HomeMy WebLinkAboutContract 49793 y� J
o
o
0
CIT
STANDARD COMMUNITY FACILITIES AGREEMENT
OF TEXAS § City Secretary Q
COUNTY OF TARRANT § Contract No. qqq 13
WHEREAS, Walton Development and Management TX, LLC , ("Developer"), desires to
make certain specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Chisholm Trail Ranch Sec 1 Phase 2
("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Chisholm Trail Ranch Sec 1 Phase 2 OFFICIAL RECORD
CFA Official Release Date:02.20.2017 CITY SECRETARYPage 2 of 11
FT.WORTH,TX
w= .�."
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) ®, Sewer(A-1) ®, Paving(B) ®, Storm Drain(B-1) ®, Street Lights & Signs
(C) Z.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified,insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Chisholm Trail Ranch Sec 1 Phase 2
CFA Official Release Date:02.20.2017
Page 3 of 11
iii. To require the contractor(s)it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
1. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Chisholm Trail Ranch Sec 1 Phase 2
CFA Official Release Date:02.20.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits,actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Chisholm Trail Ranch Sec 1 Phase 2
CFA Official Release Date:02.20.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Chisholm Trail Ranch Sec 1 Phase 2
CFA Official Release Date:02.20.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Project Dean
CFA Official Release Date: 02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name: Chisholm Trail Ranch Sec 1 Phase 2
CFA No.: 2017-072 City Project No.: 100540
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 277,397.50
2.Sewer Construction $ 422,992.00
Water and Sewer Construction Total $ 700,389.50
B. TPW Construction
1.Street $ 626,905.30
2.Storm Drain $ 545,034.00
3.Street Lights Installed by Developer $ 108,555.12
4. Signals $ -
TPW Construction Cost Total $ 1,280,494.42
Total Construction Cost(excluding the fees): $ 1,980,883.92
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 14,007.79
D. Water/Sewer Material Testing Fee(2%) $ 14,007.79
Sub-Total for Water Construction Fees $ 28,015.58
E. TPW Inspection Fee(4%) $ 46,877.57
F. TPW Material Testing(2%) $ 23,438.79
G. Street Light Inspsect'ion Cost $ 4,342.20
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 74,658.56
Total Construction Fees: $ 102,674.14
Choice
Financia/Guarantee Options,choose one Amount mark one
Bond=100% $ 1,980,883.92 x
Completion Agreement=100%/Holds Plat $ 1,980,883.92
Cash Escrow Water/Sanitary Sewer=125% $ 875 486.88
Cash Escrow Paving/Storm Drain= 125% $ 1,600,618.03
Letter of Credit=125%w/2yr expiration period $ 2,476,104.901
City of Fort Worth,Texas
Standard Community Facilities Agreement-Chisholm Trail Ranch Sec 1 Phase 2
CFA Official Release Date:02.20.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Walton Development and Management TX,LLC
Jesus J. Chapa
Assistant City Manager
Date: Name: John John Vic
Recommended by: Title: President
b' 4- U, Date: -
Wendy Chi-Babulal, EMBA, P.E. ATTEST: (Only if required by Developer)
Development Engineering Manager
Water Department
,a4
C.J. 611 Signature
Douglas Wiersig, P.E. yName:
Director
Transportation &Public Works Department Contract Compliance Manager:
Approved as to Form &Legality: By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
_ ensuring all performance and reporting
Richard A. McCracken requirements.
Assistant City Attome
M&C No. ri 4
Date:
N me: Janie Morales
Form 1295: A)14= itle: Development Manager
ORT -`
ATTES �<(�
Kayser k
City Secretary .SPS
City of Fort Worth,Texas
Standard Community Facilities Agreement-Chisholm Trail Ranch Sec 1 Phase 2 OFFICIAL RECORD
CFA Official Release Date:02.20.2017 CITY SECRETARY
Page 9 of 11 FT.WORTH,TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A: Water Improvements
® Water Cost Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Cost Estimate
® Exhibit B: Paving Improvements
® Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Chisholm Trail Ranch Sec 1 Phase 2
CFA Official Release Date:02.20.2017
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100540
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Chisholm Trail Ranch Sec 1 Phase 2
CFA Official Release Date:02.20.2017
Page 11 of 11
COLUMRS
BENBROOK Q
LAIC
FORT
FRS
VILLAGE Pop�
rop 792.727
r` &.ate 3
o Park
N
M FORT �1
N S
N (
P ECT
T OR CITY
c
� 3
i
�P
LL-
0
2�v WEST CLEBLME-CROWLEY
Q
LL-
Q) Q
I
N EQ
Q�
N N
0
s CRO -PLOVER
CL
— W E
c
0
S
V
I
VICIN17 YMAP
V
D_
C (OILS[ TRAIL RANCH
s
0
o'
SECT10N I . PHASE 2
LDCAM IN
H
E OF FORT WORM, TEffM
0
r- DEMOPBRAMNEX-
PMAM BY:
MMMMMMIU)
Walton GOODMg
i M20 LBJ FREEWAY SUM 790 MMMAU.
N DALLAS. TX. U FTED STATES. 76240 CML EN(1NIEMS-PLANNERS-SURVEYORS
(972)713-0000
(.0 2106 kko"DiM.QrMPW4kl9.TO=70MI
0 Meru 017)9204878
Lu
JUNE9 2017
CIESHOLM TRAIL RANCH N ..
SECTION 2, ]PHASE ASIE 2 W E
WATER S
]E?YlE) Fr"A„
SCALE: I" 2DOy
48
DCK
29 26 27 2fi 25 24
1 I 1
� wrnt v la
42 r"mAc — , 1x
CHI3/lpLY TH42 Rlht y
110
9 8 7 6 5 4
i
BLOCK
41X '30---
41X
9 I
... 3f ff .t_... � 21 22 /
41X �..30 i I L.._.��. I �-I I1 23
BLOCK K C- ....3 I 11 12 13 �147115 ' 1B 1 17011 18 19 j 20 I 1 .BLOCK .;
fy
32 �
I
....... _ ... 24 (ufa
33 55
CH(SH" f MMH
Bt2pQc K_ �r7--�--f
'�l35�34 33 32 3•• 1 30 29 28 27 r2fi� 25 ` 54
34 ���
3 r.� 53 r.
7 i_ 36
36
i
}
14 tmvvns 15 40 1 39 38 �_— :( 38 39 40 47 42 43 44 45 45 47 - 48 4950 51�
14 sdcnoN riurL PHL46 f!I I 37
cxtsrwLr REACH j .__.1 .�€
�.._ ....._ .._.. .. ...
28
r i I � 1
} 12 3 4 5 6 7 I BX 19 I SD 11 12 113 ( 14 � 1 1 i ! I S I 1 I
15 16 17X 1B 19 ! 20 21 122 23 1 24 t 25 27%
2fi f
4z,:r
LEGEND
W PROPOSED WATER LINE
W EXISTING WATER LINE PRBPARMBY: DEVE.®PER/OWNEFL,
PROPOSED FIRE HYDRANT ASSEMBLY (GCODVMI Walton TM NOTE"
-6 EXISTING FIRE HYDRANT ASSEMBLY 6RM6LL 9 5420 L8J FREEWAY SLATE 790 ALL WATER LINES SHOWN
CML EMQINFERB—FiANNEr1s-BUFNEYO119 GALLAS, TX.(97U2N TED:713 00005,75240 ARE 6" IN DIAMETER UNLESS
►� PROPOSED GATE VALVE 21061A snpDIW.� 73' ' OTHERWISE NOTED
IXl EXISTING GATE VALVE
E;\10612 — Chisholm Trail Ranch\Plans\CTR — Section I Phase 2—CFA.pro Fri Jun 02 14: 17; 17 2017
CH][S�1L(1�1®���,e1V}1111¶11�L'��1[1,]ll���RC�11��1..H N
SI1..sC 1110 V 19 PHASE 2 W E
SEWER S
EXHIBrr wA—l" A � SCALE: 1 L'lY7I'
/...• I I ^O II 9
/ I r 29 28 27 25 25 24
i
_ 1x
rr
/ I f f0 9 8 76 5 4 3 2 7-- \
9m(K 30 a41X 21 22 23
31 13 14 L5 16 17 18 19 20 a_m 0..'
23% \ 32 11 12 /` ,_-�'`� f t 6t
\ MW Erma AMR
\ .. __...-. .__ 24
1 33 _.. 55
/ 34 35 34 33 32 31 30 29 28 27 26 25 54
. /
37 36
35
53
13 13 .I.// * 36MAW %f
40 -T-
CAR
9 38 37 38 39 40 41 42 43 44 45 d6 d7 48 49 50 51
.'; amaarr faea .T
2 3 7 1 ---�
/ B% / 9 10 11 12 13 14 15 16 17% 18 19 20 21 22 23 24 25 26 27%
LEGEND
PROPOSED SANITARY
SEWER LINE
s- EXISTING SANITARY
SEWER LINE
. PROPOSED SANITARY MWARRMUY. DEVHAPEWOWNEW
SEWER MANHOLE
Q EXISTING SANITARY GOODWMI Walton '"
SEWER MANHOLE bU RSHALH.Y NOTE 1
5420 LB,I FREEWAY 88rtE 750
avaerDa+gDOM Ar4xere-au+uEroae DALLAS.Tx,ur7ED STATES.7e240 ALL PROPOSED SANITARY SEWER
PROPOSED SDR-35 SANITARY , 157z 1 713-0000
SEWER SERVICE moo w"on-an LINES SHOWN ARE 8' IN DIAMETER
E:\10612 — Chisholm Trail Ranch\Plans\CTR — Section I Phase 2—CFA.pro Fri Jun 02 14118+41 2017
C HESIH O L�1�I TRAID a CHI N
SIEC TEO V I , PHASE 2 W E
STtETSi S
IEIffi�IlII "�" 4e : �—
__ SCALE: I"=2W9
29 i 28 27 26 25 24
42 ffT/�ITIIf�TIT .
� fu«� l — ..._t, ..• SX
4-1 Aa —_ — — —T'
CNw"rL
BLOCK K � 10 9 8 j 7 6 5
41x P31
IE15
z1 2223
�Op1 16 17 f8 19 20�- 561 I 1223X f � _ �..._�__�.J �.
f\ �� �cw slf� rnif55srxtr ...
33Iff�/MITTfff/J'ffflfff'/�II/lfl . , 24
34 pe,' 135 � 34 33 32 3130 29�28 27 26�� 25 "' 54
37 36
-. ... t @LOCK 0.,.; 3 Y
13 : 13 .. 36 ..I..._
14 rtm u 151.
40 39 38 4_... _.'✓ �... 39 40 41 1...42 43 44 ..45 46 47 48_..49 50 51
:'i 14 savrrax r.r•"ns .. I 37 6LOItiK
cwsfroWr rnuc n�xcx �.._W 1 _— f I( \ T
LL ll--........ ---_L. .....� I�J..-. ..--
\
zJ �ri�frTf�f �r�1
�S $� T— r. __ _ T — _.
:•: 2 35 6 1 7 BX 9 10 11 12 L13 14 S S T \
d TT OfM I' SS ( 1fi 17XJ 113 19 j 20 21 22 23 24 25 �26 27X
I i
}X,;• !
LEGEND
PROPOSED 29'13—B ROADWAY
w/ 50'R.O.W.
6' THICK REINFORCED
CONCRETE PAVEMENT
PREPARED BY: IDEVELOPEVOWN]ER:
4 cGOODVANs Walton T11
PROPOSED 37'8-13 ROADWAY SIDEWALK P THIS CONTRACT MAMH[AU 5420 LSJ FREEWAY SUITE 790
CML ENGINEERS—PLANNERS—SURVEYORS DALLAS. TX, UNITED STATES• 75240
W/ 60'R.O.W.
9' THICK REINFORCED x;ae M;.mM tm(17)329 37S�eoef (9721 713-0000
CONCRETE PAVEMENT ►�.co(s1>)s294sys
E:\10612 — Chisholm Trail Ranch\Plans\CTR — Section I Phase 2—CFA.pro Fri Jun 02 14:20: 17 2017
C FESIHI®IL\M TRAIL IIL RA CIHI
S •C`I HON 19 PHASE ASIE 2 N
SWORN DRAIN W E
SCALE: 1"o 2.00'
43
....... F21 26 27�26 25 24
f
e cIsa 1 V I .
...._ ..� �'
42 nm�Rr __� ...._. ..._
1%
sacrtox c rxare Fr ) ,� •\
IFISFgLY fRIlL NAfp I
A r// 109 B ` 7 1 6 5 4 3
�OQC K 1 3D i + f 0 I
41% :.__. _ 21 22
11 � + ! J 23
g_OaI K 31 h; I 13 14 15 16 17 18 19 200 ` �pIX 0
' ' 1f i 12
23X
( r 3fLll0 t.PF49i
CHISFO PRUSFA.kF _.
33 24 4 — t�l 5 tiY'
3J T35
34 33 i 32�1 30 � �34 , `� `\1
3fi � 54
13 i 13 1fi 1 _ .. ..
1 � 36 :1� OIX
i
_ 52
Y
p'ner 14 rtmrFa 15 4 '� 'f I 38 39 40 41 42 43 44 45 46 47 4849 50 5f
`7 ` /� Ie•F.C/
37
.,. � .... cius°LTFupiFi�i..�i�zuvF l-p.Mrr :l � � � � �, / B""_.\
_ l /
BG —777
l S �_ er P �
2 3 4 5 fi 7 15 f6 �1% f8 g 20 21 22 23 1 24 125 26 27%
tlltl . r «Ill(
LEGEND
PROPOSED STORM DRAIN LINE
PREPARED BY: DEVELOPER/OWNER-
EXISTING STORM DRAIN LINE
PROPOSED STORM DRAIN INLET GOODWINI Walton
/C►/aI+On T11
5420 LBJ FREEWAY SUITE 790
CMll'O
L ENGINEERS DALLAS, T%, UNITED STATES,73252
40
�---PROPOSED STORM DRAIN DROP INLET 2.05 Mummv D4 GrapW b Tm MOM (9721 713-0000
M."MI77 3 29 43 73
E1\10612 — Chisholm Trail Ranch\Plans\CTR — Section I Phase 2—CFA.pro Fri Jun 02 14121148 2017
CCIHDISHO LM TRAIL RANCH
SECTHON 19 PHASE 2 W N E
STREET ll.l[QsHTS
IHS SCALE:
p 1C S
40
2-9 28 f 27 6 25 24
11 II I I
42rrmrAr _ -_- I 1%
91CTI0N 1,PHIsl[l[ �
cN[s{Nu!SR4fL RANLX ��'/ A I 1
1 _
fo9 0 7 6 5 1 4 3 2 _
fiOpC K r...._ ;+ t
J
41% I 30 I •B- 2f 22
0 1 - /
23
&0Q1 K .� 31 I I 13 f4 LLf5 16 17 18 19,' 20 I �00C 0
11 12
23x �-32I i /^"•� �,,,,�, As 56 .•..
3liT'H! 1.PRA"[
I� -_..---.Li__j �55 '
2433 _.__.34 i 35 34 33 32 31 30 29 28 27 26 � �
36
311 am I
.. .1313 "16 tt��' - I �.....�_ - lF.
152.. ... ..... I. I 36 1 7 �4f 42 43 44 45 /i
14 RIM- 540 39 g 1! 3B 39 40 46 47 4B 49 51
50
I 1q j" 98L'r[5N 1,PHI3S fl( I — 37 f (
. carsxaLr r L H4wx 9 •
__) r
t' 2 i 3 { 4 5 6 B% 9 I f0 11 i 12 13 14 15 16 17% SB 1 19 2B 21 22 23 24 25 25 { 27%
I l i I
LEGEND
2' PVC CONDUIT _
LIGHT POLE PREPAR®EY: DEVE[AF'EWOWNEPU
EXISTING LIGHT POLE �A GCOD7 NI Walton TI.1
TRANSFORMER ON PAD90
MMHAIL Y Walton
CML ENGINEERS-PLANNERS-SURVEYORS 5420 LBJ FREEWAY SUITE 752
GALLAS. T%,UNITED STATES.75240
HAND HOLE 2405 M,st"Dom,Gnp"m,Tin.M161 19721 713-0000
® M.w(ef rl�za4ar3
E:\10612 — Chisholm Trail Ranch\Plans\CTR — Section I Phase 2_CFA.pro Fri Jun 02 141231 14 2017
CCIUSIH O LM TRAM RANCH N
SIE=N 1, PHASE 2 W E
ST=SIGNS s
.=IT"C-11, �,1n
SCALE: fl 11=2GO'
40 'jesrat3zKws,
rq m+r
I.
w`£`ri-r BB wu v F29 28 27 W26 25 24
42
_ 1x
CbTIaN�PH.19d �.
Nlr.RaAY 7RIlL RANCH i�Y 0.`T4
iM 10
-- / Y
K7 Sr 6 4i 3
BLOCK K u
41X 90 rsauHs�su
_sr.
j;wsr
0 I ner4t s521 ' 22
F
q11
23
Oaf K ....31�111 12 x,13 1y 10 16
sr�v� 17 18�f9 20 / IiOIX 0
....
23X ..
a caw I A9f 56
32 1i stw sww Ra _�._ BLAS
' ...aftALiD5J3.DBr4 1 !J 1i J CHI380 TRIry R.INC&"
24 55
..34 �' I ......_...�35 34 33 32 31 30 2 i 28 27 25` 54
— i 37 36
i
I3 , � � 13 16 (.. _....._. 1�647
�III15 40 . 39 30 `i 38 39 140 41 42 43 44 45 40 49 50 51
14 7'j sacrroN r.r21=1
`_.cdrdROAr
_....i _
BLT
- � .
___"
2 4 5 6 7 10 11 12 13 14 i
rRAc sr. 8X I I ( f5 + Sfi 17X 182] 2224 25 26 27X
4%• ® o7a s swv rnu. ae sr.ss
al-r srcw sra+xR ffwrrrsaRr Aar sr sial
ceTac5 Lb'S.r.LGBI RI-15TLY Shia RA
LIET.Y.5063J.BBB
LEGEND PREPARM BY: DEVEL®PEPJOWNER:
X PROPOSED STREET SIGN GvOOD WI Walton '"
5420 LSJ FREEWAY
SUITE 790
81
CML ENOEFA8-PIMIHFAB-BURVEI'DH8 DALLAS, T% UNTED,UMTEO STATES,755
240
2408 M7.—W;DMw,9Z-.Z,T-78W51 (972)713-0000
MM(617)32&4918
E:\10612 — Chisholm Trail Ranch\Plans\CTR — Section I Phase 2—CFA.pro Fri Jun 02 14 24 41 2017
SECTION 99 42 43
Derebpe Awetded Pmjacb-PROPOSAL FORM
ChiYohn T. Ranch,S tiw 1,Ph-2
UNIT PRICE BID
AajeG Is®hd'otmrtiu CONATSER
Bidlia SpeofivationSarim Uaa of
Itm No. DmetlPaoa No. t4eaaue BidQry Uot Prim Bid Valw Stn Numhr R Qu'NY
W.-Fac918n 3
1 3311.0261 8'PVC Water Pi 331112 LF 3.870 .00 $131580.00 3,870
2 3312.3003 8"Gate Valve S Valve Box 331220 EA 9 $1.150.00 $M350.00 9
3 3312.0001 File H dmnt Ass®bl 331240 EA 4 $4,500.00 $18000.00 4
1 331220031"Domestic Water Services 331210 EA 98 $950.00 $93100.00 98
5 3312.0117 Co t W Exis' 8"W.L. 331225 EA 2 $600.00 $1,200.00 2
6 3312 4311 36"x 8"Tapjmg Sleeve A Valve 331225 EA 1 $7,500.00 $7,500M 1
7 3311 0001 Ductile Loa Water Finn s w/Restraint 3311 11 TON 3.4 $4,300.00 $14700.00 3.4
8 3305.0109 Tsmch Sddy 330510 LF 3,870 $0.25 $967.50 3,870
Water Subtaw $277,397,501
Shmt Number a
Seo Sewxr Facilities 4 5 6 7
9 3331.4115 8"SDA-26 PVC Serer Pipe 3311 10,33 31 12,3331 20 LF 3,107 $37.56 $116.7W00 0 1670 1437 0
10 3331.4115 10*SDR-26 PVC Sera Pipe 331110.333112, LF I.I. 541.00 $61828.00 0 0 0 1508
12,11,
11 9999.0001 Core into E7jstiM Manhok 000000 EA 1 $1500.00 $1500.00 0 0 0 1
12 3331.3313 Ca ct W Exi 8"S.S. 333t 50 EA 2 $800.00 $1 800.00 0 1 1 0
13 3331.3313C-d.Ed 10'S.S. 3331 50 EA 1 $1000.00 $7000.00 0 0 0 1
14 3339.1001 4'Std.Dia.S.S.Manhole 33 3910,33 39 20 EA 16 $3,6W.00 $57 600.00 0 3 9 4
15 3339.1101 5'Std.Die.S.S.Manhole 3339 10,33 39 20 EA 3 $4,000.00 $12.000.00 0 0 1 2
/8 3349.7002 5'EA,.W Mnohole 334920 EA 2 $5000.00 $10000.00 0 1 0 1
17 3339.1003 Em'a (4'Std.Dia.Mmhok 333910,333920 VF 57 $775.00 59975.00 0 7.2 2004 29.1
18 3339.1103 Ewm tm 5'Std.Dia.Manhole 333910,33 39 20 VF 25 $185.00 $4 625.00 0 2.8 0 21.7
19 9999.0002 Etna f«S'ExtmW Manhole 000000 VF 18 $205.00 $3690.00 0 11.2 0 6.8
20 0241.2201 It-Exis' S.S.Manhole and Di Onsite 024114 EA 3 $1,000.00 $3,000.00 3 0 0 0
27 21.2014 Rmrove 10'3.3. 0241 t4 LF 234 $20.00 $4,680.00 234 0 0 0
22 3331.5749 Plug Exismy 10"SS.aed Fi0 with Flowable Fill 3311 10,33 31 12.
33 31 2D LF 1,118 $15.00 $16770.00 1.118 0 0 0
23 3331.41168"PVC Sewxsr Pipe w/CSS RafiH 331110,333112,M31 m LF 140 $$3.00 $7420.00 0 m 100 0
24 3331.4116 101 PVC Serer Pipe w/CSS Backfill 3311 10,33 3112.
LF 80 $57.00 $4,560.00 0 0 0 80
25 3331.3101 4"Sewer Service SDR-26 333150 E4 126 $650.00 $81900.00 0 41 M17
28 3305.0109 Troch Ssf 330510 LF 4,835 $2.00 59670.00 0 1710 1
27 33390001E Crated MsWo Li.. 333980 VF 44 $795.00 58,580.00 0 2.0002 Pmt C.C.T.V.W tion 330131 LF 4,835 $1.00 $4,83500 D17]0 ]0107330130 EA 21 50.00 $1,050.00 0 5
Sanitary Sewer Subtotal $422,992.00
ShetNamba
a otomy
Sl-Di.F+Aaa 29 1 30 1 31 32 33
m 133195W22, Curb Wel 334920 EA 1 $4,000.00 $4000.00 1 0 0 0 0
2t 3349.5001 10 Cucbinlet 334920 EA 5 $2,500.00 $12,500.00 1 0 0 0 4
32 9999.0003 Remorc Exit' 48"RCP 000000 IF 16 $20.00 $320.00 16 0 0 0 0
33 -990004Remove Exb' 48'Hmdwall WOO OD EA t $1,000.00 $1000.00 1 0 0 0 0
-L 9999.0005 Remove Ewtmg 5'.Y R.C.B.C. 000000 LF 34 530.00 $1.020.00 0 0 34 0 0
35 9999.0006 Remorc$xis' S'x3'Head-B 000000 EA 7 E1,200.00 $1200.00 0 0 1 0 0
38 334!.0201 21'Class IlI RCP
3341 10 LF 69 $45.00 $3,105. 0 0 0 0 69
37 3341.0205 24"Clue III RCP 334110 LF 309 $50.00 $15.450.00 309 0 0 0 0
38 3341.030230"Claw III AC P. 334110 LF 20 $65.00 $1300.00 0 0 20 0 0
3P 3341.0309 36"Cl-III R C P. 33 41 10 LF 188 $95.00 575 480.00 0 0 188 0 0
40 13341,0317 39'RCP Cl-,fl 334110 LF 351 1 $100.00 $35100.00 281 0 323 0 0
41 334>.lMt1948" CP Clan i0 334110 LF M8 $125.00 $86000.00 185 0 0 503 0
42 9499000;%'x4'R.C.B r_ 000000 LF 383 $320.00 $176180.00 0 121 0 0 0
43 9999.008 Inv 4'R.C.B.C. OD 00 00 LF 121 $480.00 $58 080.00 0 121 0 0
44 9999 W0 *x S Strom 3mrcpm Box 000000 EA 1 $7,500.00 57 500.00 0 0 1 0 0
45 ',349411019'Si-T 1 334940 EA 1 $4,000.00 $4000.00 1 0 0 0 0
46 .33494113 48"SET 1 00
334940 EA 2 $4,5 .00 $9000.00 1 0 0 1 0
47 1w99 0010 Cosw Headwsii Wo Wv alts 000000 EA 1 $38,500.00 $38500.00 0 1 0 0 0
48 9999.0011 41'is-a Hewtwall with K--a, 000000 EA 2 $18,500.00 $37.000.00 0 1 1 0 0
49 9Nro 0012 C--W EAM 48'RCP 000000 EA 1 $500.00 $500.00 1 0 0 0 0
50 9999.0013 C--to Exi S'x 3'R.C.B C. 000000 EA 1 $750.001 $750.001 01 ol 1 01- 0
51 33050112 Cou:rele Collar
330517 EA 4 5300.00 $1200.00 1 0 2 1 0
52 33050109 Trends Sat 330510 LF 2,014 $1.00 52,014.00 548 121 531 503 69
53 12136.0104 Csabim Mntttess 31 3600 BY 683 $121001 $85,375MI 18268 3971 1
54 3137.0101 Co `o Ri 313700 1 BY 133 $60.00 $7,980.00 ol Of of 133 0
Storm Drain Subtotal 1 $545,034.00
Hid Sara
W ataelSaltitary 8wwr/Storm pnM FatiBHu HubhNY
$1,245,423.50
P arfamatlWM eBwga $0.00
TOTAL HID I 111,245A23MI
artvsarwuee
aAteavnwma0cnotl®�,--•,-xmov 4wA®noeen ar.r 1r�a.a Len z
Ie•YwNwrri791d m41O BieAgeal
SECTION 004247
D�v� rAra_Rq -PROPOSALFORM
CFishdm Tsrl F Se, 1 Arse 2
UMT PRICE BID
Pr.)W h-I.$onn- O17.cO
DidltA Spaifimfi- Uidtd Bid
72m D-ipion Sarin Na M-1Quoury Ihit Prim Bid V.I. Shea Nu ber a arrwry
No.
P-iFat il- 1619 20 1 22 23 24 25
1 3213.0 01 C Concrete Pavement vdemial 32 13 13 SY 12.222 $31.45 381.90 0 334 1462 1786 2328 2730 3596 0
3211+05016"Lime boxed S RaidcnUal 32 11 29 SY 13,064 $2.85 $37,232.40 0 353 1,564 1897 2473 2909 3838 0
3211 0400 Hd,,d lime 321bs./S.Y. sidential 3211 29 TON 209 $155.00 S32.395.00 0 5.6 24.9 30.4 39.6 46.5 61.4 0
4 3213.01019"Cmxrde Pewmem Artedd 331313 SY 800 ¢11.35 080.00 0 0 0.0 0 0 0 0 800
5 3211.0502 8'Limc Taatcd S Artmal 32 11 29 SY 857 $2.95 $252815
0 0 0.0 0 0 0 0 857
321I.OWOH ntd limo 4216s./S.Y. sidmtial 321129 TON 18 $155.00 2790.00 0 0.0 0 0 0 0 18
3213.050613e+ria Fa Run 7 P-1 321320 EA 14 $1600.00 400.00 0 0 0 6 0 8 0 0
3213.0 Barris Fra M-2 32 1320 EA 4 $1 900.00 7 600.00 0 0 0 2 0 2 0 0
9 9999. 14 em t a .Corerte Pavement 00 00 00 LF 58 $8.00 $464.00 0 29 0 0 0 0 29 0
10 9999.0015 Remoee Ed o(Roed Baednde 00 OD 00 EA 2 $250.00 $500.00 0 1 0 0 0 0 1 0
11 13471.0001 TralLc Cant 347113 LS i 1 $1500.00 $1.500,DOI 0 0 0 0 0 0 0 1
12 3213.0302 S Cancate Sidewalk 321320 LF 1,243 $23.2 $28.899.75 0 101 252 30 0 325 396 139
13 9999.00168'Cancrtxe Sidewalk 000000 LF 1,396 $41.20515.20 1.072 0 0 0 0 324 0 0
14 oncato
9999.0017 CHmda 00 00 00 LF 116 $10.00 1 160.00 0 0 0 0 0 58 0 58
15 99990018 S..0 d ud Remove Fais4 6"Curb 000000 LF 96 $18.00 $1,728.00 0 0 0 0 0 0 0 %
J6 9999.0019 Ed ofRnd B.,i.& 000000 EA 4 $1.50000 SMODO 0 0 0 0 0 2 0 2
1 9999.00204'Yellow Ther estic Stn 000000 LF 201 $1.30 1.30 0 0 0 0 0 0 0 201
18 9999.0021 8"Ycllow Tla: otic Stsi 000000 LF 201 $2.60 52260 0 0 0 0 0 0 0 201
1 9999.00228"White IuCc Stri 000000 IF 45 $260 117.00 0 0 o 0 0 0 0 45
20 9999.0023 24"Whitc St Bar 00 00 00 LF 20 $16.50 $330.00 0 0 0 0 0 0 0 20
PaAng SubOdal $621'405'30
Shi Nwnbex A na
mdfitles
5 q
9499.0024 Suca Si000000 EA 8 $375.00 000.00 0 3 2 I I1 22 1 00
99991X125 St Si-a 00 00 00 EA 5 5000 t 750.00 0 0 0 1 1 1 0 0
23 9999.0076 Sxaot Muka Nada $750.00 0 z z 2 0 0
Sbeat$ba SubbDtw 1 $5,500,001
DM
PMnD FadWMa Suhk0tM $821405.30
Sbwl Sion FacURW Sub10W 500.00
400.00
TOTAL DID 505.$0
..wmrmiea. aor.aowsrvnasa,.r..�ms.osn ras.x
n..arr sa raar..a
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
Chisholm Trail Ranch,Section 1,Phase 2
UNIT PRICE BID
Project Item Information IUC
Bidlist Specification Unit ofBid
Item Description Unit Price Bid Value Sheet Number
N Section No. Measure Quantity and
tv
Street Lighting Facilities 39
1 13441.3201 LED Lighting Fixture 34 41 20 EA 19 $4,438.00 $84,322.00 19
2 12605.3011 2"Conduit PVC SCH 40 T 26 05 33 LF 1,948 $6.531 $12,720.44 1,94e
3 13441.1408 Insulated Elec Condr,#6 XHHW 3441 10 1 LF 1 5,844 1 $1.971 $11,512.68 5.&u
Street Lighting Subtotal $108,555.12
Bid Summary
Street Lighting Facilities Subtotal $108,555.12
Payment/Performance/Maintenance Bonds $0.00
TOTAL BID $108,555,12
CITY OF FORT WORTH
STANDARD CONSTRUCTION BE)PROPOSAI.DEVELOPER AWARDED PROILCTS Chi 1W,TniI R—h Sat.1,Ph.2
F—R—d Nov k,2,A15 W 42 43 Bid PYq-1
TIE CITY OF FORT WORTH, TEXAS
PLANS FOR THE CONSTRUCTION OF �!
WATIB 9 SEWED, PAVING, DRAINAGE �
A!
0
& STREET LIGHT dv2ROVEMENTS
TO BENNE
amH\ HOL T AISL RANCH F
it
TI
SIE ON I, PHASE 2
TPAtsaaasw�nawv�vle naAwAt�a�w'ueswm�+ro �
9C i,rf."�✓ ,tlr' - a-R —
��l�� � is �<�„�+u�* .•-re; �. .a."�.°'�..'°"`�w:
J � awi.w.sE.cn mane•s-.._ w.•r.- n: aa.«o�,u ou auowo xr.o 0
TSY PRIC �� cN1rvaar r�v.r�TMr:ri��.n�u Y019 $ ` �0Po1£ M^_
siQYGR \ b. div a—1 Wmiii�i uM M 9E.Fn rcrKs �CHOP:""`si.�r�':oo a a g
DAVO COOKE �' -- `ar' w"mom W
CITY MANAGER mrvrcm s "
DOUGLAS W. WERSIG, P.E ~�r / n� mi.:e`°"<�,o_ : oro•:
TIlpf19PORTATION APAP urE
PUBLIC WORKS DRECTOR >i: s n i.e•w•a
JOHN ROBERT CARMAN f ": a�e:u "•`'"•;�w. �"�; •
WATER DEPARTMENT DREGIOR \j j-'— - a: mr 4�iw?waTM i* onry x..ie 6
sice�r uax*rc*...s
.11
"MIT
spm%xoeTZ1.
8,tt[ OFi�O
ww
FiLEK OP X-29$50&W-243$
POWAREDHY:
WATER#89M4000445-100640.001680 �«ra w GCODV✓1N!
SEINER#6060 4=4W10W40.001380 Walton
alton
OrrY PRO W;CT# 100540
NfDVffi7?A16
ng � is
°¢' � § \ m r.,� 4 � ..�•'\ � �tet. cuf. nms ( ''ti.
�AAIJJ
✓UAN✓O.SE O SURVEY`:, F 4 ed m'
ABSTRACTRACr XG 6 ' \ +� ` ( ®. h.,r•_X X qct �_
R-
m
r
1
m
aIN
- - - - - B — —
;t,ax^ �. AMM
n
ero�o
mm n
m®
i I: A �w 7 g.. - m :..•.
m n
v
m 1
-
B� P
eIP
----
�
07 E 11
m
m
n
—
s®��-"mos'
une�cmn� •-
;m I ( Woa ,nsSTRA I< F, °I,n� 1
wmaoe Im naa lamxaaa Ina.wa lam fas
FINAL PLAT
LOTS 23)1.24-40,BLOCK E;LOTS I%2-34,BLOCK Eannsn O;
FlfBY: &LOTS 1X,2-7.S74 4-16,1774 18-26,27X.2&-32.BLOCK T '3
owr+swusvm
�rY2�Yuu?r-faEvxpoc:*o[fw�o afs CWx+0�c0fwaDnawN.asINw�mIf++Ia.rrFa0mw,mn 92fIDIlPf.�/1[ CI.H[MC1I.0.VST8HWO1Bcn1IfttmM1V7HeB➢�TRAILs,e m RTRA
RANCH
L—A" AN MWad}Ona NN6NR9m.
{
eRFq�g4
{AYLWI WUB1Y.l8%fS
laaef, FQYf�t PIPE Nl.�16-W3 fMu,-®avn�N.�l�
nrarr Y OF a -
� r
a ,{ O 1XsvE
r ""��
ami er lamer S�, Si Sfi AL�C�AX .�.1MA—AM ,xnxme
t II I JvAhr JAXSTX
1
s;
w�
a r
_
p m
....a«,.:a....e ....,.....so.m»•.:x.�x.-.« =�__ lom � ®.r -iyerr-- "� --.J �' ��� m.e� anmrtwmevnc+nn ....e..e.:m"��x�r..m...
:•a I� I T(LKr NBX4�4
. r.m F A�
.na J XTR .,..w.-
.vs,a w",a.T °`L T .a,
.,.x«a.xx. a e. ..a..wsvo....wx..a.•.. �.,...�..,,. .«..m.�.w.m...,.....«�7ro�::[:..,«�
vn
X11x
:n -x.
woN a«a xa M.w K.w..e....a vax6m�.•.?x`wwe`w m P�. n cz...e.a..mm..,,r ae lea roa' mORC1eCBmPI➢®Im Wmlt.elB1H �
ryrvS r
n[•¢ rea«a,xa e+ •.nar..v�u ° a•sw.P •..r rw.
'.w m,aax.+•.ao.w.._.z..we...m a...om.. e.' 6MAG1'11�
aw—.n'...4...mw....zxx BxA.°eaxx��.°m rt mm.e�'r wee:n.ru+aa•.n aar°nw a J. r.a e..a�arva n:am"re �f ,v ..gym wY.�s�w+zw•.w we.e.aa w.u.
a'Y PmID10fLO�omAltIDBmna1iM10Nxm.dWi0LB0e
swwanaa.zs....cw..awn w,u ea ix gee vz a«ra.0•e° o-g ��a
..,,,..•«. _m�n_a_,r.<,... ,,�w..,x� N
WTA PW.eR��
W E w. CITY PLAN COMMISSION
GTY OF FORT WORTH,nE AS
.n...s..r m..rorn rri.aumm er ea. mwavire
VICINITY MAP
ur
�°�s; �,'de' rem�...�;.,.r..., u�:u•��'r m °..«" r ma..,en. �Lro
:'' :a ix' ...a .,.«a.,.. r•. M,,._.r. m..,.. ..............�. ,.. s.o..wr res.'en m se0`w11'"`0�e..,..
FINAL PLAT 6
LOTS 237424-10.BLOCK K:LAM
1277,28
C,2-54,BLOCK O;
°•^^�•,•°6^°a d I.CT15 1X,?r7.8X,9-16.17X,18-26,2770,28-32,BLOCK T
PRPPARRW BY: CHMOLM TRAM RANCH
E
>=....a owr�m9mBv�.orBB: GOODWIM 274ACIM
MAMIL&ILY
BRtl�]mm-n/Hem-WIH.ertTW NANRIOM�lA00lUlv8Y.MHRACIN0.A {
Walton GAWN8NBY8T..mAAciNQ99e. {
9xmmrmp,pN•OSM�.}N QI'YOPIOIIPWK14 TAelAMfbI1M1Y,T®[N -
sr�i{xira nm� RI7f]m-mfI ffCfRN L mll4 H
.,w...w...m•« rww.xiu_.omo TmE'�RZD�. z FiWL RAT WE W.�FP-01fi-009 Mmma
rfFERYi G�w. SNEEf Z OF Z
Developer and Project Information Cover Sheet:
Developer Company Name: Walton Development and Management TX,LLC
I
Address, State,Zip Code: 5420 LBJ Freeway,Dallas,TX,75240
Phone&Email: 214-838-2101,
Authorized Signatory,Title: John Vick,President
Project Name: Chisholm Trail Ranch Sec 1 Phase 2
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: Southeast Comer of McPherson Boulevard and Summer Creek Drive
Plat Case Number: LNone Plat Name:INone
Mapsco: L 1103-W Acouncil.District:F6
I
CFA Number: ! 2017-072 City Project Number: 500540
taffRTo be complete y staff.-
Received
eceived by: Date: d
A2345
Q� s�
�,Q11
`9StiEZ � ��
City of Fort Worth,Texas
Standard Community Facilities Agreement-Chisholm Trail Ranch Sec 1 Phase 2
CFA Official Release Date:02.20.2017
Page 1 of 11