HomeMy WebLinkAboutContract 49788 Developer and Project Information Cover Sheet:
Developer Company Name: D.R. Horton-Texas, LTD.,A Texas Limited Partnership
Address, State,Zip Code: 6751 North Freeway,Fort Worth,TX 76131
Phone&Email: 817-230-0800, mpallen@drhorton.com
Authorized Signatory, Title: Mark Allen ,Assistant Vice President
Project Name: Oak Creek Trails Phase 3B
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: Northease corner of F.M156 and Double Eagle Drive
Plat Case Number: FP-17-006 Plat Name: Oak Creek Trails Phase 3B
Mapsco: 642-U Council District: 7
CFA Number: 2017-108 City Project Number: 101022
To be completed by staff.-
P
4
Received by: Date: d 7
,\ 23456 �
WOI N
(9`9Slip, £ Z `�d
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Creek Trails Phase 3B
CFA Official Release Date: 02.20.2017
Page 1 of 11
Q 1- 3 4 Ss
,`�' RECEIVED o
� C1T'I OF CP
F0R1 wORTN ti
STANDARD COMMUNITY FACILITIES AGREEMENT
� C1TY SECAECARY S'.a
STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. I
WHEREAS, D.R. Horton- Texas, LTD., A Texas Limited Partnership, ("Developer"),
desires to make certain specific improvements as described below and on the exhibits attached
hereto ("Improvements") related to a project generally described as Oak Creek Trails Phase 3B
("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
R Developer shall provide financial security in conformance with paragraph 6, Section 11, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Creek Trails Phase 3B OFFICIAL RECORD
CFA Official Release Date:02.20.2017
Page 2 of 11 CITY SECRETARY
FT.WORTH,TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) ®, Sewer(A-1) ®, Paving(B) ®, Storm Drain(B-1) ®, Street Lights & Signs
(C) 0.
E The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section 11, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified,insured,licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure,and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Creek Trails Phase 3B
CFA Official Release Date:02.20.2017
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
L City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Creek Trails Phase 3B
CFA Official Release Date: 02.20.2017
Page 4 of 11
J Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such iniuries. death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
mercers. servants, or employees.
NL Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with,the construction of the infrastructure contemplated
herein, whether or not such iniuries. death or damages are caused. in whole or in part,
by the alleged negligence of the City of Fort Worth. its o,xtcers, servants, or evees.
Further,Developer will require its contractors to indemnify,and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Creek Trails Phase 3B
CFA Official Release Date:02.20.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2) years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Creek Trails Phase 3B
CFA Official Release Date: 02.20.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and (2)will not boycott Israel during the term of the contract.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Creek Trails Phase 313
CFA Official Release Date: 02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name: Oak Creek Trails Phase 3B
CFA No.: 2017-108 City Project No.: 101022
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A.Water and Sewer Construction
1. Water Construction $ 321,040.90
2.Sewer Construction $ 287,321.43
Water and Sewer Construction Total $ 608,362.33
B. TPW Construction
1.Street $ 779,618.05
2.Storm Drain $ 448,317.50
3.Street Lights Installed by Developer $ 6,600.00
4. Signals $ -
TPW Construction Cost Total $ 1,234,535.55
Total Construction Cost(excluding the fees): $ 1,842,897.88
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 12,167.25
D. Water/Sewer Material Testing Fee(2%) $ 12,167.25
Sub-Total for Water Construction Fees $ 24,334.50
E. TPW Inspection Fee(4%) $ 49,117.42
F. TPW Material Testing(2%) $ 24,558.71
G. Street Light Inspsection Cost $ 264.00
H. Signals Inspection Cost $ -
H.Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 73,940.13
Total Construction Fees: $ 98.274.63
Choice
Financial Guarantee Options,choose one Amount (Mark one)
Bond=100% $ 1,842,897.88 x
Completion Agreement=100%/Holds Plat $ 1,842,897.88
Cash Escrow Water/Sanitary Sewer= 125% $ 760,452.91
Cash Escrow Paving/Storm Drain=125% $ 1,543,169.44
Letter of Credit= 125%w/2yr expiration period $ 2,303,622.35
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Creek Trails Phase 3B
CFA Official Release Date: 02.20.2017
Page 8 of 11
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
D.R. Horton-Texas, LTD.,
a Texas Limited Partnership
By: D.R. Horton, Inc.,
Jesus J. Chapa a Delaware Corporation,
Assistant Ci y Manager its Authorized Agent
Date: 0
Recommended by:
ame: Mark Allen
�p Title: Assistant Vice President
ej, Z
Wendy Chi- abulal, EMBA, P.E. Date:
Q' Q.�tai1
Development Engineering Manager
Wa er Department ATTEST: (Only if required by Developer)
Douglas W. Wiersig, P.E. Signature
Director Name:
Transportation &Public Works Department
Contract Compliance Manager:
Approved as to Form &Legality:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
Richard A. McCracken ensuring all performance and reporting
Assistant City Attorney, requirements.
M&C No. N��
Date:
Form 1295: N//:*-- ame: Janie Morales
Title: Development Manager
ATTEST FOR..
O: O;P
M6Y J./Kayser
City Secretary
••7FXP5
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Oak Creek Trails Phase 313
CFA Official Release Date: 02.20.2017 CITY SECRETARY
Page 9 of 11 FT. WORTH,TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A:Water Improvements
® Water Cost Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Cost Estimate
® Exhibit B: Paving Improvements
® Paving Cost Estimate
® Exhibit 13-1: Storm Drain Improvements
® Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Creek Trails Phase 313
CFA Official Release Date:02.20.2017
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 101022
None
City of Fort Worth, Texas
Standard Community Facilities Agreement-Oak Creek Trails Phase 3B
CFA Official Release Date: 02.20.2017
Page 11 of 11
TEXA S MOTOR
PEED WA Y
VICTORY CIRCLE
Cc
JPS
CnP �
TEXAN P� (S—H——11-4—)
41
ti 0�y0
DOU BLE
Fel ]j� �y® °�]j�l]l�.T I 3 5 W
cocn Pbeth L l�d'7111 TION
N
W E
0 T jRTH
a ITY LIMITS S
0.
a
M
VICINITYMAP
< KLi
LLU
re)
-n
REED T C.)ARTL 1 10
H
PHASE 3B
0
0
LOCATED I V
Ul
CrTY OF FORT WORTH, TEXAS
a
i
Ul
0
L
LD t GLOPERIOW NEW
�c PREPARED BY:
D • R • HORTON ��� _
HAUN
6751 North Freeway CML�i�S�N SURVEYORS
Fort Waith.Texas 76131 3405 Mvo.%o,,,,,, Tmme 7W51
v Phoma:(817)230-0800 Mean(e»)32I)JIM
Fax:(817)230-0896 AUGUST, 2017
w
OAK CREEK EIEK SN
WE
]PHASE 31B
NOTE: S
ALL WATER LINES SHOWN
WATER 37 3e 35 ARE 8' IN DIAMETER. SCALE: V�303>
ipNRnRl ET 11 A 11 3< 33�
lliLlVCllllllDllll N /32
3f
3p
3e 29 ,
OQC
39 <0 ,5 27
25
51
A6
3 53 52 90 e9 24
LEGEND I " 23
R �
-W PROPOSED WATER LINE 5A - 22551
2 10
W EXISTING WATER LINE y`� ° ! �'I^I s 6 I ] a 9 y
1777 L 2°
51
PROPOSED FIRE HYDRANT ASSEMBLY 1a T 1
SS e2 21 20 19 l6 V 165 i]I 13 12 i._11 1 19 le t] 5
►� PROPOSED GATE VALVE 59 Ss
b f,
EXISTING FIRE HYDRANT ASSEMBLY i. T-- —r— 4 53
6f
D4 EXISTING GATE VALVE 52 j 2 3 J i' x9 10 u z 1 < 151 16 v is 11 10
37 36
3A �32 131 3° 29 28 27 26 25 24 23 22 21 - 19
9
65
65
67 f 2 3 < 5 1 6 7 a 19 fa fi N 11 6
1 2 3 � 5 6 7 8 9 Sa 5
M
59_� 2l 20 19 .1 l]1161 15 1 1/ 13 12 5 .. .. ..... _ a
LCPN R 100317 di 24 23 22 21 20 19 16 17 16 15 14 13 12 3
CPN A 1003!3x
M
9 la 11 12 13 1t SS 16 17 SB
D • R • HORTON PREPARED BY:
6751 North Freeway G OODWI[N 9
Fort Worth,Texas 76131 MAUI L 11
Phone:(817)230-0800 CIVIL ENOINEUM-PLANNERS-SURVEYORS
Fax:(817)230-0896 24N M°N1q 13tH,o1ww1°s,Tm 76061
M6°0 R17)3204373
E1\10644- Oak Creek Troils\Plans\Oak Creek Trails 38-CFA.pro 13 Sep 2017
N
®AK CREEK 1RES W*
E .
PHASE, 3B S
SAIYUARY SES SCALE: 1" 300'
MUBBTr"A—V
~`s
37 35
35
3a s�
33
32
31
29 S
39 40 41 7 27
NOTE
' 43 25 s\ ALL PROPOSED SANITARY SEWER
53 51 5049a% '15d6 a 24 s LINES SHOWN ARE 8' IN DIAMETER,
1'M4Ki 23
54 r 22 LEGEND
$ 1 2 3 1 4 5 6 9 f0 PROPO2120 s S SEWER SL NE ED SANITARY
] e
51EXISTING SANITARY
56 22 21 23 I9 1S 17 f6 15 14 13 12 11 l9 F. 11 16 15 4 SEWER LINE
59 g
14
- -- - PROPOSED SANITARY
i3 v SEWER MANHOLE
6f 1 2 3 < 5 fi ]
e 9 f0 1f f2 f3 14 15 le v fe t1 CAV#100313 O EXISTING SANITARY
63 rrI ...... 10 SEWER MANHOLE
6_4 3� 34 33 32 31 so z9 za 2] 26 25 24 23 22 21 20 19 9 PROPOSED SDR-35 SANITARY
Q- 6 SEWER SERVICE
ti 9 s ] \ EXISTING SDR-35 SANITARY
67 ` 2�3 4 5 6 ] 6 1 w 11 6 —1— SEWER SERVICE
� 1 M
24 z .............. -
21 1221 19�16 1]�16 35 14
13 f2 1) 3 22 21 20 16 16 v] 16 15 14 I 13 12 IJ'
tI `I 3
....._ - .._I....... S
IDEVELOPER/OW1476R: w 1 _
9 t0 if 12 13 14 15 16'17 1e PP"AF BY:
D • R • HORTON _ GOODWH41
6751 North Freeway MAMHALL 9
FOR Worth.Texas 76131. CML ENGINEERS–PLANNERS–SURVEYORS
Phone:(817)230--0800 t"4m M ft"Dore.G1ePYV—.Taw 76061
Paz(817)230-08% Metra(61 7)32w-13]3
E.\10644—Oak Creek Trails\Plans\Oak Creek Trails 36—CFA.pra 13 Sep 2017
OAK CREEK S W+EN
PHASE 3B S
'STREETS^ SCALE: I"_300"
37 LEGEND
3s
36
33
1 31
T % SIOEWALK PER THIS CONTRACT' PROPOSED 29'B-B ROADWAY
SIDEWALK PER THIS CONTRACT J � 41 6/ TOHICK REINFORCED
l
14 CONCRETE T CONCRETE PAVEMENT
45
53
4
53 �51 �I49 gpp�A1.f � 24
J ��._..�._.�RPi4e14f1t_
55 T 2
M' rg 10
p
1--5=]- 1_ 8 -SIT
(/ 58 21 I p Ig to[ 17�... .� 19'IB I6
09
I 116 15 16 l3 f2 1l 15
13
900
3 4 6 7 0 i 9 IO IS f2 f3'l4 15 l6 1 177 18 1l
1
643 I.— 10
��131 3] 29 2B 2] 25 25 24 23 M 21 V 19 9/
65
64- 35
r- --- _(
`a f - 'P"�-- / � $10EWALK PER THIS CONTRACT
�2 3 d ................ M 31 6
6] I 5 6 7 8 9'10 1 1 2 3 4 5 6 7 8 9 f0
21 I p 19 16 1] f6 45 14l I ... ._ 60C M
f311 12 1 24 23 22 21 W 19�111 I..1�3 12 l Ir-3
4IYly 1 J\\ I�
2`
9 10 i 1f�12'13'14 15 f6 f]I l8 -
D • R • HORTON OGDVIW,
6751 Nath Freeway MApgg)(.ALL Il
FortWorth,Texas 76131
CML F1401NEEF8—PLANNERS—BIIFYEYOR6
Phone:(817)230-0800 2405 Muwbrp on...oma.,T—79051
Fax:(817)230-0896 MWO tem 329-4378
E \10644 -Oak Creek Trails\Plans\Ook Creek Trails 3B-CFA.pro 3 Aug 2017
OAK CREEK EIEK S N
PHASE 3B W*E
.STORM DRAIN
LEGEND
3) 35
35
34 33 PROPOSED STORM DRAIN LINE
M
31 EXISTING STORM DRAIN LINE
30
3 401 4128 PROPOSED STORM DRAIN INLET
43
4d yr
d5
52,51 46
53 `�49 q� l•n.t. 2d
_iRAP48dd1X 0•N£T 23
es-
21i
r �-
401f 3 I° 5 6 ) B l5' to
ET 2a
21
� 19 1S 1) 16 15�-U 13 12 11 19 1B 11
Ifi l5
ro 10 14
)T-
51 r 1-I 2�g 4 5 Ix al M.�T 2
6 ]� 9 f0 11 12 l3 Id 15 16 1) 1B 11
63 p; 10
L 37L 36 35
TI2
6, 3d 33 32'31 30�2g 20 2) 2b 25 24 23 122 21 20 f9 9
65 E I Iii WI Ei B
' 2
3f4 4 g;ap(111 I'rA r 11\ 6
6] 6 f6 ] \
69 /21 19 18 f7 I6I 15114 f3 12 if Y !�. 3 22 21 20 19 l0 I] 16 13 1d L3 sa
£.ro vd 3
]S, Z
EY.a'YLET N '
DEVEWPMOWNM* 9 to
l3 14 15 16 1) is
D • R • HORTON PREPARED BY:
CuCODWINe
6751 Nath Freeway }MUHA,p+Y
Fort Wath,Texas 76131 CML ENGINEERS-PLANNERS-SURVEYORS
Phone:(817)230-0800 2da6MIIWrg0 .Gray" ,T—)6061
etr
Fax:(817)230-08% Mo rem 3294373
E.\10644 -Oak Creek Trails\Plans\Oak Creek Trails 3B-CFA.pro 3 Aug 2017
OAK CREEK S "
P11116 SE M W E
STRMUGHTS
1EXmr"c" SCAM: V 300'
37 M
3d
33
M
31
30
29
2 28
39 1 41/T
2]
LEGEND Q 43
44 �
45,
24
52 �
2' PVC CONDUIT 53 3f I—4
9 47 ) 23
[[
54 /.
LIGHT POLE
f $ Y 21
EXISTING LIGHT POLE . lfKf 1 2 3 4 5 6 7 6 9 \]o
" zo
TRANSFORMER ON PAD 57
5B 22 2l a l9 W 17 is LS 14 13 f2 11 l9 1a 17 f6
HAND HOLE ® s9 5
14X--77 7 3
61 1 21 4 5 6 ] e 9 10 31 12 13 1d 15 Ifi 17 w �1f
62 L
63 ]0
37
60^ 33132 31 es 27 3 25 24 23 ]2 21 20 19 9
65
L_ 6
66 — — 7
_^ 1
67 2 3 d 5. .6 ] 6 9 ._- M
l0 1 2 3 415 5 ] 6 9 f0 6
Be
69"; 1 I
y
21 20 19 1B .... `` d
17 161]y 1d 13 12 11 24 23 22 21 V 19 1B 1] 16 15 14 13
2
N 1
9 14 11 12 13 Id 15 Ifi 17 18
I 1
DEVE1.0?W, 0WNEd:
PREPARED BY:
D • R • HORTON GOODWIN3
6751 Nath Freeway MARSHALL 9
Fort Wath,Texas 76131
CML ENCINFFiB–PLRNNERS–SURVEYORS
Phone:(817)230-0800 2406 MuMW thM,CM*PMIM,Tw 76051
Fax:(817)230-0896 Mebo t817t 323+373
E:\10644 -Oak Creek Trails\Plops\Oak Creek Trails 313-CFA.pro 3 Aug 2017
OAK CREEK EIEK S N
PHASE 3B wE
STREET SIGNS"C-111 SCALE:�V'=300'
3] 35
LEGEND
32
31 30 PROPOSED STREET NAME SIGN
38 �
/-,g
b d1 2]
25
13
� "
45
52 dfi
53 51 50 49 SL09 47 24
.�RM6byCK
23,1"
56 Y 21
('�-�°,W`7 f 2 3 3 4 d 5 6 7 B
t�� 9 f0 \ 20
58 22 21 20 19 is 17 16 15 I la 13 12 If 1918 17 18
15
14
13
61 1 2 34 5I 6r x _ 12
B 9 10 11 12 13 1d15 16 17 IB
62 1 Si
63
10
37 3fi
33 32 3l 30 29 2B 2] 2fi 25 24 23 22 21 20 19 9
65
66 7
6] 1 / 2 3 45 6 fiLOIX Y 11 8
l 2 3 4 5 6 ] B 9`10
66
16
21
20 l9 19
1d I f] l5 P3 72 1 AA
i 2d 23 22 24 p 19 16 1T U —3 l2 d`—
2
N T -1
9 10 11 12 13 14 15 16 17
DEVELOPER/OWNER:
D ' R • HORTON PREPARED BY:
c300DWINe
6751 North Freeway }\/��g,�HAU 9
Fort Worth,Texas 76131
CML Pl1O1NEER9—PLANNERS—SViNEVOflB
Phone:(817)230-08W 2106 M. DrK%GrmmAm,T—76061
Fax:(817)230-0896 Meso(817]3294373
E1\10644 -Oak Creek Troils\Plans\Oak Creek Trails 313-CFA-pro 3 Aug 2017
IllID DATA
CUHW DATA
if
!!E
dN
'e VICINITY MAP
OR.
LLz;tNO
Ll I-
V7
6mml D-R-HORTON
T—
GOODWINI
UARSHAU V
� 6e fsu+,000„m
kIlk
q 2.-2,
W_ rx'�- ®oo ay o:�:. c ` �� ��1 ww
CLAY CREW LANE
FINAI�PLAT
...........
..........
SHEET 1 OF 4
.............
&
SIC M BWcK
OAK CREEK TRAILS
MM M.
\\� HATCH LINE
SEE SFEET 3
31.
n
/ (
MDM MEAD DRNE -— --L ],Q
s,
_—
�FGIAl PWT
SEE SHEET I FOR
mz 9
LINE AND CURVE DATA lois -le.emccv
Iola i-,e,H1oeH v SHEET 2 OF a.,
RO
109 1-66.bZ 6TY.HfOC{Y
D R HORTON GHOODWINI OAK CREEK TRAILS
PdAARSHAT T 1 m.ea uHes
ro���u1 c1m moo..��r.�,o, +zm eaxvex�emeact xo.eve
ro�mrawtaoon�--�`a,,,;' � arr`o lost conte 6vmx rouxrc,Tam
P¢01'R fD-000 nd..eau �MT�IM.ii` b a.�MIYt 101]�]YPp 9PYl mfs
m,RUI,Go¢I100 01!18 Qele
I �
s�
%
// I! r------ ------ -- -------
J, ^a..r------
1 — --
O
i 1O ulx.rs. i..
o n.
% � � 1 �i, — •�_ ,�, •� � v-� vv ���, of
ural Erre
m.--�sNrEr z •
�
SEE SHEET I FOR
5 1 I•_ -W ��u e \\\ LINE AND CURVE DATA FINAL PLAT
o:e�n�cc v SHEET 9 OF 4 jwj
• I I --.— ,/+ ei: IeTB l-m.BIDCL Y
leis aY-e�,eu awn x
'u OODWIN� xoO,-ea,ee[ev.RAIL u
p,FpFI3uAri.� OAK CREEK TRANS
D•R•HORTON
e,a
fa w.nYa. u, neBBan B606'L'YR,ou oa .mes
�mimaBam ao-oo aY r.m¢w'�.'.'� ,ee Res�cmu rtme eo'>oew sv.ca
P,+1�aBR
_7-
4p
Z
IT.
MM,
TT�
I°a7 9wmmn
v.-lzll-1 V I
CI TY PLAN COMMISSION dN. SP
CITY 6 FTBiT WORTH,—AS EE
11F-:5 B"t
FINAL PLAT
SHEET 4 OF 4
A—
OAK CRREK TRAILS
D-R-HORTOR
R.CAiNEYAWPF4�Na 7
—.1 N C-
-17
x-2 435
THE CITY OF FORT WORTH TEXAS a
FORT WORTH PLANS FOR THE CONSTRUCTION OF
WATER, SEWER, ]PAVING, DRAINAGE
& STREET]LIGHT IMPROVEMENTS �
TO SERVE
OAK CREED TRAILS, PHASE 3B
WRT17, Iia; ,ZocA-.4
ra AVX Mac."R :
INDEX
ZOIN .1 � .., .
�WtW,
TEXAS Mar r'b. °Y` siw
PEEDWAY
a. swreav �•r+•
1°1miwac°°'�•,rEY11p,3w wwc.wwrronc Y➢
DAVt3� C(7{tiK$ � �rwrimn">w'bcM..ry04�'vaE ..0
g
C
PT7 oR,WU7tKSDBPARTYCNT n°+" a.'•ae.owo.ao ai:.'e wN'°n..
K/+RA
WAL. SHotJR0I2g '°' °.rowua•g-
rRm
LOCAT*A MAP
Vdi. YM�T 4'b+r i%r.1u
_ _6n. 1TII'10.W[cTAW
• u: moY��eir.s
MAPSCO N0. 64£-U
ti•L� �c `t f�r._17 �
COUNCIL DISTRICT , 7DOUD - W{ERSIG. P.E. — Dn7'
•� DIRECTOR'TRANSPORTATION AND PUBLIC WORKS
CITY PROJECT NO. 10102T �m
WATER PROJECT NO.�•1��"�1 Asx:
(�R 1 O t���,� n��sY: GR#Y M1�S�fiE9! �
SEWER PROJECT NO.• AM-V-mIQ13-001380 D R HVacoDwim
r"FA...yWz
csirtee,aeauae.n.
FILE NO. X-24M& -2 M Pott ersFNw7lF3!
pYoex(EI7001l1ABfl r.oi.�a�a+raa 9dfliid38R - k
X-x4435
tam
D.V-Bmt#OPQSAI-
hpldl
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project lum Ink-hon Biddle.Propoml
Bidb91tao Uuitof Bid shat Numbs and
Daaipb- spa
afwliw 8ectkn N.. � Q-.W unit Price Bid Vdae Q-ory
PIT 1-WATEI IMPROV 4 5
1. 1_8*PVC Water Pipe. ._._. 331710T3311Al2 LF 5x767 522,.80 5130,334.20 2928 2639
2 3312 3003 8 Gale Valve d Valve Box 39,12 20 EA 14,_ 57,300.00 518,20000 6 6
3 3312.0001 Std.Fire Hydrant Assembly wl 6'Gate Valve 6 331240 EA 7
Valve Box $3 400.00 Z23 800)00 3 4
4 3311.0001 Ductile Iron Water Fittings wl Res!TiM 33.1117 .. TON 2.3 57,100. 578.330.00 Li 1.2
5 3305.0109 Trench Sat 33 0510LF_- _S 767 5010 _ -�
.. ...... etY .. ....... ...... 8570.70 2926 2839
8 33122103 1 Water SeMce 331210 EA 166 ,, $75000 124,500,00 90 76
__..... __. .... 5.
...... 7.__.3312 2103 1 Irtigalan ServiceW.. .. _......... .. _ 3411210 ............ EA _.1 S90000 1
82
3312 2103 -Imgalion Service 1312 10 EA 57,100,.00 S2 8,0,0.00 1 1
9 3312.0117 Conneclan to Extsting 4"-12"Water Main 33 t2 25 EA 4 590D.00 $3 800,00 I ;
TOTAL UNIT I:WATER IMPROV $321,040.90
It:SANITARY 7 8 9 10 11
1 3331.4115 8"SDR-35 PVC Sewer Pipe 33 11 10,33 31 12.33 LF
---
.............._.._._-..__..._.-.....,..,.................._..........._..___..._.__.._.._...__._..__'__ .....,....,...._3:1.20--1_.._.... .._4 ._.....-....WS24.00 5104x831.93 1753 1503 1112
2 3331 3313 8"Sewer Service,Reconnection_ 333150 EA 2 ._ 57,000 00__ 52-000,00 2
...,.._.... .. .. ..._.. ..... .._.. _. .__ ...
3 3331.3101 SDR-35 4-Sewer Services 3331 50 EA 142 $800.00 885 200.00 90 52
4 33391001 4 Std.Dta Manhole ._.,. 333910 333920 EA ,.,.,._22,_____ 52,430.00 553480:00 14 6
5 3339 1003 Extra Depth for 4 Dia.Manhole 33 39 10 33 39 20 VF
43 $14500 _. $8,235:00 26 8 7
6 3339.0001 Warren Epoxy Manhole Liner„.,,_ ,__. ...- 33.39 60 VF 11_.. __5200,00 _$2x100:00 6 5
7 3301 0101 Manhok Vacuum Testing....... ......... ......... 33 01 30 .._. EA ... _..23 ....._511000 52.530.00 14 9
_ .. .. ....... _......... ...... ........ .............. ..
'3331.4116 8"PVC Sewer Pipe,CSS Bao ftl_,.,..._,.,._ ,..,,,.,._33 1116 33 31.12,_33 LF__ 309,... .. _ .547:00...,_„__$12,889.00 149 so so
0330.0001 Concrete Encasement- ,» ....033000 . _._ LF 20...........__550.00._____$1,000.00 20
16 3301.0002 Post-CCTV Inspection 33 01 31 LF 4 677 1.50 $7015-50 1902 1563 1192
11.. 3339.1103......Drop Manhole.... � � .. ,__.. ,..,..33 39 10,33 39 20, FA ,1,-„_.._._._54x . ..34,. 1
.._ 12 3339 1103 S Exba Dcplh Manhok ____, 33,39 10,33 39 20 .............VF 5 .....$220.00 51 100.00 5
13 3305.0109 Trench Safety 33 OS 10 LF 4 877 SY.00 $4.677.00 1902 1583 1192
$287,321.43
I IN:DRAINAG E IMPROVEMENTS 38 39 40 41 42 43
7 3349.5001 10'Depressed Curb Inlet 33 49 20 EA 12 53,600.00 $43,200.00 4 4 4
. 2 ....3349 5002 15'Depressed Curb Inlet .....93.49 20.......... .EA 4 .....54.,900 00 519,800.00 2 2
3 3341.0201 Zi"Class III RCP...._...___..-._.._._........................._.....,_-_..._33.4..10....._._ ...._- --..._281_....... _W$5§:00 ,455,00 151 29 71 30
4 3341.0205 24"Class III RCP _ 3341 10 LF 2 247 585.00 $14605500 717 308 655 a76 89
5 3341.0208 27"Class 111 RCP 3441 10 LF 77 371.00 55 487.00 77
.__._8..__. ._141:0302 30'Claw IN RCP. _._._._...._......... 3541 10 LF _.113.__.: ....__.__ .__ ......_._S9r288.00 70 43
.,_. 7 3341 0405 42"Class III R C P. _._.__. 38 41 10 LF $100,014,00 209 424
........_8..........3341.0409 48"Class lll_R:C.cP:............_........_..........._....................._.._......................_3341._1.0..........,,......._._ .............._300:._.....,..........._5792.00..........._558,752,00 306
................._...
9 3349.0001 4'Storrs Junction Box ,,.33 49 10 EA 2_ __,-._33,800.,,00 _____$7,800;00 1 I
10 3349.0008 Bk4'Sbnn Junction Box 34 49 10 EA 3 S5 400.00 Sib 200.00 21 I
mm 11 -i.0006 6k5:Stonn Junction Boxmm_ --_ _ ._._35 49 10 _ _EA 1 .., _ 55,800.00_ 55 600.00 I
12_3305 0109 Trench Safety ..._.._._._.___._..___._.._ 33 05 10 ._ LF......._..3,857 ._.`
..__._ __......_ _..... __ _ _. _ __ _.._..._�`� ..,.,,_._.51,828;50 1224 759 422 685 478 L
13 3349100324"Flared Headwall l pipe.......... 334940 EA 2,., .,$1,80000 53,800.00
.. .9 ... Flared
_._.......... ........... .. .. _.......... . . ......_..- .... ....._..
14 3349 1009 42"Flared Headwall 1 papa 344940 EA 1 _$3,000 00 000.00 1
.. 15 3348.1011 W F_4Md Headwalls 1 pipe..........W....._._ ...__.. .35 4940 _._..._ ._....__1._.._. _ 53, OO,W__.._._$3,200,00 1
16 3138.0104 Install Twisted Gabion Mabess 313600 SY 68 5110.00 S7 480.00 32 32 4
�- .....,.,.. _ .__...__ ____.._...
17 9999.0001 Connect to Extsteg_24". _..............._....................._......__...__000000.._.._.. _.,_E`__..__J-__._...._...... ...:_60._....__....$500.08 t
18 5.0112 Concrete Collar 330517 EA 5 .00 $1,500.00 2 2
TOTAL IT IN,DRAINAGE IMPROVEM NTS $448,317.50
Bid Summary
UNIT I:WATER IMPROVEMENTS $321,040,90
UNIT II:SANITARY SEWER IMPROVEMENTS $287,321.43
UNIT IN:DRAINAGE IMPROVEMENTS $448,317.
Total Cowtruction Bid $1,056.679.83
Performance/Payment and 2-year Maintenance Bonds $20,000.00
Gn.d Taal $1,076,679.83
C.ak.crr.g-l.wmpl.l.WORK 6,FINAL ACC9"ANCL wahla taltadar dry. fkr dr dal.whnW
CONTRACTp,.4ded l.d.(ae..al C.mad-
QTTUFpOar-`rr
srwrm,atomras7au.-rron.ppap3cwnou DocTaslm-oev¢apBa wwweDmpaorecrs
pas V�e.yY��1.AU 6wD..Oad nub 3B
DNP-PID PR01'06AL
Pya]or]
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Projzt[um INormedm eidderr Pmporel
eidlisr llcm Urdt ofBid Shccl Number Rntl
No. De+�^Plio^ SpcciCwian Salimi Na. MessWe Qvamity U.Pnoc Bid Value ORyu
e'
UNIT:PAVIN IMPROVEMENTS 24113'1
A 25 26 29 28 29 30 31
_1 3213.0101 6`Concrele Pavement ResidenGel�, 321313 _y _SY _ 19609 31.95, E632897.56 27199 36n 32a IaT2 27e7 2911 ISos ]saa
2 32110501 6 Lme Treated Subgrade,(Res denaal) 3211 29 SY 21,780 .....;2:15 $46,84850 29910 4001 356 1619 3066 3202 1611 3.11
_3 3211.0400 H d led Lime 3010sJS.v R sId tat 321129 TON 327 $150.00 49050.00 455 60
._,_.__ --- Y _--@ ._(_._ _L__ - ,___ _,�--� _ -__..__ ,_...�_. _w s z4 46 4s zs ss
4 3213,0504 Barner Free,Ramp Type M-2 321320 EA 8...,, $1,900.00 $15,200,00
... .. ...
5 32130506 Bamer Free Ramp type P-1 321320 EA 16 $1650.00 $26400W
32130301 5 Concrete Sidewallr _ 32,1320 LF 246 ___$25M $615000 n 110uo
7 9999.0004 Connect to Cut B Gutter 000000 LF 116 $7.00 $812.00 29.00 29.00 2900 29.00
9_999.0006 Install End of Road Barricade 000000 EA 1 $1,500.00 „$1500X00 09999.0007 Remove End of Road Bamcade 000000 EA 3 $250.00 $750.00 Lon 100 Iao
__10 9999.0011 Conuethloeder 000000 EA7 10.00 10.00 0
PAVINGTOTAL UNIT JU. NT $779,618.05
UNIT1: E I N IMPROVEMENTS 24 14A 25 26 27 28 29 31
1 9999,0006 Slrael Sign w/Slop Sign(Ga'
van—d Post) 000000 EA �10�$40000 $320000 2 1 '2 9999.0009 Str e[Sin w/a Stop Sgn�Gal an zedPost) DOEA0 Street Marker Blades Installed on above osl 000000 EA 2500 $1000.00 2 4 2 x x z 2
IT II: TRE T I IMPR VEM $6,600.00
Did Summ
UNIT 1.PAVING IMPROVEMENTS ary _ $779,618.05
UNIT II'STREET SIGNAGE IMPROVEMENTS $6600.01)
TOra]ConnrvM Bid $788 219.05
Performance/Payment and 2-year Maintenance Bonds $v 200.00
GrtlM Toll 1 $797,418.05
CRmragar a{rtu 1p wrry]Me WORKTor TINAL ACCDl'TANCE xkhiR,�1'�,]`� OWw4u dnrr after IM1r tlarc 4vMn IM
CONTRACT romlrcxu[0 run a pmrWOd in the CeneN Condnbor.
CITY OFFMT WOM
CON6mrULTTON 9P¢CIFlCATC4]WCUMEMS-DPvOLOP¢a AWNADm PRO]ILTP
Paw Vemn6epwoAa 1.2015 CFA rwk Gmk TrWa 3B
Lwdims
DAP-BLDPROP03AL
Paae3 d7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project loam Inf—tion Bidder's Propmd
Bidlist Item Uoit of Bid
No. De—Wt— Spxification sea"No. Me Quantity Unit Price Bid Value Shat sod Quunuty
UNIT I•STREET LIGOTING I PR V EMEN" 48
q13
41 3201 50W LED Lighting FiMure,Type 11,w/33R:,rm 344"
ZO EA 24 $2,762'00 $66,268.00 48
05 3011 2"ConduitPVCSCH40(T) 26 05 33 LF 1700 8.52 1448400 1700
41 1408 Insulated Elec Cu
.d::�,,:n�Jr;,�;k XHHu 34 41 10 LF5,100 $0.79 $4 029.00 5100
T T NIT T I IG IM V $84,801.00
Bid Summary
UNIT I:STREET LIGHTING IMPROVEMENTS $84,801.00
Total Construction Bid $84,801.00
Performance/Paymantand 2-year Maintenance Bonds Included
GrandTot.11 $84,801.00
CoNraclor agree to mmplde WORK for FINAL ACCEPTANCE whYin ealodar days after the dale when the
CONTRACT commove to ro m provided in the Genual Condition.
CrrY OF FORT WORTH
STANDARD CONStRUCT10N SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
F—v—sepmbr 1,2013 CFAOrkCm&T,ib3B