Loading...
HomeMy WebLinkAboutContract 28082-A3 CITY SECRETARY AMENDMENT No.3 CONTRACT NO, TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and RJN Group, Inc. , (ENGINEER) made and entered into City Secretary Contract No.28082 , (the CONTRACT) which was authorized by M&C C-19234 on the 10th day of September, 2002 in the amount of $399,527 .00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount $96,083.00 which was authorized by M&C C- 19886 on August 12 , 2003 and Amendment No. 2 in the amount of $39 ,010 .75 administratively authorized May 20, 2015; and WHEREAS, the CONTRACT involves engineering services for the following project: Wholesale Customer Wastewater Meter Station Site Selection; and Design -Edge Cliff Meter Station; and WHEREAS, it has become necessary to execute Amendment No.3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 29, 2017, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $49, 977 .25 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $584 ,598 .00. OFFICIAL RECORD 3. CITY SECRETARY FT. NORTH, TX Page -1- All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER RJN Group, 149c. , Jesus J. Chapa Daniel Jac son, P.E. Assistant City Manager Vice President DATE: 4e7"/�f DATE: APPROVAL RECOMMENDED: P'oolt /4/t C Chris Harder, P.E. Assistant Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee Title: Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A Douglas W. Black Senior Assistant City Attorne O ATTEST:_ ��CORT Ma y I J-JkAyer` City Secretary * OFFICIAL RECwT�1.. ............ CITY SECRETARY` p ,` FT.WORTH, Tx � Page -2- —A{ r�'n T , www.rjn.com e Excellence through Ownership September 29,2017 Mr. Robert Sauceda,P.E., Project Manager,Fort Worth Water Department City of Fort Worth 1000 Throckmorton St. Fort Worth,TX 76102 RE: Contract Amendment No. 3—Edgecliff Village Revised Meter Station Design Plan Mr. Sauceda: The RJN Group, Inc. (RJN)has performed additional Professional Engineering Services for this project which addresses the provision of additional City authorized design services for the Town of Edgecliff Village Wholesale Customer Wastewater Meter Station. Due to existing hydraulic grade issues on the Edgecliff Village owned segment of M-283 located under the previously named Missouri and Kansas railroad line(now the Union Pacific railroad(UPRR)),the final wholesale meter station site was required to be located east the UPRR line which divides the City of Fort Worth from Edgecliff Village. This amendment specifically addresses the provision of engineering and subcontracting services for the sighting and preliminary design of the third(3rd)proposed meter site location and the initial planning for the fourth(4th)proposed meter station site location that had to be pursued on this project due to the impacts of hydraulic grade busts in the existing pipeline as noted above and the localized floodplain and floodway impacts of the West Branch of Sycamore Creek. Supplemental Project Activities Conducted Associated with Amendment Request Amendment No. 3 to the above reference professional services project addressed the required reconfiguration of existing M-216* and M-283 piping east of the railroad associated with proposed meter site number three. The third(3rd)meter site was a relatively shallow, compressed footprint,meter station design that was located in the floodway of the West Branch of Sycamore Creek; as a result,the design of a metering facility at this site required the placement of the meter station controls and solar panel power supply equipment outside of the floodway. They were proposed inside of an existing Argos-US concrete batch plant off old Hemphill Road. RJN conducted preliminary negotiations and design coordination with local Argos officials to site those meter station controls within the plant property. One of the critical design elements RJN had to address to make this meter site alternative viable was to design a floodwall gate into the stacked concrete block floodwall surrounding the existing concrete plant property. Preliminary plans were produced and submitted to the City for concurrence and authorization to proceed with final design at this location. RJN staff met with Chris Harder in the field to review r,0 n rO ,D www.rin.com Excellence through Ownership this proposed meter site location and it was ultimately not approved due to long term access concerns for Field Operations personnel. During that site visit,RJN staff and Mr.Harder investigated a fourth(41)location. This site was determined to be the final site location for the proposed meter station. The fourth(4"')meter station location was set on the east side of the West Branch of Sycamore Creek on the high bank of the creek and adjacent to the Tarrant Regional Water District's 96-inch raw water line easement. Because of its' unique location in a very active floodplain,this meter station required substantive additional engineering services to address site access,limited right- of-way(easement)space and restrictions,constructability,a major sewer line creek crossing,poor system hydraulics and existing sewer system surcharging impacts. More specifically,this meter station location design required the extension of 250 LF of 18-inch sanitary sewer in a 30-inch casing pipe installed by trenchless construction methods to relocate the current Edgecliff Village point of entry into the City of Fort Worth collection system. This meter site increased the overall depth and size of the meter station structure to approximately 26.5 feet and the meter vault footprint expanded from a 6-ft by 6-ft cast in place vault to an 8-ft by 8-ft cast in place vault. Due to floodplain concerns the meter station controls had to be placed on a raised structural platform and be constructible without encroaching on the existing TRWD raw water line easement. This site restriction significantly impacted our ability to make alignment adjustments(several alternatives were analyzed)to the meter station piping in order to improve the overall meter station hydraulics from low flow to downstream surcharging events on M-283. Polymer manholes were selected for the siphon structures located upstream and downstream of the new meter vault. The purpose of this amendment request is to address costs associated with the additional work performed and described in detail on this project to date as noted above. The additional work was performed during the third and fourth alternative development and site selection processes conducted for the proposed City of Fort Worth wastewater meter station to serve the Town of Edgecliff Village(ECV). Additionally,this amendment request also incorporates new engineering fees required for completing the station design due to the new design plan and revised meter station location in the 100-year floodway and floodplain boundaries. The table below summarizes the cost recovery amounts being sought to address the amendment items worked on and discussed above. Task. Description Hrs Labor($) Expenses($) Total Costs w 5%Inar kup) $ Task 1 Project Management. 1.2.3 Design Submittal Meetin s4.5 $625.00 $ 22.05 $ 647.05 Subtotals: 4.5 $625.00 $ 22.05 $ 647.05 Task 3 Preliminary Design: 3.1.1 Site 3—Hydraulic analysis, 57 $6,750.00 $ 89.25 $6,839.25 pipe routing plans&details 3.1.A1 Additional Electrical Design — 30 $3,790.00 $ 12,915.00 $ 16,705.00 6701Brentwood Road,Suite 1 11W-Fort Worth, • • 11 16 r;n ,�..� o u,., www.rjn.com Excellence through Ownership new Electrical sub for MS Loc#4 with 5%markup 3.LB Structural Design Services for 40 $5,600.00 $ 992.25 $ 6,592.25 MS Loc#3 with 5%markup 3.1.13 Floodwall Gate Design by RJN 66 $9,100.00 $ 52.50 $ 9,152.50 —MS Loc#3 Subtotals: 193 $25,240.00 $14,049.00 $39,289.00 Task 9 Permitting Services: 9.1 SW3P—erosion and sediment 16 $2,020.00 $ 0.00 $2,020.00 control plans 9.2 Environmental Services 20 $2,930.00 $ 1,244.25 $4,174.25 (desktop survey and site visit— MS Loc#3&4 9.3 ECV MS#3 &4—Floodplain 17 $2,310.00 $ 47.25 $2,357.25 permit 9.7 Coordination with EC Village— 10 $ 1,490.00 $ 0.00 $ 1,490.00 MC Loc#3 &4 Subtotals: 63 $ 8,750.00 $ 1,291.50 $10,041.50 TOTAL: 260.50 $34,615.00 $ 15,362.55 $49,977.55 AMENDMENT NO.3 TOTAL AMOUNT: $49,977.55 CERTIFIED PROJECT PARTICIPATION SUMMARY As noted before, there are supplemental services required to be performed by existing certified M/WBE firms previously identified with this project. More specifically, $8,055.00 of the total amendment request will be performed by the following certified M/WBE/SBE firms as follows: Task Firm Amount Percent(%) Additional Electrical Design Gupta and Associates,Inc. $10,750.00 21.51% Additional Structural Design JAKAN Engineering,PLLC $ 500.00 1.00% TOTAL: $11,250.00 22.51% The proposed M/WBE/SBE services noted above represents a twenty-two and one half percent (22.51%) commitment level to the project costs associated with Amendment No. 3. Contract Amendment No. 3 represents approximately nine point three-five percent(9.35%) increase in the total project contract value. Therefore,we are requesting Contract Amendment No. 3 to the Edgecliff Village Meter Station Improvements Project Agreement be approved in the amount of$49,977.55. r'n g1roua www.rjn.com Excellence through Ownership For your convenience, a summary of the total project fees are as follows: Contract Item Fee Original Contract Amount $ 399,527.00 Amendment No. 1 $ 96,083.00 Amendment No. 2 $ 39,010.00 Amendment No. 3 $ 49,977.55 Amended Contract Value $ 584,597.55 Please do not hesitate to contact us should you have questions or need any additional background information concerning this matter. Thank you for your time and consideration. Sincerely, /�k..Z4 Chris Brooks,P.E., Senior Project Manager RJN-18274500 CC: Tony Sholola,P.E.,FWWD,City of Fort Worth Daniel Jackson,P.E.,Vice President,RJN Group