Loading...
HomeMy WebLinkAboutContract 46981-A1 CITY SECRETARY AMENDMENT No.1 CONTRACT NO. TO CITY SECRETARY CONTRACT No. 46981 WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 46981, (the CONTRACT) which was authorized by M&C C-27418 on the 18 day of August, 2015 in the amount of $ $204 , 190 . 00; and WHEREAS, the CONTRACT involves engineering services for the following project : Six Points Urban Village Streetscape Phase II, Project No. 02653; WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated May 25, 2017, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design management and construction phase coordination to be performed by Engineer totals $127,520. 00. (See Attached Funding Breakdown Sheet, Attachment B) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $331, 710. 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . .34 56 99 t1` j0 n CL C', c�j)0S ort OFFICIAL RECORD r PrdNe . tset^vicesAg e entAmendmentTemplate e MOO ase 8/� 12 CITY SECRETARY O. age 1 ooti G8 FT.WORTH9 TX Z� Z995Z EFFECTIVE as of the date subscribed by the City' s designated Assistant City Manager. APPROVED: City of Fort Worth ENGINEER Freese and Nichols, Inc. Fernando Costa Chris Bosco, P.E. Assistant City Manager Principal DATE: _ /////7 DATE: l�/a3/ice APPAL AREMMENDE R dle Ha ood Director, Planning and Development Department APPROVED AS TO FORM AND LEGALITY: M&C: C-28414 a7 Date: October 10, 2017 Douglas"< Black Form 1295# : 2017-198869 Assistant City Attorney Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitorin and administration of this contract, including ensuring all pe,�m ce and repo ing irements . A=6? Wilma Smith, P.E. , Senior Professional Engineer Transportation and Public Works Department ATTEST: * GiTY 0 ' •o Mary J. a e City Secretary ••*••Ny'+a OFFICIAL RECORD City Fort Worth CITY SECRETARY Professional Services Agreement Amendment Template PMO 2 of 3 Release 8/1/2012 FT.WORTH,TX ATTACHMENT B FUNDING BREAKDOWN SHEET City Secretary No. 46981 Amendment No . 1 Department Fund Identifier Department (FID) Amount Planning & 34014-0060419-5330500-CO2653- Development C06530-2016-14010205 $127, 520 . 00 Total: $127 , 520 . 00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA 'FORTWORTH COUNCIL ACTION' Anorovea on ,w iv,.rw R DATE: 10/10/2017 REFERENCE*"C-28414 NAME:LUU 06SIXPOINTSUVPH1&2DESIGNAMENDS CODE: C TYPE: CONSENTPUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment 2 to City Secretary Contract No.46057, in the Amount of$133,700.00, and Amendment 1 to City Secretary Contract No. 46981, in the Amount of $127,520.00, Both Being Engineering Services Agreements with Freese and Nichols, Inc., for Additional Engineering and Project Management Services for the Six Points Urban Village Streetscape Improvements(2014 BOND PROGRAM) (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council: 1. Authorize Execution of Amendment 2 to City Secretary Contract No. 46057 in the amount of $133,700.00, an Engineering Services Agreement with Freese and Nichols, Inc., for additional engineering and project management services for the Six Points Urban Village Phase 1 Streetscape Improvements along Race Street from Grace Avenue to Holden Street; and 2. Authorize Execution of Amendment 1 to City Secretary Contract No. 46981 in the amount of $127,520.00, an Engineering Services Agreement with Freese and Nichols, Inc.,for additional engineering and project management services for the Six Points Urban Village Phase 2 Streetscape Improvements along Race Street from Grace Avenue to Oakhurst Scenic Drive and Along Sylvania Avenue from 150 Feet North of Race Street to the State Highway 121 Frontage Road. DISCUSSION: On June 2, 2015, Mayor and Council Communication (M&C G-18493), the City Council allocated the amount of$2,500,000.00 in 2014 Bond Program Urban Village Funds to the Six Points Urban Village for complete street improvements in accordance with the 2007 Six Points Urban Village Master Plan and the Comprehensive Plan. In addition, as part of the Fiscal Year 2017 capital projects budget, an additional $1,548,533.00 in 2014 Bond Program Urban Village Funds was appropriated to the Six Points Urban Village complete street improvements projects to cover an anticipated Phase 1 shortfall due to increases in construction costs and easement acquisition costs, for a total 2014 Bond Program Urban Village Funds appropriation of$4,048,533.00 for the Six Points Urban Village. Phase 1 Scope Amendment On October 14, 2014, Mayor and Council Communication (M&C C-27028), the City Council authorized the execution of an Engineering Services Agreement in an amount not to exceed $217,925.00 with Freese and Nichols, Inc., for the design of pedestrian and streetscape improvements in the Six Points Urban Village. On January 1, 2016, the City executed Contract Amendment 1 (46057-A1) in the amount of$33,000.00 for additional easement acquisition services, including processing 25 additional easement documents. The proposed Contract Amendment 2 includes the following expanded scope: historic resources survey, additional survey documents, additional project design and property owner meetings, and construction phase meetings and documentation (City and TxDOT). Phase 2 Scope Amendment On August 18,2015, Mayor and Council Communication (M&C C-27418), the City Council authorized http://apps.fortworthtexas.gov/council_packet/mc_review.asp?ID=25129&councildate=l... 10/13/2017 the execution of an Engineering Services Agreement in an amount not to exceed $204,190.00 with Freese and Nichols, Inc., for preparation of engineering documents for the construction of the Six Points Urban Village Phase 2 streetscape improvements. The proposed Contract Amendment 1 includes the following expanded scope: modify the preliminary design, prepare intersection design details for design competition, additional project and property owner meetings, construction phase meetings and documentation. Below is the Six Points Streetscape Improvements Project(Phase 1 &2) estimated schedule. The Phase 1 bid advertisement date is contingent upon TxDOT approval. Activity JlPhase 1 Phase 2 Design Complete August 2017 Iseptember 2017 Design Services Contract October 2017October 2017 Amendment M&C Approval Advertise Construction September 2017 1 October 2017 Award Construction Contract ,December 2017 January 2018 The project is included in the 2014 Bond Program.Available resources within the General Fund will be used to provide interim financing until debt is issued. Once debt associated with the project is sold, bond proceeds will reimburse the General Fund, in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 21241-05-2014)and subsequent events taken by the Mayor and City Council. Streetscape projects such as this typically have a higher long-term basic maintenance cost than standard street projects because of additional landscaping and paving details. The Park and Recreation Department has estimated an annual budget impact for this project could average $5,400.00 per 1/10th mile (block), depending upon the extent of landscape improvements. Freese and Nichols, Inc., agrees to maintain its initial DBE commitment of 14 percent that it made on the original Agreement(CSC No.46981) and extend and maintain the same DBE commitment of 14 percent to this first amendment. Therefore, Freese and Nichols remains in compliance with the City's BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous DBE Commitment form executed by an authorized representative of its company. Freese and Nichols, Inc., agrees to maintain its initial DBE commitment of 13 percent that it made on the original Agreement(CSC No. 46057) and extend and maintain the same DBE commitment of 13 percent to this second amendment. Therefore, Freese and Nichols, Inc., remains in compliance with the City's BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous DBE Commitment form executed by an authorized representative of its company. The project is located in COUNCIL DISTRICT 9. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as appropriated, of the Grants Fund for the Phase 1 project, and that the appropriations are included in the Fiscal Year 2017 Adopted Budget of the 2014 Bond Program pursuant to Ordinance No. 21457- 09-2014. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year (Chartfield 2) FROM http://apps.fortworthtexas.gov/council_packet/mc review.asp?ID=25129&councildate=l... 10/13/2017 Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year I (Chartfield 2) Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Randle Harwood (6101) Additional Information Contact: Patrina Newton (8068) ATTACHMENTS MC Map - Six Points Phase I.pdf _ MC Map - Six Points Phase II.pdf Phase1Form 1295.pdf Phase2Form 1295.pdf http://apps.fortworthtexas.gov/council_packet/mc_review.asp?ID=25129&councildate=l... 10/13/2017 ts Urban Village Phase II Streetscape Project IRGINIA` zM �� uo� MURPHY r m t °r Lu — M� roposed ImprovementsLI , `. 1f ,k1MC„_I:ELEMORE IS, KAIo_ �. � ” PUM1fl100 z I.Y. <� ; � , • k,'AKERS� ! ! � ,-� �` DAMON: � : � +� f u t DAMONRm 1,4, MARS e -L eGRAPEWOOD 3 MARSHALL•x LL, (ALPS NOBLE. �.. z � � � � o �• ,; r ' lu ti • w Q.� -•; ' a + ' P TTSBURG ;v a P� �An z > AIRPORT 4 �._'�I x Legend Z ,21i. m, STATE=HWY.12 Six Points Urban Village ;5[A RpYNERg ,x: CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3.5,and 6 if there are no interested parties. CERTIFICATION OF FILING I Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-198869 Freese and Nichols,Inc. Fort Worth,TX United States Date Filed: 2 Name of governmental entity or state agency that is a parry to the contract for which the form s 04/26/2017 being filed. City of Fort Worth Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract Contract No.46981-A1 Engineering Services Nature ofinterest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Payne,Jeff Frisco,TX United States X New,John San Antonio,TX United States X Hatley,Tricia Oklahoma City,OK United States X Gooch,Tom Fort Worth,TX United States X Milrany,Cindy Fort Worth,TX United States X Nichols,Mike Fort Worth,TX United States X Coltharp,Brian Fort Worth,TX United States X Pence,Bob Fort Worth,TX United States X Herchert,Robert Fort Worth,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. SUSANNE M.JOHNSON * aotary t�hlk.5t"of Texas nn ooeFlip- - 91070 Not"ID i1MM&A Sign re ofth zed agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said Kelly J.Shriver this the 26th day of Apfll , 20 17 ,to certify which,witness my hand and seal of office. nqSusanne M.Johnson Notary Signature of officer administeroath Printed name of officer administering oath Tide of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883 Innovative •• •_ r .. ,�,�rachc_ ?1V ■ / _ e 4055 International Plaza,Suite 200 • Fort worth,Texas 76109 • 817-735-7300 • fax 817-735-7491 www.freese.com May 25, 2017 Mrs.Wilma Smith Project Manager City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102 Re: Phase II-Contract Amendment Proposal No. 1 for Six Points Urban Village Phase (Contract No.46981-Ai) Dear Mrs.Smith: This letter is written in response to our discussions related to providing additional design management and construction phase coordination services for the City of Fort Worth for the Six Points Urban Village project from Oakhurst Scenic Drive to Grace Avenue. It is our understanding that the City of Fort Worth will be providing full time construction inspection and performing materials testing. FNI would provide project management services during construction in support of TPW during construction. With the decision from the City legal department to no longer allow right-of-entry agreements for minor grading we have include 15 additional temporary easement documents in this amendment for your review and approval. FNI proposes a contract modification fee not to exceed $127,520.00. Refer to the attached level of effort spreadsheet for a detailed breakdown of the proposed services.The following is a summary of our DBE participation to date for this project. Contract and Amendments Total Fee SBE Fee SBE% Original Contract $204,190 $29,850 14.6% Amendment No. 1 $127,520 $18,000 14.1% Project Total $332,710 $47,850 14.4% Thank you for the opportunity to be of service to the City of Fort Worth. If you have any questions concerning this proposal, please do not hesitate to contact me at 817-735-7359. Sincerely, Freese and Nichols,Inc. Chris Bosco, P.E. Project Manager AMENDMENT No.1 TO CITY SECRETARY CONTRACT No. 46981-A1 WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 43013, (the CONTRACT) which was authorized by M&C C-27418 on the 3rd day of September, 2015 in the amount of $ $204,190. 00; and WHEREAS, the CONTRACT involves engineering services for the following project: Six Points Urban Village Streetscape Phase II, Project No. 02653; WHEREAS, it has become necessary to execute Amendment No.1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated May 25, 2017, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design management and construction phase coordination to be performed by Engineer totals $127,520. 00. (See Attached Funding Breakdown Sheet, Attachment B) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $331, 710. 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth Professional Services Agreement Amendment Template PMO Official'Release 8/1/2012 Page 1 of 3 EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Freese and Nichols, Inc. Fernando Costa Chr. s Bosco, P.E. Assistant City Manager Principal DATE: DATE: APPROVAL RECOMMENDED: Randle Harwood Director, Planning and Development Department APPROVED AS TO FORM AND LEGALITY: M&C: Date: Douglas W. Black Assistant City Attorney ATTEST: Mary J. Kayser City Secretary City of Fort worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 3 FUNDING BREAKDOWN SHEET City Secretary No. 46981-A1 Amendment No. 1 Department Fund-Account-Center Amount Planning & C210 531200 069650265330 Development $127, 520 .00 Total: $127, 520 .00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 ATTACHMENT "A" Scope for Engineering Desiqn Related Services for Construction Coordination The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE The objective of the project is to provide project management support for the Six Points Urban Village project and provide regular updates to the Transportation and Public Works department WORK TO BE PERFORMED Task 1. Design Phase Management Support Task 2. Project Management Support during Construction Task 3. Survey—Temporary Easement Documents Task 4. Additional Services TASK 1. Design Phase Management Support ENGINEER will support the construction phase of the project as follows. 1.1 Project Management Support • The ENGINEER shall coordinate with Right-of-Way agent(Up to 4 meetings) • The ENGINEER shall attend and document up to 10 additional meetings with property owners • The ENGINEER will coordinate with project control specialist monthly. • The ENGINEER will attend up to 15 meeting with program manager • The ENGINEER will prepare documents for M&C's (Up to 2 M&C's) • The ENGINEER will update the intersection design concept materials and specs based on the results of the design competition. • The ENGINEER will update the final plans with a reduced cross section to 11 feet lanes to maximize the parkway width. ASSUMPTIONS • 10 property owner meetings • The intersection design competition selection will not change the geometry of the intersection. The modification will only include material design and material specifications. City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 1 of 3 .w DELIVERABLES A. Meeting Documentation TASK 2. Project Management Support during Construction. ENGINEER will support the construction phase of the project as follows. 2.1 Project Management Support • The ENGINEER will prepare project summary memo • The ENGINEER will prepare weekly progress meetings (up to 30) • The ENGINEER will coordinate reviews of submittals, BFI's, pay estimates, and change orders. • The ENGINEER shall attend up to 24 construction coordination meetings and document the meeting with meeting minutes • The ENGINEER will prepare up to 15 monthly progress memos with project photos and description of progress and any current construction issues or delays. • The ENGINEER will coordinate with project control specialist monthly. • The ENGINEER will review record drawings for project closeout ASSUMPTIONS • 24 site visits or attendance at construction meetings DELIVERABLES A. Monthly project status memos B. Decision Log TASK 3. Survey—Temporary Easement Documents 3.1 Survey Documents • FNI's sub consultant will prepare up to 17 additional temporary construction easements for the project. ASSUMPTIONS • The temporary construction easements are needed for minor grading adjacent to the proposed sidewalk extending beyond the existing right-of-way. DELIVERABLES A. 15 Temporary Construction Easements City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 2 of 3 TASK 4. ADDITIONAL SERVICES ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existing Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Construction management and inspection services • Construction survey staking • Performance of materials testing or specialty testing services. • Post Construction Subsurface Utility Engineering • Asbuilt Survey City of Fan Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 3 of 3 Level of Effort SPreedstleet TASK/HOUR BREAKDOWN Design Services for Six Points Urban Village(Phase II) City Project No.02553 Tuk ervWltn* Cts ui_ Ted iu4 tta. TM Lw— OIkBe Dabi�Y! TM ReplelCllee e� to DPDiw Mut n $107,1$0 Inwalm so tif0 As mm sus, AgwA oanl.eD aetlngs(f —W) ol 1 $1.012. "21 lopulYu.—mewkpa(lalfeeWDs) lol 4 i$.3410M fl $1 ..am Maealp ODamfrea0cn o $1,Sv u. elect f 1 i10,22f itm fl ftp. mwMWal 6L2 31,20/ Vc ft.2 s7+f2 w m s7.fn b p clam$ IOS. $12. U P"4mt Mulegenwal supput t ID N . ISiuea Multi 2 51,W1. $1,07 115) 50 $4070 se f>a Sabmiwl Reviews -rLB SIdni0e4 z m M.aW F. ReWaw ue W RFlY FJL 10 RFPs B m fe.$M f0.9c Revew unrul P laid EsLBP Ixnl ab $else $5. C xdn 0m wet ICOeaW leksl ESL 10 les 2 21 L4.0$0 M. Carekmlion CoordNldonM 2f 1f so $11,2$2. sM ftf. pp—and SIOIeIfM MNxMs w fe.DO fa Review C 17rEer oast Eel f C Dr0ersl 4 53.D1$. u W MMMeN Dedebn - 4 21 m.m N. Review Pr iRecaa Dt feD0so FlrW Iflevffw uel Gk-A v AmlUmei erlgm —115) 4feDs fle,om i10 fla .. ... .r,... �'`� PfebcilPellmery $'.I tw T"E— tie w s MO wi ME FmMiw-- OIY d Fwf WwP,Tave Axedmwf 8-laWl d Ellin BtppWewa Plq UAJeI Rdeem Db 51a.2olD lq1