Project Name:1 Water and Sanitary Sewer Replacement Contract 2015 WSM-B,Pt.3 City Sec No.: 47858
Project No.(s): 59601/59607-0600430/070430-83 1 DOE No. 7435 City Proj.No.: 02436
Project Description: Water and Sanitary Sewer Replacement on Schieffer Street,E.Mulkey Avenue,Colvin Avenue,E.Devitt Street,E.
Cantey Street and Alleyway
Contractor:I Conatser Construction TX,LP Change Order# 0 Date: 10/31/2017
City Project Mgr.1 Walter Norwood City Inspector: Edward Davila
Phone Number: 817-392-5026 Phone Number: 817-223-2268
Dept. Water Sewer Totals Contract Time
(Calender days)
Original Contract Amount $787,321.00 $271,360.00 $1,058,681.00 1160
Extras to Date $11,180.00 $13,208.00 $24,388.00 045
Credits to Date $0.00 $0.00
Pending Change Orders(in M&C Process) $0.00 $0.00
•st to Date $798,501.00 $284,568.00 $1,083,069.00 205
Amount of Proposed Change Order $0.00 $0.00 $0.00 0
Revised Contract Amount $798,501.00 $284,568.00 $1,083,069.00205
Original Funds Available for Change Orders $52,079.00 $34,140.00 $86,219.00
Remaining Funds Available for this CO $40,899.00 $20,932.00 $61,831.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.30%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,323,351.25
JUSTIFICATION(REASONS)FOR CHANGE ORDER
All
Change Order No.2 rectifies the error on Change Order No.1 that allowed for the deletion of 204 L.F.of the
pay item for "4'Wide Asphalt Pavement Repair, Residential",even though the actual quantity of the pay
item was only 42 L.F.This change order will provide for the 162 L.F.of"4'Wide Asphalt Pavement Repair,
Residential"to make up for the-162 L.F. (42-204)from change order No. 1.The change will also provide for
the deletion of unused quantities of additional"Asphalt Pavement Repair Beyond Determined Width".
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full(both time and money)for all costs arisinn n it nt nr innirientat to,the above Channe Order
Conaster Construction TX,LP Jesse Martinez
1 114W l7 � re-t ? S
Date' .. City M er , , Dntpd IRU. ;
R�
i n Qf4fore a
C1
Cft`f Number umbel L—�` ` = � `__ M&C Date A r ved N/A r
MAP rNhOReaway
TX
FORT WORTH City of Fort Worth
Change Order Additions
Project Name Water and Sanitary Sewer Replacement Contract 2015 WSM-B,Pt.3 City Sec No.: 47858
Project No.(s): 59601/59607-0600430/070430-83 DOE No. 7435 City Proj.No.: 02436
Project Water and Sanitary Sewer Replacement on Schieffer Street,E.Mulkey Avenue,Colvin Avenue,E.Devitt Street,E.
Description Cantey Street and Alleyway
Contractor Conatser Construction TX,LP Change Order:= Date: 10/31/2017
City Project Mgr, Walter Norwood City Inspector F Edward Davila
ADDITIONS
ITEM DESCRIPTIZ514 DEPT QtY. Unit Unit Cost Total
9 4'Wide Asphalt Pvmt Repair Resieential Sewer 162.00 SY $48.00 $7,776.00
Nater
Sewer $7,776.00
Page 2 Additions Sub Total $7,776.00
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name anitary Sewer Replacement Contract 2015 WSM-B,Pt.3 City Sec No.: 47858
Project No.(s): 55.. „u.... h30/070430-83 DOE No. 7435 City Proj.No.: 02436
Project Description Water and Sanitary Sewer Replacement on Schieffer Street,E.Mulkey Avenue,Colvin Avenue, E.Devitt Street,E.
Cantey Street and Alleyway
Contractor Conatser Construction TX,LP Change Order: 0 Date 10/31/2017
City Project Mgr Walter Norwood City Inspector: FEdward Davila
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Totat,
11 asphalt Repair Beyond Determined Width Sewer 94.40 SY S40.00 a7 776.00
- Water
Sewer $7,776.00
Deletions Sub Total $7,776.00
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
_A&,-
Signature
Iva
Name of Employee
sir• �r�-�'�s s;���n`y��
Title