HomeMy WebLinkAboutContract 48148 CITY SECRETARY i/
D.O.E. FILE CITY SFCRETAW L
CONTRACTOR'S BONDING CO. CONTRACT NO.
CONSTRUCTION'S COPY
CLIENT DEPARTMENT FORT WORTH
PROJECT MANUAL
FOR
THE CONSTRUCTION OF
FW SOUTH PAVEMENT REPLACEMENT
(FYI 5 -CD 9 STREET REPAIR AND RECONSTRUCTION PROGRAM)
COLLEGE AVE.(W.VICKERY TO PENNSYLVANIA AVE)
JARVIS ST(COLLEGE AVE TO LIPSOMB ST)
FW SOUTH PAVEMENT REPLACEMENT
(NEAR SOUTH SIDE MED. DIST. W SS MAIN IMPROVEMENTS)
JENNINGS AVE (ROSEDALE ST.TO MAGNOLIA AVE)
LEUDA ST.(MAIN ST.TO ST.LOUIS AVE)
LIPSCOMB ST.(JARVIS ST.TO PENNSYLVANIA AVE)
MAY ST.(MAGNOLIA AVE.TO FELIKS GWOZDZ PL)
PETERSMITH ST.(FULTON ST.TO HEMPHILL ST)
City Project No.02445&02375
Betsy Price David Cooke
Mayor City Manager
John Robert Carman
Director, Water Department
Douglas W. Wiersig,P.E.
Director,Transportation and Public Works Department
Prepared for
The City of Fort Worth
Transportation and Public Works Department
& Water Department
l
2016 � I 0#TlLttt� ti(
I
t
:*rrfr '
A.N.A.Consultants LLC r*: ..••••••' 'AggpA� .r
S000 Thompson Colleyville,TX 76034 Terrace f•••�ARK ..........
.6 • ..�r
8 4,N
TBPE Registered Firm No.F-20 l 06.6
SEP -8 OFFICIAL RECORD
C'M 0�FORT WORTH CITY SECRETARY
ctT�s�cR�TraRY FT.WORTH,TX
CITY OF FORT WORTH CD9 Street Repair&Recon FYI and Near Southside Medical District
City Project No.02375 and 02445
FORT WORTH
NOTICE TO APPARENT LOW BIDDER
PROJECT NAME: FY15 CD9 Repair&Reconstruction Program -FW South Pavement
Replacement near Southside Medical District Water& Sewer Main Improvements
CITY PROJECT NUMBER: CO2375 & CO2445 DATE OF NOTICE: August 18,2016
BID DATE: April 31,2016
BIDDER: McClendon Construction Company,Inc.
PO Box 999
Burleson,TX 76097
817-295-0066
NOTICE TO APPARENT LOW BIDDER: You are notified that your Bid for the above
Project has been determined to be the apparent low bid. A Notice of Award will be issued
once the City Council has awarded the contract.
Four(4) copies of the Contract Documents (except Drawings) are available for you to pick
up, or can be delivered to you at your expense and include the following forms which must
be completed:
• 00 45 26 Contractor's Compliance with Workers' Compensation Law
• 00 52 43 Agreement
0 00 6113 Performance Bond
• 00 6114 Payment Bond
• 00 6119 Maintenance Bond
• 00 6125 Certificate of Insurance
PLEASE DO NOT DATE THE AGREEMENT OR BONDS AT THIS TIME. A Power of
Attorney must accompany the Bonds.
Deliver executed Contract Documents to:
Tara Fishback
Transportation and Public Works Department
City Hall—2°d Floor
1000 Throckmorton Street
Fort Worth, Texas 76102
Phone: 817-392-2021
Tara.fishback(ti),fortworthtexas.Ilov
END OF SECTION
THE CITY OF FORT WORTH * 1000 THROCKMORTON STREEF * FORT WORTH,TEXAS 76102
817-392-8220 * FAx 817-392-8195
REVISED MAY 28,2012
FORT WORTH.
City of Fort Worth
Standard Construction Specification
Documents
Adopted September 2011
*v
v
1100
b
ry Its, ?
l �u
Air
z
r
v
r`
CITY OF FORT WORTH CD9 Street Repair&Recon FYI and Near Southside Medical District
City Project No.02375 and 02445
000000-1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page]of 5
SECTION 00 00 00
TABLE OF CONTENTS
Division 00-General Conditions
0005 10 Mayor and Council Communication
0005 15 Addenda
00 11 13 Invitation to Bidders
0021 13 Instructions to Bidders
0035 13 Conflict of Interest Affidavit
00 41 00 Bid Form
00 42 43 Proposal Form Unit Price
0043 13 Bid Bond
00 43 37 Vendor Compliance to State Law Nonresident Bidder
0045 11 Bidders Prequalifications
0045 12 Prequalification Statement
0045 13 Bidder Prequalification Application
00 45 26 Contractor Compliance with Workers' Compensation Law
00 45 40 Minority Business Enterprise Goal
00 45 41 Small Business Enterprise Goal
00 52 43 Agreement
0061 13 Performance Bond
0061 14 Payment Bond
0061 19 Maintenance Bond
00 61 25 Certificate of Insurance
00 72 00 General Conditions
00 73 00 Supplementary Conditions
Division 01 -General Requirements
01 11 00 Summary of Work
01 25 00 Substitution Procedures
01 31 19 Preconstruction Meeting
01 3120 Project Meetings
01 32 16 Construction Progress Schedule
01 3233 Preconstruction Video
01 33 00 Submittals
01 35 13 Special Project Procedures
01 4523 Testing and Inspection Services
01 5000 Temporary Facilities and Controls
01 5526 Street Use Permit and Modifications to Traffic Control
01 57 13 Storm Water Pollution Prevention Plan
01 58 13 Temporary Project Signage
01 6000 Product Requirements
01 6600 Product Storage and Handling Requirements
01 70 00 Mobilization and Remobilization
01 71 23 Construction Staking and Survey
01 74 23 Cleaning
01 7719 Closeout Requirements
01 78 23 Operation and Maintenance Data
01 7839 Project Record Documents
CITY OF FORT WORTH CD9 Street Repair&Recon FY 15 and Nem•Southside Medical Dist ict
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 22,2013
000000-2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 2 of 5
Technical Specifications listed below are included for this Project by reference and can be
viewed/downloaded from the City's Buzzsaw site at:
htps://projectpoint.buzzsaw.com/client/fortworthgov/Resources/02%20-
%20Construction%2ODocuments/Specifications
Division 02-Existing Conditions
0241 13 Selective Site Demolition
0241 14 Utility Removal/Abandonment
0241 15 Paving Removal
Division 03-Concrete
03 3000 Cast-In-Place Concrete
03 34 13 Controlled Low Strength Material(CLSM)
03 34 16 Concrete Base Material for Trench Repair
03 8000 Modifications to Existing Concrete Structures
Division 26-Electrical
26 05 00 Common Work Results for Electrical
2605 10 Demolition for Electrical Systems
26 05 33 Raceways and Boxes for Electrical Systems
26 05 43 Underground Ducts and Raceways for Electrical Systems
Division 31 -Earthwork
31 1000 Site Clearing
3123 16 Unclassified Excavation
3123 23 Borrow
31 24 00 Embankments
31 25 00 Erosion and Sediment Control
Division 32-Exterior Improvements
3201 17 Permanent Asphalt Paving Repair
3201 18 Temporary Asphalt Paving Repair
32 01 29 Concrete Paving Repair
32 11 23 Flexible Base Courses
32 11 29 Lime Treated Base Courses
32 11 33 Cement Treated Base Courses
32 12 16 Asphalt Paving
32 1273 Asphalt Paving Crack Sealants
32 13 13 Concrete Paving
32 1320 Concrete Sidewalks,Driveways and Barrier Free Ramps
32 13 73 Concrete Paving Joint Sealants
32 16 13 Concrete Curb and Gutters and Valley Gutters
32 1723 Pavement Markings
32 1725 Curb Address Painting
3231 13 Chain Fences and Gates
3231 26 Wire Fences and Gates
3231 29 Wood Fences and Gates
3232 13 Cast-in-Place Concrete Retaining Walls
CITY OF FORT WORTH CD9 Street Repair&Recon FY15 and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 22,2013
000000-3
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 5
3291 19 Topsoil Placement and Finishing of Parkways
3292 13 Hydro-Mulching, Seeding,and Sodding
32 93 43 Trees and Shrubs
Division 33-Utilities
3301 30 Sewer and Manhole Testing
33 01 31 Closed Circuit Television(CCTV)Inspection
3303 10 Bypass Pumping of Existing Sewer Systems
3304 10 Joint Bonding and Electrical Isolation
33 04 30 Temporary Water Services
33 04 40 Cleaning and Acceptance Testing of Water Mains
33 04 50 Cleaning of Sewer Mains
33 05 10 Utility Trench Excavation,Embedment, and Backfill
33 05 12 Water Line Lowering
33 05 13 Frame,Cover and Grade Rings
3305 14 Adjusting Manholes,Inlets,Valve Boxes, and Other Structures to Grade
3305 16 Concrete Water Vaults
33 05 17 Concrete Collars
33 05 20 Auger Boring
33 05 26 Utility Markers/Locators
33 05 30 Location of Existing Utilities
33 1105 Bolts,Nuts, and Gaskets
33 11 10 Ductile Iron Pipe
33 11 11 Ductile Iron Fittings
33 11 12 Polyvinyl Chloride(PVC)Pressure Pipe
33 11 13 Concrete Pressure Pipe,Bar-Wrapped, Steel Cylinder Type
33 11 14 Buried Steel Pipe and Fittings
33 12 10 Water Services 1-inch to 2-inch
33 12 11 Large Water Meters
33 1220 Resilient Seated Gate Valve
33 1221 AWWA Rubber-Seated Butterfly Valves
33 1225 Connection to Existing Water Mains
33 1230 Combination Air Valve Assemblies for Potable Water Systems
33 1240 Fire Hydrants
33 1250 Water Sample Stations
33 1260 Standard Blow-off Valve Assembly
33 31 20 Polyvinyl Chloride(PVC)Gravity Sanitary Sewer Pipe
33 31 21 Polyvinyl Chloride(PVC)Closed Profile Gravity Sanitary Sewer Pipe
33 31 50 Sanitary Sewer Service Connections and Service Line
33 31 70 Combination Air Valve for Sanitary Sewer Force Mains
3339 10 Cast-in-Place Concrete Manholes
33 39 20 Precast Concrete Manholes
33 39 30 Fiberglass Manholes
33 39 60 Epoxy Liners for Sanitary Sewer Structures
3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts
33 46 00 Subdrainage
33 46 02 Trench Drains
3349 10 Cast-in-Place Manholes and Junction Boxes
33 49 20 Curb and Drop Inlets
CITY OF FORT WORTH CD9 Street Repair&Recon FYI 5 and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 22,2013
000000-4
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 4 of 5
Division 34-Transportation
3471 13 Traffic Control
Appendix
GC-6.06.13 Minority and Women Owned Business Enterprise Compliance
GC-6.07 Wage Rates
GC-6.09 Permits and Utilities
GC-6.24 Nondiscrimination
GR-01 60 00 Product Requirements
END OF SECTION
CITY OF FORT WORTH CD9 Street Repair&Recon FYI 5 and Near Sowlrside Medica!District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 22,2013
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 8/23/2016 -Ordinance No.22365-08-2016,
22366-08-2016,22367-08-2016&Resolution No.4665-08-2016
DATE: Tuesday,August 23,2016 REFERENCE NO.: C-27883
LOG NAME: 20FW SOUTH PAVEMENT RELACEMENT(FY15-CD9)
SUBJECT:
Authorize Execution of a Contract with McClendon Construction Company,
Inc.,in the Amount of$3,079,663.55 for Round 1 of the Council District 9
Street Repair and Reconstruction Program and Near Southside Medical
District Water and Sanitary Sewer Main Improvements,Provide for Additional
Project Costs and Contingencies for a Project Construction Cost of
$3,434,853.55,Adopt Appropriation Ordinances and Resolution Expressing
Official Intent to Reimburse Expenditures with Proceeds of Future Debt
(COUNCIL DISTRICT 9)
RECOMMENDATION:
It is recommended that the City Council:
1.Adopt the attached resolution expressing official intent to reimburse
with proceeds of future debt for the Near Southside Medical District Water
and Sanitary Sewer Main Improvements Project;
2.Authorize the transfer of$147,600.00 from the Sanitary Sewer Main 503
and Main 257,Part 1 project to supplement the funding of the Near
Southside Medical District Water and Sanitary Sewer Mains Improvements
project;
3.Adopt the attached appropriation ordinance increasing estimated
receipts and appropriations in the amount of$147,600.00 in the Near
Southside Medical District Water and Sanitary Sewer Mains Improvement
Project of the Water/Sewer DPN Fund and reduce fund appropriation in the
Sanitary Sewer Main 503 and Main 257,Part I project by the same amount;
4. Adopt the attached appropriation ordinance increasing estimated
receipts and appropriations in the Sewer Capital Projects Fund in the
amount of$2,000.00 from available funds for the purpose of funding Near
Southside Medical District Water and Sanitary Sewer Mains Improvements;
5.Authorize an amendment to the Fiscal Year 2016 Stormwater Capital
Improvement Plan to increase appropriations in the amount of$25,000.00
for drainage improvements in the Council District 9 Street Repair and
Reconstruction Program by decreasing appropriations for Victoria
Emerywood/North Riverside project(C-02272)in the same amount;
6. Adopt the attached appropriation ordinance increasing estimated
receipts and appropriations in the amount of$25,000 in the Council
District 9 street repair and reconstruction program for drainage
improvements and decrease estimated receipts and appropriations in the
Victoria Emerywood/North Riverside project by the same amount within the
Stormwater Capital Project–Bond Fund; and
7. Authorize the execution of a contract with McClendon Construction
Company,Inc.,in the amount of$3,079,663.55 for Round I of the Council
District 9 Street Repair and Reconstruction Program and Near Southside
Medical District Water and Sanitary Sewer Main Improvements Project.
DISCUSSION:
On August 5,2014, (M&C C-26906)the City Council Authorized a Resolution
executing a funding agreement with Fort Worth South,Inc., in the amount
of$10,000,000.00 for Council District 9 Street Repair and Reconstruction
Program. The Program leveraged funding in an amount up to $5,000,000.00
from the Tax Increment Reinvestment Zone No. 4(Southside TIF)over four
years. The City of Fort Worth matched the funds in an amount up to
$1,000,000.00 using 2014 Bond Program-Street Improvements Funds and 2014
Bond Program-Grant Matches Funds in an amount up to $4,000,000.00.
On March 3,2016 and March 10,2016 the combined Council District 9 Street
Repair and Reconstruction Program Round 1 and Near Southside Medical
District Water and Sanitary Sewer Main Improvements project was advertised
for bids in the Fort Worth Star-Telegram, On April 31.2016,bids were
received as shown in table below.
idders AinoLmL
McClendon Construction $3,079,663.55
Co.,Inc.
Jackson Construction Ltd. $3,401,154.47
Project management, inspection,material testing and contingency amounts
for Water Department management, inspection and material testing amount up
to$129,900.00(water: $108,600.00; sewer: $21,300.00)and contingency
amount up to$43,800.00 (water: $35,500.00; sewer: $8,300.00). TPW project
management,inspection,material testing and contingency amount up to
$181,490.00.
This project requires additional funding for Water and Sanitary Sewer,in
the amount of$147,500.00 for cost overruns as well related project
management and contingency costs. Staff recommends these additional funds
be transferred from the Revenue Bond Funds for the Construction of
Junction Structures on Sanitary Sewer Main 503 and Sanitary Sewer Main
257,Part 1. The project scope and schedule for the construction phase
will change based on the results of the ongoing flow study investigations
in the Village Creek basin. Both projects are included in the Fiscal Year
2016-2020 Five-Year Capital Improvement Plan, adopted February 2,2016
(M&C G-18662).Additional$2,000.00 is required for Staff charges in the
Sewer Capital Projects Fund.
Construction of the Council District 9 Street Repair and Reconstruction
Program and Near Southside Medical District Water and Sanitary Sewer Main
Improvements is one component of the overall project that includes
Engineering,Project Management,Real Property Acquisitions,material
testing,Inspection, and contingencies. Total overall project budget is
$3,837,878.55.
This project is anticipated to be included in a future revenue bond issue
for the Water and Sewer Fund.Available cash within the Water and Sewer
portfolio and the City's portfolio along with the appropriation authority
authorized is under the Direct Purchase Note(DPN).Program will be used
to provide interim financing for this project until debt is issued. To the
extent resources other than the Water and Sewer portfolio are used to
provide interim financing,the Water and Sewer Fund will be charged
interest that is equivalent to the overall rate of return being earned by
the City portfolio(currently approximately one-percent annually). Should
the City's portfolio not support the liquidity needed to provide an
interim short-term financing source,another funding source will be
required,which could mean issuance of securities under the DPN program or
earlier issuance of Water and Sewer revenue bonds than is currently
planned. Once debt associated with this project is sold,bond proceeds
will be used to reimburse the Water and Sewer portfolio and the City's
portfolio in accordance with the attached Reimbursement Resolution.
The City Council adopted the Water Department' s Fiscal Year 2016-2020
Five-Year Capital Improvement Plan on February 2,2016 (M&C G-18662). The
adopted plan includes this specific project,with funding identified
through the DPN Program to be reimbursed with future revenue bonds. In
accordance with the provisions of the Financial Management Policy
Statement, Staff anticipates presenting revenue-supported debt issuances
to the City Council for consideration within the next three years. This
debt must be issued within approximately three years to provide
reimbursement for these expenses. If that does not occur,the costs will
no longer be reimbursable by issuing tax-exempt debt and the funding
source will have to be made whole through budgetary methods. Adoption of
this resolution does not obligate the City to sell bonds,but preserves
the ability to reimburse the City from tax-exempt bond proceeds.
The City Council adopted the 2016 Stormwater Capital Improvement Plan on
December 15, 2015 (M&C G-18625). The adopted plan authorized funding of
$1,100,000.00 for Roadway Crossings and Channel Improvements for project
C-02272 for drainage improvements at Victoria Emerywood/North Riverside.
Based on updated cost estimates,the North Riverside project budget can be
reduced by$25,000.00 and made available for funding drainage improvements
for Council District 9 street repair and reconstruction in the amount of
$25,000.00,under project C-02375.
A portion of this project will include 2014 Bond Funds.Available
resources within the General Fund will be used to provide interim
financing for these expenses until debt is issued. Once debt associated
with this project is sold,bond proceeds will reimburse the General Fund
in accordance with the statement expressing official intent to reimburse,
that was adopted as part of the ordinance canvassing the bond election
(Ordinance No. 21241-05-2014)and the subsequent ordinance authorizing
debt in 2016 (Ordinance No. 22216-05-2016).
Construction is anticipated to commence in September 2016,with a contract
time of 280 calendar days,the construction is estimated to be complete by
the end of July 2017.
Upon completion of this capital project,it is anticipated that there will
be no impact on Transportation and Public Works annual operation budget
and no impact to the Water Departments operating budget.
M/WBE OFFICE: McClendon Construction Co.,Inc., is in compliance with the
City's BDE Ordinance by committing to four percent MBE participation and
documenting good faith effort.McClendon Construction Co.,Inc. identified
several areas subcontracting and supplier opportunities.However,the
MBE's contacted in the areas identified did not respond or did not submit
the lowest bids. The City's MBE goal on this project is 12 percent.
The project is located in COUNCIL DISTRICT 9,Mapsco 76H,76M,77E and
77J.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that upon approval of the above
recommendations and adoption of the attached appropriation ordinances
funds will be available in the current capital budget,as appropriated,of
the 2014 Bond Program Fund,the Specially Funded Projects Fund,the
Stormwater Capital Projects Fund, and the Water Capital Projects Fund and
the Sewer Capital Projects Fund. The Fiscal Year 2016 Water and Sewer
Operating Budget includes appropriations of$26,300,046.00 for the purpose
of providing Pay-As-You-Go funding for Sewer Capital Projects. After this
the transfer for Fiscal Year 2016,the balance will be$7,292,741.00 The
Director of Finance also certifies that the appropriation is available as
directed by(M&C G-18375)in the 2017 Water and Sewer Revenue Bonds
Capital Project Fund for the Fort Worth South Pavement Replacement and
Near Southside Medical District Water and Sanitary Sewer Main Improvements
Project.
Additional
Existing Proposed
Description Appropriations Appropriat� C Per Appropriation
CD9 Sheet Repair
Street Rehab Fund $191,100.00 $0.00 $191,000.00
34014
CD9 Street Repair Fund $1,500,000.00 $0.00 $150,000.00
39007
$25,000.00 $25,000.00
CD9 Street Repair Fund
59651 $0.00
Near Southside Medical
District 56005 $1,291,000.00 $147,600.00 $1,438,600.00
Near Southside Medical $106,692.00 $0.00 $106,692.00
District 59601
Near Southside Medical
District $ 17,473.00 $2,000.00 $19,473.00
59607
CD9 Street Repair $1,000,000.00 $0.00 $1,000,000.00
Grant Match Fund 34014
Project $106,265.00 $174,600.00 $4,280,865.00
Total
FUND IDENTIFIERS (FIDs):
TO
Department Project Budget Reference#
Fund ID Account ID ProgramActivity year (Chartfield Amount
2)
2&3)56005 0600430 4956010 CO2445 C01780 2016 $147,600.00
2&3)56005 0600430 5740010 CO2445 C01780 2016 $147,600.00
4) 59607 0700430 4956001 CO2445 C01730 2016 $2,000.00
4) 59607 0700430 5110101 CO2445 CO2445 2016 $2,000.00
6) 59651 0200431 4905420 CO2375 002880 2016 $25,000.00
6) 59651 0200431 CO2375 002880 2016 $25,000.00
FROM
Department Project Budget Reference#
Fund ID Account ID ProgramActivity year (Chartfield Amount
2)
7) 56005 0600430 5740010 CO2445 C01780 2016 $1,182,564.06
7) 56005 0700430 5740010 CO2445 C01780 2016 $82,200.00
7) 34014 0200431 5740010 CO2375 CO2480 2016 14010199 $191,100.00
7) 34014 0200431 5740010 CO2375 CO2180 2016 14010211 $744,984.74
2) 56005 0700430 5900015 C01226 C01780 2016 $147,600.00
6) 59651 0200431 4905420 CO2272 002880 2016 $25,000.00
6) 59651 0200431 5330500 CO2272 002880 2016 $25,000.00
7) 59651 0200431 5740010 CO2375 002880 2016 $25,000.00
7) 39007 0200431 5740010 CO2375 CO2180 2016 $853,814.75
CERTIFICATIONS:
Submitted for City Manager's Office by: Jay Chapa (5804)
Originating Department Head: Douglas Wiersig (7801)
Additional Information Contact: Najib Fares (7802)
ATTACHMENTS
1. 20FW S PAVEMENT REPL REIMB RESOLUTION(Rev8.04.16).doc (Public)
2. 20FW SOUTH PAVEMENT RELACEMENT(FY15-CD9)FY2016 AO
59651R(RevS.04.16).docx (Public)
3. 20FW SOUTH PAVEMENT RELACEMENT FY15-CD9 dpn AO16 Rev8.04.161.docx
(Public)
4. 20FW SOUTH PAVEMENT RELACEMENT FY15-CD9 sewer AO 16r(Rev8.04.16).docx
(Public)
5. CD9 STREET REPAIR RECON FYI AND NEAR SOUTHSIDE MEDICAL DISTRICT.pdf
(Public)
6. Draft MC 20FW SOUTH PAVEMENT REPLACEMENT(FYI 5CD9)(dwbRL8 04.16).docx
(CFW Internal
7. FW SOUTH PAVEMENT RELACEMENT(FY15-CD91.pdf (CFW lnternal)
8. Journal 67608.JPG (CFW Internal)
9. JOurnal 67659.JPG (CFW lnternal)
10. McClendon Construction searchResults(38).12df (CFW Internal)
11. McClendon Form 1295.12df (Public)
12. South Pavement Replacement-M&C Revisions-2.docx (CFW Internal)
13. South Pavement Replacement-M&C Revisions.docx (CFW Internal)
CERTIFICATE OF INTERESTED PARTIES
FORM 1.2955
1of1
Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number:
of business. 2016-46840
McClendon Construction Company, Inc
Burleson,TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 04/28/2016
being filed.
City of Fort Worth Date Ack wledged:
LI
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a
description of the services,goods or other property to be provided under the contract.
City Proj#02445&02375
Paving and Utility Construction
4 Nature of interest(check applicable)
Name of Interested Party City,State,Country(place of business)
Controlling Intermediary
McClendon, Dan Burleson,TX United States X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct.
Signature of authorized agent of contracting business entity
AFFIX NOTARY STAMP/SEAL ABOVE
Sworn to and subscribed before me,by the said //{1r 11—"1Uk 072 this the p?8 day of ,
20�,to certify which,witness my hand and seal of office.
MARY I PORTER
MY COMMISSION EXPIRES`
September 17,2016
HA vu ae le
Signal officer administering oath Printed n rrre of officer administering oath Title of officer admin isterin oath
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.1021
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, August 23, 2016 REFERENCE NO.:
LOG NAME: 20FW SOUTH PAVEMENT RELACEMENT (FY15-CD9)
SUBJECT:
Authorize Execution of a Contract with McClendon Construction Company, Inc., in the Amount of
$3,079,663.55 for Round 1 of the Council District 9 Street Repair and Reconstruction Program and Near
Southside Medical District Water and Sanitary Sewer Main Improvements, Provide for Additional Project
Costs and Contingencies for a Project Construction Cost of$3,434,853.55, Adopt Appropriation
Ordinances and Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future
Debt (COUNCIL DISTRICT 9)
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached resolution expressing official intent to reimburse with proceeds of future debt for the
Near Southside Medical District Water and Sanitary Sewer Main Improvements Project;
2. Authorize the transfer of$147,600.00 from the Sanitary Sewer Main 503 and Main 257, Part 1 project to
supplement the funding of the Near Southside Medical District Water and Sanitary Sewer Mains
Improvements project;
3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
amount of$147,600.00 in the Near Southside Medical District Water and Sanitary Sewer Mains
Improvement Project of the Water/Sewer DPN Fund and reduce fund appropriation in the Sanitary Sewer
Main 503 and Main 257, Part 1 project by the same amount;
4. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Sewer Capital Projects Fund in the amount of$2,000.00 from available funds for the purpose of funding
Near Southside Medical District Water and Sanitary Sewer Mains Improvements;
5. Authorize an amendment to the Fiscal Year 2016 Stormwater Capital Improvement Plan to increase
appropriations in the amount of$25,000.00 for drainage improvements in the Council District 9 Street
Repair and Reconstruction Program by decreasing appropriations for Victoria Emerywood/North Riverside
project (C-02272) in the same amount;
6. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
amount of$25,000 in the Council District 9 street repair and reconstruction program for drainage
improvements and decrease estimated receipts and appropriations in the Victoria Emerywood/North
Riverside project by the same amount within the Stormwater Capital Project— Bond Fund; and
7. Authorize the execution of a contract with McClendon Construction Company, Inc., in the amount of
$3,079,663.55 for Round 1 of the Council District 9 Street Repair and Reconstruction Program and Near
Southside Medical District Water and Sanitary Sewer Main Improvements Project.
Logname: 20FW SOUTH PAVEMENT RELACEMENT (FY15-CD9) Page 1 of 5
DISCUSSION:
On August 5, 2014, (M&C C-26906) the City Council Authorized a Resolution executing a funding
agreement with Fort Worth South, Inc., in the amount of$10,000,000.00 for Council District 9 Street
Repair and Reconstruction Program. The Program leveraged funding in an amount up to $5,000,000.00
from the Tax Increment Reinvestment Zone No. 4 (Southside.TIF) over four years. The City of Fort Worth
matched the funds in an amount up to $1,000,000.00 using 2014 Bond Program-Street Improvements
Funds and 2014 Bond Program-Grant Matches Funds in an amount up to $4,000,000.00.
On March 3, 2016 and March 10, 2016 the combined Council District 9 Street Repair and Reconstruction
Program Round 1 and Near Southside Medical District Water and Sanitary Sewer Main Improvements
project was advertised for bids in the Fort Worth Star-Telegram. On April 31, 2016, bids were received as
shown in table below.
Bidders mount
McClendon Construction Co., Inc. $3,079,663.55
Jackson Construction Ltd. $3,401,154.47
Project management, inspection, material testing and contingency amounts for Water Department
management, inspection and material testing amount up to $129,900.00 (water: $108,600.00; sewer:
$21,300.00) and contingency amount up to $43,800.00 (water: $35,500.00; sewer: $8,300.00). TPW
project management, inspection, material testing and contingency amount up to $181,490.00.
This project requires additional funding for Water and Sanitary Sewer, in the amount of$147,500.00 for
cost overruns as well related project management and contingency costs. Staff recommends these
additional funds be transferred from the Revenue Bond Funds for the Construction of Junction Structures
on Sanitary Sewer Main 503 and Sanitary Sewer Main 257, Part 1. The project scope and schedule for the
construction phase will change based on the results of the ongoing flow study investigations in the Village
Creek basin. Both projects are included in the Fiscal Year 2016-2020 Five-Year Capital Improvement
Plan, adopted February 2, 2016 (M&C G-18662). Additional $2,000.00 is required for Staff charges in the
Sewer Capital Projects Fund.
Construction of the Council District 9 Street Repair and Reconstruction Program and Near Southside
Medical District Water and Sanitary Sewer Main Improvements is one component of the overall project
that includes Engineering, Project Management, Real Property Acquisitions, material testing, Inspection,
and contingencies. Total overall project budget is $3,837,878.55.
This project is anticipated to be included in a future revenue bond issue for the Water and Sewer Fund.
Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation
authority authorized is under the Direct Purchase Note (DPN). Program will be used to provide interim
financing for this project until debt is issued. To the extent resources other than the Water and Sewer
portfolio are used to provide interim financing, the Water and Sewer Fund will be charged interest that is
equivalent to the overall rate of return being earned by the City portfolio (currently approximately one-
percent annually). Should the City's portfolio not support the liquidity needed to provide an interim short-
term financing source, another funding source will be required, which could mean issuance of securities
under the DPN program or earlier issuance of Water and Sewer revenue bonds than is currently planned.
Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and
Sewer portfolio and the City's portfolio in accordance with the attached Reimbursement Resolution.
Logname: 20FW SOUTH PAVEMENT RELACEMENT (FY15-CD9) Page 2 of 5
The City Council adopted the Water Department' s Fiscal Year 2016-2020 Five-Year Capital Improvement
Plan on February 2, 2016 (M&C G-18662). The adopted plan includes this specific project, with funding
identified through the DPN Program to be reimbursed with future revenue bonds. In accordance with the
provisions of the Financial Management Policy Statement, Staff anticipates presenting revenue-supported
debt issuances to the City Council for consideration within the next three years. This debt must be issued
within approximately three years to provide reimbursement for these expenses. If that does not occur, the
costs will no longer be reimbursable by issuing tax-exempt debt and the funding source will have to be
made whole through budgetary methods. Adoption of this resolution does not obligate the City to sell
bonds, but preserves the ability to reimburse the City from tax-exempt bond proceeds.
The City Council adopted the 2016 Stormwater Capital Improvement Plan on December 15, 2015 (M&C
G-18625). The adopted plan authorized funding of$1,100,000.00 for Roadway Crossings and Channel
Improvements for project C-02272 for drainage improvements at Victoria Emerywood/North Riverside.
Based on updated cost estimates, the North Riverside project budget can be reduced by $25,000.00 and
made available for funding drainage improvements for Council District 9 street repair and reconstruction in
the amount of$25,000.00, under project C-02375.
A portion of this project will include 2014 Bond Funds. Available resources within the General Fund will be
used to provide interim financing for these expenses until debt is issued. Once debt associated with this
project is sold, bond proceeds will reimburse the General Fund in accordance with the statement
expressing official intent to reimburse, that was adopted as part of the ordinance canvassing the bond
election (Ordinance No. 21241-05-2014) and the subsequent ordinance authorizing debt in 2016
(Ordinance No. 22216-05-2016).
Construction is anticipated to commence in September 2016, with a contract time of 280 calendar days,
the construction is estimated to be complete by the end of July 2017.
Upon completion of this capital project, it is anticipated that there will be no impact on Transportation and
Public Works annual operation budget and no impact to the Water Departments operating budget.
M/WBE OFFICE: McClendon Construction Co., Inc., is in compliance with the City's BDE Ordinance by
committing to four percent MBE participation and documenting good faith effort. McClendon Construction
Co., Inc. identified several areas subcontracting and supplier opportunities. However, the MBE's contacted
in the areas identified did not respond or did not submit the lowest bids. The City's MBE goal on this
project is 12 percent.
The project is located in COUNCIL DISTRICT 9, Mapsco 76H, 76M, 77E and 77J.
FISCAL INFORMATION /CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations and adoption of the
attached appropriation ordinances funds will be available in the current capital budget, as appropriated, of
the 2014 Bond Program Fund, the Specially Funded Projects Fund, the Stormwater Capital Projects Fund,
and the Water Capital Projects Fund and the Sewer Capital Projects Fund. The Fiscal Year 2016 Water
and Sewer Operating Budget includes appropriations of$26,300,046.00 for the purpose of providing Pay-
As-You-Go funding for Sewer Capital Projects. After this the transfer for Fiscal Year 2016, the balance will
be $7,292,741.00 The Director of Finance also certifies that the appropriation is available as directed by
(M&C G-18375) in the 2017 Water and Sewer Revenue Bonds Capital Project Fund for the Fort Worth
South Pavement Replacement and Near Southside Medical District Water and Sanitary Sewer Main
Improvements Project.
Logname: 20FW SOUTH PAVEMENT RELACEMENT (FY15-CD9) Page 3 of 5
Additional
Existing Proposed
Description
FAp
propriations AppropM&C ns Per Appropriation
CD9 Street Repair Street
Rehab Fund 34014 1 F$191,100.00 $0.00 $191,000.00
CD9 Street Repair Fund $1,500,000.00 $0.00 $150,000.00
39007 1 F
CD9 Street Repair Fund
59651 $0.00 $25,000.00 $25,000.00
Near Southside Medical 600.00 $1,438,600.00
District 56005 1 $1,291,000.00 $147,
Near Southside Medical
District 59601 F $106,692.00 $0.00 $106,692.00
Near Southside Medical
District 59hsi $17,473.00 $2,000.00 7$19,473.00
CD9 Street Repair Grant
Match Fund 34014 $1,000,000.00 $0.00 $1,000,000.00
Project Total $106,265.00 $174,600.00 $4,280,865.00
FUND IDENTIFIERS (FIDs):
TO
Fund Department Account Project ProgramActivity Budget Reference # Amount
ID ID Year Chartfield 2
2&3 56005 0600430 4956010 CO2445 C01780 2016 $147,600.00
2&3)56005 0600430 5740010 CO2445 C01780 2016 $147,600.00
59607 0700430 4956001 CO2445 C01730 2016 $2,000.00
59607 0700430 5110101 CO2445 CO2445 2016 $2,000.00
6 59651 0200431 4905420 CO2375 002880 2016 $25,000.00
6) 59651 0200431 CO2375 002880 2016 $25,000.00
FROM
Fund Department Account Project ProgramActivity Budget Reference # Amount
ID ID Year (Chartfield 2)
7)56005 0600430 5740010 CO2445 C01780 2016 $1,182,564.06
T)56005 0700430 5740010 CO2445 C01780 2016 $82,200.00
7 34014 0200431 5740010 CO2375 CO2480 2016 14010199 $191,100.00
7 34014 0200431 5740010 CO2375 CO2180 2016 14010211 $744,984.74
2 56005 0700430 5900015 C01226 C01780 2016 $147,600.00
6 59651 0200431 4905420 CO2272 002880 2016 $25,000.00
6 59651 0200431 5330500 CO2272 002880 2016 $25,000.00
7 59651 0200431 5740010 CO2375 002880 2016 $25,000.00
7)39007 0200431 5740010 CO2375 CO2180 2016 $853,814.75
CERTIFICATIONS:
Submitted for City Manager's Office by: Jay Chapa (5804)
Originating Department Head: Douglas Wiersig (7801)
Additional Information Contact: Najib Fares (7802)
Logname: 20FW SOUTH PAVEMENT RELACEMENT (FY15-CD9) Page 4 of 5
ATTACHMENTS
1. 20FW S PAVEMENT REPL REIMB RESOLUTION(Rey8.04.16).doc (Public)
2. 20FW SOUTH PAVEMENT RELACEMENT (FY15-CD9) FY2016 AO 59651 R(Rev8.04.16).docx
(Public)
3. 20FW SOUTH PAVEMENT RELACEMENT FY15-CD9 dpn A016(Rev8.04.16).docx (Public)
4. 20FW SOUTH PAVEMENT RELACEMENT FY15-CD9 sewer A016r(Rev8.04.16).docx (Public)
5. CD9 STREET REPAIR RECON FY15 AND NEAR SOUTHSIDE MEDICAL DISTRICT.pdf (Public)
6. Draft MC 20FW SOUTH PAVEMENT REPLACEMENT (FY15CD9)(dwbRL8.04.16).docx (CFW
Internal)
7. FW SOUTH PAVEMENT RELACEMENT (FY15-CD9).pdf (CFW Internal)
8. Journal 67608.JPG (CFW Internal)
9. Journal 67659.JPG (CFW Internal)
10. McClendon Construction searchResults (38).pdf (CFW Internal)
11. McClendon Form 1295.pdf (Public)
12. South Pavement Replacement- M&C Revisions -2.docx (CFW Internal)
13. South Pavement Replacement- M&C Revisions.docx (CFW Internal)
Logname: 20FW SOUTH PAVEMENT RELACEMENT (FYI5-CD9) Page 5 of 5
FORT WORT H,o
City of Fort Worth
Transportation Public Works Department
ADDENDUM No. 1
To the Specifications and Contract Documents
FOR
FW SOUTH PAVEMENT REPLACEMENT
(FY15 - CD 9 STREET REPAIR AND RECONSTRUCTION PROGRAM)
FW SOUTH PAVEMENT REPLACEMENT
(NEAR SOUTH SIDE MED. DIST. W SS MAIN IMPROVEMENTS)
CITY PROJECT NO. 02375 & 2445.
Addendum No. 1 - Issue Date: March 29, 2016
Bid Receipt Date: April 14, 2016
This addendum forms part of the contract documents referenced above and modifies the original
Contract Documents. Acknowledge receipt of this addendum by signing and attaching it to the Contract
Documents (inside). Note receipt of the Addendum in the Bid Proposal and on the outer envelope of
your bid.
Prospective Bidders are hereby notified of the following:
SPECIFICATION AND CONTRACT DOCUMENTS.-
Bid
OCUMENTS;Bid Date has been delayed until {1:30 P.M. CST, Thursday, April 14, 20161, and bids will be
opened publicly and read aloud at 2:00 PM CST in the Council Chambers at 1000
Throckmorton Street Fort Worth, TX 76102.
00 00 00 - Table of Contents
• Updated to Add the following sections:
o 34 4120.03 Residential LED Roadway Luminaires
00 42 43 - Bid Proposal Form
• REPLACE THE BID PROPOSAL FORM IN THE SPECIFICATION BOOK WITH THE
ATTACHED (UPDATED EXCEL FILE UPLOADED)
00 52 43 - Agreement
• Item 3.2 Final Acceptance-Added work time to 280 calendar days
ADDENDUM NO.1
March 29, 2016
FORTWORTH.
CONSTRUCTION PLAN SHEETS.-
Replace
HEETS:Replace Plan Sheets 34 And 35
• Updated With Additional Paving Details
Replace Plan Sheet 43 And 44
• Updated With Conduit Location And Additional Notes
CLARIFICATION AND PROJECT INFORMATION:
Construction Survey for College Ave. and Jarvis Ave. pavement and storm drainage
improvements will be provided by A.N.A. Consultants, L.L.C. survey Crews. All water and
sanitary sewer construction staking and will be provided contractor under this contract,
College Ave, 12" water line SHEET 7 Removal of Tee and replace with segment of pipe is
considered subsidiary to WATER IMPROVEMENTS Item 28 - 3312,0117 Connection to
Existing 4'=12"Water Main.
The Bus Stop Pad is for informational purposes only. The T will provide a new Bus Stop
structure at a later date post construction.
The 7"Concrete paving is the parking areas located on Jarvis Street,
All other provisions of the plans, specifications and contract document for the project, which are not
expressly amended herein shall remain in full force.
Failure to return a signed copy of the addendum with the Proposal shall be grounds for rendering the
bid non-responsive.
A signed copy of this addendum shall be placed into the Proposal at the time of submittal.
R eip Acknowle ged: Najib Fares, P.E.
Transportation Public Works
By: Department
Title.
1 Project manager
f�0 SSPZE.�TF�.gs
MARK N.ASSAAD
8 61i
ANA.CONSULTANTS,LLC
TBPE REGISTERED FIRM NO.F-20
THE SEAL APPEARING ON THIS
DOCUMENT WAS AUTHORIZED BY
MARK N.ASSAAD,P.E.#87619
ON MARCH 28,2016
ADDENDUM NO.1
March 29, 2016
FORT WORTH.
City of Fort Worth
Standard Construction Specification
Documents
Adopted September 2011
00 00 00-1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 1 of 5
SECTION 00 00 00
TABLE OF CONTENTS
Division 00-General Conditions
0005 10 Mayor and Council Communication
0005 15 Addenda
0011 13 Invitation to Bidders
0021 13 Instructions to Bidders
0035 13 Conflict of Interest Affidavit
00 41 00 Bid Form
00 42 43 Proposal Form Unit Price
0043 13 Bid Bond
00 43 37 Vendor Compliance to State Law Nonresident Bidder
0045 11 Bidders Prequalifications
0045 12 Prequalification Statement
0045 13 Bidder Prequalification Application
00 45 26 Contractor Compliance with Workers'Compensation Law
00 45 40 Minority Business Enterprise Goal
00 45 41 Small Business Enterprise Goal
00 52 43 Agreement
0061 13 Performance Bond
0061 14 Payment Bond
0061 19 Maintenance Bond
00 61 25 Certificate of Insurance
00 72 00 General Conditions
00 73 00 Supplementary Conditions
Division 01 -General Requirements
01 1100 Summary of Work
01 25 00 Substitution Procedures
01 31 19 Preconstruction Meeting
01 3120 Project Meetings
01 32 16 Construction Progress Schedule
01 3233 Preconstruction Video
01 3300 Submittals
01 35 13 Special Project Procedures
01 45 23 Testing and Inspection Services
01 50 00 Temporary Facilities and Controls
01 55 26 Street Use Permit and Modifications to Traffic Control
0157 13 Storm Water Pollution Prevention Plan
0158 13 Temporary Project Signage
01 60 00 Product Requirements
01 66 00 Product Storage and Handling Requirements
01 70 00 Mobilization and Remobilization
01 7123 Construction Staking and Survey
01 74 23 Cleaning
01 7719 Closeout Requirements
01 7823 Operation and Maintenance Data
01 78 39 Project Record Documents
CITY OF FORT WORTH CD9 Street Repair&Recon FY 15 and Near Southside Medica!District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 22,2013
000000-2
STANDARD CONSTRUCTION SPECIFICA'T'ION DOCUMENTS
Page 2 of 5
Technical Specifications listed below are included for this Project by reference and can be
viewed/downloaded from the City's Buzzsaw site at:
his://proj ectpoint.buzzsaw.com/client/fortworthgov/Resources/02%20-
%20Construction%20Documents/Specifications
Division 02-Existing Conditions
0241 13 Selective Site Demolition
0241 14 Utility Removal/Abandonment
0241 15 Paving Removal
Division 03-Concrete
03 30 00 Cast-In-Place Concrete
03 34 13 Controlled Low Strength Material(CLSM)
03 34 16 Concrete Base Material for Trench Repair
03 80 00 Modifications to Existing Concrete Structures
Division 26-Electrical
26 05 00 Common Work Results for Electrical
26 05 10 Demolition for Electrical Systems
26 05 33 Raceways and Boxes for Electrical Systems
26 05 43 Underground Ducts and Raceways for Electrical Systems
Division 31-Earthwork
31 1000 Site Clearing
3123 16 Unclassified Excavation
31 23 23 Borrow
31 24 00 Embankments
31 25 00 Erosion and Sediment Control
Division 32-Exterior Improvements
3201 17 Permanent Asphalt Paving Repair
3201 18 Temporary Asphalt Paving Repair
32 01 29 Concrete Paving Repair
32 11 23 Flexible Base Courses
32 11 29 Lime Treated Base Courses
32 11 33 Cement Treated Base Courses
32 12 16 Asphalt Paving
32 12 73 Asphalt Paving Crack Sealants
3213 13 Concrete Paving
32 13 20 Concrete Sidewalks,Driveways and Barrier Free Ramps
32 1373 Concrete Paving Joint Sealants
32 16 13 Concrete Curb and Gutters and Valley Gutters
32 17 23 Pavement Markings
32 17 25 Curb Address Painting
3231 13 Chain Fences and Gates
32 31 26 Wire Fences and Gates
32 31 29 Wood Fences and Gates
32 32 13 Cast-in-Place Concrete Retaining Walls
CITY OF FORT WORTH CD9 Street Repair&Recon FY 15 and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 22,2013
000000-3
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 5
3291 19 Topsoil Placement and Finishing of Parkways
3292 13 Hydro-Mulching, Seeding,and Sodding
32 93 43 Trees and Shrubs
Division 33 -Utilities
33 01 30 Sewer and Manhole Testing
33 01 31 Closed Circuit Television(CCTV)Inspection
3303 10 Bypass Pumping of Existing Sewer Systems
33 04 10 Joint Bonding and Electrical Isolation
33 04 30 Temporary Water Services
33 04 40 Cleaning and Acceptance Testing of Water Mains
33 04 50 Cleaning of Sewer Mains
33 05 10 Utility Trench Excavation,Embedment, and Backfill
3305 12 Water Line Lowering
33 05 13 Frame,Cover and Grade Rings
33 05 14 Adjusting Manholes, Inlets,Valve Boxes, and Other Structures to Grade
33 05 16 Concrete Water Vaults
3305 17 Concrete Collars
33 05 20 Auger Boring
33 05 26 Utility Markers/Locators
33 0530 Location of Existing Utilities
33 1105 Bolts,Nuts,and Gaskets
33 11 10 Ductile Iron Pipe
33 11 11 Ductile Iron Fittings
33 11 12 Polyvinyl Chloride(PVC)Pressure Pipe
33 11 13 Concrete Pressure Pipe,Bar-Wrapped, Steel Cylinder Type
33 11 14 Buried Steel Pipe and Fittings
33 12 10 Water Services 1-inch to 2-inch
33 12 11 Large Water Meters
33 1220 Resilient Seated Gate Valve
33 1221 AWWA Rubber-Seated Butterfly Valves
33 1225 Connection to Existing Water Mains
33 1230 Combination Ai Valve Assemblies for Potable Water Systems
33 1240 Fire Hydrants
33 1250 Water Sample Stations
33 1260 Standard Blow-off Valve Assembly
33 31 20 Polyvinyl Chloride (PVC)Gravity Sanitary Sewer Pipe
33 3121 Polyvinyl Chloride(PVC)Closed Profile Gravity Sanitary Sewer Pipe
33 3150 Sanitary Sewer Service Connections and Service Line
33 31 70 Combination Air Valve for Sanitary Sewer Force Mains
3339 10 Cast-in-Place Concrete Manholes
33 39 20 Precast Concrete Manholes
33 39 30 Fiberglass Manholes
33 39 60 Epoxy Liners for Sanitary Sewer Structures
3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts
33 46 00 Subdrainage
33 46 02 Trench Drains
3349 10 Cast-in-Place Manholes and Junction Boxes
33 49 20 Curb and Drop Inlets
CITY OF FORT WORTH CD9 Street Repair&Recon FY 15 and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 22,2013
000000-4
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 4 of 5
Division 34-Transportation
34 41 20.03 Residential LED Roadway Luminaires
3471 13 Traffic Control
Appendix
GC-6.06.1) Minority and Women Owned Business Enterprise Compliance
GC-6.07 Wage Rates
GC-6.09 Permits and Utilities
GC-6.24 Nondiscrimination
GR-01 60 00 Product Requirements
END OF SECTION
CITY OF FORT WORTH CD9 Street Repair&Recon FY 15 and Near Southside Medica!District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 22,2013
004243 Pmj-Manual
Bid Tub
Page 1 af3
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Description Specification Unit of Bid Quantity Unit Price Bid Value
UNIT 1:WATER No. Section No. Measure
IMPROVEMENTS
1 3311.0461 12"PVC Water Pipe 33 11 12 LF 2,051
2 3311.0452 12"DIP Water,CSS Backfill 33 11 10 LF 120
3 3311.0262 8"PVC Water Pipe,CSS Backfill 33 11 12 LF 120
4 3311.0261 8"PVC Water Pipe 3311 12 LF 3,293
5 3311.0161 6'PVC Water Pipe 331112 LF 171
6 3311.0061 4"PVC Water Pipe 33 1112 LF 90
7 0241.1118 4"-12"Pressure Plug - 0241 14 EA __.._6
8 0241.1218 4"-12'Water Abandonment Plug 02 41-14- EA 22
9 0241.1301 Remove and Salvage 4"-12"Water Valve 0241 14 EA 33
10 0241.1510 Remove and Salvage Fire Hydrant 02 4114 EA 9
11 3201.0400 Temporary Asphalt Paving Repair 3201 18 LF 4,483
12 3201.0122 5'Wide Asphalt Pvmt Repair,Arterial 3201 17 LF 111
13 3201.0112 5'Wide Asphalt Pvmt Repair,Residential 3201 17 LF 1,731
14 3213.0101 6"Conc Pvmt 32 13 13 SY 298
15 3213.0301 4"Conc Sidewalk 32 13 20 SF 201
16 3213.0401 6"Concrete Driveway 321320 SF 170
17 3216.01016'Conc Curb and Gutter 321613 LF 1,860 -
18 3304.0101 Temporary Water Services 33 04 30 LS 1
19 3312.0001 Fire Hydrant 331240 EA 9
20 3305.0101 Fire Hydrant Stem Extension 330514 EA 9
21 3312.2201 2"Water Service,Meter Reconnection 331210 EA 3
22 3312.2203 2-Water Service 331210 EA 3
23 3312.2001 1"Water Service,Meter Reconnection 33 12 10 EA 41
24 3312.2003 1"Water Service 33 12 10 EA 41
25 3312.2004 1Private Water Service 33_12 10 LF 115
26 3312.2101 1 1/2°Water Service,Meter Reconnection 33 12 10 EA 5
27 3312.2103 11/2"Water Service 331210 EA _.5 _.
_..__6. -__- _ _.._ ____._
28 3312.0117 Connection to Existing 4-12"Water Main 33 12 25 EA 34
29 3311.0001 Ductile Iron Water Fittings 33 11 11 TON 6
30 3305.0109 Trench Safety 33 05 10 LF 240
31 3365.-0003-8*Waterline Lowering 3305 12 EA 5
32 3312.3002 6'Gate Valve 33 12 20 EA 12
33 3312.3003 8"Gate Valve 33 1220 EA 33
34 3312.3005 12"Gate Valve 33 12 20 EA 17
35 3312.310512"Cut-in Gate Valve 331220 EA 1
36 3471.0001 TmfBc Control 3471 13 MO 3
37 9999.0001 Connect to Existing 3"Service 00 00 00 EA 1
38 9999.0002 Construction Staking(Water) 01 71 23 LS 1
39 9999.0003 Construction Surveying 9(Water) - 017123 LS 1
409999.0004 Construction Allowance 00 00 00 LS 1 $ 50,000.00
Subtotal-Water Improvments
UNIT II: SEWER
VEMENTS
1 3331.4115 8 Sewer Pipe 33 11 10 LF 210
2 3331.4120 8"DIP Sewer Pipe,CSS Backfill _331110 LF 55
3_ 3201.0400 Temporary Asphalt Paving Repair_ 32 Ot 18 LF 60
4. 3201.0113 6'Wide.Asphalt Pvmt Repair,Residential 3201 17 LF 200
5 3213.0401 6"Concrete Driveway _ 32 13 20 SF 180
6 3216.0101 6"Conc Curb and Gutter 32 16 13 LF 60 -
7 3301.0001-Pre-CCTV Inspection 33 0131 LF 245
8 3301.0002 Post CCTV Inspection ,_. 33 01 31 LF 245--
9 3339.1001 4'Manhole 3339201 ------EA 5
10 3331.3101 4"Sewer Service 33 3160 EA -4------
11 3301.0101 Manhole,Vacuum Testing 330130 EA 4
_.12._ 3339.0001 Epoxy Manhole Liner _.. 333960 VF 20
13. 3305.0109 Trench.Safety____ _ 330510 LF 200
14 3292.0100 Block Sod Placement 32 92 13 SY 10
15 3125.0101 SWPPP a 1 acre 312,500 LS 1
16 0241.2201 Remove 4'Sewer Manhole 02 4114 EA _3
17 3471.0001 Traffic Control _ 34 71 13 MO 1
18 9999.0001 Construction Staking(Sewer) _ 0171213 LS- 1
19 9999.0002 ConsWction Surveying(Sewer) ._ 01 7123 LS 1 _
20 19999.0003 Construction Allowance 1 000000 LS 1 1 1
$.... 5,000.00
UNIT IIIA: PAVING Subtotal-Sewer Improvments
RECONSTRUCTION IMPROVEMENTS
CRY OF FORT R'ORRF
TFANDARD CONSFRUCFION SPECIRCAT ION DOCUM FMS
F-RniW20110627 ca�raoe imwz§+'�',m..cxawxmnsrv4 rdn.m
00424}P i-Manual
Bid Tub
Page 2.0
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Unit Of
No. Section No. Measure Bid Quantity Unit Price Bid Value
1 0241.0100 Remove Sidewalk 02 41 13 SF 4,033
2 0241.0300 RemaveADARamp 024113 EA
3 0241.0401 Remove Concrete Drive 0241 13 SF 1,428
0241.0402 Re-move Asphalt Drive 024113 SF 400
5 0241.1300 Remove Conc Curb&Gutter 02 41 15 LF 2,565
6 3125.0101 SWPPP 2!1 acre 312500 LS I
- 32111.0400 Hydrated Lime 321129 TN 135
8, 3211.0501 6"Lima Treatment 32 1129 SY 8,412
9 3212.0401 HMACTransition 321216 TN 47
10 3213.0102 7"ConcPvmt 32 13 13 SY 224
,11 3213.0104 9"-Conc Pvmt 32 13 13 -SY 7,072
12 3212.0303 3"Asphalt Pvmt_Type D 321216 _SY 579
__131 3212.0503 6"Asphalt Base Type B 33 12 16 Sy 579
---14 3216.0102 7'Conc Curb and Gutter 32 16 13 LF 466
15 3213.0301 4"Conc Sidewalk 32 13 20 SF 13,842
16 3213.0401 6"Concrete Driveway 33 13 20 SF 1,956
17 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 13
18 3213.0506 Barrier Free Ramp.Type P-1 321320 EA_ 2
19 3213.0507 BarrierFreeRamp,Type P-2 32 13 20 EA 2
20 3292.0500 Seeding,SoilRetentionBlanket 32 92 13 BY 1,150
21 3471.0001 Traffic Control 3471 13 MO 6
22 3305.0107 Manhole Adjustment,Minor 330514 EA 6
23 3305.0111 Valve Box Adjustment 330514 EA ... 13
24 2605.0121 FurnishAnstall Elec,Sew Pole Mot 260500 EA .1
25 2605.2101 Conduit Box - 260533 EA 17
26 2605-3018 2'Condt PVC SCH 80,Open Cut 26 0533 LF 1,783
27 3441-3021,OmamentalAssmbly,Simple 344120 EA 2
28 3441.3303 Rdwy Illum Foundation TY 7 34 41 20 EA 2
29 3441-3401,6-6-6 Triplex Alum Elec Conductor......... 34 41 20 LF 205
30 3110.0102_6"-12"Tree,Removal 31 1000 EA 5
------ -----
31 9999.0001 Remove and Disposal of Buried Railroad tracks 00 00 00 LS I
32 9999.0002 Steel Plate Sidewalk Cover 00 00 00 EA I
33i0003 Consction Allowance 1 000000 1 LS 1 1 1$ 76,000.00
Subtotal T_ i-2 - -l!PAVING truNG IMPROVEMENTS i
UNIT 11113: STORM DRAIN IMPROVEMENTS
1 0241.3101 15"Storm Abandonment Plug 02 41 14 EA 3
2 0241.3401 Remove,I'Storm Junction Box 0241 14 EA 1
3 0241.4401 Remove HeadwalUSET 0241.14 EA
4 0241.4001 Remove 5-1 O'Curb Inlet 024114 EA 9
5 3341.0103-1-8-RCP,Class 111 3341110 LF 153
6- 3341.0201 21'RCP,Class III 33,4110 LF_ 101
7 3341.0205 24"RCP,Class 111 3341 10 LF 140
3349.0001 4'Storm_Junction_Box 33 4910 EAI
9 3349.0006 Storm JunctionStructure33 49 10 LS_ 1
10_ 3305.0112 Concrete Collar 33 05 17 EA I
11 3349.6001 10'Curb inlet 33 49 20 EA 9
12 9999.0001 5'Curb Inlet 33 49 20 EA 1
i
13 9 990003 Construction Allowance 00 00 00 LS I $ 6,000.00
F
su tal-STORM
DRAIN IMPROVEMENTS'
UNIT IIIC: PAVING IMPROVEMENTS-PULVARIZATION AND HMAC OVERLAY
(LIPSCOMB ST.,JENNINGS AVE.,AND MAY ST.)
1 3211.0702 W Cement Treatment 32 11 33 -SY 10,671
2 3211.0600 Cement 32 11 33_ TON 69
3 9999.0001 RoadBond ENI 000000GAL 80
-----------
_4_ 3212.0302 2"Asphall Pvmt TypeD, 331216 SY - 10.671
5 3216.0102.7"Com;Curb and Gutter 32 16 13 LF 600
6 3213.0301-4'ConcSidewalk- 32 13 20 SF 5,435
3213.0501 Barrier Free Ramp,Type R-1 321320EA 26
8 3305.0107 Manhole Adjustment,Minor _330514 EA . ......29
9 ---3305.0111 Valve Box Adjustment _3305114 EA _37
10 9999.0003 Construction Allowance 000000 $54.060.60
Subtotal- PAVING IMPRO VEMENTS-PUL-VAMR72-TWINI AND MAC OVERLAY
(LIPSCOMB ST.,JENNINGS AVE.,AND MAY ST.)
CITY OF FORT WORTII
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
I-,Raised
1
00424TP gmt blanuil
Bid Tab
P.W343
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
BidlN Item Description Specification Unit of Bid Quantity Unit Price Bid Value
'UNIT IIID: PAVING No. Section No. Measure
• OVERLAY
STON AVE.AND PETER SMITH AVE.)
1 3212.0302 2"Asphalt Pvmt Type D 33 12 16 SY 5,244
2 0241.1502 2*Wedge Milling— _ _._ 0241.15 SY 11961 -
3 0241.1600 Butt Milling _ _ 02 41,15 _LF
_4 9999.0001 RoadBond EN1 Soil Stabilizer 00 00 00 GAL 39
5 3216.0102 7"Cone Curb and Gutter _ _ 32 16 13 LF 360
_6 3213.0301 4"Conc Sidewalk 32 13 20 8F 4,365
7 3213.0501 Barrier Free Ramp,Type RA__. 32 13 20 EA 14
_8 3305.0107 Manhole Adjustment,Minor 330514 EA 13
9 3305.0111 Valve Box Adjustment 33 0514 EA 23
10 19999.0003 Construction Allowance 000000 LS 1 $25,000.00
Subtotal- PAVING IMPROVEMENTS-MILLAND HMAC OVERLAY
GALVESTON AVE.AND PETER SMITH AVE.
-• • • R a WTVA I Lei
1 3211.0702 8"Cement Treatment 321133 SY 518
2 3211.0600 Cement 32 11 33 TON 3
3 9999.0001 RoadBond ENI Soil Stabilizer 00 00 00 GAL 4
4 3212.0302 2"Asphalt Pvmt Type D 331216 SY 518
3216.0102 7 Cone Curb and Gutter _ 32 16 13 LF 208
63213.0501 Barrier Free Ramp.Type R-1 _ 321320 EA 2
7. 3305.0107 Manhole Adjustment,.Minor 330514 EA 2
3305.0111 Valve Box Adjustment _ _ 330514 EA 1
9 19999.0003 Construction Allowance 00 00 00 LS 1 $31000.00
Subtotal- PAVING IMPROVEMENTS-PULVARIZATION AND HMAC OVERLAY OLEANDER ST.
:• • � r
1 3212.0302 2"Asphalt Pvmt Type D _ 331216 SY 1,950
2_ 0241.1502 2"Wedge Milling _ 0241,15 SY 750
3 0241.1600 Butt Milling 02 41 15 LF 90
4 9999.0001 RoadBond EN1 Soil Stabilizer 000000 GAL 15
--5- 3216.0102 7"Conc Curb and Gutter - _ 32 1613 LF 150
_6 3213.0301 4"Cone Sidewalk 32 13 20 SF 2,255
7 3213.0501 Barrer Free Ramp,Type R-1 32,1320 EA 6
8 3305.0107 Manhole Adjustment,Minor 330514 EA 3
9 3305.0111 Valve Box Adjustment 330514 EA 4
10 19999.0003 Construction Allowance1 000000 1 LS I 1 1 $9,000.00
Subtotal- PAVING IMPROVEMENTS-MILL AND HMAC OVERLAY LEUDA ST.
�• •�
=2 .213.0501
01 4"Cone Sidewalk 32 13 20 SF 2,710
Barrer Free Ramp,Type R-1 32 13 20 EA 6
03 Construction Allowance 000000 LS 1
Subtotal- SIDEWALK IMPROVEMENTS MORPHY ST.AND VICKERY BLVD.
BID SUMMARY
BASE BID
UNIT l:WATER IMPROVEMENTS
UNIT II:SEWER IMPROVEMENTS
UNIT IIIA:PAVING IMPROVEMENTS
UNIT IIIB:STORM DRAIN IMPROVEMENTS
UNIT IIIC:PAVING IMPROVEMENTS-PULVARIZATION AND HMAC OVERLAY LIPSCOMB ST,JENNINGS AVE.AND MAY ST.
UNIT IIID:PAVING IMPROVEMENTS-MILL AND HMAC OVERLAY GALVESTON AVE.AND PETER SMITH AVE.
UNIT IIIE:PAVING IMPROVEMENTS-PULVARIZATION AND HMAC OVERLAY OLEANDER ST.
UNIT IIIF:PAVING IMPROVEMENTS-MILL AND HMAC OVERLAY LEUDA ST.
UNIT IIIG:SIDEWALK IMPROVEMENTS MORPHY ST.AND VICKERY BLVD.
Total Bid
CrTYOFFORC WORTH
SLVIDARD CONSTRUCTION SPECIFICATION DOCUMENTS
F-Rniud20110627 mq '1dpD}"t"'n�co x" sacry
i
005243-1
Agreement
Page 1 of 4
SECTION 00 52 43
AGREEMENT
TRIS AGREEMENT,authorized on is made by and between the City of Forth
Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager,
("City"), and ,
authorized to do business in Texas, acting by and through its duly authorized representative,
("Contractor").
City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
follows:
Article 1.WORK
Contractor shall complete all Work as specified or indicated in the Contract Documents for the
Project identified herein.
Article 2.PROJECT
The project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:
CD9 Street Repair&Recon FY1 S and Near Southside Medical District Water and Sewer Main
improvements
City Project Numbers 02375& 02445)
Article 3.CONTRACT TIME
3.1 Time is of the essence.
All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
Documents are of the essence to this Contract.
3.2 Final Acceptance.
The Work will be complete for Final Acceptance within (280} calendar days after the date
when the Contract Time commences to run as provided in Paragraph 2.03 of the General
Conditions.
3.3 Liquidated damages
Contractor recognizes that time is of the essence of this Agreement and that City will
suffer financial loss if the Work is not completed within the times specified in Paragraph
3.2 above, plus any extension thereof allowed in accordance with Article 12 of the
General Conditions. The Contractor also recognizes the delays, expense and difficulties
involved in proving in a legal proceeding the actual loss suffered by the City if the Work
is not completed on time. Accordingly, instead of requiring any such proof, Contractor
agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay
City Six Hundred Fifty and 00/100 Dollars ($650.00 for each day that expires after the
time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter
of Acceptance.
CITY OF FORT WORTH CD9 Street Repair&Recon FY 15 and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised February 2,2016
005243-2
Agreement
Page 2 of 4
Article 4.CONTRACT PRICE
City agrees to pay Contractor for performance of the Work in accordance with the Contract
Documents an amount in current funds of Dollars
Article 5. CONTRACT DOCUMENTS
5.1 CONTENTS:
A. The Contract Documents which comprise the entire agreement between City and
Contractor concerning the Work consist of the following:
1. This Agreement.
2. Attachments to this Agreement:
a. Bid Form
1) Proposal Form
2) Vendor Compliance to State Law Non-Resident Bidder
3) Prequalification Statement
4) State and Federal documents(project specific)
b. Current Prevailing Wage Rate Table
c. Insurance ACORD Form(s)
d. Payment Bond
e. Performance Bond
f. Maintenance Bond
g. Power of Attorney for the Bonds
h. Worker's Compensation Affidavit
i. MBE and/or SBE Commitment Form
j. Form 1295 Certification No.
3. General Conditions.
4. Supplementary Conditions.
5. Specifications specifically made a part of the Contract Documents by attachment
or, if not attached, as incorporated by reference and described in the Table of
Contents of the Project's Contract Documents.
6. Drawings.
7. Addenda.
8. Documentation submitted by Contractor prior to Notice of Award.
9. The following which may be delivered or issued after the Effective Date of the
Agreement and,if issued,become an incorporated part of the Contract Documents:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
CITY OF FORT WORTH CD9 Street Repair&Recon FY 15 and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised February 2,2016
005243-3
Agreement
Page 3 of 4
Article 6.INDEMNIFICATION
6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
expense, the city, its officers, servants and employees, from and against any and all
claims arising out of, or alleged to arise out of, the work and services to be performed
by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
under this contract. This indemnification provision is specifically intended to operate
and be effective even if it is alleged or proven that all or some of the damages being
sought were caused,in whole or in part,by any act, omission or negligence of the city.
This indemnity provision is intended to include, without limitation, indemnity for
costs,expenses and legal fees incurred by the city in defending against such claims and
causes of actions.
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
the city,its officers,servants and employees,from and against any and all loss,damage
or destruction of property of the city,arising out of,or alleged to arise out of,the work
and services to be performed by the contractor, its officers, agents, employees,
subcontractors, licensees or invitees under this contract. This indemnification
provision is specifically intended to operate and be effective even if it is alleged or
proven that all or some of the damages being sought were caused, in whole or in part,
by any act,omission or negligence of the city.
Article 7.MISCELLANEOUS
7.1 Terms.
Terms used in this Agreement which are defined in Article 1 of the General Conditions will
have the meanings indicated in the General Conditions.
7.2 Assignment of Contract.
This Agreement, including all of the Contract Documents may not be assigned by the
Contractor without the advanced express written consent of the City.
7.3 Successors and Assigns.
City and Contractor each binds itself, its partners, successors, assigns and legal
representatives to the other party hereto, in respect to all covenants, agreements and
obligations contained in the Contract Documents.
7.4 Severability.
Any provision or part of the Contract Documents held to be unconstitutional, void or
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
remaining provisions shall continue to be valid and binding upon CITY and
CONTRACTOR.
7.5 Governing Law and Venue.
This Agreement, including all of the Contract Documents is performable in the State of
Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
Northern District of Texas,Fort Worth Division.
CITY OF FORT WORTH CD9 Street Repair&Recon FY 15 and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised February 2,2016
005243-4
Agreement
Page 4 of 4
7.6 Other Provisions.
The Contractor agrees to pay at least minimum wage per hour for all labor as the same is
classified, promulgated and set out by the City, a copy of which is attached hereto and
made a part hereof the same as if it were copied verbatim herein.
7.7 Authority to Sign.
Contractor shall attach evidence of authority to sign Agreement, if other than duly
authorized signatory of the Contractor.
IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple
counterparts.
This Agreement is effective as of the last date signed by the Parties("Effective Date").
Contractor: City of Fort Worth
By:
David Cook
By: City Manager
(Signature)
Date
Attest:
(Printed Name) City Secretary
(Seal)
Title:
Address:
M&C
Date:
City/State/Zip: Approved as to Form and Legality:
Date Douglas W.Black
Assistant City Attorney
APPROVAL RECOMMENDED:
Douglas W.Wiersig,P.E.
DIRECTOR
Transportation and Public Works Department
CITY OF FORT WORTH CD9 Street Repair&Recon FY 15 and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised February 2,2016
FORTWORTH®
City of Fort Worth
Transportation Public Works Department
ADDENDUM No. 2
To the Specifications and Contract Documents
FOR
FW SOUTH PAVEMENT REPLACEMENT
(FY15 - CD 9 STREET REPAIR AND RECONSTRUCTION PROGRAM)
FW SOUTH PAVEMENT REPLACEMENT
(NEAR SOUTH SIDE MED. DIST. W SS MAIN IMPROVEMENTS)
CITY PR03ECT NO. 02375 & 2445.
Addendum No. 2 - Issue Date: April 12, 2016
Bid Receipt Date: April 14, 2016
This addendum forms part of the contract documents referenced above and modifies the original
Contract Documents. Acknowledge receipt of this addendum by signing and attaching it to the Contract
Documents (inside). Note receipt of the Addendum in the Bid Proposal and on the outer envelope of
your bid.
Prospective Bidders are hereby notified of the following:
SPECIFICATION AND CONTRACT DOCUMENTS:
00 42 43 - Bid Proposal Form
• REPLACE THE BID PROPOSAL FORM IN THE SPECIFICATION BOOK WITH THE
ATTACHED (UPDATED EXCEL FILE UPLOADED)
• Added Bid Item for Unclassified Excavation by Plan added to bid form under
Unit IIIA
• Removed Bid Item 9999.0001 Road Bond EN1 Soil Stabilizer from Unit IIID
and Unit IIIF
CLARIFICATION AND PROJECT INFORMATION:
Pulverization and Overlay will be performed as such:
Contractor will pulverize and treat to a depth of 10" then remove 2" of material and
compact and shape 8"of cement treated material. Removal and haul-off of 2"of material
will be subsidiary to the cost of cement treatment per Section 02 41 15 3.4 Pavement
Removal H. Pavement Pulverization item Z
The 6"Concrete paving in Unit I-Water is intended for use on Leuda Street, May Street, and
Lipscomb Street.
ADDENDUM NO.2
April 12, 2016
FORT WORTH
The 6" curb and gutter in Unit I-Water is intended for use on Leuda Street, May Street,
Lipscomb Street, and Peter Smith Street.
All other provisions of the plans, specifications and contract document for the project, which are not
expressly amended herein shall remain in full force.
Failure to return a signed copy of the addendum with the Proposal shall be grounds for rendering the
bid non-responsive.
A signed copy of this addendum shall be placed into the Proposal at the time of submittal.
Rec ' cknowledged: Najib Fares, P.E.
Transportation Public Works
By: AA Department
Title:
Project manager
~ etPjE.�TFx9S1.1
MARK N.ASSAAD
i.Q._.....8..619_....-Qi
A.N.A.CONSULTANTS,L.L.C.
TBPE REGISTERED FIRM NO.F-20
THE SEAL APPEARING ON THIS
DOUMENT WAS AUTHORIZED BY
MARK N.ASSAAD,PE.#87619
ON APRIL 12,2016
ADDENDUM NO.2
April 12, 2016
00424}Pmjsl Manual
Bid Tab
Page 143
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Description Specification Unit of Bid Quantity Unit Price Bid Value
No. Section No. Measure
IMPROVEMENTSUNIT 1: WATER
1 3311.0461 12"PVC Water Pipe 3311 12 LF 2,051
2 3311.0452 12"DIP Water,CSS Backfill 3311 10 LF 120
3 3311.0262 8°PVC Water Pipe,CSS Backfill 3311 12 LF 120
4 3311.0261 8"PVC Water Pipe - 33 11 12 LF 3,293
5 3311.0161 6"PVC Water Pipe 3311 12 LF 171
6 3311.0061 4°PVC Water Pipe 3311 12 LF 90
7 0241.1118 4'-12"Pressure Plug 0241 14 EA 6
8 0241.1218 4'-12'WaterAbandonment Plug 024114 EA 22
9 0241.1301 Remove and Salvage 4"-12"Water Valve 0241 14 EA 33
10 0241.1510 Remove and Salvage Fire Hydrant 02 41 14 EA 9
11 3201.0400 Tempomry Asphalt Paving Repair 320118 LF 4,483
12 3201.0122 5'Wide Asphalt Pvmt Repair,Arterial 3201 17 LF 111
13 3201.0112 F Wide Asphalt Pvmt Repair,Residential 3201 17 LF 1,731
-14 3213.0101 6"Cone Pvmt 321313 SY -298
15 3213.0301 4"Conc Sidewalk 32 13 20 SF 201
16 3213.0401 6"Concrete Driveway 32 13 20 SF 170
17 3216.0101 6"Cone Curb and Gutter 32 16 13 LF 1,860
183304.0101 Temporary Water Services 33 04 30 LS _...1
19 3312.0001 Fire Hydrant 33 12 40 EA 9
20 3305.0101 Fire Hydrant Stem Extension 330514 14 EA 9
21 3312.2201 2"Water Service,Meter Reconnection 3312 10 EA 3
22 33122203 2"Water Service331210 EA 3
23 33122001 1"Water Service,Meter Reconnection 331210 EA 41
24 3312.2003 1°Water Service 331210 EA 41
25 3312.2004 1"Private Water Service 33 12 10 LF 115
26 3312.2101 1 1/2"Water Service,Meter Reconnection 33 12 10 EA 5
27 3312.2103 1 1/2°Water Service 33 12 10 FA 5
28 3312.0117 Connection to Existing 4"-12'Water Main 33 12 25 EA 34
29 3311.0001 Ductile Iron Water Fittings 33-11-11 TON 6
_ -- -------
30 3305.0109 Trench Safety '330510 LF 240
31 3305.0003 8"Watedine Lowering 330512 EA 5
32 3312.3002 6°Gate Valve 33 12 20 EA 12
33 3312.3003 8"Gate Valve 3312 20 EA 33
34 3312.3005 12"Gate Valve 33 12 20 EA 17
35 3312.3105 12°Cut-in Gate Valve 33 12 20 EA 1
36 3471.0001 Traffic Control 3471 13 MO 3
37 9999.0001 Connect to Existing 3"Service 00 00 00 EA 1
38 9999.0002 Construction Staking(Water) 01 71 23 LS 1
39 9999.0003 Construction Surveying(Water) 01 71 23 LS 1
409999.0004 Construction Allowance 000000 LS 1 $ 50,000.00
Subtotal-Water Improvments
UNIT Ik SEWER IMPROVEMENTS
1 3331.4115 8"Sewer Pipe 33 11 10 LF 210
2 3331.4120 8"DIP Sewer Pipe,CSS Backfill _33,11 10 LF 55
3 3201.0400 Temporary Asphalt.Paving Repair 3201.18 LF 60
4 3201-0113,6'Wide Asphalt Pvmt Repair,Residential 3201 17 LF 200
5 3213.0401 6"Concrete Driveway _ 32 13 20 SF 180
6 3216.0101 6"Cone Curb and Gutter, 32 16 13 LF 60
7 3301.0001 Pre-CCTV Inspection_ 33 01 31 LF 245
8 3301.0002 Post-CCN Inspection 330131 LF 245
9 3339.1001 4'Manhole 333920 EA 5
10 3331.3101 4°Sewer Service 333180 EA 4
11 3301.0101 Manhole Vacuum Testing 33 01 30 EA 4
12 3339.0001 Epoxy Manhole Liner 33 39 60 VF 20
13 3305.0109 Trench Safety _ 330510 LF 200
14 3292.0100 Block Sod Placement 32 92 13 SY 10
15 3125.0101 SWPPPa 1 acre 312500 LS 1
16 0241.2201 Remove 4'Sewer Manhole 02 41 14 EA 3
17 3471.0001 Traffic Control 3471 13 MO 1
18 9999.0001 Construction Staking(Sewer) 01 71 23 LS 1
19 9999.0002 Construction Surveying(Sewer) 01 71 23 1
209999.0003 Construction Allowance 000000 LS 1 $ 5,000.00
Subtotal-Sewer Improvments
UNIT IIIA: PAVING RECONSTRUCTION IMPROVEMENTS
CTFYOFFORTwORTH
STANDAR)CONSTRUCTION SPECIFICATION DOC UMEN IS _
F-Revised 20110627 wr r# coex nua�«
00424}P.*t\9.A
Bid Tab
Page 2 of3
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Specification Unit of
No. Description Section No. Measure Bid Quantity Unit Price Bid Value
1 0241_,0100 Remove Sidewalk 02 41 13 SF 4,033
,2 0241.0300 Remove ADA Ramp 024113 EA 8
3 0241.0401 Remove Concrete Drive 0241 13 SF 1,428
4 0241.0402 Remove Asphalt Drive 024113 SF 400
5 0241.1300 Remove Conc CurbBGutter 024116 LF 2,565
6 3125.0101 SWPPP 1 acre 31 2500 LS 1
7 3123.0101 Unclassified Excavation by Plan 3123 16 CY 4,206
8 3211.0400 Hydrated Lime ., 32 11_29 TN 135
9 3211.0501 6'Lime Treatment 321129 SY 8,412
10 3212.0401 HMAC Transition 32 12 16 TN 47
11 3213.0102 7"Cone Pvmt 321313 SY 224
12 3213.0104 9'Cone Pvmt 32_13 13 SY 7,072
13 3212.0303 3-Asphalt Pvmt Type D 321216,_ SY 579
14 3212.0503 6"Asphalt Base Type B 3312_16 SY 579
15 3216.0102 7"Conc Curb and Gutter 321613 LF 466
16 3213.0301 4'Conc Sidewalk 32 13 20 SF 13,842
17 3213.0401 6"Concrete Driveway 33.13 20 SF 1,956 _
18 3213.0501 Barrier Free Ramp,,Type R-1 32 13 20 EA 13
19 3213.0506 Barrier Free Ramp,,Type P-1 _ 32 13 20 EA 2
20 3213.0507 Barrier Free-Ramp,Type P-2 32 13 20 EA 2
21 3292.0500 Seeding Soil Retention Blanket _ 32_92 13SY 1,150
li
22 3471.0001 Trac Control 34 71 13 MO 6
23 3305.0107 Manhole Adjustment,Minor 33 0514 EA 6
24 3305.0111 Valve Box Adjustment 33 05 14 EA 13 _
25 2605.0121 Fumish/Install Elec Sew Pole Mnt _ 26 05 00 EA 1
26 2605.2101 Conduit Box 26 05 33 EA 17
27 2605.3018 2"Condt PVC SCH80,Open Cut 26 05 33 LF 1,783
28 3441.3021 Ornamental Assmbly,Simple 34,4120 EA 2
29 3441.3303 Rdwy Ilium Foundation TY 7 34 41 20 EA 2
30 3441.3401_6-6-6 Triplex Alum Elec Conductor 34 41 20 LF 205
31 3110.0102 6"-12°Tree Removal 31 1000 EA 5
32 9999.0001 Remove and Disposal of Buried Railroad tracks 00 00 00 LS 1
33 9999.0002 Steel Plate Sidewalk Cover 00 00 00 EA 1
34 19999.0003 Construction Allowance 000000 LS 1 $ 78,000.00
Subtotal-PAVING IMPROVEMENTS
STORMUNIT IIIB: DRAIN IMPROVEMENTS
1 0241.310115"Storm Abandonment Plug 02 41 14 EA 3
2 0241.3401 Remove 4'Storm Junction Box 02 41 14 EA 1
3 0241 A401 Remove HeadwalUSET 02 41 14 EA 1
4 0241.4001 Remove 5'-10'Curb Inlet 02 41 14 EA 9
_5 3341.0103 18"RCP,Class 111 33 41 10 __LF 153
.6. 3341.0201 21"RCP,Class 111- - --- 334110 -LF 101 -- - --
7 3341.0205 24'RCP,Class III 3341 10 LF 140
8 3349.0001 4'Storm Junction Box 334910 EA 1
-9 3349.0006 Storm Junction Structure 334910 LS 1
_10 3305.0112 Concrete Collar
330517 _ EA 1
11 3349.6001 10'Curbinlet --- - - 334920 EA -g
12 9999.0001 5'Curb Inlet 33 49 20 EA 1
13 9999.0003 Construction Allowance 000000 LS 1 $.... 6,000.00
Subtotal-STORM DRAIN IMPROVEMENTS
'UNIT IIIC: PAVING R• • AND HMAC OVERLAY
(LIPSCOMB
1- 3211.0702 W Cement Treatment 32 11 33 SY 10,671
2 3211.0600 Cement 321133 TON 69
3_ 9999.0001 RoadBond EN1 00 00 00 GAL 80
4_ 3212.0302 2"Asphalt Pvmt TypeD 33 12 16 SY 10,671
5 3216.0102 7"Conc Curb and Gutter 32 16 13 LF 600
6 3213.0301 4'Conc Sidewalk 321320 SF 5,435
7 3213.0501 Barrier Free Ramp,Type R-1 32_1320 EA 26
8 3305.0107 Manhole Adjustment,Minor _ _ _ 330514 EA _29
9 3305.0111 Valve Box Adjustment 3305 14 EA 37
10 19999.0003 Construction Allowance000000 LS 1 $54,000.00
Subtotal- PAVING IMPROVEME TS-P LAR ON D HMAC OVERLA
LIPSCOMB ST.,JENNINGS AVE.,AND MAY ST.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS c -xw_immuk�++m .mc�y c�s;�
Fame Rni-I 20110627 w� nt»�uxmnt-ndr�m
004243-P j-1 M...l
Bid Tab
Page 3 ora
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Description Specification Uninit Price t of Bid Quantity UBid Value
No. Section IN Measure
IMPROVEMENTS-MILL,UNIT IIID: PAVING OVERLAY
(GALVESTON
1 3212.0302 2"Asphalt Pvmt Type D 331216 SY 5,244
2 0241.1502 2Wedge Milling _ 024115 SY 1,961
3 0241.1600 Butt Milling ,. 02 41 15 LF 567
4 3216.0102 7"Conc Curb and Gutter, 32 16 13 LF 360
_5 3213.0301,4"Conc Sidewalk 32 13 20 SF 4,365
6 3213.0501 Barrier Free Ramp,Type R-1 321320, EA 14
7 3305.0107 Manhole Adjustment,Minor 330514 EA 13
6 3305.0111 Valve Box Adjustment 33 05 14 EA 23-
9 19999.0003 Construction Allowance 000000 LS 1 $25,000.00
Subtotal- PAVING IMPROVEMENTS-MILL AND HMAC OVERLAY
GALVESTON AVE.AND PETER SMITH AVE.
01,111111111111M A..• • • • •
1 3211.0702 8'Cement Treatment 32 11 33 SY 518
2 3211,0600 Cement 321133 TON 3
3 9999.0001 RoadBond ENI Soil Stabilizer 00 00 00 GAL 4
4 3212.0302 2°Asphalt Pvmt Type D 331216 SY 518
5 3216.0102 T Cone Curb and Gutter 32 16 13 LF 208
6 3213.0501 Barder Free Ramp,Type R-1 _ 32 13 20 EA 2
7 3305.0107 Manhole AdjustmentMinor 330514 EA 2
8 3305.0111 Valve,Box Adjustment _ 330514 EA 1
9 19999.0003 Construction Allowance 1 00 00 00 1 LS 1 t $3,000.00
Subtotal- PAVING IMPROVEMENTS-PULVARIZATION AND HMAC OVERLAY OLEANDER ST.
Z•1VA I ITI 1:1 k&TI IT,I I a wil kq I III;11TIF-11 OX01WINI
1 3212.0302 2'.Asghalt Pvmt Type D 331216 SY 1_,950
2 0241.1502 2°Wedge Milling _ 02,41 15 SY 750
3 0241.1600 Butt Milling 0241 15 LF 90
4 3216.0102 7"Conc Curb and Gutter 32 16 13 LF 150
5 3213.0301 4'Conc Sidewalk 321320, SF 2,255
6 3213.0501 Bamer Free Ramp,Type R-1 32 13 20 EA 6
7 3305.0107 Manhole AdjustmenLMmor 33 05 14 EA 3
8 3305.0111 Valve Box Adjustment 33 05 14 EA 4
9 19999.0003 Construction Allowance 1 00 00 00 1 LS I 7 1 $9,000.00
Subtotal- PAVING IMPROVEMENTS-MILL AND HMAC OVERLAY LEUDAST.
�• •�
1 7� onstrucfion
4'Cone Sidewalk 32 13 20 SF 2,710
_J
2 Bamer Free Ramp,Type R 1 - 32 13 20 EA 6 _
-- -- -3 CAllowance 00 00 00 LS 1 $1,600.00
Subtotal- SIDEWALK IMPROVEMENTS MORPHY ST.AND VICKERY BLVD.
BID SUMMARY
BASE BID
UNIT I:WATER IMPROVEMENTS
UNIT II:SEWER IMPROVEMENTS
UNIT IIIA:PAVING IMPROVEMENTS
UNIT IIIB:STORM DRAIN IMPROVEMENTS
UNIT IIIC:PAVING IMPROVEMENTS-PULVARIZATION AND HMAC OVERLAY LIPSCOMB ST.,JENNINGS AVE.AND MAY ST.
UNIT IIID:PAVING IMPROVEMENTS-MILL AND HMAC OVERLAY GALVESTON AVE.AND PETER SMITH AVE.
UNIT IIIE:PAVING IMPROVEMENTS-PULVARIZATION AND HMAC OVERLAY OLEANDER ST.
UNIT IIIF:PAVING IMPROVEMENTS-MILLAND HMAC OVERLAY LEUDA ST.
UNIT IIIC:SIDEWALK IMPROVEMENTS MORPHY ST.AND VICKERY BLVD.
Total Bid
CITY OFFORMOKTH
STANDARD CONSTROCIION SPECIFICATION DOCUMENTS
I—R—d 20110627 ani coruavn> 3F..a�k.
FORTWORTH®
City of Fort Worth
Transportation Public Works Department
ADDENDUM No. 3
To the Specifications and Contract Documents
FOR
FW SOUTH PAVEMENT REPLACEMENT
(FY15 - CD 9 STREET REPAIR AND RECONSTRUCTION PROGRAM)
FW SOUTH PAVEMENT REPLACEMENT
(NEAR SOUTH SIDE MED. DIST. W SS MAIN IMPROVEMENTS)
CITY PROJECT NO. 02375 & 2445.
Addendum No. 3 - Issue Date: April 14, 2016
Bid Receipt Date: April 21, 2016
This addendum forms part of the contract documents referenced above and modifies the original
Contract Documents. Acknowledge receipt of this addendum by signing and attaching it to the Contract
Documents (inside). Note receipt of the Addendum in the Bid Proposal and on the outer envelope of
your bid.
Prospective Bidders are hereby notified of the following:
SPECIFICATION AND CONTRACT DOCUMENTS:
Bid Date has been delayed until {1:30 P.M. CST, Thursday, April 21, 2016), and bids will be
opened publicly and read aloud at 2:00 PM CST in the Council Chambers at 1000
Throckmorton Street Fort Worth, TX 76102.
All other provisions of the plans, specifications and contract document for the project, which are not
expressly amended herein shall remain in full force.
Failure to return a signed copy of the addendum with the Proposal shall be grounds for rendering the
bid non-responsive.
A signed copy of this addendum shall be placed into the Proposal at the time of submittal.
Rec ' t Acknowledged: Najib Fares, P.E. _y�PZE X TFxgf11
Transportation
Public Works MARK N.ASSAAD
By: Department
Title: Project mana�+A
++
I/l.P t c.�
A.N.A.CONSULTANTS,L.L.C.
TRPE REGISTERED FIRM NO.F-20
THE SEAL APPEARING ON THIS
DOUMENT WAS AUTHORIZED RY
MARK N.ASSAAD,P.E.#87619
ON APRIL 14,2016
ADDENDUM NO.3
April 14, 2016
001113-I
INVITATION TO BIDDERS
Pagel of 3
SECTION 00 1113
INVITATION TO BIDDERS
RECEIPT OF BIDS
Sealed bids for the construction of
FW SOUTH PAVEMENT REPLACEMENT
(NEAR SOUTH SIDE MED. DIST. W SS MAIN IMPROVEMENTS)
City Project No 2375,X-23397
FW SOUTH PAVEMENT REPLACEMENT
(FYI 5-CD 9 STREET REPAIR AND RECONSTR UCTION PROGRAM)
City Project No 2445, K-2443 will be received by the City of Fort Worth Purchasing Office:
City of Fort Worth
Purchasing Division
1000 Throckmorton Street
Fort Worth,Texas 76102
until 1:30 P.M. CST,Thursday, March 31,2016, and bids will be opened publicly and read aloud
at 2:00 PM CST in the Council Chambers.
GENERAL DESCRIPTION OF WORK
The major work will consist of the(approximate)following:
Street Reconstruction for:
• College Avenue from W Vickery to Pennsylvania Ave. (Approx. 1,900 L.F.)
• Jarvis Street from College Ave. to Lipscomb St. (Approx. 900 L.F.)
Street Pulverization and 1114A Overlay(POL)for:
• Jennings Avenue from Rosedale St. to Magnolia Ave. (Approx. 900 L.F.)
• Lipscomb Street from Jarvis St to Pennsylvania Ave. (Approx. 1,600 L.F.)
• May Street from Magnolia Ave to Feliks Gwozdz Pl. (Approx. 900 L.F.)
• Vickery Boulevard from Galveston Ave. to Main St. (Approx. 550 L.F.)
• Oleander Street from Grainger St. to Jennings Ave. (Approx. 300 L.F.)
Street Mill and HAM Overlay(MOL)for:
• Leuda Street from St.Louis Ave. to Main St. (Approx. 750 L.F.)
• Peter Smith Streetfrom Fulton St. to Hemphill St. (Approx. 1,200 L.F.)
• Galveston Avenue from Terrell Ave. to Cannon St. (Approx. 650 L.F.)
Water and Sewer Replacement for:
• College Ave from W Vickery to Pennsylvania Ave
o approx. 860 IF 12" WL, by open cut
o approx. 52 IF 8"SS L-231, by open cut
• Jennings Ave from Rosedale St. to Magnolia Ave.
o approx. 610 LF 12" WL, by open cut
• Leuda St. (Main St to St Louis Ave)
o approx. 629 IF 12" WL, by open cut
• Lipscomb St(Jarvis St to Pennsylvania Ave)
o approx. 1465 IF 8" WL, by open cut
CITY OF FORT WORTH CD9 Street Repair&Recon FY 15 and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised December 23,2015
00 11 13-2
INVITATION TO BIDDERS
Page 2 of 3
o approx.60 LF 12" WL, by open cut
• May St. (Magnolia Ave to Feliks Gwozdz PI)
o approx. 919 LF 8" WL, by open cut
o approx.60 LF 12" WL, by open cut
• Peter Smith St. (Fulton St. to Hemphill St.)
o approx. 919 LF 8".WL, by open cut
o approx. 191 LF 8"SS L-245, by open cut
PREQUALIFICATION
The improvements included in this project must be performed by a contractor who is pre-
qualified by the City at the time of bid opening. The procedures for qualification and pre-
qualification are outlined in the Section 00 21 13—INSTRUCTIONS TO BIDDERS.
DOCUMENT EXAMINATION AND PROCUREMENTS
The Bidding and Contract Documents may be examined or obtained on-line by visiting the City
ofFort Worth's Purchasing Division website athttpeti%w�.t';rt�v,urt11�z,OV. and
clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site. The
Contract Documents may be downloaded,viewed, and printed by interested contractors and/or
suppliers. The contractor is required to fill out and notarize the Certificate of Interested
Parties Form 1295 and the form must be submitted to the Project Manager before the
contract will be presented to the City Council.The form can be obtained at
https://www.ethics.state.tx.us/tec/1295-info.htm .
Copies of the Bidding and Contract Documents may be purchased from A.N.A. Consultants,
which is as follows 5000 Thompson Terrace, Colleyville, Texas 76034
The cost of Bidding and Contract Documents is:
Set of Bidding and Contract Documents with full size drawings: $1?0
Set of Bidding and Contract Documents with half size(if available)drawings: .W
PREBID CONFERENCE
A prebid conference may be held as described in Section 00 21 13 -INSTRUCTIONS TO
BIDDERS at the following location, date, and time:
DATE: Murch 15. _'016
TIME: 9:OOAM
PLACE: City Hall—Transportation Public Works Department
1000 Throckmortcni Sheet
Fort Worth, Texas 76102
LOCATION: ?"d Floor TPW Conference Room 270
CITY'S RIGHT TO ACCEPT OR REJECT BIDS
City reserves the right to waive irregularities and to accept or reject bids.
FUNDING
Any Contract awarded under this INVITATION TO BIDDERS is expected to be funded from revenues
generated from grants and dedicated by Resolution to the work under this INVITATION TO BIDDERS.
INQUIRIES
All inquiries relative to this procurement should be addressed to the following:
CITY OF FORT WORTH CD9 Street Repair&Recon FYI and Near Southside Aledica!District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised December 23,2015
001113-3
INVITATION TO BIDDERS
Page 3 of 3
Attn: Na/ib Fares, P.E.. City of Fort Worth Transportation Public Works
Email: Na1ib,Fvres�a%1�rtavori&e.yas.,s u�
-- s .
Phone: (817) 39?-780'
AND/OR
Attn: Mark N.Assaad,P.E.,
A.N.A. Consultants,LLC
Email: Mark.Assaad@anallc.com
Phone: 817-335-9900
ADVERTISEMENT DATES
March 3. 2016
March 10, 2016
END OF SECTION
CITY OF FORT WORTH CD9 Street Repair&Recon FYI and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised December 23,2015
� �.
��d\
.x <m
a > > : .
3
2 : f
v » m A, i -01
« w a
\
A", °^
- .
A
».. » . . .
. . : . .�. .
� y« • — � � y ® . _
-
y < . , » »
�y��
. . y 1 y y
CITY OF mRT worm cgs rG@ka ReconFYI and Near Southside MdaDisrr
Q%wAa No.02375a 02445
0021 13-1
INSTRUCTIONS TO BIDDERS
Page 1 of 9
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
1. Defined Terms
1.1.Terms used in these INSTRUCTIONS TO BIDDERS,which are defined in Section 00 72
00-GENERAL CONDITIONS.
1.2.Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the
meanings indicated below which are applicable to both the singular and plural thereof.
1.2.1. Bidder: Any person,firm,partnership,company, association, or corporation acting
directly through a duly authorized representative, submitting a bid for performing
the work contemplated under the Contract Documents.
1.2.2. Nonresident Bidder:Any person, firm,partnership, company,association, or
corporation acting directly through a duly authorized representative, submitting a
bid for performing the work contemplated under the Contract Documents whose
principal place of business is not in the State of Texas.
1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City
(on the basis of City's evaluation as hereinafter provided)makes an award.
2. Copies of Bidding Documents
2.1.Neither City nor Engineer shall assume any responsibility for errors or misinterpretations
resulting from the Bidders use of incomplete sets of Bidding Documents.
2.2.City and Engineer in making copies of Bidding Documents available do so only for the
purpose of obtaining Bids for the Work and do not authorize or confer a license or grant
for any other use.
3. Prequalification of Bidders(Prime Contractors and Subcontractors)
3.1.All Bidders and their subcontractors are required to be prequalified for the work types
requiring prequalification at the time of bidding.Bids received from contractors who are
not prequalified(even if inadvertently opened)shall not be considered. Prequalification
requirement work types and documentation are as follows:
3.1.1. Paving—Requirements document located at;
iittps:i/urojectpoint.buzzsaw.com/fortworthgov/Resources/02%20-
%20Construction%20Documents/Contractor%20Prequal ification/TP W%20 Paving
%20Contractor%2OPrequal itication%2OProgram/PREQUALIFICATION%20REQ
UIRE MENTS%20FOR%20PAVING%2000NTRACTORS.PDF?public
3.1.2. Roadway and Pedestrian Lighting—Requirements document located at;
CITY OF FORT WORTH CD9 Street Repair&Recon FY15 and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 27,2012
002113-2
INSTRUCTIONS TO BIDDERS
Page 2 of 9
https:Hpro jectt)oint.buzzsaw.com/fortworthgov/Resources/02%20-
%24Construction%20 Documents/Contractor%20PrequaI i fication/TP W%20Pavin g
%20Contractor%2OPreguali f ication%2OProgram/PREQ UAL I F IC ATION%20REO
U[REM ENTS%20FOR%20PA VING%2000NTRACTORS.PDF?public
3.1.3. Water and Sanitary Sewer—Requirements document located at;
https://proiectpoi; ..,-,uzzsaw.com/fortwortilgoviResource5 _ ;_0-
%20Construction%2ODocuments/Contractor%2OPregual ification/Water%2Oand%2
OSan itary%2OSewer%2OContractor%20 Preg ua l i ficaf ion%20 Program/W SS%20pre
qua1%20requirements.doc?public
3.2.Each Bidder unless currently prequalified,must be prepared to submit to City within
seven(7)calendar days prior to Bid opening,the documentation identified in Section 00
45 11,BIDDERS PREQUALIFICATIONS.
3.2.1. Submission of and/or questions related to prequalification should be addressed to
the City contact as provided in Paragraph 6.1.
3.3.The City reserves the right to require any pre-qualified contractor who is the apparent low
bidder(s)for a project to submit such additional information as the City,in its sole
discretion may require,including but not limited to manpower and equipment records,
information about key personnel to be assigned to the project,and construction schedule,
to assist the City in evaluating and assessing the ability of the apparent low bidder(s)to
deliver a quality product and successfully complete projects for the amount bid within
the stipulated time frame.Based upon the City's assessment of the submitted
information,a recommendation regarding the award of a contract will be made to the
City Council. Failure to submit the additional information,if requested,may be grounds
for rejecting the apparent low bidder as non-responsive.Affected contractors will be
notified in writing of a recommendation to the City Council.
3.4.In addition to prequalification,additional requirements for qualification may be required
within various sections of the Contract Documents.
4. Examination of Bidding and Contract Documents,Other Related Data,and Site
4.1.Before submitting a Bid,each Bidder shall:
4.1.1. Examine and carefully study the Contract Documents and other related data
identified in the Bidding Documents(including"technical data"referred to in
Paragraph 4.2,below).No information given by City or any representative of the
City other than that contained in the Contract Documents and officially
promulgated addenda thereto, shall be binding upon the City.
4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and
site conditions that may affect cost,progress,performance or furnishing of the
Work.
CITY OF FORT WORTH CD9 Street Repair&Recon FY15 and Nem•Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 27,2012
002113-3
INSTRUCTIONS TO BIDDERS
Page 3 of 9
4.1.3. Consider federal,state and local Laws and Regulations that may affect cost,
progress,performance or furnishing of the Work.
4.1.4. Study all: (i)reports of explorations and tests of subsurface conditions at or
contiguous to the Site and all drawings of physical conditions relating to existing
surface or subsurface structures at the Site(except Underground Facilities)that
have been identified in the Contract Documents as containing reliable"technical
data" and(ii)reports and drawings of Hazardous Environmental Conditions,if any,
at the Site that have been identified in the Contract Documents as containing
reliable"technical data."
4.1.5. Be advised that the Contract Documents on file with the City shall constitute all of
the information which the City will furnish.All additional information and data
which the City will supply after promulgation of the formal Contract Documents
shall be issued in the form of written addenda and shall become part of the Contract
Documents just as though such addenda were actually written into the original
Contract Documents.No information given by the City other than that contained in
the Contract Documents and officially promulgated addenda thereto, shall be
binding upon the City.
4.1.6. Perform independent research, investigations,tests,borings,and such other means
as may be necessary to gain a complete knowledge of the conditions which will be
encountered during the construction of the project. On request, City may provide
each Bidder access to the site to conduct such examinations, investigations,
explorations,tests and studies as each Bidder deems necessary for submission of a
Bid. Bidder must fill all holes and clean up and restore the site to its former
conditions upon completion of such explorations, investigations,tests and studies.
4.1.7. Determine the difficulties of the Work and all attending circumstances affecting
the cost of doing the Work,time required for its completion,and obtain all
information required to make a proposal.Bidders shall rely exclusively and solely
upon their own estimates, investigation,research,tests,explorations,and other data
which are necessary for full and complete information upon which the proposal is
to be based.It is understood that the submission of a proposal is prima-facie
evidence that the Bidder has made the investigation,examinations and tests herein
required. Claims for additional compensation due to variations between conditions
actually encountered in construction and as indicated in the Contract Documents
will not be allowed.
4.1.8. Promptly notify City of all conflicts,errors,ambiguities or discrepancies in or
between the Contract Documents and such other related documents.The Contractor
shall not take advantage of any gross error or omission in the Contract Documents,
and the City shall be permitted to make such corrections or interpretations as may
be deemed necessary for fulfillment of the intent of the Contract Documents.
4.2. Reference is made to Section 00 73 00—Supplementary Conditions for identification of:
CITY OF FORT WORTH CD9 Street Repair&Recon FYI and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 27,2012
002113-4
INSTRUCTIONS TO BIDDERS
Page 4 of 9
4.2.1, those reports of explorations and tests of subsurface conditions at or contiguous to
the site which have been utilized by City in preparation of the Contract Documents.
The logs of Soil Borings, if any,on the plans are for general information only.
Neither the City nor the Engineer guarantee that the data shown is representative of
conditions which actually exist.
4.2.2, those drawings of physical conditions in or relating to existing surface and
subsurface structures(except Underground Facilities)which are at or contiguous to
the site that have been utilized by City in preparation of the Contract Documents.
4.2.3. copies of such reports and drawings will be made available by City to any Bidder
on request. Those reports and drawings may not be part of the Contract
Documents,but the "technical data" contained therein upon which Bidder is entitled
to rely as provided in Paragraph 4.02. of the General Conditions has been identified
and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is
responsible for any interpretation or conclusion drawn from any"technical data" or
any other data, interpretations, opinions or information.
4.3.The submission of a Bid will constitute an incontrovertible representation by Bidder(i)
that Bidder has complied with every requirement of this Paragraph 4,(ii)that without
exception the Bid is premised upon performing and furnishing the Work required by the
Contract Documents and applying the specific means,methods,techniques,sequences or
procedures of construction(if any)that may be shown or indicated or expressly required
by the Contract Documents,(iii)that Bidder has given City written notice of all
conflicts, errors,ambiguities and discrepancies in the Contract Documents and the
written resolutions thereof by City are acceptable to Bidder, and when said conflicts,
etc.,have not been resolved through the interpretations by City as described in
Paragraph 6., and(iv)that the Contract Documents are generally sufficient to indicate
and convey understanding of all terms and conditions for performing and furnishing the
Work.
4.4.The provisions of this Paragraph 4, inclusive, do not apply to Asbestos,Polychlorinated
biphenyls(PCBs),Petroleum,Hazardous Waste or Radioactive Material covered by
Paragraph 4.06. of the General Conditions,unless specifically identified in the Contract
Documents.
5. Availability of Lands for Work,Etc.
5.1.The lands upon which the Work is to be performed,rights-of-way and easements for
access thereto and other lands designated for use by Contractor in performing the Work
are identified in the Contract Documents. All additional lands and access thereto
required for temporary construction facilities, construction equipment or storage of
materials and equipment to be incorporated in the Work are to be obtained and paid for
by Contractor. Easements for permanent structures or permanent changes in existing
facilities are to be obtained and paid for by City unless otherwise provided in the
Contract Documents.
CITY OF FORT WORTH CD9 Street Repair&Recon FYI and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 27,2012
002113-5
INSTRUCTIONS TO BIDDERS
Page 5 of 9
5.2.Outstanding right-of-way,easements,and/or permits to be acquired by the City are listed
in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right-
of-way,easements,and/or permits are not obtained,the City reserves the right to cancel
the award of contract at any time before the Bidder begins any construction work on the
project.
5.3. The Bidder shall be prepared to commence construction without all executed right-of-
way,easements,and/or permits,and shall submit a schedule to the City of how
construction will proceed in the other areas of the project that do not require permits
and/or easements.
6. Interpretations and Addenda
6.1.All questions about the meaning or intent of the Bidding Documents are to be directed to
City in writing on or before 2 p.m.,the Monday prior to the Bid opening. Questions
received after this day may not be responded to. Interpretations or clarifications
considered necessary by City in response to such questions will be issued by Addenda
delivered to all parties recorded by City as having received the Bidding Documents.
Only questions answered by formal written Addenda will be binding. Oral and other
interpretations or clarifications will be without legal effect.
Address questions to:
City of Fort Worth
1000 Throckmorton Street
Fort Worth,TX 76102
Attn: Najib Fares, P.E., City of Fort Worth Transportation Public Works
Email: naiib.fares( fortworthtexas.gov
Phone:(817)392-7802
6.2.Addenda may also be issued to modify the Bidding Documents as deemed advisable by
City.
6.3.Addenda or clarifications may be posted via Buzzsaw at
hups:Aprojecipointbuazsaw.contlcliendforlwor•thgovlltifi•crstructure Pr(?iec1s/02375-
CD9 Sheet Repair%2526 Recon FY15/Bid Documents Package.
6.4.A prebid conference may be held at the time and place indicated in the Advertisement or
INVITATION TO BIDDERS. Representatives of City will be present to discuss the
Project. Bidders are encouraged to attend and participate in the conference. City will
transmit to all prospective Bidders of record such Addenda as City considers necessary
in response to questions arising at the conference. Oral statements may not be relied
upon and will not be binding or legally effective.
7. Bid Security
CITY OF FORT WORTH CD9 Street Repair&Recon FYI and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 27,2012
0021 13-6
INSTRUCTIONS TO BIDDERS
Page 6 of 9
7.1.Each Bid must be accompanied by Bid Bond made payable to City in an amount of five
(5)percent of Bidder's maximum Bid price on form attached, issued by a surety meeting
the requirements of Paragraphs 5.01 of the General Conditions.
7.2.The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award
have been satisfied. If the Successful Bidder fails to execute and deliver the complete
Agreement within 10 days after the Notice of Award,City may consider Bidder to be in
default,rescind the Notice of Award,and the Bid Bond of that Bidder will be forfeited.
Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all
other Bidders whom City believes to have a reasonable chance of receiving the award
will be retained by City until final contract execution.
8. Contract Times
The number of days within which,or the dates by which,Milestones are to be achieved in
accordance with the General Requirements and the Work is to be completed and ready for
Final Acceptance is set forth in the Agreement or incorporated therein by reference to the
attached Bid Form.
9. Liquidated Damages
Provisions for liquidated damages are set forth in the Agreement.
10. Substitute and "Or-Equal" Items
The Contract, if awarded,will be on the basis of materials and equipment described in the
Bidding Documents without consideration of possible substitute or"or-equal" items.
Whenever it is indicated or specified in the Bidding Documents that a "substitute" or"or-
equal" item of material or equipment may be furnished or used by Contractor if acceptable to
City, application for such acceptance will not be considered by City until after the Effective
Date of the Agreement. The procedure for submission of any such application by Contractor
and consideration by City is set forth in Paragraphs 6.05A.,6.05B. and 6.05C. of the General
Conditions and is supplemented in Section 01 25 00 of the General Requirements.
11. Subcontractors,Suppliers and Others
11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020-
12-2011 (as amended),the City has goals for the participation of minority business
and/or small business enterprises in City contracts.A copy of the Ordinance can be
obtained from the Office of the City Secretary.The Bidder shall submit the MBE and
SBE Utilization Form, Subcontractor/Supplier Utilization Form,Prime Contractor
Waiver Form and/or Good Faith Effort Form with documentation and/or Joint
Venture Form as appropriate. The Forms including documentation must be received
by the City no later than 5:00 P.M.CST,five(5)City business days after the bid
opening date. The Bidder shall obtain a receipt from the City as evidence the
documentation was received. Failure to comply shall render the bid as non-
responsive.
11.2. No Contractor shall be required to employ any Subcontractor, Supplier,other person
or organization against whom Contractor has reasonable objection.
CITY OF FORT WORTH CD9 Street Repair&Recon FY15 and Nen-Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 27,2012
002113-7
INSTRUCTIONS TO BIDDERS
Page 7 of 9
12. Bid Form
12.1. The Bid Form is included with the Bidding Documents;additional copies may be
obtained from the City.
12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form
signed in ink. Erasures or alterations shall be initialed in ink by the person signing
the Bid Form. A Bid price shall be indicated for each Bid item,alternative,and unit
price item listed therein. In the case of optional alternatives,the words "No Bid,"
"No Change,"or"Not Applicable"may be entered.Bidder shall state the prices,
written in ink in both words and numerals,for which the Bidder proposes to do the
work contemplated or furnish materials required.All prices shall be written legibly.
In case of discrepancy between price in written words and the price in written
numerals,the price in written words shall govern.
12.3. Bids by corporations shall be executed in the corporate name by the president or a
vice-president or other corporate officer accompanied by evidence of authority to
sign. The corporate seal shall be affixed. The corporate address and state of
incorporation shall be shown below the signature.
12.4. Bids by partnerships shall be executed in the partnership name and signed by a
partner,whose title must appear under the signature accompanied by evidence of
authority to sign. The official address of the partnership shall be shown below the
signature.
12.5. Bids by limited liability companies shall be executed in the name of the firm by a
member and accompanied by evidence of authority to sign. The state of formation of
the firm and the official address of the firm shall be shown.
12.6. Bids by individuals shall show the Bidder's name and official address.
12.7. Bids by joint ventures shall be executed by each joint venturer in the manner
indicated on the Bid Form. The official address of the joint venture shall be shown.
12.8. All names shall be typed or printed in ink below the signature.
12.9. The Bid shall contain an acknowledgement of receipt of all Addenda,the numbers of
which shall be filled in on the Bid Form.
12.10. Postal and e-mail addresses and telephone number for communications regarding the
Bid shall be shown.
12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of
Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance
to State Law Non Resident Bidder.
CITY OF FORT WORTH CD9 Street Repair&Recon FYI and Near Southside Medical Disttict
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 27,2012
002113-8
INSTRUCTIONS TO BIDDERS
Page 8 of 9
13. Submission of Bids
Bids shall be submitted on the prescribed Bid Form,provided with the Bidding Documents,
at the time and place indicated in the Advertisement or INVITATION TO BIDDERS,
addressed to City Manager of the City, and shall be enclosed in an opaque sealed envelope,
marked with the City Project Number,Project title,the name and address of Bidder,and
accompanied by the Bid security and other required documents. If the Bid is sent through the
mail or other delivery system,the sealed envelope shall be enclosed in a separate envelope
with the notation "BID ENCLOSED"on the face of it.
14. Modification and Withdrawal of Bids
14.1. Bids addressed to the City Manager and filed with the Purchasing Office cannot be
withdrawn prior to the time set for bid opening. A request for withdrawal must be
made in writing by an appropriate document duly executed in the manner that a Bid
must be executed and delivered to the place where Bids are to be submitted at any
time prior to the opening of Bids. After all Bids not requested for withdrawal are
opened and publicly read aloud,the Bids for which a withdrawal request has been
properly filed may, at the option of the City,be returned unopened.
14.2. Bidders may modify their Bid by electronic communication at any time prior to the
time set for the closing of Bid receipt.
15. Opening of Bids
Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An
abstract of the amounts of the base Bids and major alternates(if any)will be made available
to Bidders after the opening of Bids.
16. Bids to Remain Subject to Acceptance
All Bids will remain subject to acceptance for the time period specified for Notice of Award
and execution and delivery of a complete Agreement by Successful Bidder. City may,at
City's sole discretion,release any Bid and nullify the Bid security prior to that date.
17. Evaluation of Bids and Award of Contract
17.1. City reserves the right to reject any or all Bids, including without limitation the rights
to reject any or all nonconforming,nonresponsive,unbalanced or conditional Bids
and to reject the Bid of any Bidder if City believes that it would not be in the best
interest of the Project to make an award to that Bidder,whether because the Bid is
not responsive or the Bidder is unqualified or of doubtful financial ability or fails to
meet any other pertinent standard or criteria established by City. City also reserves
the right to waive informalities not involving price,contract time or changes in the
Work with the Successful Bidder. Discrepancies between the multiplication of units
of Work and unit prices will be resolved in favor of the unit prices. Discrepancies
between the indicated sum of any column of figures and the correct sum thereof will
be resolved in favor of the correct sum. Discrepancies between words and figures
will be resolved in favor of the words.
CITY OF FORT WORTH CD9 Street Repair&Recon FYI and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 27,2012
002113-9
INSTRUCTIONS TO BIDDERS
Page 9 of 9
17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists
among the Bidders,Bidder is an interested party to any litigation against City,
City or Bidder may have a claim against the other or be engaged in litigation,
Bidder is in arrears on any existing contract or has defaulted on a previous
contract,Bidder has performed a prior contract in an unsatisfactory manner,or
Bidder has uncompleted work which in the judgment of the City will prevent or
hinder the prompt completion of additional work if awarded.
17.2. City may consider the qualifications and experience of Subcontractors, Suppliers,and
other persons and organizations proposed for those portions of the Work as to which
the identity of Subcontractors, Suppliers,and other persons and organizations must
be submitted as provided in the Contract Documents or upon the request of the City.
City also may consider the operating costs,maintenance requirements,performance
data and guarantees of major items of materials and equipment proposed for
incorporation in the Work when such data is required to be submitted prior to the
Notice of Award.
17.3. City may conduct such investigations as City deems necessary to assist in the
evaluation of any Bid and to establish the responsibility,qualifications, and financial
ability of Bidders,proposed Subcontractors, Suppliers and other persons and
organizations to perform and furnish the Work in accordance with the Contract
Documents to City's satisfaction within the prescribed time.
17.4. Contractor shall perform with his own organization,work of a value not less than
35%of the value embraced on the Contract,unless otherwise approved by the City.
17.5. If the Contract is to be awarded,it will be awarded to lowest responsible and
responsive Bidder whose evaluation by City indicates that the award will be in the
best interests of the City.
17.6. Pursuant to Texas Government Code Chapter 2252.001,the City will not award
contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than
the lowest bid submitted by a responsible Texas Bidder by the same amount that a
Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a
comparable contract in the state in which the nonresident's principal place of
business is located.
17.7. A contract is not awarded until formal City Council authorization. If the Contract is
to be awarded,City will award the Contract within 90 days after the day of the Bid
opening unless extended in writing. No other act of City or others will constitute
acceptance of a Bid.Upon the contractor award a Notice of Award will be issued by
the City.
17.8. Failure or refusal to comply with the requirements may result in rejection of Bid.
18. Signing of Agreement
When City issues a Notice of Award to the Successful Bidder,it will be accompanied by the
required number of unsigned counterparts of the Agreement. Within 14 days thereafter
Contractor shall sign and deliver the required number of counterparts of the Agreement to
City with the required Bonds, Certificates of Insurance,and all other required documentation.
City shall thereafter deliver one fully signed counterpart to Contractor.
END OF SECTION
CITY OF FORT WORTH CD9 Street Repair&Recon FYI and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised November 27,2012
w
a
v
i 74
a
Now 15,1
r
CITY OF FORT WORTH CD9 Street Repair&Recon FY 15 and Near Southside Medical District
City Project No.02375 and 02445
003513-1
CONFLICT OF INTEREST AFFIDAVIT
Page 1 of 1
SECTION 00 35 13
CONFLICT OF INTEREST AFFIDAVIT
Each bidder,offeror, or respondent(hereinafter also referred to as"you")to a City of Fort Worth
(also referred to as"City")procurement are required to complete Conflict of Interest
Questionnaire(the attached CIQ Form)and Local Government Officer Conflicts Disclosure
Statement(the attached CIS Form)below pursuant to state law. This affidavit will certify that the
Bidder has on file with the City Secretary the required documentation and is eligible to bid on
City Work. The referenced forms may be downloaded from the website links provided below.
http://www.ethics.state.tx.us/forms/CIQ.pdf
http://www.ethics.state.tx.us/forrns/CIS.pdf
EZ/CIQ Form is on file with City Secretary
CIQ Form is being provided to the City Secretary
CIS Form is on File with City Secretary
0 CIS Form is being provided to the City Secretary
BIDDER:
McClendon radon Constru+ Co.,Inc-By:
Company P.O. BOX 9W MsePrint)
Signature:
Address BudWw,TX 7W97 - u&,)2 a":�,
� /
Title: (J t/LP S lIL C.4
City/State/Zip (Please Print)
END OF SECTION
CITY OF FORT WORTH CD9 Street Repair&Recon FY 15 and Near Southside Medical District
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.02375&02445
Revised March 27,2012
00 41 00
BID FORM
Pagel of 3
SECTION 00 4100
BID FORM
TO: The City Manager
c/o:The Purchasing Department
1000 Throckmorton Street
City of Fort Worth,Texas 76102
FOR: FW SOUTH PAVEMENT REPLACEMENT AND NEAR SOUTHSIDE WATER AND SEWER REPLACEME
City Project No.: 02375 and 02445
Units/Sections: SECTION A: Water Improvements P253-609170244583
SECTION B: Sewer Improvements P 258-709170244583
1. Enter Into Agreement
The undersigned Bidder proposes and agrees,if this Bid is accepted,to enter into an Agreement with City in the form included in the
Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within
the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.
2. BIDDER Acknowledgements and Certification
2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and
INSTRUCTIONS TO BIDDERS,including without limitation those dealing with the disposition of Bid Bond.
2.2. Bidder is aware of all costs to provide the required insurance,will do so pending contract award,and will provide a valid
insurance certificate meeting all requirements within 14 days of notification of award.
2.3.Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or
entity and is not submitted in conformity with any collusive agreement or rules of any group,association,organization,
or corporation.
2.4.Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
2.5.Bidder has not solicited or induced any individual or entity to refrain from bidding.
2.6.Bidder has not engaged in corrupt,fraudulent,collusive,or coercive practices in competing for the Contract. For the
purposes of this Paragraph:
a. 'corrupt practice"means the offering,giving,receiving,or soliciting of any thing of value likely to influence the
action of a public official in the bidding process.
b. "fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process to
the detriment of City(b)to establish Bid prices at artificial non-competitive levels,or(c)to deprive City of the
benefits of free and open competition.
c. 'collusive practice"means a scheme or arrangement between two or more Bidders,with or without the
knowledge of City,a purpose of which is to establish Bid prices at artificial,non-competitive levels.
d. "coercive practice"means harming or threatening to harm,directly or indirectly,persons or their property to
influence their participation in the bidding process or affect the execution of the Contract.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CAU. )J)n-win7\[) u s\D.Bncin \Bid.C-1\S.0 h Side Pn Repl CFvn
Foml Revised 20110627 Copy.004100 00 42 43_0043 13_00 43 37-COBW 02375-Bid Fo
0041 00
BID FORM
Page 2 of 3
3. Prequalitication
The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors:
a. 3,200 LF 8"WATER LINE INSTALL AND 2,300 LF 12"WATER LINE INSTALL
b. 250 LFL 8"SANITARY SEWER INSTALLATION
c. ARTERIAL CONCRETE ROADWAY CONSTRUCTION AND RESIDENTIAL ASPHALT ROADWAY CONSTRUCTII
d. PULVERIZATION AND HMAC OVERLAY(POL)OF ROADWAY AND MILL AND HMAC OVERLAY(MOL)OF R1
4. Time of Completion
4.1. The Work will be complete for Final Acceptance within 280 days after the date when the
the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions.
4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work
(and/or achievement of Milestones)within the times specified in the Agreement.
5. Attached to this Bid
The following documents are attached to and made a part of this Bid:
a. This Bid Form
b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the
General Conditions.
c. Proposal Form Section
d. Vendor Compliance to State Law Non Resident Bidder,Section 00 43 37
e. MWBE Forms(optional at time of bid)
f. Prequalification Statement,Section 00 45 12
g. Conflict of Interest Affidavit,Section 00 35 13
h. Any additional documents that may be required by Section 12 of the Instructions to Bidders
6. Total Bid Amount
6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount.In the space
provided below,please enter the total bid amount for this project.Only this figure will be read publicly by the City at the
bid opening.
6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to
verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated
quantities shown in this proposal and then totaling all of the extended amounts.
6.3. Total Bid $3,079,663.55
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
C:\Users\Uao-Wia'ABacumrnts\Dan Busi�l[3ids-Cwrent\5outh Side Pav Rept CFM
FORA Revised 20110627 Copy.00 41 00_0042 43_00 43 13_00 43 37-COFWS 02375-Bid F—
00 41 00
BID FORM
Page 3 of 3
7. Bid Submittal
This Bid is submitted on 4/21/2016 by the entity named below.
Respect y sub tted, Receipt is acknowledged of the
Initial
followingAddenda:
By: Addendum No. 1:
Signature) Addendum No.2:
Addendum No.3:
Dan McClendon Addendum No.4:
(Printed Name)
Title: President
Company: McClendon Construction Co,Inc Corporate Seal:
Address: PO Box 999
Burleson,TX 76097
State of Incorporation: Texas
Email: dan@mcclendonconstruction.com
Phone: 817/295-066
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CAU—U)—M.70.—vx.B.ia—ABids.C—ASua,sialP—RTI CFm
Form Revised 20110627 Copy of00 4100 00 42 43_0043 13_0043 37-CORY9 02375-Bid F—
OI Oj C) Of C) c) c:,! c) c:-' c) c> c> c> � c> OI O.
O; C) c) c> c) c> c� kr) 5 C:, CD
o C� C� ) 6
C>; C> 00 m 6 6 c; C; Ci C3 C,
('4; "D c) "o o C) (Z> C:, tf) � kn "D kr) C-4 00
� C�; r- 0000 m
CT� 4 06� C,�� o"i 6; -tzt � 4 r 2 A
■ 001 V) 6,f) 4�,S; 694�,S 00 696q "D kr)
M
Tu- 09 69En
CD Cf) > 690 G
CLdi
0
U
CLO O
C) C) C) O 0 0 CD (D OCo C) c) O 0 C) C) C)
Lf) C) C), c) c) o (D a : c) C) C) CD C) (D
CO: , CD
-0 (D 00 cri f (,5 6 6! Lo C) C) CO; 6 C-� C>
COC)
Fl- C\l CY) LID LO LO LO C) LO N 0) 1- LO (14 04 Cl)1 C)
66 6A I 6A k CY)
63 6fl 64 69-' (Y)
613.1 64 69-
c 69,
LO
CD
C) CD
ca Cl C�, OD CO 40
CO (D
U') 0) C)
N ` CO 1,- 0 ; O P- 00 -
C6
FO
0
0
0
LL
< LL LL LL
Cl) LL LL LL i U- LL LL LL LL U)
'E C13 .j -j -j -j -i -j w w w w -j _5 -j _j _j
j (D
0 0
N # CD (Ij N . (N (N RTd q- -T CO I- r- CO CD o m CD
Z
M m C9 (0
C) C)
cD
C-4 W 0 (Y) Cf) (Y) (y) M Ce) CN C-4 04 N C\l N N N . (N C\1 C\l 5 (Y)
(D C) c,) M M M c) c) CD co I (Y) m m m mco m m i
me CL
LL CUD)
CD
C) —J
0 0
n
00
ui (Y- .2
(D
a) ,
'tf (D
se
(D
0- c m ; a
IL 0 U)
U) a)
2-
1 Ca U)
m C) z
co
a) U) 0)� 0 :3 (D
cL E E ca
a)
> >
CL Q-' CL Q-i 0- Ca > > ; m CL 0- i -,z (D
= i — , >
a) ca C:
CL 10- 0
a) < w U) i m cu
a) a) a) a) a) -0 -0 < f = 0
[ -a z
a)
V r "
—co cl) (D E a)
(u (u 1 U) a , =;
(n >
0) ca M
>
> 0
(D
o 0 0
(L 0 o i CL 0
CL E E 1 E 0 C) C) E
(D a) C)
(D a)
(VAN `-uj CO CO (0 �T "t Lo Lo Co v- Co i CO
O
00 00
C) CN 0
Lo (o Co Co (D CD S CN
(D C) Of C) Oro
(N r C) rN i M LOm
(D o C) 1 O 7 t 7 C) C) I C) C) C) C) C) 1 CD
CY5 C6 C'i i (o 94
o a C) CD
M
1 M M j cl) m m (N A (N (N CO 0
M CO CO m co C) C). C), C) co co M M M 4 CO m S m
U)
0
(AZ CD C\j (Y) Lo (.C) r- 00
co LOCO r— OD 0-)
0 C4
Ea)
H HO C> C> C)!
4, (=> c> c. c> c) c) CD CD
0 Cl C) CD O. C>
C� C� C�i C� C, Cl
C C) O O CD O. C) kr) CD cli C> Oc) c> C), c) t— C;
0.7 PQ W) Is C,i m kr) N kr) 00 ke) O f C> kn C>
(=� = W)
w 00 cq; -'r C-4 C-4 C� "o
=3
P. 0 : — r-i r) M j cq
fA Fq
M 6q Qq; — �;� oq
(A I I 4as 6q '.0 ,1 ZZ e
-FD I I fA
o oq
0En
qt--
m
CL
a) o C� C) , C) , CD C) CD CD CD
� CD C) C) CD CD CD ! C) C> C) CD
-a � C) C3, o C) C) CD CD C�
CL C� C> C5 C) , C5 C5, C5 (5 C:) , 5 Cl
C) C) C) , Oo CD L6 6 C) N C) CD C) (D CD,
C::> Lo in
di m Lo � Cq ! Lo r— j C) Lo ,; 6oLO C) (D ' Lo ' U)
LO 6c.�' I,— '
LO LO CO N 61) LO CO I— N co M (c)
FJ-
ce) C
CN r rl- LOC\l m
vy w 6-" 613- cq 69-i
69 61), 69-,
cq
CD
(0
Lo
M 0) m m LO LO m
co
a)
0
Z <
0 LL w
CO LL < < < Q ` Q
'E M � W ' W , WW =W , Wi -Jiwwiwl Lij I W
(D
c:
CD Lr) C:)
0 0 C) CD CD C:)
Z CD 'It 0 C) C) (Y) C)
m C\l (N C\l C,4 C-4 r 0 -
M U
C\l LO (%J C\l C\l C-4 C\l 04 LO LO (N 04 N C%J
0 C3
C) C) r— C>
C4 0 a) 0! (Y) cl) , ce) CY) ce) ce) (Y) cy) cy) cv) ce) 1 ce) (Y) cy) C)
Ce)
Ce) CY) Ce) ty) CY) C)
a) CY) CY) CY) (Y) (Y) (Y)
(Y) (Y) ce) CY) O
LL U) U)
CD
CD
0
0
W
Cl) CL
-.0 o
0 o a)
a) a)
ID ol
C:
a) 1 ol a)
a)
03 3
0
C.)
0 1i CIJ
a) a)
dU.2 (D
U)
CL a)
U)
a) (D : 1 o 2 i c
Xi Z i i 'E
a) CF)
w
a)
LL
C0m
a)
Ei a) X � a) >
W
a) a) (1) (D o a) a) a) � I ia, 0
(a 0 a) (1)
(U o -J a) a) > X
C : CN . a) (L) (L) (L) > > 2
W
(J) i U)
(u , m 0 Co
i a) (a m 10P i - U) c o Z!
C)
(U M
c\l
o Cj C,4
a)
uj C-4 F- 00 (D 00 Ft
i CY) (Y) r co f-- q r 0) cy) cj cy)
C) C) (D CD C) C) C) C) C)l CD C) CD CD i C) C> C) 0 = C,
i C:) C) C:) i u
CD C14 f 04 CD C) C> (::> CD C)
0 04 NC\l C) CD C) C) Ce) (Y) Ce) Ce) C:)
O c! N C\l C\l C\l
C\l LO i 04 CIJ 04 N
C-� C� C-� L6 L6 C'i (,i C\i C-�
C:> C) 1:4 F--
cy) m
a. co co cy) c) c) c) cy) co (y) i cy) co co (Y) (Y) (Y) cy) 0
M I (Y) CY) CY)
(Y) (Y) CY) CY)
CY) CY) ce) (y) ce) ce) M 0) z
CY) CY) i
1:4
u
f o
U) z
0') C) 04 CO It LO CO rl- 00 0) CD C\j cy) q LO
E C-4 C-4 C\l 04 C-4 C-4 CN CN 04 MM co M Co Ce) ce) cy) 00
CO a)
4. C); C> 110 c) c> Cl Cl O< C) c) C:�; c) O. c>
O C> C) c) O.i C) c) c> C) C> C> 0
C, CD,
d) 5 5 "D C): C) 00, ob m C1kf): C:�1 Cq 'o 5 a
00
bo a) C�; r- 'T r-, 00; "D m 'T (q
Cd
Gs 46 Os kn
6
kf) 00 Goq 69C's Gos,
CD L4q Z.s rs rq
C) CO)
0C:)
0
Y)
CL
C) C) O C)i Co C) a t C)i OC) C) C) C) Co CD
O' 0 , C) CS i (CE), 't
CL C�I C) C) C) C) C) C) C) CD
70 a) i C)
0 CD I C) 0 C,� CO C'i Ci cj C) c) Lo Lo ": 6!�
C) j CD C:) 00 C)
I C) 04 1 LO 04 (Y) 6,)�1 66- Lo c) Lo (D . 6--- N ;
LO s
1 f-a
cc�i 61) 0) (Ij
6'f 6Ci
'E ,3�
U*)
i 69-
C:)
C)
CY
C) O C) C) C) Lo Lo
(X) CD CD
C) 't i i Lf) i "T -,zrC)
LLo (0 , (0 q Ni,I
C14 N ' cli N
C,
0
— 5) U) co LL LL LL LL
u-, LL i LL LL LL < < < LL
'E w w w >
0 z '
CM Cl) CO C) a a 00 1-- c)M cy) 40 C:) a c): C) ce)
CN c) C) CO (D
C14 C14 C) yC\j LO
Eri C0 (D (Y) Lin (14
t— C)
C) C) cy) Cf) O ce) CY)
CY)N
Co
M M C\j C) M (OC\1 (N C\l C\l (Y) cy) I (y) MI
0 CL (L) c) CD 0 M cf) (Y) ce)t ce) cy) cy) cy) (Y) ce) CY) CY)
O LL
U)
0
LU
U) M
Fn
ca a)
a) i aT
W
c
a) cu a
CIO
c
U)
a)
>
> a)
z
co (u c 0
a) > 0 i
cl a)
r
ca o- i a) E
= —I > a)i
-2 4)
(U a)
(.)� 0
E z
< i a) ; 0
> CL�
I U) > ! E
0 0 i 0
(1) (u Q. 0 U) i 0 ,
> 1 (u
a). F- a) a)
=3 =3 :3 CL U)
7 01 -a! C) C)
CID
w
0 u
(n co
E Uig 1 Ei 0 : 0 i U) 2 (f) C: 1 0 ,
0 CU 0- a) ! o
0 ' 0 0 • Ni
W0 0 0 co oo F- -(0 (D
(Y)
04 (Y) U-) C) C) cj r r 0) c) ZO
C) C) c) 04 O i i f CD C) C) f C) C) CD C) O C) C) F-
.I- , -T C> I CD C) C)
C) CD Co
C:) C:)k C:) ,T C:) O a i b i c) i C:) co b
C) C) i C)
1 (14 0�
6 16 (Y; (.6 '
cy)
o) 0) 0) (Y) CY) C) (Y) C3 C:) ! 0) 1 0
(3) cy)
Cj (.q
0. CY) CY) M C,4 (N CY) (y) cy) CY) ce)1 cy) (y) C-i i
cy) cy) C)
(Y) CY) CV) CY)
0) 1 (7) 1 0) (Y) m CY) c) c) CY) cy.) Z
CD
t--6rq
; 04
o
00 mr C) ci Ce)
E co c) ci cv) U) (D r- 00 o'), 02 ID
Co a)
F- o
O' g c> (pOz <D c, C) O' <D C) C), C) I- Off` O�;
O O O O O O O ink (5 5 c> kr) C:) Off; in Ni o
kn
C C) CD
> C) (=> C> C:) C-i C; c> c> C'i
(>O t-
C:, in' (5 �.D C) C)
C:) It kr) t-- t-- kn' �0! I--
CIA r- t-- ClC)i kr) N00
C)1 00 t— 00
tn c, C-4
Gq Is 00
Alma
GO)
fA;
r
Cl)
0
OL
0
V
a) C) CD a CD (D (D i C) ! C� a C, C> C) (D CD (D' (D
CD 0 CD f CD C) LO I CD � LO ; LO C) ,
Ni )
N C) N 't 40 'IT LO Cl
U) C) LO Co CD O (f) i Lo 60- U3 64 to m d 6') 1-- U)
N
6,3
160-
co601 60-
r rLO
61)-
C>
Cl
co (o
CD UO
C) LO
co CN
C:)
co
C> U) (N M K*-
Cl
0 L)
to (D Q O U)
L.L Ll- LL L.L
U)��C/) z Z :
'E -J! Wim _j
_j 1_j U) W (O; CD,
(D u) :
0
0
�p Z C�` V- 0 co m �(D Cl (0 0) , 0) CO . M
(f) CY) Ce) Ce) Lr)
CN c)
ca C) C) CN CN
C:1
C) LO CO CN M
tr_ 0 U)
NO
C-4
C\l CN C14 (14 C\j I C\l 1 04 c\1
0 CL (1) Ce) Of ce) CD C) C) c) CD c) c) c)i ce) M (Y) cy) cy) ce)
Me U-
CD
CD
Z
Op
Uo •
W .2
� d OE j
M
(D
M
(D
.0 (D
a)
a)
C Oy > a) 0:
> 06
(D
3: a)
a) ,
cu o a)
cu a)t w) < P L) 01 M W a) E
co > < c: C E
0 o ol >
A :;T i o
0 o o
iz� <
0 < Al (D CL 1
q--
L- (D (1)
(1) (1) a) U) a)
> >
CL > CL > > >
0
Co 0
ca 0 ; c
E En co U) <
E E E E
a E E
a) a) a) 0 a) a)
O; 0 � 0
N}M
O C) cj O i C) 04 0
O C) C) O C)
C) a a C> C) o o 0 c:> C) C) F-
Fr C\l 1 CD CD CD C) r CY) CO
LO
I C> C), (D
C) 1 C, CD CD, C:) C:) c:>
C� C� 5 c) u
L6 r-
N q- I-- O)l a) 0 d' CN NF- �
V- 0' 0;0 CN (N NDN • (N CN 0
CS
C) co m 0) a) C) CS C3 M i m co
U
1:4
O LO co a .Q rCe) r Co m
(01 r C) Lo (o
F. C)
U ul
Aa ro
I- Cl) I-- C> C) In f C> C), C) m g 0= C) CD C> O. Op C>
5
Cl) C) 5 c. In
C� cl M C) CD C> C� C� (=> (=> (=>
06 Q �o d
r" C; C; c) c)1 O. c) c)
f r- tf),
:3
�o 00;
�e 1 m "6� � 01C,�i 69
I
cf) os 69 69 6n .s
En cq
0
0
CL
0
CL
C) CD i C) 0 C:) CD C:) CD; cl CD a C) OO OO 1 C) C)
CLN
LO CD Lf) c) c) Lo C) CD C) C) C) C) CD co C) C) c) C)I Lo
C)
(0 C) CD CD C) 0 CD C) C) 00 (nN
04 i M CN i 60- 60-CD C)r 5 u)- C5 a C) Lo Lo 64} C\l 64
U) 69- U> 60- CY) 00 04 00 CO i Lo CD (D , CD
O
LO
U> 613-
C)
(U 04m 1 C.0c) Lo a CD m (o Lo co (Y) Lo cD
I I M C14 (01 (c)
CY LO LO 'It C)
C',
U
U < < 1 0
in U- ILL I <i < i <, <� LL LL
w -J
'E W (1), - 'co U), W � W , (0 LU UJI , W W
C:
0 0
C) (Y)
I C:) M M C) C, C)
-4-- Z CO i CO 1 CO C) CD CD C) C)
(a N N < N " 04 04 c) cy) M 'sNsN? Ni
co (N (N (0 m (Y) m m m Lo Lo Lo Lo U)1
af
C)
.2 1
C) f a
C)
0 C\l CN C\I N Ce) N NDN 04 'IT ce) (Y) co (0 (D 14- 'IT
CN 0 a) M Cl) Cl) Mcy) cy) (Y) cf) Mc)
M M s CO N CNI M M ± M
IRT LL U)
Z C/)
Op
0
W
CO)
a)
0 '
6 ! L)
a) :3
a) (D
a)
M0
0
AI >
i m C: 0 E i
(L) a) a)I
0-i
a)
>,l >,i >,i 0 (D! (D 0
a) a)1 :3 -71 C: co
C � a) = � W
a) Q-i a i rn -r
!z Q':ci� w i
-,z a) (D E a)
i C) u
> E E E
-0� < —� X > z —
E i (D a) a) � 0
dim co a) -a 1 m LL t X
> � e
N a) a) ! U) x
(1 0 E
! C) 0
z- � :3
U- e O -
u
1 U) :3i Cl
o o o o a) a) 2) �5 =0 (D : E
Cu
> ID
L) C)1 C)
cu
ca f M C o (6
LL 0
0) (Y) (0
LU rl- ;T =(o m m m w
i to rl- C) P- 00 ce)
C) C) C) C) C) C) C) C) CD a0 ;C) C,4 C)
Lo U) C) C) CN CD
C)i C) C) i C). (Y) ce) ce) CY)
C� C) CD i CD O. c) c) c) c) (N
C)
Lr)
CN CN i CO CY) CY) CY) CO (Y) L6E6 ,
CY) Il- CD CD C) C), C) 'IT 'IT 'IT
(N (N (N v- co m co (o (o -q-! v- T ! C)
a. co m co co m m m m m co co m M. CN N N co (Y) (1)
O
EO)
z
C\J CO 'qt U)' (o
r- 00 0') CD 04 (Y) LO (.0 r- 00 1 0.) co
O C)
a)
Cl CD C) C> r-- CD, c>' O 3 O; O' C)r c>' O. c) O. c>
i C) C� O. C� cl� C) C) C> C:) CD i (=> C> C) C) C>
C, C; c' c> c)
�o m to tn wi tn* m C) C> C>i C> C>s (D
C)
C) ke) C) 00 N i r- I- N M �o (D tn i CD Cl
CT! �C! cA c) 01
=3cY 6 oc� 006R 69 Is �'
00
Go!)1 Iz cl) GII) IDSM� G's); Go)
fA: i v� C�
0 cu 6n E9 os Q9
o CA GS
CL
4) 0 CD C� C) C) C) 1 C) CD CD C) C) CD CD i Co i C) o :c)
m
_0 C) C)i CD jo OHO a C) CD CD C) C) � 0 C) C);C5
-0 (D CD,i 6 . ;
10
L6 ui L6 L6 u C6 .4 �i 6 6 1 ci ci CD
Lo
Cl) (0
61. r-
64 60-
cD
cD
C:
M
Ool
C)
=3 U) M
C
CO wo
(D
4-
u
O
LL LLU- U) < U)
Uj Uj Uj W _j
-E M w i -j 1 WSJ uj W uj W —> > _; --i
a)
0 op
� v ver C) CD CD C) C) r- C) C) C�
C) CD CD
C) O i a c) (N CN C)
C:
4- 0 C) C) C) C) 0) of Lo (3) m c)
1p c) (5 a d q -.t CD
0 C) C) C) C-4 (-4 C-i C\l c) ce) MSM ce) (Y)i cl) c) c)
CL a) co c� a a a C) c) CD ce) ce) ce) M M Co M C)
LL U)
0 0
Uo
ui
cu
M
a)
X
(D C3) o
a)
> z
o a)
z
1 01 0 0 w
U) Ljj
a) U); =3 1
C) >
0 LLI 0 c -5 i cu 1
cLi :3
M
U) u
0 > E M C) 0
a) 0 �: (D � 0
-0 M 0' �p� C: 1 CU
i L = <
M (U (o� z
-0 cu 01 0
a)! 0
a.
0 (D a) a) 0- 1 CL
i u
0 > > >
pQ
[ C) C)
MW
> FL 23 0 0 0
0
C\j cf) i
ol E 0
i u
W
E! E E
a) 1 0
a) 0 (D co 1 1 —i
(D : Lo
Z
N co CY) LO CD C-4 lm
0
Cl CD CDC) i C� 0 i CD r CD i CD i CD
CD > C) C) C) O `C)
O ? CD C) N N C) CD Cl
: CD C) x u
< C) OHO CD C) o '(D cn Ci 'T CD C) C)i (0 C) C)
-i
VC) M :M
ii r pa 0) 0
co m m m co m m
m co j �: z
ce) s
m c) CD a ODM (Y) (Y) m m c) 0)
cs L)
o
AW
01
CY) CD i C'4 icy)
CI) , CJ : cy) 'q- , Lo ' (0 '� I- 0c); 0),
M cy) w ani
0 C4
a)
F.
U
C) Lo 00 a c) of 0, Oi a C) M r-
CD• Lr)j — C) c)f c) c) c) C5 r-
00 — (3i 6 ci ci ci c; 6 06 (D i
Zo
m 04 C) CO T C) 00 0 C) C) C) —
C)e ":T� -) C) N. 4-; -,r I q 5 CO6 ce)
u CD;
�A
C11 M 00 C) oil C\f (6� C61 'ItLO LO
00 O 59 LO Lr)
75 >
C4
6-9- 6% 60- 60- 6% EA CV) 6%j C)
61) V*;
0 60,
CL
0
C3 0 ! C) C) c) CD 1 C)i c) CD fc) C)
CLN
LO 1 C) LO LO L C) C) C) 0 Co C) LO
6 06 6 r
C) 0) C:) -- 1 Oc; ci
6$3-j Lf) (N 6F9-I C) CD CD CD C)
60,
6% 64
cq
C:)
i Lo 0
r,-
(.01 C)
Zo
00 Cq(0 (,4 (Y) 04
C)
C)
C) LO
C>
C:)
0
0 w u
<
C:
0 0
Z CO (Y) CD LO ; M c) c) T c)
(a (Y) (Y)�i C) r C\I C14
C) C\j ID X
0 CO M Lo LO CD
— cl 0 C) C)
C4 0 a) 0 (N CD co N N CN m
cn I co c) CY)
M.CN cy) c) c) cy) ce) cy) CD
It ce) z ce)
LL U) U)
z
Z CO
0
00
Oo
0
W fy_
N
M
E
_j
E
a) z
w
0. 0
z
W
CO) •
LLJ
.2
Z
c
c ;i
0
a) uj ui
a)
5-
=3
•
c
a)
CL! a) w
E
c: E E 0> ou) • L)
0
ca
a) E i as i .�i < E
Z Z > n >
Z_i Fo P! < � x ' .2 0.
Z C: LL (D' 0
E
0! 0 0 CO :3 z CL!
(t) CLi c c , 0 i
LY 0 (D � 0 o r- a) CO
C) i E u) � uj
a) CU ! < > <
O � -
uj 00 0; Naim :;r ; > : 0 z (14 cl1
U . C-4 c) rI (\I , C\1 — — z
� CM 0
> N
0 c) C) c) CD C) CD C) CD C)
r- (D C) Cl) (Y) LO C) cy)
O C) C) OO 0 0 a • C) i U
C� C� n
(3i C14 (f) co
Cj 0 ' CY) 0 C)
a. • CN 1 04 CY) C-4 N N! Mt c) 0) C\1
(y) i cf) 0 c) co c) c)I (Y) c) (y) cy) Z
0
r4
0
0
C'4 '
M' 't LO CO(o
• 1-- i co m !—
E a-
64
a)
U 2
.0 -0 2
�11 cl
r- a C); CD C:)! C) C) (D (Y) O c,)i (o r-; cl! o; O? o
M. CD C) Or C) C) cD C) (Y) C) 00 C) (9 C); 0, C) 0
6 4
(.C; li 63 c; 6 6 c D* 6 rl- (.C) 0 C) CD
(o t-- C\l� (14' a c) c) IT (Y), C> (D CM, C) C) Co
to (D r,�. rl-, al! w w (Y)
C) Lo Lo; -q-! -,t (o co N
ld9,, 61
cr�
CA 1�3 0), Lo EN Lo Lo f co
CN 6,)�� to
60- m 69' N m EAE 6A 6A 64
o (D 69-
0 61>
Q-
0
U
CL
(L) C) CD C) 0. CD CD CD C) a i co C) CD co C)1 C) C)
-aC:) Oro o c) c)f C)�C) IX) CD Lr) Lo a C) C) Cl
C=; 6
-a a) N06 6 6
OO O I,-j C:) CD o
69-1 Lf) C\l C) C) C)
69k C\l 04 o CD C)
613- EA (Y) (o IT C)
(0-i 60- M (0, I;t
(a t EA j LA
69- EA 60- 6rt
6n, C%4 61>
64 00
o
Lo CD
00 1 00
m M , (Y) qT C:) ' C,4 C\I ' �'
; 1 — � C)
cv C\l C,4
CY Lo c) Lr) L0
0 u
L.L
j U) LL cu U)i LL-i LL-i U)
W w w
U) U) -J W <W LU
0 ZOl to Lo (Y) 0 C) C) Q (Y) CY) (D (D m C)
(N C) M (y) :
A2 (D cy) m Lo: Lo g (D (N (0 ; (Y) , L0 Lo
0 C)
'14- lq- C) C) , C� C)
LU •
0 04 N04 (14 C\l Oe-M CD C,4 C\l a M C,4 (N m m
CL (D B
M co m m m C) 0-51 cn, (5 m m cy) co m
U)
Z
00
0 0
ui w
ujC: <
(D
•
m � _
0
.0 i z V)
LLI
a) N (D CL
5,
a)
a) (D W cU)i CL: :3 i
— i (D (D
a)
al a) E M LU
E0
>
E! go ui U) E E -�5
0
M ca 0 CL So) E (0'1 cu
> �0 ! i z
a)1 LFi < 1 c W cl F- ; w ! o- 1 " ! 4) < 0
Q) i < i X� 0 CL a)i <! Xi -
3)( .- U- a) 0 i z w
L) C-) :3 C U-I a) 0
u
i COO Cc: —0
0 E
a)
0 (D
a)
-0 ,; < ! >
C)
uj w
a) cu cc
0 z co 0 cq 1
04
V)
z
04 C) Nt- cy) > Nf 041 rl-
(D CD C) C) O CD C) (5 5 c, i CD a i CD c)
LO u
LC) (0 Mi LA Cl z 1l (D C:) CY)
a � c� O. c)
O' cli C) C) C) • b c) c,. C� C6
(61 CY5 vi! L6 O? 6 cq (o co L6 L6
C) 0)
CD (D ,
M M M 0 c,
CL (N N i CIJ Cq 04 m (N (N 04 m co
CN
C) (D m m In
0 C:)
CLj
1:4U
M) Z O J
04 M It ' U*) (0 1- 00$0) i CN i M IT Lo (o co,
P. ;>
om
di a) C4
c) (D: C), C) C) CD C) C) 0 CD
F- F- 4, D CD! CD: CD a c)
0 9 Lq C) C) C) (D C) c) c) CD (D CD (D (D f 0 c)
C) Lo ci; C=; 6' 6 c; Co C) C) C)
I ;: 6 ci 6 i
0.) O In 1,-, C) 00 Lo 0) c)'! C:) C)H C) CD oo c) o 00
0') C) 04 i 14- 00 (D C) (01 CO (D
0 :3 lq- LO
(3) Lr)
cu M 04 CD It C5
75 > 6,)- N N: 6,3 N69- 6A64 f- NEA MCO) 61). 601, 60, ('q!
Cr) -0 69- 6,� v), 61t C,
0
D-
0
CL
C) CD CD (D CD C) C) (D C) C) C) C) vo
CL CD LJD 0. O c) CD CD a
C) CD C) CD 0
U
O C.0 C,
00 CD C3
C)
6", CN 04 60- C) CD C) C) 6,3!0 :0�
CL w
o) (o 't 1c) a)!(D
.a
C6 69'! 6,3 (Ji
'E 69- 6c.� 6,3
Z
L
O
Ma
(D O C) Lo
Q4D Co
Lo M
1 LO i CN (D m q- r (D
di C)
'4.
MJ
2 uj u
0 =3 i
— to (1) > LL U- Li <1 < LLJ LL
M -J 0 U) -j -J , U)7 WIWI W � -j
ui
0 0
(.0 , Lr) Lo Ce) ol q "T CD C)!0 io
C) C\l cq
C) 04 (14 ,
LO LC) a CV)
CD CN 1 (0 M CO
tr_ 0 - (Y) 0
>
C) cl i .q- i C) OHO 1CD
a) c) Cl) C-4 C%4 C,4 C\l c%,i cy) (Y) C) ui (14 C\l �CD
P) m m
O C, (L) CD z co c) CD > I z
M (Y) (Y) c) CY) C)
Z < z
00
O
0
w fy_
CO) IL
E
Z
E
z
(D
0 '
.9a z
i 1 Z
(DLI
w a) CLw Qacw
uvi Ns
cl UJ >1CL� CL0)
(D �
> 1 ! i E r-
W0 E E o > E
cu� M :3 � = co
< 0 E <
0 jL
> a) (D C
a) < I c: -o
_0 i r
C)) :3 i
0 a. <
Lj-
0
a
0
cn 0 _j
0 a)
0 i 0
1
< > U)
ca
0 Z
0
ui z ca CO
cq
CO N , 1 M > rirsM uj
O C) [ C)I Cl CD O; (D C) (D'CD
CD Q m LO (o r co Lo r t r C) Q co Lo fa
O
C� C) C) C) 0 CD CD jc) U)
C'� M ,co:0) P4
F-
C) C) m
0)
a. N CN j M V)i M CN N ,m 0 C5
0) C) C) M M M
C4
0 0 0 0
z mo Z 1
Aw
CY) 04 �' (Y) 'It (0 0) (N :
E Lf) F-- 00
M
1:4
(D
On,
u En
E \ R % g 2 E E 2 [
/ k 2
g 0 � G G � P
-� e a
\ u > k 2 / / 7 0 cD
\
0 2 m m
V e 6 m _ 4t
_ I }
CL
$ »
�
�
c
k cD
® w
\
e I @ > =
0 w O « J
CO) 2 0 a m
uj> w
c « ■
\ k O 2 j \
M / § Q o w O
C4 0wZ CL
k O
LL m ® < 0 2 2 W w 0
o
2 k w w > W M >- J a a
O p @ « > > o a w « o w
U O W W a 2 0_ 0 J 2
W � 2 m E U > R
E ■
m / w w / \ CO) W
£
2 _ >
± m o 2 6 w w
a) k k L _� -i z O
/ § R / I
: % 7 f 0 7 {
3 a. M a > q /
0 w \
w 2 2 _k _k \
_ M a. R R /
0 K k °
a.
ui > lij \
f a 2 /
$ / / / &
am a 2 / / /
k_ \ \ \
E
� 4