Loading...
HomeMy WebLinkAboutContract 49788 Developer and Project Information Cover Sheet: Developer Company Name: D.R. Horton-Texas, LTD.,A Texas Limited Partnership Address, State,Zip Code: 6751 North Freeway,Fort Worth,TX 76131 Phone&Email: 817-230-0800, mpallen@drhorton.com Authorized Signatory, Title: Mark Allen ,Assistant Vice President Project Name: Oak Creek Trails Phase 3B Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: Northease corner of F.M156 and Double Eagle Drive Plat Case Number: FP-17-006 Plat Name: Oak Creek Trails Phase 3B Mapsco: 642-U Council District: 7 CFA Number: 2017-108 City Project Number: 101022 To be completed by staff.- P 4 Received by: Date: d 7 ,\ 23456 � WOI N (9`9Slip, £ Z `�d City of Fort Worth,Texas Standard Community Facilities Agreement-Oak Creek Trails Phase 3B CFA Official Release Date: 02.20.2017 Page 1 of 11 Q 1- 3 4 Ss ,`�' RECEIVED o � C1T'I OF CP F0R1 wORTN ti STANDARD COMMUNITY FACILITIES AGREEMENT � C1TY SECAECARY S'.a STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. I WHEREAS, D.R. Horton- Texas, LTD., A Texas Limited Partnership, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Oak Creek Trails Phase 3B ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. R Developer shall provide financial security in conformance with paragraph 6, Section 11, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Oak Creek Trails Phase 3B OFFICIAL RECORD CFA Official Release Date:02.20.2017 Page 2 of 11 CITY SECRETARY FT.WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®, Sewer(A-1) ®, Paving(B) ®, Storm Drain(B-1) ®, Street Lights & Signs (C) 0. E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 11, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured,licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Oak Creek Trails Phase 3B CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. L City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Oak Creek Trails Phase 3B CFA Official Release Date: 02.20.2017 Page 4 of 11 J Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its mercers. servants, or employees. NL Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such iniuries. death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth. its o,xtcers, servants, or evees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Oak Creek Trails Phase 3B CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Oak Creek Trails Phase 3B CFA Official Release Date: 02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2)will not boycott Israel during the term of the contract. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Oak Creek Trails Phase 313 CFA Official Release Date: 02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Oak Creek Trails Phase 3B CFA No.: 2017-108 City Project No.: 101022 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A.Water and Sewer Construction 1. Water Construction $ 321,040.90 2.Sewer Construction $ 287,321.43 Water and Sewer Construction Total $ 608,362.33 B. TPW Construction 1.Street $ 779,618.05 2.Storm Drain $ 448,317.50 3.Street Lights Installed by Developer $ 6,600.00 4. Signals $ - TPW Construction Cost Total $ 1,234,535.55 Total Construction Cost(excluding the fees): $ 1,842,897.88 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 12,167.25 D. Water/Sewer Material Testing Fee(2%) $ 12,167.25 Sub-Total for Water Construction Fees $ 24,334.50 E. TPW Inspection Fee(4%) $ 49,117.42 F. TPW Material Testing(2%) $ 24,558.71 G. Street Light Inspsection Cost $ 264.00 H. Signals Inspection Cost $ - H.Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 73,940.13 Total Construction Fees: $ 98.274.63 Choice Financial Guarantee Options,choose one Amount (Mark one) Bond=100% $ 1,842,897.88 x Completion Agreement=100%/Holds Plat $ 1,842,897.88 Cash Escrow Water/Sanitary Sewer= 125% $ 760,452.91 Cash Escrow Paving/Storm Drain=125% $ 1,543,169.44 Letter of Credit= 125%w/2yr expiration period $ 2,303,622.35 City of Fort Worth,Texas Standard Community Facilities Agreement-Oak Creek Trails Phase 3B CFA Official Release Date: 02.20.2017 Page 8 of 11 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER D.R. Horton-Texas, LTD., a Texas Limited Partnership By: D.R. Horton, Inc., Jesus J. Chapa a Delaware Corporation, Assistant Ci y Manager its Authorized Agent Date: 0 Recommended by: ame: Mark Allen �p Title: Assistant Vice President ej, Z Wendy Chi- abulal, EMBA, P.E. Date: Q' Q.�tai1 Development Engineering Manager Wa er Department ATTEST: (Only if required by Developer) Douglas W. Wiersig, P.E. Signature Director Name: Transportation &Public Works Department Contract Compliance Manager: Approved as to Form &Legality: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including Richard A. McCracken ensuring all performance and reporting Assistant City Attorney, requirements. M&C No. N�� Date: Form 1295: N//:*-- ame: Janie Morales Title: Development Manager ATTEST FOR.. O: O;P M6Y J./Kayser City Secretary ••7FXP5 City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Oak Creek Trails Phase 313 CFA Official Release Date: 02.20.2017 CITY SECRETARY Page 9 of 11 FT. WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A:Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit 13-1: Storm Drain Improvements ® Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Oak Creek Trails Phase 313 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101022 None City of Fort Worth, Texas Standard Community Facilities Agreement-Oak Creek Trails Phase 3B CFA Official Release Date: 02.20.2017 Page 11 of 11 TEXA S MOTOR PEED WA Y VICTORY CIRCLE Cc JPS CnP � TEXAN P� (S—H——11-4—) 41 ti 0�y0 DOU BLE Fel ]j� �y® °�]j�l]l�.T I 3 5 W cocn Pbeth L l�d'7111 TION N W E 0 T jRTH a ITY LIMITS S 0. a M VICINITYMAP < KLi LLU re) -n REED T C.)ARTL 1 10 H PHASE 3B 0 0 LOCATED I V Ul CrTY OF FORT WORTH, TEXAS a i Ul 0 L LD t GLOPERIOW NEW �c PREPARED BY: D • R • HORTON ��� _ HAUN 6751 North Freeway CML�i�S�N SURVEYORS Fort Waith.Texas 76131 3405 Mvo.%o,,,,,, Tmme 7W51 v Phoma:(817)230-0800 Mean(e»)32I)JIM Fax:(817)230-0896 AUGUST, 2017 w OAK CREEK EIEK SN WE ]PHASE 31B NOTE: S ALL WATER LINES SHOWN WATER 37 3e 35 ARE 8' IN DIAMETER. SCALE: V�303> ipNRnRl ET 11 A 11 3< 33� lliLlVCllllllDllll N /32 3f 3p 3e 29 , OQC 39 <0 ,5 27 25 51 A6 3 53 52 90 e9 24 LEGEND I " 23 R � -W PROPOSED WATER LINE 5A - 22551 2 10 W EXISTING WATER LINE y`� ° ! �'I^I s 6 I ] a 9 y 1777 L 2° 51 PROPOSED FIRE HYDRANT ASSEMBLY 1a T 1 SS e2 21 20 19 l6 V 165 i]I 13 12 i._11 1 19 le t] 5 ►� PROPOSED GATE VALVE 59 Ss b f, EXISTING FIRE HYDRANT ASSEMBLY i. T-- —r— 4 53 6f D4 EXISTING GATE VALVE 52 j 2 3 J i' x9 10 u z 1 < 151 16 v is 11 10 37 36 3A �32 131 3° 29 28 27 26 25 24 23 22 21 - 19 9 65 65 67 f 2 3 < 5 1 6 7 a 19 fa fi N 11 6 1 2 3 � 5 6 7 8 9 Sa 5 M 59_� 2l 20 19 .1 l]1161 15 1 1/ 13 12 5 .. .. ..... _ a LCPN R 100317 di 24 23 22 21 20 19 16 17 16 15 14 13 12 3 CPN A 1003!3x M 9 la 11 12 13 1t SS 16 17 SB D • R • HORTON PREPARED BY: 6751 North Freeway G OODWI[N 9 Fort Worth,Texas 76131 MAUI L 11 Phone:(817)230-0800 CIVIL ENOINEUM-PLANNERS-SURVEYORS Fax:(817)230-0896 24N M°N1q 13tH,o1ww1°s,Tm 76061 M6°0 R17)3204373 E1\10644- Oak Creek Troils\Plans\Oak Creek Trails 38-CFA.pro 13 Sep 2017 N ®AK CREEK 1RES W* E . PHASE, 3B S SAIYUARY SES SCALE: 1" 300' MUBBTr"A—V ~`s 37 35 35 3a s� 33 32 31 29 S 39 40 41 7 27 NOTE ' 43 25 s\ ALL PROPOSED SANITARY SEWER 53 51 5049a% '15d6 a 24 s LINES SHOWN ARE 8' IN DIAMETER, 1'M4Ki 23 54 r 22 LEGEND $ 1 2 3 1 4 5 6 9 f0 PROPO2120 s S SEWER SL NE ED SANITARY ] e 51EXISTING SANITARY 56 22 21 23 I9 1S 17 f6 15 14 13 12 11 l9 F. 11 16 15 4 SEWER LINE 59 g 14 - -- - PROPOSED SANITARY i3 v SEWER MANHOLE 6f 1 2 3 < 5 fi ] e 9 f0 1f f2 f3 14 15 le v fe t1 CAV#100313 O EXISTING SANITARY 63 rrI ...... 10 SEWER MANHOLE 6_4 3� 34 33 32 31 so z9 za 2] 26 25 24 23 22 21 20 19 9 PROPOSED SDR-35 SANITARY Q- 6 SEWER SERVICE ti 9 s ] \ EXISTING SDR-35 SANITARY 67 ` 2�3 4 5 6 ] 6 1 w 11 6 —1— SEWER SERVICE � 1 M 24 z .............. - 21 1221 19�16 1]�16 35 14 13 f2 1) 3 22 21 20 16 16 v] 16 15 14 I 13 12 IJ' tI `I 3 ....._ - .._I....... S IDEVELOPER/OW1476R: w 1 _ 9 t0 if 12 13 14 15 16'17 1e PP"AF BY: D • R • HORTON _ GOODWH41 6751 North Freeway MAMHALL 9 FOR Worth.Texas 76131. CML ENGINEERS–PLANNERS–SURVEYORS Phone:(817)230--0800 t"4m M ft"Dore.G1ePYV—.Taw 76061 Paz(817)230-08% Metra(61 7)32w-13]3 E.\10644—Oak Creek Trails\Plans\Oak Creek Trails 36—CFA.pra 13 Sep 2017 OAK CREEK S W+EN PHASE 3B S 'STREETS^ SCALE: I"_300" 37 LEGEND 3s 36 33 1 31 T % SIOEWALK PER THIS CONTRACT' PROPOSED 29'B-B ROADWAY SIDEWALK PER THIS CONTRACT J � 41 6/ TOHICK REINFORCED l 14 CONCRETE T CONCRETE PAVEMENT 45 53 4 53 �51 �I49 gpp�A1.f � 24 J ��._..�._.�RPi4e14f1t_ 55 T 2 M' rg 10 p 1--5=]- 1_ 8 -SIT (/ 58 21 I p Ig to[ 17�... .� 19'IB I6 09 I 116 15 16 l3 f2 1l 15 13 900 3 4 6 7 0 i 9 IO IS f2 f3'l4 15 l6 1 177 18 1l 1 643 I.— 10 ��131 3] 29 2B 2] 25 25 24 23 M 21 V 19 9/ 65 64- 35 r- --- _( `a f - 'P"�-- / � $10EWALK PER THIS CONTRACT �2 3 d ................ M 31 6 6] I 5 6 7 8 9'10 1 1 2 3 4 5 6 7 8 9 f0 21 I p 19 16 1] f6 45 14l I ... ._ 60C M f311 12 1 24 23 22 21 W 19�111 I..1�3 12 l Ir-3 4IYly 1 J\\ I� 2` 9 10 i 1f�12'13'14 15 f6 f]I l8 - D • R • HORTON OGDVIW, 6751 Nath Freeway MApgg)(.ALL Il FortWorth,Texas 76131 CML F1401NEEF8—PLANNERS—BIIFYEYOR6 Phone:(817)230-0800 2405 Muwbrp on...oma.,T—79051 Fax:(817)230-0896 MWO tem 329-4378 E \10644 -Oak Creek Trails\Plans\Ook Creek Trails 3B-CFA.pro 3 Aug 2017 OAK CREEK EIEK S N PHASE 3B W*E .STORM DRAIN LEGEND 3) 35 35 34 33 PROPOSED STORM DRAIN LINE M 31 EXISTING STORM DRAIN LINE 30 3 401 4128 PROPOSED STORM DRAIN INLET 43 4d yr d5 52,51 46 53 `�49 q� l•n.t. 2d _iRAP48dd1X 0•N£T 23 es- 21i r �- 401f 3 I° 5 6 ) B l5' to ET 2a 21 � 19 1S 1) 16 15�-U 13 12 11 19 1B 11 Ifi l5 ro 10 14 )T- 51 r 1-I 2�g 4 5 Ix al M.�T 2 6 ]� 9 f0 11 12 l3 Id 15 16 1) 1B 11 63 p; 10 L 37L 36 35 TI2 6, 3d 33 32'31 30�2g 20 2) 2b 25 24 23 122 21 20 f9 9 65 E I Iii WI Ei B ' 2 3f4 4 g;ap(111 I'rA r 11\ 6 6] 6 f6 ] \ 69 /21 19 18 f7 I6I 15114 f3 12 if Y !�. 3 22 21 20 19 l0 I] 16 13 1d L3 sa £.ro vd 3 ]S, Z EY.a'YLET N ' DEVEWPMOWNM* 9 to l3 14 15 16 1) is D • R • HORTON PREPARED BY: CuCODWINe 6751 Nath Freeway }MUHA,p+Y Fort Wath,Texas 76131 CML ENGINEERS-PLANNERS-SURVEYORS Phone:(817)230-0800 2da6MIIWrg0 .Gray" ,T—)6061 etr Fax:(817)230-08% Mo rem 3294373 E.\10644 -Oak Creek Trails\Plans\Oak Creek Trails 3B-CFA.pro 3 Aug 2017 OAK CREEK S " P11116 SE M W E STRMUGHTS 1EXmr"c" SCAM: V 300' 37 M 3d 33 M 31 30 29 2 28 39 1 41/T 2] LEGEND Q 43 44 � 45, 24 52 � 2' PVC CONDUIT 53 3f I—4 9 47 ) 23 [[ 54 /. LIGHT POLE f $ Y 21 EXISTING LIGHT POLE . lfKf 1 2 3 4 5 6 7 6 9 \]o " zo TRANSFORMER ON PAD 57 5B 22 2l a l9 W 17 is LS 14 13 f2 11 l9 1a 17 f6 HAND HOLE ® s9 5 14X--77 7 3 61 1 21 4 5 6 ] e 9 10 31 12 13 1d 15 Ifi 17 w �1f 62 L 63 ]0 37 60^ 33132 31 es 27 3 25 24 23 ]2 21 20 19 9 65 L_ 6 66 — — 7 _^ 1 67 2 3 d 5. .6 ] 6 9 ._- M l0 1 2 3 415 5 ] 6 9 f0 6 Be 69"; 1 I y 21 20 19 1B .... `` d 17 161]y 1d 13 12 11 24 23 22 21 V 19 1B 1] 16 15 14 13 2 N 1 9 14 11 12 13 Id 15 Ifi 17 18 I 1 DEVE1.0?W, 0WNEd: PREPARED BY: D • R • HORTON GOODWIN3 6751 Nath Freeway MARSHALL 9 Fort Wath,Texas 76131 CML ENCINFFiB–PLRNNERS–SURVEYORS Phone:(817)230-0800 2406 MuMW thM,CM*PMIM,Tw 76051 Fax:(817)230-0896 Mebo t817t 323+373 E:\10644 -Oak Creek Trails\Plops\Oak Creek Trails 313-CFA.pro 3 Aug 2017 OAK CREEK EIEK S N PHASE 3B wE STREET SIGNS"C-111 SCALE:�V'=300' 3] 35 LEGEND 32 31 30 PROPOSED STREET NAME SIGN 38 � /-,g b d1 2] 25 13 � " 45 52 dfi 53 51 50 49 SL09 47 24 .�RM6byCK 23,1" 56 Y 21 ('�-�°,W`7 f 2 3 3 4 d 5 6 7 B t�� 9 f0 \ 20 58 22 21 20 19 is 17 16 15 I la 13 12 If 1918 17 18 15 14 13 61 1 2 34 5I 6r x _ 12 B 9 10 11 12 13 1d15 16 17 IB 62 1 Si 63 10 37 3fi 33 32 3l 30 29 2B 2] 2fi 25 24 23 22 21 20 19 9 65 66 7 6] 1 / 2 3 45 6 fiLOIX Y 11 8 l 2 3 4 5 6 ] B 9`10 66 16 21 20 l9 19 1d I f] l5 P3 72 1 AA i 2d 23 22 24 p 19 16 1T U —3 l2 d`— 2 N T -1 9 10 11 12 13 14 15 16 17 DEVELOPER/OWNER: D ' R • HORTON PREPARED BY: c300DWINe 6751 North Freeway }\/��g,�HAU 9 Fort Worth,Texas 76131 CML Pl1O1NEER9—PLANNERS—SViNEVOflB Phone:(817)230-08W 2106 M. DrK%GrmmAm,T—76061 Fax:(817)230-0896 Meso(817]3294373 E1\10644 -Oak Creek Troils\Plans\Oak Creek Trails 313-CFA-pro 3 Aug 2017 IllID DATA CUHW DATA if !!E dN 'e VICINITY MAP OR. LLz;tNO Ll I- V7 6mml D-R-HORTON T— GOODWINI UARSHAU V � 6e fsu+,000„m kIlk q 2.-2, W_ rx'�- ®oo ay o:�:. c ` �� ��1 ww CLAY CREW LANE FINAI�PLAT ........... .......... SHEET 1 OF 4 ............. & SIC M BWcK OAK CREEK TRAILS MM M. \\� HATCH LINE SEE SFEET 3 31. n / ( MDM MEAD DRNE -— --L ],Q s, _— �FGIAl PWT SEE SHEET I FOR mz 9 LINE AND CURVE DATA lois -le.emccv Iola i-,e,H1oeH v SHEET 2 OF a., RO 109 1-66.bZ 6TY.HfOC{Y D R HORTON GHOODWINI OAK CREEK TRAILS PdAARSHAT T 1 m.ea uHes ro���u1 c1m moo..��r.�,o, +zm eaxvex�emeact xo.eve ro�mrawtaoon�--�`a,,,;' � arr`o lost conte 6vmx rouxrc,Tam P¢01'R fD-000 nd..eau �MT�IM.ii` b a.�MIYt 101]�]YPp 9PYl mfs m,RUI,Go¢I100 01!18 Qele I � s� % // I! r------ ------ -- ------- J, ^a..r------ 1 — -- O i 1O ulx.rs. i.. o n. % � � 1 �i, — •�_ ,�, •� � v-� vv ���, of ural Erre m.--�sNrEr z • � SEE SHEET I FOR 5 1 I•_ -W ��u e \\\ LINE AND CURVE DATA FINAL PLAT o:e�n�cc v SHEET 9 OF 4 jwj • I I --.— ,/+ ei: IeTB l-m.BIDCL Y leis aY-e�,eu awn x 'u OODWIN� xoO,-ea,ee[ev.RAIL u p,FpFI3uAri.� OAK CREEK TRANS D•R•HORTON e,a fa w.nYa. u, neBBan B606'L'YR,ou oa .mes �mimaBam ao-oo aY r.m¢w'�.'.'� ,ee Res�cmu rtme eo'>oew sv.ca P,+1�aBR _7- 4p Z IT. MM, TT� I°a7 9wmmn v.-lzll-1 V I CI TY PLAN COMMISSION dN. SP CITY 6 FTBiT WORTH,—AS EE 11F-:5 B"t FINAL PLAT SHEET 4 OF 4 A— OAK CRREK TRAILS D-R-HORTOR R.CAiNEYAWPF4�Na 7 —.1 N C- -17 x-2 435 THE CITY OF FORT WORTH TEXAS a FORT WORTH PLANS FOR THE CONSTRUCTION OF WATER, SEWER, ]PAVING, DRAINAGE & STREET]LIGHT IMPROVEMENTS � TO SERVE OAK CREED TRAILS, PHASE 3B WRT17, Iia; ,ZocA-.4 ra AVX Mac."R : INDEX ZOIN .1 � .., . �WtW, TEXAS Mar r'b. °Y` siw PEEDWAY a. swreav �•r+• 1°1miwac°°'�•,rEY11p,3w wwc.wwrronc Y➢ DAVt3� C(7{tiK$ � �rwrimn">w'bcM..ry04�'vaE ..0 g C PT7 oR,WU7tKSDBPARTYCNT n°+" a.'•ae.owo.ao ai:.'e wN'°n.. K/+RA WAL. SHotJR0I2g '°' °.rowua•g- rRm LOCAT*A MAP Vdi. YM�T 4'b+r i%r.1u _ _6n. 1TII'10.W[cTAW • u: moY��eir.s MAPSCO N0. 64£-U ti•L� �c `t f�r._17 � COUNCIL DISTRICT , 7DOUD - W{ERSIG. P.E. — Dn7' •� DIRECTOR'TRANSPORTATION AND PUBLIC WORKS CITY PROJECT NO. 10102T �m WATER PROJECT NO.�•1��"�1 Asx: (�R 1 O t���,� n��sY: GR#Y M1�S�fiE9! � SEWER PROJECT NO.• AM-V-mIQ13-001380 D R HVacoDwim r"FA...yWz csirtee,aeauae.n. FILE NO. X-24M& -2 M Pott ersFNw7lF3! pYoex(EI7001l1ABfl r.oi.�a�a+raa 9dfliid38R - k X-x4435 tam D.V-Bmt#OPQSAI- hpldl SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project lum Ink-hon Biddle.Propoml Bidb91tao Uuitof Bid shat Numbs and Daaipb- spa afwliw 8ectkn N.. � Q-.W unit Price Bid Vdae Q-ory PIT 1-WATEI IMPROV 4 5 1. 1_8*PVC Water Pipe. ._._. 331710T3311Al2 LF 5x767 522,.80 5130,334.20 2928 2639 2 3312 3003 8 Gale Valve d Valve Box 39,12 20 EA 14,_ 57,300.00 518,20000 6 6 3 3312.0001 Std.Fire Hydrant Assembly wl 6'Gate Valve 6 331240 EA 7 Valve Box $3 400.00 Z23 800)00 3 4 4 3311.0001 Ductile Iron Water Fittings wl Res!TiM 33.1117 .. TON 2.3 57,100. 578.330.00 Li 1.2 5 3305.0109 Trench Sat 33 0510LF_- _S 767 5010 _ -� .. ...... etY .. ....... ...... 8570.70 2926 2839 8 33122103 1 Water SeMce 331210 EA 166 ,, $75000 124,500,00 90 76 __..... __. .... 5. ...... 7.__.3312 2103 1 Irtigalan ServiceW.. .. _......... .. _ 3411210 ............ EA _.1 S90000 1 82 3312 2103 -Imgalion Service 1312 10 EA 57,100,.00 S2 8,0,0.00 1 1 9 3312.0117 Conneclan to Extsting 4"-12"Water Main 33 t2 25 EA 4 590D.00 $3 800,00 I ; TOTAL UNIT I:WATER IMPROV $321,040.90 It:SANITARY 7 8 9 10 11 1 3331.4115 8"SDR-35 PVC Sewer Pipe 33 11 10,33 31 12.33 LF --- .............._.._._-..__..._.-.....,..,.................._..........._..___..._.__.._.._...__._..__'__ .....,....,...._3:1.20--1_.._.... .._4 ._.....-....WS24.00 5104x831.93 1753 1503 1112 2 3331 3313 8"Sewer Service,Reconnection_ 333150 EA 2 ._ 57,000 00__ 52-000,00 2 ...,.._.... .. .. ..._.. ..... .._.. _. .__ ... 3 3331.3101 SDR-35 4-Sewer Services 3331 50 EA 142 $800.00 885 200.00 90 52 4 33391001 4 Std.Dta Manhole ._.,. 333910 333920 EA ,.,.,._22,_____ 52,430.00 553480:00 14 6 5 3339 1003 Extra Depth for 4 Dia.Manhole 33 39 10 33 39 20 VF 43 $14500 _. $8,235:00 26 8 7 6 3339.0001 Warren Epoxy Manhole Liner„.,,_ ,__. ...- 33.39 60 VF 11_.. __5200,00 _$2x100:00 6 5 7 3301 0101 Manhok Vacuum Testing....... ......... ......... 33 01 30 .._. EA ... _..23 ....._511000 52.530.00 14 9 _ .. .. ....... _......... ...... ........ .............. .. '3331.4116 8"PVC Sewer Pipe,CSS Bao ftl_,.,..._,.,._ ,..,,,.,._33 1116 33 31.12,_33 LF__ 309,... .. _ .547:00...,_„__$12,889.00 149 so so 0330.0001 Concrete Encasement- ,» ....033000 . _._ LF 20...........__550.00._____$1,000.00 20 16 3301.0002 Post-CCTV Inspection 33 01 31 LF 4 677 1.50 $7015-50 1902 1563 1192 11.. 3339.1103......Drop Manhole.... � � .. ,__.. ,..,..33 39 10,33 39 20, FA ,1,-„_.._._._54x . ..34,. 1 .._ 12 3339 1103 S Exba Dcplh Manhok ____, 33,39 10,33 39 20 .............VF 5 .....$220.00 51 100.00 5 13 3305.0109 Trench Safety 33 OS 10 LF 4 877 SY.00 $4.677.00 1902 1583 1192 $287,321.43 I IN:DRAINAG E IMPROVEMENTS 38 39 40 41 42 43 7 3349.5001 10'Depressed Curb Inlet 33 49 20 EA 12 53,600.00 $43,200.00 4 4 4 . 2 ....3349 5002 15'Depressed Curb Inlet .....93.49 20.......... .EA 4 .....54.,900 00 519,800.00 2 2 3 3341.0201 Zi"Class III RCP...._...___..-._.._._........................._.....,_-_..._33.4..10....._._ ...._- --..._281_....... _W$5§:00 ,455,00 151 29 71 30 4 3341.0205 24"Class III RCP _ 3341 10 LF 2 247 585.00 $14605500 717 308 655 a76 89 5 3341.0208 27"Class 111 RCP 3441 10 LF 77 371.00 55 487.00 77 .__._8..__. ._141:0302 30'Claw IN RCP. _._._._...._......... 3541 10 LF _.113.__.: ....__.__ .__ ......_._S9r288.00 70 43 .,_. 7 3341 0405 42"Class III R C P. _._.__. 38 41 10 LF $100,014,00 209 424 ........_8..........3341.0409 48"Class lll_R:C.cP:............_........_..........._....................._.._......................_3341._1.0..........,,......._._ .............._300:._.....,..........._5792.00..........._558,752,00 306 ................._... 9 3349.0001 4'Storrs Junction Box ,,.33 49 10 EA 2_ __,-._33,800.,,00 _____$7,800;00 1 I 10 3349.0008 Bk4'Sbnn Junction Box 34 49 10 EA 3 S5 400.00 Sib 200.00 21 I mm 11 -i.0006 6k5:Stonn Junction Boxmm_ --_ _ ._._35 49 10 _ _EA 1 .., _ 55,800.00_ 55 600.00 I 12_3305 0109 Trench Safety ..._.._._._.___._..___._.._ 33 05 10 ._ LF......._..3,857 ._.` ..__._ __......_ _..... __ _ _. _ __ _.._..._�`� ..,.,,_._.51,828;50 1224 759 422 685 478 L 13 3349100324"Flared Headwall l pipe.......... 334940 EA 2,., .,$1,80000 53,800.00 .. .9 ... Flared _._.......... ........... .. .. _.......... . . ......_..- .... ....._.. 14 3349 1009 42"Flared Headwall 1 papa 344940 EA 1 _$3,000 00 000.00 1 .. 15 3348.1011 W F_4Md Headwalls 1 pipe..........W....._._ ...__.. .35 4940 _._..._ ._....__1._.._. _ 53, OO,W__.._._$3,200,00 1 16 3138.0104 Install Twisted Gabion Mabess 313600 SY 68 5110.00 S7 480.00 32 32 4 �- .....,.,.. _ .__...__ ____.._... 17 9999.0001 Connect to Extsteg_24". _..............._....................._......__...__000000.._.._.. _.,_E`__..__J-__._...._...... ...:_60._....__....$500.08 t 18 5.0112 Concrete Collar 330517 EA 5 .00 $1,500.00 2 2 TOTAL IT IN,DRAINAGE IMPROVEM NTS $448,317.50 Bid Summary UNIT I:WATER IMPROVEMENTS $321,040,90 UNIT II:SANITARY SEWER IMPROVEMENTS $287,321.43 UNIT IN:DRAINAGE IMPROVEMENTS $448,317. Total Cowtruction Bid $1,056.679.83 Performance/Payment and 2-year Maintenance Bonds $20,000.00 Gn.d Taal $1,076,679.83 C.ak.crr.g-l.wmpl.l.WORK 6,FINAL ACC9"ANCL wahla taltadar dry. fkr dr dal.whnW CONTRACTp,.4ded l.d.(ae..al C.mad- QTTUFpOar-`rr srwrm,atomras7au.-rron.ppap3cwnou DocTaslm-oev¢apBa wwweDmpaorecrs pas V�e.yY��1.AU 6wD..Oad nub 3B DNP-PID PR01'06AL Pya]or] SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Projzt[um INormedm eidderr Pmporel eidlisr llcm Urdt ofBid Shccl Number Rntl No. De+�^Plio^ SpcciCwian Salimi Na. MessWe Qvamity U.Pnoc Bid Value ORyu e' UNIT:PAVIN IMPROVEMENTS 24113'1 A 25 26 29 28 29 30 31 _1 3213.0101 6`Concrele Pavement ResidenGel�, 321313 _y _SY _ 19609 31.95, E632897.56 27199 36n 32a IaT2 27e7 2911 ISos ]saa 2 32110501 6 Lme Treated Subgrade,(Res denaal) 3211 29 SY 21,780 .....;2:15 $46,84850 29910 4001 356 1619 3066 3202 1611 3.11 _3 3211.0400 H d led Lime 3010sJS.v R sId tat 321129 TON 327 $150.00 49050.00 455 60 ._,_.__ --- Y _--@ ._(_._ _L__ - ,___ _,�--� _ -__..__ ,_...�_. _w s z4 46 4s zs ss 4 3213,0504 Barner Free,Ramp Type M-2 321320 EA 8...,, $1,900.00 $15,200,00 ... .. ... 5 32130506 Bamer Free Ramp type P-1 321320 EA 16 $1650.00 $26400W 32130301 5 Concrete Sidewallr _ 32,1320 LF 246 ___$25M $615000 n 110uo 7 9999.0004 Connect to Cut B Gutter 000000 LF 116 $7.00 $812.00 29.00 29.00 2900 29.00 9_999.0006 Install End of Road Barricade 000000 EA 1 $1,500.00 „$1500X00 09999.0007 Remove End of Road Bamcade 000000 EA 3 $250.00 $750.00 Lon 100 Iao __10 9999.0011 Conuethloeder 000000 EA7 10.00 10.00 0 PAVINGTOTAL UNIT JU. NT $779,618.05 UNIT1: E I N IMPROVEMENTS 24 14A 25 26 27 28 29 31 1 9999,0006 Slrael Sign w/Slop Sign(Ga' van—d Post) 000000 EA �10�$40000 $320000 2 1 '2 9999.0009 Str e[Sin w/a Stop Sgn�Gal an zedPost) DOEA0 Street Marker Blades Installed on above osl 000000 EA 2500 $1000.00 2 4 2 x x z 2 IT II: TRE T I IMPR VEM $6,600.00 Did Summ UNIT 1.PAVING IMPROVEMENTS ary _ $779,618.05 UNIT II'STREET SIGNAGE IMPROVEMENTS $6600.01) TOra]ConnrvM Bid $788 219.05 Performance/Payment and 2-year Maintenance Bonds $v 200.00 GrtlM Toll 1 $797,418.05 CRmragar a{rtu 1p wrry]Me WORKTor TINAL ACCDl'TANCE xkhiR,�1'�,]`� OWw4u dnrr after IM1r tlarc 4vMn IM CONTRACT romlrcxu[0 run a pmrWOd in the CeneN Condnbor. CITY OFFMT WOM CON6mrULTTON 9P¢CIFlCATC4]WCUMEMS-DPvOLOP¢a AWNADm PRO]ILTP Paw Vemn6epwoAa 1.2015 CFA rwk Gmk TrWa 3B Lwdims DAP-BLDPROP03AL Paae3 d7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project loam Inf—tion Bidder's Propmd Bidlist Item Uoit of Bid No. De—Wt— Spxification sea"No. Me Quantity Unit Price Bid Value Shat sod Quunuty UNIT I•STREET LIGOTING I PR V EMEN" 48 q13 41 3201 50W LED Lighting FiMure,Type 11,w/33R:,rm 344" ZO EA 24 $2,762'00 $66,268.00 48 05 3011 2"ConduitPVCSCH40(T) 26 05 33 LF 1700 8.52 1448400 1700 41 1408 Insulated Elec Cu .d::�,,:n�Jr;,�;k XHHu 34 41 10 LF5,100 $0.79 $4 029.00 5100 T T NIT T I IG IM V $84,801.00 Bid Summary UNIT I:STREET LIGHTING IMPROVEMENTS $84,801.00 Total Construction Bid $84,801.00 Performance/Paymantand 2-year Maintenance Bonds Included GrandTot.11 $84,801.00 CoNraclor agree to mmplde WORK for FINAL ACCEPTANCE whYin ealodar days after the dale when the CONTRACT commove to ro m provided in the Genual Condition. CrrY OF FORT WORTH STANDARD CONStRUCT10N SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS F—v—sepmbr 1,2013 CFAOrkCm&T,ib3B