t^^.mm+l+xa+.e�m
MARINE CREEK RANCH SECTION 4 9/1/2017
CFA PROJECT QUANTITY MATRIX
UNIT 1:WATER
SHEET N0. ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM UNIT 5
1 TRENCH SAFETY L.F. 1,525 1,525 $ 0.10 $ 152.50
2 DUCTILE IRON FITTINGS W/RESTRAINT TON 0.5 0.5 $ 8,600.00 $ 4,300.00
3 8"PVC WATER PIPE L.F. 1,505 1,505 $ 24.60 $ 37,023.00
4 8"DIP WATER L.F. 20 20 $ 35.00 $ 700.00
5 FIRE HYDRANTASSEMBLY EA. 4 4 $ 3,300.00 $ 13,200.00
6 1"WATER SERVICE EA. 38 38 $ 840.00 $ 31,920.00
7 8"GATE VALVE EA. 3 3 $ 1,300.00 $ 3,900.00
8 CONN.TO EX.8"WATER MAIN EA. 2 2 is 750.00 $ 1,500.00
UNIT TOTAL $ 92,695.50
YAM HOAI
t Iff DEVELOPER
ty OPEN SPACE \
FLOODPLAIN FASEPAENT J
CAO.A.SLOE 12" \
PFrcr
f/-._\` O
YAR04E CREEK RANGE \ IAOp ROODPLAW PER /
C4 12014882 ; YYY row ww 48439MI60K
oplorry " DAIED SEPTENWR A.7009
A
• �\ APPROXAMIE LOCAMW Or
l 800 TEAR FLCREEZOM-LAW PER
/ '• " 4 FLOOD
STLDY�A ar
DOHA RAMAR04 A 20 DA RD' .
1• \1
\
15'SANrARY SERER ESYE
ML \
y
OzN \
y � 4
" 2 LOT•SIL BOCK R
pp " AIAMNE CREEK RANCH
\ CAR A.SILF 12800
Y i WATTS BAR Pprcr
COURT uO
'J Y a o • EX. 18"
�VAM HGA/ Y SANITARY
11CVELR'ER
—" — D"E"SPACE SEWER LINE
15,Sw
SEPARA 7E
Y J J . • • ) • RISTRfgIENi
•� �� TAYLORSWLLE DRW 1p
15'SSE
EswT
PRIMAK HOA 15
VY - ENSPACE D .E.
O
_ r
at
YAlE HOA/ •ESMT 13 OwSB=ARA rE
DPER SPACE r�_ -
z=
-: s YARp�CI�£K RANGI — 1
VOL17O/9 TEXAS ELECRRC 310071501R3R \—
mn-w-rrr
aTtr 1a 21D6 P6 5ro PRTn
_ DRTCI •. -
JO'SARRARr sERER rswr �� _•..
1 V10L.14M PC.So
r ML.1.164 PG I®
6Rrcr `
LEGEND
• SANITARY SEWER MANHOLE
8" SANITARY SEWER
SANITARY SEWER SERVICE
200 0 100 200 400 QS EX. SANITARY SEWER MANHOLE
—SS— EX. SANITARY SEWER LINE
inch = 200 ft.
DATE: 0910112017 �m a
MARINE' CRETE'I
PROJECT 1. 2652-08-01 RAN,r-vH
-25
DRAWN BY.-M. BIGGERSTAFF SE'CTIQN 4 fll d",s t,�ti# r�liin7a ,zs�o%iat
�•,;1,..,.,: u,�rt�o L�D�m..ldw.aA..c1v
1•q�•irOtl'01 NWAW.t-2m
WASTEWATER 2 00 vast s b,r1R
CHECKED BY. A. TAYLOR
ariingten• texas 76010
EXHIBIT "A-1"
etT-4eq-igTt
SHLE. NO: 3 OF 7 r.K: 817-:74-8757
srr.mreoleKrs.eol*
MARINE CREEK RANCH SECTION 4 9/1/2017
CFA PROJECT QUANTITY MATRIX
UNIT 2:SANITARY SEWER
SHEET NO.SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM UNIT 6 7
1 POST CCTV INSPECTION L.F. 1712 1,712 $ 1.50 $ 2,568.00
2 MANHOLE VACUUM TESTING EA. 10 10 $ 110.00 $ 1,100.00
3 TRENCH SAFETY L.F. 1712 1,712 $ 1.00 $ 1,712.00
4 CONCRETE ENCASEMENT FOR UTILITY PIPES C.Y. 2.21 2.21 $ 300.00 $ 663.00
5 4"SEWER SERVICE EA. 38 38 $ 625.00 $ 23,750.00
6 8"SEWER PIPE L.F. 1632 1632 $ 33.00 $ 53,856.00
7 8"SEWER PIPE,CSS BACKFILL L.F. 80 80 $ 43.00 $ 3,440.00
8 4'MANHOLE EA. 9 9 $ 2,500.00 $ 22,500.00
9 4'EXTRA DEPTH MANHOLE V.F. 14 14 $ 110.00 $ 1,540.00
10 CONCRETE COLLAR EA. 3 3 $ 400.00 $ 1,200.00
11 CONST.5'MH OVER EX.18"VC PIPE EA. 1 1 $ 5,500.00 $ 5,500.00
UNIT TOTAL $ 117,829.00
`. , y VA TE NDA \ \
PROP. 5' i' DEVELOPER
SIDEWALK / � ,,/ "Si� j" oPEN SPACE
` / $ FLOODPLMN EASEYENT-
CAR A,RW 12000
,�i aRrcr
TYPE P-1 O \\
RAMP
bfARqC LRE£f(RANCH ' / \ 1 /-IADo A'R n LOD PLA"'rt
R
aI oatmt.et: j7 \ �! FWW YAP 48439CO16d!
aParCT `r �j r DATED SEPTEMBER 21L xm
\1 \
\
OF
l0CAD0N
TOO TEAR nDDPPER
4 CREEK RANCH E
I FLOOD PREPARED 8Y
oCWARASSOCIATES DATED A 2017
y
... EX. 4' \ \ 1
„
SIDEWALK fir• \ m'swrARYQRuEsuE
m _ (SECDrp rRACn �
�1 7 I (�� m V0.alta PG Ma➢
2 TYPE P-I\
� .... RAMP
Lor.sr.aD«l
4ACAR .SLAX 28W
I:A9 A.SiaE 17x00
m j J WATTS BAR PRrcr
1 ! covRr "Q1 PROP. 5am '
�
A y SIDEWALK Nar/ �.'
OPEN SPACE
\ sw
ESWT or
SEPARATE
J I r , a , • \ wSrRtIYERr
_� �� �� iAYtORS1RLLE DMVE \
m
ctg_
PRIYAIE ROA ,]'� /
PE S R D.E.
�M Ol OPEN SPACE s-
DE 15'
/ T 15'oz.or \
TYPE P-1 OPEN SPACE Z �--��— -
- RAMP— — =� ____ 5/
ACCESS EW i.Na s / rcxAs EEECfAC STA'IAr,',1E OOt �EARrM£CRlElC RANCH
f 9U.masa Pfi 97 /. — CLQ oRICT'EOa
atIcT wwvarcr r ancr \ 7
wO.�rc14 s,o
-
/ 70•S:NI,1 P SERER[9,T
PROP. 5' -`'— KL 1: m 436
531 \\
SIDEWALK LEGEND Orrcr
29' B—B PAVEMENT, 6"
CONC., 50' ROW
37' B—B PAVEMENT, 10'
200 0 100 zoo +00 CONC., 110' ROW
4" CONC. SIDEWALK
1 inch = 200 ft. (DEVELOPER)
DATE: 09/01/2017 m(m a
11�'ARIME CHHH K
PROJECT 1: 2652-08-01 RANCH
r?1�rcfiSki� f11C:iT?r±1v"e:;.aN'-1C""�1Ps
DRAWN BY. M. BIGGERSTAFF SHCET7IQ1'V 4t c" 4 meq w"wNdLwo-malslw
tbp registration mr4m f-2759
CHECKED
Y. A. TAYLOR WAVING 200 east ob,am
„ arlieglae, teees 76010
.EXHIBIT TIB
617-seq-ia7i
SHEET NO. 4 OF 7 tef: 617-274-6757
eetr.mmotefof.com
MARINE CREEK RANCH SECTION 4 9/1/2017
CFA PROJECT QUANTITY MATRIX
UNIT 4:PAVING
SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM UNIT 16 1 17 18 19 29
1 REMOVE CONC CURB&GUTTER L.F. 72 72 456 600 S 20.00 $ 12,000.00
2 HYDRATED LIME TN 51 58 11 120 $ 155.00 $ 18,600.00
3 6"LIME TREATMENT S.Y. 2,830 3,202 6,032 $ 3.20 $ 19,302.40
4 8"LIME TREATMENT S.Y. 602 602 $ 3.20 $ 1,926.40
5 6"CONC.PAVEMENT S.Y. 2,513 2,994 5,507 $ 37.40 $ 205,961.80
6 10"CONC.PAVEMENT S.Y. 509 509 $ 68.10 $ 34,662.90
7 4"CONC.SIDEWALK S.F. 362 663 1,025 $ 5.00 $ 5,125.00
8 REMOVE SIDEWALK S.F 159 162 321 $ 2.00 $ 642.00
9 BARRIER FREE RAMP TYPE P-1 EA, 2 4 6 $1,600.00 $ 9,600.00
10 FURNISH/INSTALL ALUM SIGN GROUND MOUNT E.A. 6 6 $ 425.00 $ 2,550.00
11 REMOVE B"PVMT MARKING L.F. 50 50 $ 10.00 $ 500.00
12 8"SLD PVMT MARKING(HAS)(W) L.F. 100 100 $ 2.75 $ 275.00
13 REFL RAISED MARKER TY 1-C EA 4 4 $ 10.00 $ 40.00
UNITTOTAL 1$ 311,185.50
)) . "17 x�
O HOA
I` DCWLOPER /
k.y`/ OPEN SPACL \
a / / FLOODPLAIN EASCA"r-/
V CAB.A.SLAX 12WO
PRIG
A
APPPOAWA IE LOCA DON OF
YARWE CREEK RAOKN.' I \ 100 YEAR nOOOFtA N PLR
Ccl a�n1�'cr�b71 �..` f/ \ FIRM YAP 4e41DC0160r 1.,y,✓.-
7r DAffD SFPnDMM 29t MOP
\ t
b
APPROAVAIE LOCAROH OF
r1 n \ 100 YEAR FLOOOPLAW PER
MARNE CREEK RANCH SECRON C
N4 /FLOOD SYLOY PREPARED BY
OONA10 ASSOC1ADAMO,
MARCH 610101 7
t \ N \
11 L_ \
( M Q \ 77` (SECOND Or,CSYi.
VOL er1A PO.w10
mv/ M v O
W
H j WATTS BAR N \ A!R ROD(K
(j YARMELor CREEK RAkpN
COURT CAa A SLAX 128M
PRICT
I
-- �— WL
OPEN�
15,Cu
tNLETS `j�•SSE
Eswr By
O - SLPARA,E
g 21'RCP
g affie RCP 4
TAYLORSVILLE DRIVE 15 Cu 16' HEADWALL
O� `ffi 4Xer INLETS SO.
Q SDMH —
�Z
VAR HOA/ ESYr H'O.E.0Y SEPARA>E \\
I OPEM SPACE wsrmwralr /—
10'AL(YSS ME No,S Trx"ELm"C FRNcr Co. ".ir4 VJ0CREE;7 RAIMpFI
1 VOL 1700.1C S7 RIIOR-OF-MY CC/D7IJ077eer
___.. a"`o Vol.11Oa1 P6�10 PRrcr --=_
�Y, �- — 10`SA1•TARY FUER ESI1fVOL 1421,4 M 4"
\\
VOL 145K Pa 502
OR/C7
LEGEND
EXISTING STORM SEWER LINE
PROPOSED STORM SEWER LINE
200 0 100 200 400
0 STORM MANHOLE
r
CURB INLET
1 inch = 200 ft.
D A TE: 0913 17
m1mla
PRLY. A.
—o1 MARINE' CREEK
RANCH rnyc®side+n-finds-,sssubat®s
DRAFF SECTION 4 �� °"' movb"A- te'"'w
tbv.ro°btrotion.umber.t-nsY
CHLOR STORM DRAINAGE 200 ee■t ebreEXHIBIT IIB-111 ertl 1 2-1 1e0,etr-46y-tart
Sh7 (..: e17-274-e757
•••.mmele■ol.eom
MARINE CREEK RANCH SECTION 4 9/1/2017
CFA PROJECT QUANTITY MATRIX
UNIT 3:STORM DRAIN
SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM UNIT 26
1 TRENCH SAFETY L.F. 408 408 $ 0.50 $ 204.00
2 MEDIUM STONE RIPRAP,DRY S.Y. 182 182 $ 48.00 $ 8,736.00
3 4'STORM JUNCTION BOX E.A. 1 1 $ 4,100.00 $ 4,100.00
4 21"RCP,CLASS III L.F. 99 99 $ 65.00 $ 6,435.00
5 24"RCP,CLASS III L.F. 309 309 $ 73.00 $ 22,557.00
6 24"FLARED HEADWALL,1 PIPE EA. 1 1 $ 2,400.00 $ 2,400.00
7 10'CURB INLET EA. 4 4 $ 3,500.00 $ 14,000.00
UNIT TOTAL $58,432.00
ME HOADMOPER
/
J ghlr OPEN SPAS �\
r., f /
t ~ S$ FLOODPLAINEASEMENT._/ \
CAAB.S.A.A SL17606
PRTCrRTLr
MARRBr CREEEE aAHd!„�• /' / \ , �-lA Anoaa L, PER
CC/D715D1ABtt ..�, f \ v FNL MAP 48430=60K
(pR2i 7^ -._Y/ h DArEO SEPIE&WR 20.7000
. 1 \ APP90J6r7AR LOCAROH Or
100 YEAR FLOOOPLARI PER
\ MARM9 CREEK RANCH SECROM
•FLOOD SYWY PREPARED By
DONAWAY ASSOCIARS DATED
MARCH A.7017
If SAN7ARt SFROt ESY7. '.
WL 4714%
rr l0!•S;BLOCK l
•�.,1 7 WATTS BAR COURT \ Y RM RANCH
CAR A.RJW 12OW
x t \ PRICr
OO•
w 1J u n a \ •
YAR MOA/ SEPARA TE
x
�" 1{i a J ! . 7 • MIRIAfEN7
"
e Agr
518 X TAnoRSHLLE DRIVE 'sur
C
/
PMVA IE IIQA 15•
DEVELOPER AE.
i OPEN SPACE
Z : HWJ • O . 7 •
I
WILE SY¢PARAR \I DEVELOPER / [SM NSAR/MEM! \
OPEN SPACE
MARNIE CREEK RANCH —
I 70•AOF55 ESM&NO 3 TEXAS ELECMC SERMLY CO
VOL ESS P4 37 /� Oq 071J0775B7 .
RNOW-OE-WAY \ .
?!04 PG 710 PRiCr
m- Y `•
i r 2wSAMrARr SLIER ES WT \\
ORRT
ig Ak
7 LE ND
200 0 100 zoo 400 X STREET LIGHTS
0 EX. STREET LIGHTS
1 inch = 200 ft.
DATE: os/or/tor 7 A
MARINE CREEK m ma
PROJECT : 2652-08-01 ;_; /�r
l� 174V+"rwSkf? �nCit�ni��,ass�c�alE�s
DRAM 8Y.• M. BIGGERSTAFF ,�',.d!' i C.`1•'ION 4• L O R'�0 R' 'Rn ms's°
�r6{strglIm nMnb•r.1-2759
CHECKED BY: A. TAYLOR ,=TREET LIGHTS 200 6R•E Bsr•.,
EXHIBIT "C" Orlinq 7- 9-1 7ae�e
ei7-4eq-�a7�
SHEET NO: 6 OF 7 (O•: a,7-776-8757
mn<-!Pr ca
\ 2 VA rE MOA/
Of OKR
Wow spAa
/�(�. s \� � ' ted'/ . ` FLOCOPLAW EASEMENT- `
STREET NAMES &` ,r3�aN CAB.A2A 178W
PRrSTOP SIGN
\�
Is \\
APPROAINATC LOCA nM OF
NAlUNE taRE'CX RANPJ/. 1 //-too YEAR nOODPLA PCR
C'ornftot•B17 \ �C FARM UM 48119COI OK
OPRrrT r ti-,•/ p DATED MPMANUR 9A 7OD9
r \ .
APPROWAIE LOCAROR tX
o » N \ 100
YEAR x RAN PER
` r YW~CREEK RANpf mcnDAMD+!
1 FLOOD SRIDY PREPARED BY
Z \
III Al&2012 OARD-
1 N
"AWN 8 10t7
(wrcomoSE°ER rx E5.?.
WoL e7rs a�u
f \ .
WATTS BAR Lor sic BLOCK x
1 1i CO(/RT \ MARWEA.SUOC CREEK>rMIDD
w 1 � • PRrcr
t a
1 W1-1 &
STREET NAMES & # vAIr New/ • " A o W13-1 P SIGNS
STOP SIGN �� STREET NAMES &
(R1-1) I STOP SIGN
i (R1— B
ESMr I) rs• B
° Y
<N SEPARA iF
W rr ■ a e . r • WS/Rf.MrENr
as
8 Rg TAYLORSWLLE STREET NAME SIGN 15's9E
- DRrW /
• $
PRIVATE IMOA 15OEM oz.'
M j O
OPEN sPACf — r
i t i a a . r • r ft 000Pt' y(O� - — ,
VA
IE WA/ CSV 10'BE D" IE \\ .
OEt4[u'ER /
� OPEN SPACE
10'ACCLSS[WE Nus / 1ExAS Ei.EC1pC SETINL'E OQ AIARM%rE CREEK RAAK71 ti..
3 baA flmiso PC. a,-1 —/ AKNT-Or-w fl/PTJ017687 .t
pa \ '
'W13-1P SIGNS— ' m'sAwr srEsrr
KY.:4m PFc Dat 5w
\\
SIGNS—_
WLr•ZOS Pu•88
Mxrrcr ♦\
LEGEND
Zoo o loo Zoo 400 STREET SIGNS
1 inch = 200 ft.
DATE: 09/01/2017 m�m a
.MARINE CREEK
PROJECT 2652-08-01 RANCH
DRAWN BY. M. 1GGGERSTAFF SECTION .4 " wvkw*fd—@ft ww"associates
aw txteit»°hq MWIYIJYIO lutd•np•trrailtecp,n 9rRtTrt9
tboe re*trotbn number. f-1759
CHECKED er. A. rAnoR STREET SIGNS 190 east 9bro.
EXHIBIT "C-1" erlingi De. 19- 78010
817-169-11671
SHEET NO: 7 OF 7 lo.: 817-174-8757
0—Rt tie l k.6i.to
MARINE CREEK RANCH SECTION 4 9/1/2017
CFA PROJECT QUANTITY MATRIX
UNIT 5:STREET LIGHTING
SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO. IBID ITEM UNIT 29
1 2"CON DT PVC SCH 80(T) L.F. 180 180 $ 13.43 $ 2,417.40
2 Rdwy Illum Assmbly TY 8,11,and D-25 EA. 6 6 $ 1,755.00 $ 10,530.00
3 LED Lighting Fixture EA. 6 6 $ 366.00 $ 2,196.00
4 6-6-6 Triplex Alum Elec Conductor L.F. 180 180 $ 3.37 $ 606.60
5 Rdwy Illum Foundation TY 1 E.A. 6 6 $ 1,491.51 $ 8,949.06
UNIT TOTAL $ 24,699.06
Developer and Project Information Cover Sheet:
_ _.... _.... ... ................... ..._.. ..........__.. . ......... __................... _..............._.................._...._........................
:
Developer Company Name: Crystal Lake Development,LLC
__....._....................._......_..................._..J�,_......_......
.......
.._...._...._......
.....
......
.....
.......
._.................
......_........._.__..__........................
......_...........
.............
.....
._.......
........
..............
............
.._..........._............
._.....
...._.._._........_...........
........_.
Address, State,Zip Code: 382 Camp Bowie Blvd,Fort Worth, TX 76107
Phone&Email: 817665-2321
Authorized Signatory,Title: John Cockerham,Manager
Project Name: Marine Creek Ranch Section 4
Brief Description: Water, Sewer, Paving, Storm Drain, Street Lights
Project Location: East of Huffines Blvd&North of Lamb Creek Dr.
j.._......__..................._..............'-.....,............._.._............_..,......_.._..................................i....._......._...._.__.._................................_.................._......;.__..._...__........._..................................._......................_..................._................................................._.._........-_....................................
Plat Case Number: ' None Plat Name: None
__.._.._............... -_._....__._... ....._....._.....__.._,......._._......_.................._.._....................
_....__ .__...._._......_............................................._......................................._............_.._..................
__._......_.. --
Mapsco: 46H Council District: 2
CFA Number: 2017-129 ' City Project Number: 101052
To be completed b tall
Received by: i Date:
34 Ss�
0
Q RECEIVED
OCT
192017 N
r C'YOFFORTWORTH y�
CIIYSECRETARY
�8�8SbEZ %,�a
City of Fort Worth,Texas
Standard Community Facilities Agreement-Marine Creek Ranch Section 4
CFA Official Release Date:02.20.2017
Page 1 of 1