Loading...
HomeMy WebLinkAboutContract 42723-A3 CITY SECRETARY AMENDMENT No.3 CONTRACT N0. ,' 3 TO CITY SECRETARY CONTRACT No. 42723 WHEREAS, the City of Fort Worth (CITY) and James DeOtte Engineering, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 42723, (the CONTRACT) which was authorized by M&C C-25189 on the 11th day of September, 2011 in the amount of $526, 623; and WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in the amount of $149, 866 which was authorized by M&C # C-27778 on June 21, 2016, Amendment Number 2 in the amount of $39, 300 which was administratively authorized on and Apn'1 3, aei+ WHEREAS, the CONTRACT involves engineering services for the following project: Greenfield Acres Storm Drain Improvements; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated October 19, 2017, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $35, 300. 00. (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $751, 119. 00 . _ 3 . 5 0 7� 9'10 7 l Al � Wther provisions of the Contract, which are not expressly Xer�d he n, shall remain in full force and effect. �o", forth a ess in�`ISe es ement Amendment Template OFFICIAL RECORD C Offici 1. se 9 /2017 Pe.'@ G�O CITY SECRETARY IT. WORTH, TX FUNDING BREAKDOWN SHEET City Secretary No , 42723 Department Fund-Account-Center Amount TPW 59651-02000431-5330500-C01549-CO2830 $35, 300 . 00 Total: $35, 300 . 00 City of Fort Worth Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 Page 4 of 4 es ....................................... L_1� O I t e land&Wft r► . Er-,,_ _neeri.r?gi D ENGINEERING nrj ........ ..c nn..HyaouscMoaeung 19 October 2017 Mr. Steve Eubanks, P.E. Project Manager Stormwater Capital Projects Engineer TPW Stormwater Management Transportation and Public Works City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Ref: Amendment #3 GREENFIELD DRAINAGE IMPROVEMENTS Project No. 01549; City Secretary Contract No. 42723 Mr. Eubanks, Due to additional services that are outside the scope of the existing contracted agreements that have been requested by the City to be performed as part of the referenced project, James DeOtte Engineering, Inc.will perform the work outlined in the following items: Additional services: 1. Re-design of a detention pond in lieu of a drainage channel on City acquired property on the south side of South Ridge Road. Available funding has presented an option to increase the volume of the current drainage channel into a detention pond. The detention pond will be bound by the City acquired properties. The top of slope being generally offset -10' from the bordering property lines except around the re-routed sewer line along the south & west edges and the preserved trees at the northeast corner of the pond area. Slopes will be 4:1 on all sides except for the area west of the incoming box culverts at the northwest corner of the pond area. The regraded volume will be based on doubling the original construction excavation volume to create approximately an additional 32,000 cubic yards of excavation. This scope item also includes one review revision iteration after the initial update. All subsequent revision iterations that the City should wish to be performed shall be considered additional services not included in this amendment and will not be performed without agreement of another design fee amendment. 4ax E11.43D W4S =1 Dot%Lynn KoAm Sts.114• Fait WOM M 7612D phone a17.N6AW ..................................................��..�.............................................................. 1bPlS R"Rep.Na/0101�00181'E firm kap.No.8417 19 October 2017 Greenfield Drainage Improvements Amendment No. 3 2. Floodplain model update to include new detention pond in lieu of drainage channel for LOMR submittal. The scope for this item will include updating the hydraulic & hydrologic models occurring only upstream of downstream connection of the channel into the existing twin 5'x4' box culverts north of Fathom Drive using the currently proposed closed storm drainage system's figures. This scope item also includes one review revision iteration after the initial update. All subsequent revision iterations that the City should wish to be performed shall be considered additional services not included in this amendment and will not be performed without agreement of another design fee amendment. JDEI anticipates the fees listed above for the various elements of the project to be a not to exceed amount of$35,300.00. All costs, associated with the identified scope of work, will be lump sum for the scope provided and will be billed as a percentage of completed work as determined by JDEI. This scope of work assumes any services not specifically listed as part of this contract will be treated as an additional service. The owner will be notified before any additional services are performed. Summary of previous contract amendments: Original Contract $ 526,653.00 Amendment #1 $ 149,866.00 Amendment #2 $ 39,300.00 Amendment #3 $ 35,300.00 Total Revised Contract $ 751,119.00 Sincerely, Fe0tte, Jam P.E., R.P.L.S. President tmr s17:93p.011b 2301 00t$*LV Mr PQ1k%V0V 31e.119 . FW WwOh 114 76120 phorn d17.446.6tt77 ..................................................................................................................... UM FYrn Roo Ma.101014W UK Firm 20%MM 0417 40 MHwM INUM Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for Greenfield Acres Neighborhood Drainage Improvements Amendment#3 City Project No.01549 Labor lhours Ex ens. Task No. Task Description Project Project Project EIT CADD Administrative Total Labor Subconsunant Total Expense Task Sub Total Manager Mana ar Engineer Cost Travel Reproduction Cost Rate $200 $180 $120 5110 $too $75 MWBE Non-MWBE 1.0 Project Management 0 0 0 0 0 0 $0 fo $0 $0 $0 _ _ $0 0 1.1 Managing the Team 1.1.1 Ine-real Team Meetings $0 $U s0 1.1.2 UA JC $0 $0 $0 .2 Ccnn•runications and Rep,,O,g '_2.1 Pre-Design Ca'c ie0 Moc6ng $0 $0 $0 1.2.2 Bi-mnnihly Pjnj<ct Update Meetings $0 $0 $0 '..2.3 Design Submittal Review Meetings $0 $0 $0 1.2.4 Prepare Baseline Schedule $0 $0 $0 Prepare Monthly Progress Reports Win 1.2.5 Schedule $0 _ $0 _ s0 1,2.6 Prcoare Monthly r<I WBE Re its _ $0 $0 50 1.2.7 Invarcin $0 $0 $0 2.0 Conceptual Design(30 Percent 0 0 0 0 0 0 $D $0 $0 $0 _ $0 $0 $0 3.0 Pjelimina Design(60 Percent) 0 0 0 0 0 0 $0 $0 $o $0 $0 $0 $0 4.0 Final Desr n 2 4 16 16 24 0 $7,200 $0 $0 so $0 $0 $7,200 4.1 Final(100%)Plans-South Pond Re-grading 2 4 16 16 24 $7.200 $0 $1,200 4.3 Project Decision Logs $0 $0 $0 4 4 Consuuctlon Estimates $0 _ $0 SG 4 ':briitA Reproduction $0 $0 SC 5.0 Bid Phase 0 0 0 0 0 0 sos0 s0 $0 $0 $0 $0 6 C Construction Phase Services 0 0 0 0 D 0 $0 s0 $0, $0 $0. s0 $0 7.0 ROWiEasert,or S.rvicas 0 0 0 0 0 0 $0 $0 $0 s0 $0 $0 $0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 so 9.0 Permitting _ 28 0 144 40 0 e $27,880 $0 $0 $0 $220 $220 $28,100 9.1 SWI'1'P SO $0 50 9.2 $0 s0 s0 9.3 Flcotl Iain $0 $0 $0 9.3.1I U date H1 C-HMS-Ao'l $0 $0 $0 Update Stage-Slur age-Discharge tables 9.3.7.1 er new geomeby 2 20 2 $3,020 SD $3,020 City of Fort Worth,Texas Attachment B-Level of Effort Supplement PMO Oficial Release Date:S.19.2010 1 012 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Greenfield Acres Neighborhood Drainage Improvements Amendment#3 City Project No.01549 Labor hours) Ex ense Task No. Task Description Project Project Project EIT CADD Administrative Total Labor Subconsultant Total Expense Task Sub Total Manager Manager E.n lneer Cost Travel Reproduction Cost Kate $200 $180 $120 $110 $100 $75 MWBE I Non-MWBE 9.3.2 Update HEC-RAS model $0 $0 $0 9.3.2.1 Update Q fr—HMS 4 $480 $0 $450 Generate arc apply new section 9.3.2.2 geometry 4 40 4 $6,040 $0 SB,040 Compare and analyze O downstream 9.3.2.3 Fathom per FFMA flows 1 12 $1,640 $0 $1,640 5.3.2A Map floodplain and BFEs 1 4 2 $900 $0 S900 9.3.3 Prepare Exhibits and Reports $0 $160 $160 $160 9.3.3.1 11MS H dro ra hs&Workmap 1 10 4 1 $1,915 5[1 5',915 RAS x-sections,profiles,workmap.& 9.3.3.2un maty tables 1 10 4 1 $1,915 $0 5'.915 oodpla,r exhibits,(existing&proposed 9.3.3.3 ent cansllucion) 1 10 4 1 $1,915 $0 $1915 9.3 3 4 9FF co•nparison vs.existing FFs 1 10 4 1 $1,915 SO $'..915 9.3.4 Report Discussion and Response $0 $0 $0 9.3.4.1 C-ly review 4 4 $1,280 $0 $1,280 9.3.4.2 Generale rev'sod report 12 20 16 4 $6,860 1500 $60 $6,920 94 Txo01 $0 _$f] $0 9.5Raihoad $0 $0 $0 96 TULR $0 9.7 Cay of Fort�.61'orth Parks Conversion $0 SO $0 9}3 _._.-. _.__..�. Ci[ of Fort'oVn lh C, ,dlil $0 $0 $0 To[als 30 4 160 56 24 8 ;34,080 $0 0 $220 $220 $35,300 Project Summary Tnral lk,rrs 232 1 oral t abor 53S UK Tend Ex orse S22G N'^ijSE Subconsultant _ 50 Nor-MWBE Subconsultant $0 101, Sub Markup $C Total P-i-t Cost $.Is a00 City of Fort Worth,Texas Attachment B-Level of Effort Supplement PMO Oficial Release Date:5.19.2010 APPROVED AS TO FORM AND LEGALITY: M&C: Date: Douglas W. 'B'--rack Assistant City Attorney ATTEST: ORT Mary Ii. Kay er City Secretary City of Fort Worth Professional Services Agreement Amendment Template CFW Official Release 9/14/2017 Page 3 of 4 EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER James DeOtte Engineering, Inc. Jesus J. Chapa Jame45e0te, P. E. , R. P.L.S. Assistant City Manager Preside DATE: J/ —.f Z-) DATE: Z- tq0y l -7 APPROVAL RECOMMENDED: �sl [,.�• Lj Doug-As W. Wiersig, PE Director, Transportation and Public Works Department Contract Compliance Manager: s- fining, I acknowledge that I am the person responsible for the r,onik �r., nq and administration of this contract, including ensuring all p t:y1 <«nce and Ae ting requirements. Steve E. Euban , P.E. , CFM,Ptnp Sr. Professional Engineer City of Fort Worth Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 Page 2 of 4