HomeMy WebLinkAboutContract 47923-CO4 CITY SECRETARY 1 CONTRACT N0. FORTWORTH® City of Fort Worth Change Order Request Breakdown Project Namel Mark IV Parkway and Cantrell Sansom Road CitySec# 1 47923 -� Client Project#(s)l 02261 Change Order Submittal# ® Date 9/28/2017 Dept. TIPW Water Sewer Contract Time Totals CD Original Contract Amount $2,835,119.98 $2,835,119.98 250 Extras to Date $82,666.17 $82,666.17 21 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $2,) 765 , _ " n $2,917,786.15 271 Amount of Proposed Change Order 29?6 R r7Q000 •$29,468.95 56 Revised Contract Amount %$ $ $i; 9 , . $2,888,317.20 327 Original Funds Available for Change Orders $140,000.00 $140,000.00 Remaining Funds Available for this CO V-01 $57,333.83 Additional Funding ifnecess `.Y h � CHANGE ORDERS to DATE JINCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) 5398 Xeriscape features were added to the roundabout center island to reduce long term landscaping maintenance cost.Irrigation and landscaping fine items from the original bid documents and Change Order No.3 additions have been credited back on the deletions tab.The sum of the change orders(1-4)to date is$53,197.22. .r OF F� �O Aq �y .................. OFFICIAL RECORD Marr J i ys , City Secretary CITY SECRETARY - FT.WORTH,TX EqgTw0RjH City of Fort Worth Change Order Additions Project Name I Mads N Parlmay and Cm*d Sansom Road City Sec# 47923 Client Project# 1 02281 Change OrderSubmktal# Date 9R6l2017 ADDITIONS ITEM DMIRIPTION DEPT Qty Unit rtit cost Total ew UNU.0000 Xeriscape-Integral Coloredflexturedncre New 9999.0000 Xaftcape- Concrete tkw Strip ew 9999.0000 Xedscape-Decomposed Granite WalkwayDepth) gr-- Raw-9999.0000 Xedwape- Colorado Boulder ew 9999.0000 Xe-n-scape-Landscape Fabric TA5W- 2,467.00 SF $1,233.50 New 9999.0000 Xedscape-Sandy Soil Mix ew 9999.0000 Xedscape- - River Rock ew 9999.0000 enscape- n er ra (Perforated) rent ew 9999.0000 Xedscape- n e ran(Non-Perforated)(Bore T/PW $60,216.40 Water $0.00 Sewer $0.00 Sub s Change Order Additions Page 1 of 1 >Eq 'rW� 30►r� City of Fort Worth T Change Order Deletions Protect Name I Mork N Parkway and CantraB Sansom Road City Sec# 47923 tent Project# 0226 Change Order Submittal# ® Date 9!2812017 DELETIONS ITEM DFSGPJPUION DEPT Qty Unit Unft CostTotal ewJ21 irrigation Meter --Re—w—Water service account setup and payment or I year from project acceptance ew Water Senice account dozing1traftsfer back to the city Locked ate Valve for Irrigation Main Drip Irrigation System-Central Island 135 9999.0000 Landscape-Yucca a ra a erpera oe pan ora peps --72—9999.0000 Landscape-Soft Yucca(Yucca amentosa an scape-Dwark Japanese Juniper unoerus procam ems a Landscape-Cotoneaster Rock(Co—toneaster orozon fW—9999.0000 Landscape-Muhly Grass While ou mu en erg a cape ares an scape a unny oun m Grass'(Panniselum alopercurfoc 141 9999.0000 Landscape-BLffalo grass(609)(Buc oe acry on Landscape- Concrete Mow Ship fTF—9999.0000 Landscape-Decomposed Granite Walkway LandscapeGeneral Use Compost RF—9999.0000 Landscape-Landscape Mulch Rg—9999.0000 Landscape-Planting Bed Prep 9, 35 Water 0.00 Sewer $0.00, Sub otal Deletions Change Order Deletions Page 1 of 1 MISBE Breakdown for this Change Order Total 4 t3 Previous Change Orders Total Contract Compliance Manager: By signing, I acknowledge t at I am the person responsible for the monitoring and administration of this contr ct, including ensuring all performance and reporting requireme Clint Hoover, P.E. Sr. P fessional Engineer CFW Change Order Approval St-COApp10 Page 2 of 3 t FORT WORTH® City of Fort Worth j pp Change Order Request Approval q (Change Order Breakdown Available in Links) z For Change Order Submittal No.:K Change Order No.: St-COApp10 _ Date Started: 207-1 10-10— --_� City Sec. No.: 7923 — � Date Due: 2017-11-29 Project Name: Mark IV and Cantrell Sansom 02261_ "------------- �—____ DOE Numbers: Project Numbers: DOE No. --- i Projectrand struction of roundabout-at Cantrell Samson Rd^and Mark IY ! Description: 2 lanes on Cantrell Samson Rd I Project Manager: Llssette AcevedoM _ 1 City Inspector:*evin Chambers Contractor: ]CLB Contractln�s LLC --_-- I COUNCIL ACTION (If Required): M&C Log Name: 1 M&C Number:E- - ,_` - _ M&C Date: i I COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: �PW ---- - - -29,968.455 Total Cost:L$,_-29,968.45 Total Requested Days: 56 _ Approval Status: I 1 I i i https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 10/30/2017 CFW Change Order Approval St-COApp10 Page 3 of 3 Approved: Yes Comments: User: Aaron Perez Date: 2017-10-10 8:33 AM Approved: Yes Comments: i User: Lissette Acevedo I Date: 2017-10-16 8:21 AM Approved: Yes Comments: User: Lissette Acevedo Date: 2017-10-16 8:32 AM k' i 1 Approved: Yes Comments: User: Kim Arnold Date: 2017-10-17 12:25 PM i i Approved: Yes Comments: User: Doug Wlersig i Date: 2017-10-19 10:32 PM 1 Approved: Yes Comments: User: Doug Black Date: 2017-10-26 1:32 PM I 1 Approved: Yes Comments: User: Jay Chapa i Date: 2017-10-30 9:29 AM I 1 Action Required: I i f i i i i i https://projeetpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 10/30/2017 I