WHEREAS, the City of Fort Worth (CITY) and Criado &
Associates, Inc. , (ENGINEER) made and entered into City
Secretary Contract No. 43534, (the CONTRACT) which was
authorized by M&C C-25758 on the 24th day of August, 2012 in the
amount of $184,347 . 00; and
WHER +LAS, the CONTRACT was subsequently revised by:
Amendment Number 1 in the amount of $47 , 460 .00 which was
administratively authorized on October 2 , 2013, Amendment Number
2 in the amount of $5, 000.00 which was Administratively
authorized on April 7, 2014 and Amendment No. 3 in the amount of
$49,500 . 00 which was administratively authorized on September
28, 2015; and
WHEREAS, the CONTRACT involves engineering services for
the following project:
Water and Sanitary Sewer Replacement Contract 2011,
WSM-A; and
WHEREAS, it has become necessary to execute Amendment No.
4 to the CONTRACT to include an increased scope of work and
revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the
additional engineering services specified in a proposal dated
October 3, 2017 , a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer totals $47,188. 00 (water:
$28, 188 . 00; sewer: $19,000 .00) .
2 .
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services s1 a bean
amount of $333,495.00. OFFICIAL RECORD
CITY SECRETARY
Page -1- FT.NORTH,TX
3.
All other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED: ENGINEER
City of ort Worth Criado & Associates, Inc.
Jesus J. Chapa Cristina Criado, P.E.
Assistant CityManagerPresident CEO
DATE: Id�6y�G � DATE: f(2 -- 11- /7
APPROVAL/RECOMMENDED:
Chris Harder, P.E.
Assistant Director, Water Department
APPROVED AS TO FORM AND LEGALITY:
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and administration of
this contract, including ensuring all performance and
reporting requirements.
Name of Employee
M&C: N/A
Title: Project Manager
Date: N/A
Douglas W. Black
Senior Assistant City Attorney
OF Fps,.
ATTEST:
?'
Mary J. ser ;:�y OFFICIAL RECORD
City Secre ary ' CITY SECRETARY
FT. WORTH, TX
Page -2-
CRIADO
CIVIL ENGINEERING I LAND SURVEYING I SUBSURFACE UTILITY ENGINEERING CE&I
October 3,2017
Mr. Robert Sauceda, P.E.
Project Manager
City of Fort Worth Water Department
l000 Throckmorton Street
Fort Worth,Texas 76102-6311
Re: Water and Sanitary Sewer Replacement Contract 2011,WSM-A-Amendment No.4
Dear Mr. Sauceda,
Criado & Associates, Inc. (CRIADO) is pleased to s u b m i t Amendment No.4 t o C i t y S e c r e t a r y
Contract No.43534for additional Engineering Services for the project "Water and
Sanitary Sewer Replacement Contract 2011,WSM-A'. This amendment includes the following task:
PROJECT MANAGEMENT
CRIADO's contract schedule will be extended to December 30,2018.
FINAL DESIGN
CRIADO will provide three separate construction packages, instead of one, and incorporate up to three
sets of designs "by others" into the first construction package. CRIADO will provide final design plans
and estimates of probable construction cost, using standard CITY bid items for each part. CRiADO will
provide construction documents and project manuals for each part.
BID PHASE AND CONSTRUCTION PHASE SERVICES
CRIADO will attend pre-bid meetings, public meetings, and pre-construction meetings. CRIADO will
upload documents related to this amendment to Buzzsaw and maintain the plan holders list. CRIADO
will prepare three mylar cover sheets and will attend the bid opening and assist the CITY with tabulating
the bids. CRIADO will make an award recommendation to the CITY based on the documents submitted
by the bidders.
Our proposal to perform the additional engineering services is $47,188.0o and with approval of this
amendment,the total fee for all work and services will be$335,485.00. The following additional contract
documents are enclosed with this proposal:Amendment No.4(signed copy);and the Exhibit"B-2""Level
of Effort"spreadsheet.
4100 Spring Valley Road,Suite 1001,Dallas,Texas 75244 1 (972)392-9092 1 (972)392-9192(0 1 www.criadoassociates.com
CRIADO
CIVIL ENGINEERING I LAND SURVEYING I SUBSURFACE UTILITY ENGINEERING I CE&I
October 3, 2017
Robert Sauceda,P.E.
Page 2
We trust this proposal is satisfactory and we appreciate the opportunity to be of service to the City of Fort
Worth. If this proposal meets with your approval,please sign and date in the provided below and return
one copy as your order to proceed and approval of the budget. Please call me if you have any questions.
Sincerely, Original Contract $184347.00
Amendment No. 1 $47,46o.00
Amendment No. 2 $5,000.00
Amendment No. 3 $49500.00
Amendment No.4 $47.188.00
Revised Contract Total $333495.00
Cristina Criado,P.E.
President/CEO
Enclosures
APPROVED:
City of Fort Worth
Robert Sauceda,P.E.
Project Manager
By: Date:
4100 Spring Valley Road,Suite 1001,Dallas,Texas 75244 J (972)392-9092 1 (972)392-9192(f)J www.criadoassociates.com
EXHIBIT B-2
Level of Effort Spreadsheet
TASKIHOUR BREAKDOWN
Design Services for
Amendment No.4:Water and Sanitary Sewer Replacement Contract 2011 WSM-A
City Project No.01928,DOE No.6867
Labor hours Ex ones
Task No. Task Description Primipsl project Project EIT CADD I Administrative Total Labor Subconsultant Total Expense Task Sub Total
Manatier Engineer Cost Travel Reproduction Coat
ate $220 $150 $120 $100 $80 $60 MWBE Non-MWBE
1.0 Project Management 0 40 0 0 0 0 $6,000 s0 $0 $0 $0 $0 $6,000
1.1 Managing the Team 10
1.1. QA/QC 15 $2,250 $0 $2,250
1.2 Communications and Reporting
1.2. Pre-Design Coordination Meeting s0 $0 $0
1,2. Desi n Submittal Review Mee' $0 $0 $0
1.2. Pre are Baseline Schedule $0 $0 $0
Prepare Monthly Progress Reports with
1.2. Schedule 12 $1,800 $0 $1,800
1.2. Prepare M-thty MBE/SBE R rts 3 $450 1 $0 $450
2.0 Conco ual Desi n 30-Perron 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 so
2.1 Data Collection s0 $0 $0
22 Conceptual Design Parka a s0 SO
2.2. Cover Sheet $0 $0 f0
2.2. Exhibits and Su nm $0 $0 so
2.2. Phasing $0 $0 $0
2.2. Construction Estimate $0 $0 $0
3.0 PreliminaryDesign 60 Percent 0 0 0 0 0 0 $0 $0 s0 so s0 s0 s0
3.1 Preliminary Design Package $0 $0
3.1.1 Cover $0 SO $0
3.1.2 NMIL out $0 s0 $0
3.1.3 Plan and Pla refile Sheets $0 $0 $0
3.1.4 1 S lions s0 $0 $0
3.1.5 Construction Estimate $0 $0 $0
3.2 Comstrudalbk Review s0 s0 so
3.3 Lit"Ity Clearance $0 $0 $0
4.0 Final Design 1 6 35 126 48 0 $22,060 $0 $0 $0 $108 $108 $22 168
Final Dra11(90%)Construction Plans and
4.1 S icetlona 3 6 48 $4,800 sib $18 54,818
4.2 Sinai 100X ens and tions 1 4 24 72 $10900 $90 $90 $10,880
4.3 Construction Estimates(90%and 100%) 4 8 48 $8360 s0 $0,360
5.0Bid Phase 0 28 26 30 0 3 $10,500 $0 $0 $0 s0 $0 410.51)(1
5.1 Bd Su
54, U d Documents to Buaeaw 10 6 3 $2,520 $0 $2,520
SeA Contract Documents and Maintain
5.1. Plan Holders List 4 16 3 $2.580 $0 $2,580
5.1 Issue Addenda 4 18 $2760 $0 $2,760
5.1. AHend Bid O i 9 $1,350 $0 $1,350
5.1. Tabulate Bids and Recommend Award 2 9 $1,290 $0 $1,290
5.2 ar D s $0 $0 $0
City of Fort worth,Texas
Attachment B-Level of Effort Supplement
TypWA Water and Sewer ReplaC mMMt
FW WTR Official Rebase Date:8.09.2012 10r3l2017
EXHIBIT B-2
Level of Effort Spreadsheet
TASKMOUR BREAKDOWN
Design Services for
Amendment No.4:Water and Sanitary Sewer Replacement Contract 2011 WSM-A
City Project No.01928,DOE No.6867
Labor hoursEx arae
Task No. Task Description Principal Project Project EIT CADD AtlminlstnOve Tout Labor Subconsultant Total Expense Task Sub Total
Marta er En ineer Coat Travel Reprotlucdon Cost
Rate $220 $150 $120 $10D $80 $801 MWBE Non-MWBE
6.0 Constructlon Phase Services 0 20 30 0 24 0 $8,520 $01 $0 $0 $5 $0 $0,52
6.1 Construction Support
6.1. Attend Preconstruction Conference 11 12 $3,090 $0 $3,090
6.1. Attend Public Meetinga 12 $2,640 $0 $2,840
8.2 Record D sfAs BuAt 1 6 24 $21790 $D $2,790
7.0 ROW/Easement Services 0 0 a 0 0 0 $0 $0 $0 $0 $0 $0 f0
7.1 R'hl-of-Ent Documents $0 $0 $0
8.0 Starve 0 p 0 a o 0 $0 $0 $0 $0 $0 $0 $a
8.1 esrgn uney 0 $0 $0
Totals 1 90 91 1561 72 3 $47,080 SD $o $0 447,1015.00
Water Litre Footage 1,882 00% Project Summa
Sewer Lia F s 1,200 40% Total Hours 419
3 082 100% Tota(Labor 547,0811
Total Expense $108
(A) Total Fee $47,188 MBE/SBE Subconsuhant $(
(B) Survey Fee $0 N--MBE/SBE Subconsultant 50
(C) Toal Fes- Fee $47,188 10% Sub Marku $0
WaterFee(W%of C) MBE/SBE Par clation 0.%
19,O %
$28,158.00
Total Project Cost $17,188.00
City of Fort Worth,Tam
Attachment B-Level of Ell"Supplement
Typical Water and Sewer Replaxmara
FW WTR Official Release tate,.5 09.2012 10/3(2017