Loading...
HomeMy WebLinkAboutContract 47349-CO5 e 'CFW Change Order Approval St-COApp10 Page 2 of 3 CITY FORT WORTM, City of Fort Worth CONTRACT NO.SECRETARY�I_" Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.:f 5 Change Order No.: St-COApp10 Date Started: 2017-09-29 City Sec. No.:W349Date Due: 2017-10-13 Project Name: N. Beach Street from NE Loop 820 to Fossil Creek Proect Numbers: 02238 ^DOE Numbers: j - - - 7237 Project 'Widen N. Beach Street to a 6-lane divided arterial street with Description: paving, drainage, sidewalks, water, sewer, traffic signal, illumination, landscape and irrigation improvments. Project Manager: Michael Weiss City Inspector: Tom Miller Contractor: JLB Contracting, LLC COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 9,375.00 34014 0200431 5740010 CO2238 0J 0 Total Cost: $_9,375.00 Total Requested Days: 0 Approval Status: Al RECEIVED 9 ;1)11 CITY OF FORT WORTH OFFICIAL RECORD CffY SECRETARY CITY SECRETARY FT.WORTH,TX ittps://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId=4610&ActiveF... 10/9/2017 •CF'W Change Order Approval St-COApp10 Page 3 of 3 Approved: Yes Comments: Usef: Aaron Perez Date: 2017-09-29 10:18 AM Approved: Yes Comments: User: Michael Weiss Date: 2017-09-29 10:21 AM Approved: Yes Comments: User: JoAnne Kamman Date: 2017-09-29 1:40 PM Approved: Yes Comments: User: Kim Arnold Date: 2017-09-29 3:46 PM Approved: Yes ;Comments: ;User: Doug Wiersig Pate: 2017-10-02 2:05 PM FORT w� �O. 'P= (Approved: Yes b 1' Comments: y� User: Doug Black Date: 2017-10-06 3:38 PM ''cam I, J. Kayser, City cretary 'TEXp'` ;Approved: Yes (Comments: User: Jay Chapa ]Date: 2017-10-09 9:51 AM I Action Required: Contract Compliance Manager: By signing I acknowledge that I am the person responsible for " the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Michael Weiss,P.E. ._... Senior Professional Engineer OFFICIAL RECORD CITY SECRETARY FT.WORTlH$TX https://projectpoint.buzzsaw.com/ bz web/Forms/Fom Print.aspx?Siteld=51500&Processld=4610&ActiveF... 10/9/2017 a ,CFW Change Order Approval St-COApp10 Page 1 of Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Proiects/02238 - N. Beach Street from NE Loop 820 to Fossil Creek/Contractor/Change Orders/Change Order Breakdown template cos, solar powered controller- 8.29.2017.xism Attachments(01 No Attachments have been added to this form. ittps://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId=4610&ActiveF... 10/9/2017 FORT WORTH_ City of Fort Worth Change Order Request Breakdown ProjectNarnel N.Beach Street from Fossil Creek to NE Loop 820 City Sec# 1 47349 Client Project#(s)l 02238 Change Order Submittal# 0 Date 8/29/2017 Dept. T/PW Water Sewer Contract Time Totals CD Original Contract Amount $5,675,296.15 $89,335.52 $82,214.26 $5,846,845.93 541 Extras to Date $167,223.79 $0.00 $0.00 $167,223.79 14 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $5,842,519.94 $89,335.52 $82,214.26 $6,014,069.72 555 Amount of Proposed Change Order $9,375.00 $0.00 $0.00 $9,375.00 0 Revised Contract Amount $5,851,894.94 $89,335.52 $82,214.26 $6,023,444.72 555 Original Funds Available for Change Orders $488,154.00 $6,250.00 $5,750.00 $500,154.00 Remaining Funds Available for this CO $320,930.21 $6,250.00 $5,750.00 $332,930.21 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.020/6 MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $7,308,557.41 JUSTIFICATION (REASONS) FOR CHAoNGE ORDER Due to missing information on the irrigation lans,a solar powered controller is needed to operate the installed ' g p p _ p ailed irrigation system. FORT WORTH City of Fort worth Change Order Additions Project Name N.Beach Street from Fossil Creek to NE Loop 820 City Sec# 47349 Client Project# 02238 Change Order Submittal# L� Date 8/29/2017 ADDITIONS Qty Unit Unit Cost I ota 9999.0000 Irrigation ystem ns abon TMW- TIPW $9,375.00 Water $0.00 Sewer $0.00 Sub I otal Additions 9,3T Change Order Additions Page 1 of 1 FORTWORTH City of Fort worth — — Change Order Deletions Project Name N.Beach Street from fossil Creek to NE Loop 820 City Sec# 47349 ClientProject# 02238 Change Order Submittal# 0 Date 8/29/2017 DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total T/PW $0.00 Water $0.00 Sewer $0.00 Sub Total Deletions Change Order Deletions Page 1 of 1