HomeMy WebLinkAboutContract 49790 Q N RECDD r 4� a� STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Jabez Development, L.P., ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Palmilla Springs Phase 4 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section Il, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth, Texas OFFICIAL RECOR(p Standard Community Facilities Agreement-Palmilla Springs Phase 4 CFA Official Release Date: 02.20.2017 CITY SECRETARY Page 2 of 11 FT.WORTHS TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) , Sewer(A-1) ®, Paving(B) P, Storm Drain(B-1) I , Street Lights & Signs (C)0. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Palmilla Springs Phase 4 CFA Official Release Date:02.20.2017 Page 3 of 11 1 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. 1. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Palmilla Springs Phase 4 CFA Official Release Date: 02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged neali,-ence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or dama,-es are caused, in whole or in part, by the alleged neQlikence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth, Texas Standard Community Facilities Agreement-Palmilla Springs Phase 4 CFA Official Release Date: 02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 1 YEAR i. Developer shall complete the Improvements within one (1) year, provided, however, if construction of the Improvements has started within the one year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of one (1) year from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Palmilla Springs Phase 4 CFA Official Release Date: 02.20.2017 Page 6 of 11 construction of same before the expiration of one(1)year if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. AMENDMENT FOR CITY PARTICIPATION Developer agrees that upon request of the City, Developer shall amend this CFA to oversize the 10-inch off-site sewer main located at approximately at 4,200 LF west of Chapel Creek Boulevard just north of IH-30 and extending approximately 1,515 LF north along the existing tributary as shown in the exhibits attached to this Agreement and the construction plans to up to an 18-inch sewer main, and to establish the amount of funds the City shall pay to Developer for the City's participation in this Agreement to oversize the line.-Developer further agrees that upon request of the City,Developer shall amend this CFA to oversize the 10-inch water line located in Chapin Road to a 16" water line as shown in the exhibits attached to this Agreement and the construction plans, and to establish the amount of funds the City shall pay to Developer for the City's participation in this Agreement to oversize the line. R. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel, and(2) will not boycott Israel during the term of the contract. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Community Facilities Agreement-Palmilla Springs Phase 4 CFA Official Release Date: 02.20.2017 Page 7 of 11 City of Fort Worth,Texas Standard Community Facilities Agreement-Palmilla Springs Phase 4 CFA Official Release Date:02.20.2017 Page 8 of 11 Cost Summary Sheet Project Name: Palmilla Springs Phase 4 CFA No.: 2017-100 City Project No.: 101026 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 322,882.40 2. Sewer Construction $ 598,319.00 Water and Sewer Construction Total $ 921,201.40 B. TPW Construction 1. Street $ 995,358.13 2. Storm Drain $ 646,865.00 3. Street Lights Installed by Developer $ 89,098.00 4. Signals $ - TPW Construction Cost Total $ 1,731,321.13 Total Construction Cost(excluding the fees): $ 2,652,522.53 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 18,424.03 D. Water/Sewer Material Testing Fee(2%) $ 18,424.03 Sub-Total for Water Construction Fees $ 36,848.06 E. TPW Inspection Fee(4%) $ 65,688.93 F. TPW Material Testing(2%) $ 32,844.46 G. Street Light Inspsection Cost $ 3,563.92 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 102,097.31 Total Construction Fees: $ 138,945.37 Choice Financial Guarantee Optionchoose one Amount 'mark one Bond=100% $ 2,652,522.53 Completion Agreement= 100%/Holds Plat $ 2,652,522.53 Cash Escrow Water/Sanitary Sewer=125% $ 1,151,501.75 Cash Escrow Paving/Storm Drain=125% $ 2,164,151.41 Letter of Credit= 125%w/1 r expiration period $ 3,315,653.1E x City of Fort Worth,Texas Standard Community Facilities Agreement-Palmilla Springs Phase 4 CFA Official Release Date: 02.20.2017 Page 9 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Jabez Development,L.P. Jesus J. Chapa Assistant ity Manager Date: p Name: Bruce French Recommended by: Title: Sr. Vice President Date: 1151:110 Wendy Ch -Babulal, EMBA, P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department �/e Lj 7 Signature Douglas Wiersig, P.E. Name: Director Transportation &Public Works Department Contract Compliance Manager: Approved as to Form &Legality: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting Richard A. McCracken requirements. Assistant City Attornf M&C No. N114- )m Date: F �1l/�-- N me: Janie Morales Form 1295: Title: Development Manager ATTEST: FtT V►/ y J./Kayser CJ City Secretary *'• :.� City of Fort Worth,Texas OFFICIAL Standard Community Facilities Agreement-Palmilla Springs Phase 4 RECORD CFA Official Release Date: 02.20.2017 CITY SECi�E ARy Page 10 of 11 FT.V�RTH� 7x Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Cost Estimate Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements ® Paving Cost Estimate Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Palmilla Springs Phase 4 CFA Official Release Date: 02.20.2017 Page 11 of 11 D EATHER ORD y 1. TRINITY `� - w W —R(oRo OHO 8 1 W 121 a CHAPIN PROJECT LOCATION RPNoo M� PHASE 4 I Q q'() 7TH RSNw+o RICH Ro 82 30 SEDAL 30 C o o r 80 287ca Lake _ ngt � ' 820 r `� 0J�- spy MIN 81 �Q-P Q- 496 20 1287 o � 5 i U �O U y� C.F.A.Exhibit for... Palmilla Springs, Phase 4 Vicinity Map Water Project No.56008 0600430 101026 001580 Sewer Project No.56008 0700430 101026 001380 File No.X-24438&W-2503 n c.s.;.`•.< ..: v: i ..., s,_. Sheet No.1 of 1 � WI` i a e 'Z- ............ •�41D4P < _ fie® _ ,l'•c, Sz r Mm?LOW LW r / > s - '- : 1> t c.OSa PALA11EGrf.�krNe /,l�yl S'M1� h ¢ b -e •B +•�'�'fi>/{ EM,SL r N 41 \ a MEN IT _. ( y I 1_ I 11 h I � � 3 1�� > - -'I.- \ �fl/ � � �� `. �. •r ,, r 7�. LEGEND C F.A.Exhihif For... - fA7ST. WATER PROF? GAIF VALVF Palmilla Springs, Phase 4 N Water PROP. wA7ER 0 125 250 Exhibit 'A' PRO? F.H. ASS9"Y l� Wafer ProjectNo.560080600430101026001580 Sewer Project No.56008 0700430 101026 001380 File No.X-24438&W-2503 Sheet No.1 of 1 x�' - ' C.F.A.Exhibit for... EasT. 38'ss ',� ;'%< LEGEND Palmilla Springs, Phase 4 ——— EXsr ss r1,r Wastewater PRA? SS Exhibit Al EMS SWH Water Project No.56008 0600430 101026 001580 Sewer Project No.56008 0700430 101026 001380 EMT 8'SS \\ ? ., PROP. SSMH File No.X-24438 8 W-2503 \\ Sheet No.1 of 1 to'A�F57TE SS — I J 8'aTME SS 0 150 300 a 8'SS STUB A-1 ti \ / y -'x o a 8'SS UNE f ft s p + 8 SS UN£0 O A i wi a s i• s f ) + ♦ t ♦ \ SS : 1 ♦ 8'sscuN + f EGS7. 8'SS a a i � z a -0 i �j"�.>��,[f ` i o r o l `y r''� ♦ '� y � 8'QFfSITE$$ JJ r v y o i r EtlST. BEvsr 8-SS `SS " , 0 .. >,'' a • `'`"..fr i 7r r e ''U it l J✓ sr X i a .r � a �. a itr� 1` � /....-"'",+ ''�` ..`i yyi � ,?`\. •.�t t •! I Grarir3g:L.y�40JEC.'5'075327\cmd\CFA S—A.g ni 11 27,201:-,-&'7un. by`:ruMu_0 Xr f-.x3d-e=st�g.4wg-x3d-siir,atoutcag-x34-sesn.swy-r.'"+-"rarng.d+-y T` ,i,�/f. ,/ off` ✓/ LOT ix BY DEbELQpER ` YYY %t LOT 34x S/DEWALI( --- _ '. BY DEMOPER ` • ©' . \ a \ r —-a F; r LOT lX SiDEWALX !Io ; _ ' i BY DEMOPER ''` AP , .a...: iia:• n ♦ .!/♦ � i a t ii i i a_3 _ a G f— a � I ;__ _ .. ANr(F,��'�;' �` l®I♦ nl • �� �\ ..\�. ♦w a ai a .�\\ , � � x . —`I I }.�_..� a I + a'• •, x �A/[G- �\p\y y%� , t5� 'i a a 4 v l \� / `��� `- • / a,: f f ♦ � ST.I PA�MILLA PRlB�S` '�y • 1,.: C1IAPIN RD S7DL�7Y>I!X BY DfYELOPER Y � ve �.r G.HG N� �a~�••a� „ 6;C �'', ''. n a.� � a C.F.A.Exhibit for... Palmilla Springs, Phase 4 LEGEND Paving CONCRET PWT. 0 150 300 Exhibit 'B' o CONCREIE SIDEWALK Wafer Project No.56008 0600430 101026 001580 Sewer Project No.56008 0700430 101026 001380 File No.X-24438&W-2303 ftxe+i:_::r:'•,r aec*s'•,.irs<.btznwe��,ri�tanes,,cr.�-s �a�;o f ai a,21,z117-4:isa�:,by*,„._o Sheet No.1 of 1 I.cwu'.tqu��' .,afs:x3r<-exiatiagJ. :<,',1-site mnut.cr -elA-raun�uxq P S01//RCP RW RM caw N. ti b b b a, RAW > i GA \ . a t >J`a!{ r IEA7ST.PA'�,U/CLjI SPeitics' Q, ' \ ,> Rep ___ CO j i i 1.� �---e >•� },��/`\ b�•• �• b � 4 1 a n � / �A: Gl- _. ,• � b ,�, ; _l1b__-...�Z 11;gIG HSN B�Uff CL ,� �i'• � / \v, _\ ',`�o \d..-'� e �%�J [ I A C.F.A.Exhibit for... LEGEND Palmilla Springs, Phase 4 PROP. INLET Storm Drain PROP. SD 0 125 250 Exhibit 'B1' Wafer Project No.56008 0600430 101026 001580 Sewer Project No.56008 0700430 101026 001380 Fite No.X-24438&W-2503 2"t?-n: a oy r,,M_n II lcyou!.lu}w" �.ers:.:r:-slvtin,cn-s3a-ei!e ia•*xit.er -,:ip�?, :�.�_ Sheet No.1 of 1 \ \ ` i .ty. � l PROP STREET LK.1lT 1 \ R POINT DR �"- EZT SRifFT LViT .°, x I� ; \� � \r m � •% i� \ ,q �� _ 'iµ E�(ISTII C PALMILLA j$6R�NCS , J ' 'G ry COYOTE CANYON TRL \ s \ e ( t low , l 45 .... g0 NORN _._ Ff C.F.A.Exhibit for... LEGEND Palmilla Springs, Phase 4 Street Lights -� Exrsr. s�REEr LIGHTStreet 'C' PROP. STREET LIGHT o 125 250 Water Project No.56008 0600430 101026 001580 Sewer Project No.56008 0700430 101026 001380 ., :';;.,:',r,F:;_ File No.X-24438&W-2503 Sheet No.1 of 1 ~ �L _� \l f I �`�� ✓/ �// ham\ �i \zb '\ a ,I At 41, bAt •O •y �— _— ® .f IJ b �. � •. �;`lam O,%`t. PD/N DR 'tet;-T .....-.. -•a ,� f i ....... ... i-_ ANG'ALW• RGS •.y/ A'^ / b .p ' /CS // _ b\ / '' D\~ b com7E cnNroN m >\ y o RM h 1 v/ •\ 1 • T< aro7E cRNroN 7Rc v'. �\/ \ '"• ° $ /rr + ap10 f1 v Ri- I _ 41 ,• �'--' , _....-- �� +, �.. - p 0�Nom.�.. ..--i_.._ ��i `..�,✓ rj;?� ��R ��- "ci �! / C.F.A.Exhibit for... Palmilla Springs, Phase 4 LEGEND Street Name Signs • PROP. STREET SIGN Exhibit RC1 r d PROP. TRAfRC SIGN 0 125 250 Water Project No.56008 0600430 101026 001380 Sewer Project No.56008 0700430 101026 001380 Ixarn 0:\PRO•EC6\HI516327\cad CFA Editll9\CFA-c1 street siFile No.X-24438 d W-2503 y \ y�ad.y at Jun 2B 2017-2.59pm by TrWi_0 Sheet No.1 of 1 La t La U yre(s:x3d-matin d -s3d-site la l.d -x3d-paain.dr Palmilla Spnngs,Phase 4 Sheet by Sheet Ouanbbes 1 of 4 ITEM DESCRIPTION UNIT SHEETS TOTAL UNIT COST TOTAL Q� A-1 ONSITE WATER IMPROVEMENTS 6 7 8 9 1 3305.0109 Trench Safety LF 2.489 225 890 0 304 $0.50 $1.802.00 2 3311.0001 Ductile Iron Water Fittings w/Restraint TON 0.5 0.6 1.7 0.9 35 $4,000.00 $14.000.W 3 3311.0261 8"PVC Water Pipe LF 25489 225 890 3,604 $21.00 $75.684.00 4 3312.0001 Fire Hydrant FA 1 1 3 I 6 $4,163.00 $24.978.00 5 3312.0117 Connection to Existing 4"-12"Water Main EA 1 1 2 $900.00 $1,80.00 63312.2003 1"Water Service EA 18 11 28 21 78 $900.00 $70.200.00 7 3312.3003 8"Gate Valve EA 2 5 7 $1,100.00 $7.700.00 SUBTOTAL $196,164.00 A-1 OFFSITE WATER IMPROVEMENTS 10 11 1 3305.0109 Trench Safety LF 765 429 1,194 $1.10 $'313.40 2 3305.1005 30"Casing By Open Cut LF 30 30 $106.00 $3,180.00 3 3311.0001 Ductile Iron Water Fittings w/Restraint TON 0.5 0.6 1 $4,000.00 $4,400 00 4 3311.0261 8"PVC Water Pipe LF 92 92 $33.00 $3.036.00 5 3311.0541 16"Water Pipe LF 673 399 1,072 $68.00 $72.896 W 6 3305.2005 16"Water Carrier Pipe LF 30 30 $131.00 $3.930.00 7 3312.0001 Fire Hydrant EA 1 1 $4,163.00 $4.163.00 8 3312.0106 Connection to Existing 16"Water Main EA 1 1 $2,200.00 $2.200.0 9 3312.3003 8"Gate Valve EA 1 1 $1,100.00 $1.100. 10 3312.3006 16"Gate Valve w/Vault EA l 1 2 $13,000.00 116.W0.00 11 3312.6002 6"Blow Off Valve EA I 1 S4,500.001 $4500.00 SUBTOTAL I S126,71&40 Palmilla Springs,Phase 4 Sheet by Sheet Quantifies 2 of 4 ITEM DESCRIPTION UNIT SHEETS TOTAL UNIT COST TOTAL Q� B-1 ONSITE SEWER IMPROVEMENTS 13 14 15 16 17 18 1 3301.0002 Post-CCTV Inspection LF 651 849 709 447 585 489 3,730 $1.001 $3,730.00 2 3301.0101 Manhole Vacuum Testing EA 3 4 5 3 4 2 21 $300A0 $6,300.00 3 3305.0109 Trench Safety LF 506 849 709 447 585 489 3$85 $1.00 $3.585.00 4 3331.3101 4"Sewer Service EA 16 10 21 17 14 78 $700.00 $54.600.00 5 3331.4115 8"Sewer Pipe LF 506 789 629 447 565 489 3,425 $29.00 $99,325.00 6 3331.4116 8"Sewer Pipe,CSS Backfill LF 60 80 20 160 $56.00 $8.960A0 7 3339.0001 Warren Manhole Liner VF 44 1 1 25 69 $265.00 $18.285.00 8 3339.1001 4'Manhole EA 3 4 5 3 3 2 20 $2,500.00 $50.0007 9 3339.1003 4'Drop Manhole EA l 1 $8,000.00 $8.000.00 10 3339.1003 4'Extra Depth Manhole VF 43 5 I3 6 20 5 92 $240.00 $22,08000 11 9999.9999 8"Sewer Pipe,Method Other Than Open Cut LF 145 145 $260.00 $37,700.00 SUBTOTAL $312565.00 8"1 OFFSITE SEWER IMPROVEMENTS 19 10 11 11 13 1 3301.0002 Post-CCN Inspection LF 900 755 815 740 673 3,883 $1 $3.8839( 2 3301.0101 Manhole Vacuum Testing EA 2 3 4 2 2 13 $300.00 $3.900.00 3 3305.0109 Trench Safety LF 830 755 815 592 673 3,665 $1.00 $3.66590 4 3305.0112 Concrete Collar EA 2 3 3 2 3 13 $137.00 $1.781.00 5 3305.0116 Concrete Encasement for Utility Pipes CY 5 5 $220.00 $1.100.00 6 3331.4115 8"Sewer Pipe LF 140 815 592 620 2,167 $29.00 $62.843.00 7 13331.4116 8"Sewer Pipe,CSS Backfill LF 1 1 53 53 $54.00 $2.862.00 8 3331.4201 10"Sewer Pipe LF 830 615 1,445 $32.00 $46.240.00 9 3339.0001 Warren Manhole Liner VF 19 17 36 $320.00 $11,520.00 ]0 3339.1001 4'Manhole EA 1 3 2 2 2 10 $2,500.00 $25.000.00 11 3339.1003 4'Drop Manhole EA 1 2 3 $4,100.00 $12,300.00 12 3339.1003 4'Extra Depth Manhole VF 14 18 30 18 80 $265.00 $21,200.00 13 9999.9999 10"Sewer Pipe,Method Other Than Open Cut LF 70 70 $360.00 $25.200.00 14 9999.9999 8"Sewer Pipe,Method Other Than Open Cut LF 148 148 $290.00 &42.920.00 15 9999.9999 Connect to Existing Sewer Manhole EAl 1 $1,500.00 $1.500.00 16 3137.0107 Block Ri ra,Dry 12") SY 133 59 56 248 $80.00 $19,840.00 SUBTOTAL $2859754.00 Palmilla Springs,Phase 4 Sheet by Sheet Quarblies 3 of 4 TOTAL ITEM DESCRIPTION LATT SHEETS QTY. UNITCOST TOTAL GI ONSITE PA VING IMPROVEMENTS 31 32 33 34 35 36 37 1 3211.0400 Hydrated Lime TN 32 42 51 37 27 32 221 $134.46 $2974155 2 3211.0501 6"Lim Treatment(33lb/SY) SY 1,941 2,568 3,060 2150 1.540 2,016 13 75 $2.53 $33.838.75 3 3213.0101 6'Canc Pvmt SY 1.813 2.410 2.870 2,106 1,463 1.910 12,572 $34.31 $431345.32 4 3213.0301 4"Conc Sidewalk SF 2,869 3,603 1,712 236 456 8.876 $5.21 $46,243.96 5 3213.0501 Barrier Free Ramp,Type R-1 EA I 1 $1,507.33 $1.507.33 6 3213.0504 Barrier Free Ramp,Type M-2 EA 1 1 $1,551.24 $1.551.24 7 3213.0506 Banner Free Ramp,Type P-1 EA 11 5 $1,495.29 $7,476.45 8 3305.0107 Manhole Adjustment,Minor EA 3 6 6 4 1 l 21 $194.44 $4.083.24 9 9999.9999 Remove S"na e/Barnicade EA I 1 2 $426.77 $85354 -SUBTOTAL $556,642.38 G2 OFFSITEPA VING IMPROVEMENTS 39 40 42 44 45 1 3211.0400 Hydrated Lime TN 6 118 11 134 $134.461 $18,04453 2 3211.0502 8"Lime Treatment(39ib/SY) SY 277 5.597 6,224 $2.74 $1705176 3 3211.0501 6"Lime Treatment(33lb/SY) SY 104 685 789 $2.69 $2.12241 4 3212.0302 2"Asphalt Pvmt Type D SY 1,396 652 2,048 $12.42 $25,436.16 5 3212.0501 4'Asphalt Base Type B SY 1,3% 652 2,048 $22.63 $46,346.24 6 3213.0102 7'Canc Pvmt SY 259 4,243 4.502 $37.80 $170,175.60 7 3213.0101 6"Gone Pvmt SY 98 98 $34.31 $3.362.38 8 3213.0301 4'Conc Sidewalk SF 1,263 18,404 19,667 $5.60 $110,135.2 9 3213.0401 6"Concrete Driveway SF 1.239 1,239 1 $4.601 $5.699.40 10 3213.0506 Barrier Free Ramp,Type P-1 EA 4 4 1 $1,495.29 $5.981.16 11 3305.0107 Manhole Adjustment,Minor EA 2 2 $194.44 $388.88 12 9999.9999 Gravel Driveway Transition SY 141 141 $2125 $2.996.25 13 9999.9999 End of Road Barricade EA I 1 $2,572.50 $2.572.50 14 3231.0212 Smooth Wire Fence,Metal Posts LF 487 340 185 1,012 $7.34 $7.428.08 15 3231.0306 16'Gate,Steel EA l 1 $999.00 $999.00 16 9999.9999 24'Gate,Steel EA 1 1 $1,474.20 $1,474.20 17 9999.9999 Pavement Markin s/Si nae LS 0.5 OS 1 $18,500.00 $18.500.W SUBTOTAL 1 $438,715.75 Palmilla Sphngs,Phase 4 Sheet by Sheet Quantities 4 of 4 ITEM DESCRIPTION UMT SHEETS TOTAL QTY. UMT COST TOTAL D-I ONSITE STORM DRAIN IMPRO VEMENTS 49 50 53 50 1 3341.1201 5'xT Box Culvert LF 133 133 $233.00 $30,989.00 2 3341.1501 8'x4'Box Culvert LF 120 120 $404.00 $48.480.00 3 3341.0309 36"RCP,Class III LF 208 208 $119.00 $24.752.00 4 3341.0302 30"RCP,Class III LF 356 965 1.321 $89.00 $117.569.00 5 3341.0205 24"RCP,Class III LF 53 53 $69.00 S3,65TOO 6 3341.0201 21"RCP,Class III LF 38 38 76 $56.00 $4.256.00 7 3349.5003 20'Curb Inlet EA 4 2 6 $5,500.00 $33.000.00 8 3349.5001 10'Curb Inlet EA 2 2 $3,000.00 $6,000.00 9 3349.0001 4'Storm Junction Box EA 1 1 $2,800.00 $2.8DO.00 10 3349.0003 6'Storm Junction Box EA 1 1 $7,800.00 $7,800.00 - 11 3349.4001 SET,Type I for Box Culverts(8'x4',Sloped) EA I 1 $14,500.00 $14.500.00 12 0241.4401 Remove HeadwalVSET EA 1 1 $1,000.00 $1.000.00 13 19999.9999 6"Concrete Flume wl 6"Curbs SF 285 567 852 $10.00 $8,520,00 14 12137.0107 Block Riprap,Dry(12") Sy 254 28 28 310 $80.00 $24.800.00 15 3305.0109 Trench Safety LF 908 1,003 0 0 1,911 $1.00 $1.911.00 SUBTOTAL 53309034. D-2 OFFSITE STORMDRAIN IMPROVEMENTS 51 55 1 3341.2003 10'x6'Box Culvert LF 90 90 $633.00 $56.970.00 2 3341.0205 24"RCP,Class III LF 348 348 $58.00 $20.184.00 3 3341.0201 21"RCP,Class III LF 54 54 $47.00 S2.538.00 4 3349.5001 10'Curb Inlet EA 3 2 5 $2,900.00 $14,500.00 5 3349.1000 Headwall,Box Culvert(10'x6',Straight) EA 2 2 $85,000.00 $170,000.00 6 9999.9999 Pedestrian Rail per TxDOT PR1 LF 321 321 $147.00 $47,187.00 7 3137.0107 Block Riprap.Dry(18") SY 62 62 $80.00 $4,960. 8 3305.0109 Trench Safety LF 402 90 492 $1.00 $492.00 SUBTOTAL S316,831.00 E-I ONSITESTREETLIGHTIMPROVEMENTS 60 1 2805.3015 2"CONDT PVC SCH 80(T) LF 1,545 1.545 $6.531 $10,088.85 2 3441.1502 Ground Box Wth Lid and Apron-Small EA 11 11 $397.001 51.367.00 3 3441.3002 Rdwy Ilium Assembly TY 11 EA 17 17 $1,755.00 $29.835.00 4 3441.3301 Rdwy Ilium Foundation TY 1 EA 17 17 $868.00 $14,756.00 5 3441.3401 "-6 Triplex Alum Elec Conductor LF 1,545 1$45 $2.551 $3.93975 SUBTOTAL I S62-986.60 E-2 OFFSITE STREET LIGHT IMPROVEMENTS 60 1 2605.3015 2"CONDT PVC SCH 80(T) LF 1,055 1,055 1 W531 $6.889.15 2 3441.1502 Ground Box vdth Lid and Apron-Small EA 2 2 1 $397.001 $794.0 3 3441.3002 Rdwy Ilium Assembly TY 11 EA 6 6 $1,755.00 $10.530.00 4 3441.3301 Rdwy Illum Foundation TY 1 EA 6 6 $868.00 $5.208,00 5 3441.3401 6EE Triplex Alum Elec Conductor LF 1,055 1,055 $2.55 $2,690.25 SUBTOTAL $26,111.40 TOTAL $2,652,522.5 Developer and Project Information Cover Sheet: Developer Company Name: Jabez Development,L.P. Address, State,Zip Code: 1038 Texan Trail, Grapevine TX 76051 Phone&Email: 817-507-1100,bruce.french@historymaker.com Authorized Signatory,Title: Bruce French , Sr.Vice President Project Name: i Palmilla Springs Phase 4 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: West of the intersection of Chapin Rd and Chapel Creek Blvd Plat Case Number: I None Plat Name: None Mapsco: 72J Council District: 3 --- . _ _ ...... -_ ........... --- CFA Number: 2017-100 City Project Number: 101026 To be completed b staff.• Received by: zlx4z Date: ld Q� 1234 .5 N RE�ENEo c t 1 2011 C1N�F FOR1 WONZH �, � C1N SECR�ARY �a d City of Fort Worth,Texas Standard Community Facilities Agreement-Palmilla Springs Phase 4 CFA Official Release Date:02.20.2017 Page 1 of 11